CN108505754A - A kind of bridge construction anti-drop device - Google Patents
A kind of bridge construction anti-drop device Download PDFInfo
- Publication number
- CN108505754A CN108505754A CN201810222535.1A CN201810222535A CN108505754A CN 108505754 A CN108505754 A CN 108505754A CN 201810222535 A CN201810222535 A CN 201810222535A CN 108505754 A CN108505754 A CN 108505754A
- Authority
- CN
- China
- Prior art keywords
- spud pile
- control cabinet
- drop net
- drop
- embedded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/32—Safety or protective measures for persons during the construction of buildings
- E04G21/3204—Safety or protective measures for persons during the construction of buildings against falling down
- E04G21/3223—Means supported by building floors or flat roofs, e.g. safety railings
- E04G21/3233—Means supported by building floors or flat roofs, e.g. safety railings without permanent provision in the floor or roof
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/32—Safety or protective measures for persons during the construction of buildings
- E04G21/3261—Safety-nets; Safety mattresses; Arrangements on buildings for connecting safety-lines
- E04G21/3266—Safety nets
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Non-Portable Lighting Devices Or Systems Thereof (AREA)
Abstract
The invention discloses a kind of bridge construction anti-drop devices,Its structure includes the first fixed hydraulic pedestal,First removable fall arrest spud pile,Anti-drop net device,Second fixed hydraulic pedestal,Second removable fall arrest spud pile,First spud pile control cabinet,Second spud pile control cabinet,The first removable fall arrest spud pile is equipped with the first anti-drop net fixed fastener,Second anti-drop net fixed fastener,First construction illumination lamp control panel,First control cabinet maintenance door,First construction illumination lamp holder,First construction illumination lamp,First control cabinet display board,Make equipment when being used,It can be adjusted by the stretching of anti-drop net and draw the distance for setting safety net,Simultaneously anti-drop net is fixed by both ends,The workload drawn when setting anti-drop net can be mitigated,Also it can be readily disassembled and move when dismounting,Reduce the damage to bridge floor,Installation is simple,It is time saving and energy saving.
Description
Technical field
The present invention is a kind of bridge construction anti-drop device, belongs to bridge construction anti-drop device field.
Background technology
Bridge engineering mainly studies bridge water way survey, determines bridge aerodynamics, considers navigation and line requirements to determine bridge floor
Highly, consider that substrate is not washed away or frost heave is to determine embedded depth of foundation, design diversion structure etc.;Bridge style designs;
Bridge structure design;Bridge construction;Rating bridge;Bridge testing;Bridge maintenance etc..
For Ancient Bridges based on the people, animal that pass through, load-carrying is little, and deck profile grade can be relatively steep, it might even be possible to it is laid with step, from
After having railway, by increasing again, the gradient and curve post alignment request of circuit are again high, and need to build for the load-carrying that bridge is born
At the railway network to increase economic benefit, therefore, for the deeper rivers of bigger to be crossed over, valley, bridge is forced to develop to large span.
Currently, during decoration construction, since the guardrail of most of overpass is not high, it is useless to be easy to cause construction for overpass
Object or personnel fall, and cause safety accident, often set up safety net in bridge floor both sides.
The prior art is in use, because existing safety net with swell fixture after bridge floor punches mostly by fixing safety
Net supporting rack, when construction outside to bridge floor both sides, it is also necessary to which erecting scaffold installs protection network, needs waste a large amount of
Time and manpower, and it is time-consuming and laborious when removing, while certain damage can be caused to bridge floor.
Invention content
In view of the deficienciess of the prior art, it is an object of the present invention to provide a kind of bridge construction anti-drop device, it is existing to solve
Have technology in use, because existing safety net mostly by fixing safety net supporting rack with swell fixture after bridge floor punches,
When construction outside to bridge floor both sides, it is also necessary to erecting scaffold installs protection network, need to waste a large amount of time and
Manpower, and it is time-consuming and laborious when removing, while certain damage can be caused to bridge floor.
To achieve the goals above, the present invention is to realize by the following technical solutions:A kind of anti-fall dress of bridge construction
It sets, structure includes the first fixed hydraulic pedestal, the first removable fall arrest spud pile, anti-drop net device, the second fixed hydraulic
Pedestal, the second removable fall arrest spud pile, the first spud pile control cabinet, the second spud pile control cabinet, first fixer
Pressure pedestal is connected to by bolt riveted below the first removable fall arrest spud pile, the first removable fall arrest spud pile
It is connected between the first fixed hydraulic pedestal and the first construction illumination lamp by bolt riveted, the anti-drop net device is connected to
Between one removable fall arrest spud pile and the second removable fall arrest spud pile, the second fixed hydraulic pedestal passes through bolt
Riveted is connected to below the second removable fall arrest spud pile, and the second removable fall arrest spud pile is connected by bolt riveted
It is connected between the second fixed hydraulic pedestal and the second construction illumination lamp, it is removable that the first spud pile control cabinet is embedded at first
Inside fall arrest spud pile, the second spud pile control cabinet is embedded inside the second removable fall arrest spud pile, and described
One fixed hydraulic pedestal is equipped with the first foldable walking universal wheel, the first raise-lower hydraulic mobile jib, the first raise-lower hydraulic strut, described
First foldable walking universal wheel is connected to the first fixed hydraulic base bottom, the first raise-lower hydraulic master by bolt riveted
Bar is connected to the first fixed hydraulic base upper surface by bolt riveted, and the first raise-lower hydraulic strut is by excessively coordinating company
It is connected on the first raise-lower hydraulic mobile jib;The first removable fall arrest spud pile is equipped with the first anti-drop net fixed fastener, second
Anti-drop net fixed fastener, the first construction illumination lamp control panel, the first control cabinet maintenance door, the first construction illumination lamp holder, first
Construction illumination lamp, the first control cabinet display board, the first anti-drop net fixed fastener are embedded above the first control cabinet display board,
The second anti-drop net fixed fastener is embedded at below the first control cabinet maintenance door, and the first construction illumination lamp control panel is embedding
On the first removable fall arrest spud pile outer surface, the first control cabinet maintenance door is embedded at the first construction illumination lamp control
Below the panel processed, the first construction illumination lamp holder are connected to by bolt riveted at the top of the first removable fall arrest spud pile,
By being electrically connected at the top of the first construction illumination lamp holder, the first control cabinet display board is embedded at the first construction illumination lamp
Above first construction illumination lamp control panel;It is solid that the anti-drop net device is equipped with the first anti-drop net fixation strut, the second anti-drop net
Determine strut, anti-drop net main body, first anti-drop net is fixed strut and is embedded inside the first removable fall arrest spud pile, described
Second anti-drop net is fixed strut and is embedded at below the first anti-drop net fixation strut, and it is removable that the anti-drop net main body is connected to first
Between fall arrest spud pile and the second removable fall arrest spud pile;The second fixed hydraulic pedestal is equipped with the second foldable row
Universal wheel, the second raise-lower hydraulic mobile jib, the second raise-lower hydraulic strut are walked, the second foldable walking universal wheel passes through bolt riveting
Conjunction is connected to the second fixed hydraulic base bottom, and the second raise-lower hydraulic mobile jib is connected to the second fixer by bolt riveted
Base upper surface is pressed, the second raise-lower hydraulic strut is by being excessively connected on the second raise-lower hydraulic mobile jib;The institute
The second removable fall arrest spud pile is stated to shine equipped with the second anti-drop net fixed fastener, the second anti-drop net fixed fastener, the second construction
Bright lamp control panel, the second control cabinet maintenance door, the second construction illumination lamp holder, the second construction illumination lamp, the second control cabinet are shown
Plate, the second anti-drop net fixed fastener are embedded above the second control cabinet display board, and the second anti-drop net fixed fastener is embedding
Below the second control cabinet maintenance door, the second construction illumination lamp control panel is embedded at the second removable fall arrest and fixes
On stake outer surface, the second control cabinet maintenance door is embedded at below the second construction illumination lamp control panel, second construction
Illuminating lamp holder is connected to by bolt riveted at the top of the second removable fall arrest spud pile, and the second construction illumination lamp passes through electricity
It is connected at the top of the second construction illumination lamp holder, the second control cabinet display board is embedded on the second construction illumination lamp control panel
Side;The first spud pile control cabinet is equipped with the first anti-drop net fixing device, the first construction illumination circuit for lamp device, first anti-fall
Net head, the first anti-drop net fixing device are connected to the first spud pile by bolt riveted and control on chamber interior wall, institute
It states the first construction illumination circuit for lamp device to be connected in the first spud pile control cabinet inner bottom surface by bolt riveted, described first
Anti-drop net head is connected to by bolt riveted inside the first spud pile control cabinet;The second spud pile control cabinet is equipped with
Second anti-drop net fixing device, the second construction illumination circuit for lamp device, the second anti-drop net head, second anti-drop net are solid
Determine device to be connected on the second spud pile control chamber interior wall by bolt riveted, the second construction illumination circuit for lamp device passes through
Bolt riveted is connected in the second spud pile control cabinet inner bottom surface, and the second anti-drop net head is connected by bolt riveted
It is connected to inside the second spud pile control cabinet.
Further, first anti-drop net fixes strut and is embedded slot equipped with the first kelly, and first kelly is embedded slot
The first anti-drop net is embedded to fix on strut upper surface.
Further, second anti-drop net fixes strut and is embedded slot equipped with the second kelly, and second kelly is embedded slot
The second anti-drop net is embedded to fix on strut lower surface.
Further, the first anti-drop net fixing device be equipped with first fix kelly, second fix kelly, described first
Fixed kelly is connected to by bolt riveted in the first spud pile control cabinet inside top surface, and the second fixation kelly passes through bolt
Riveted is connected in the first spud pile control cabinet inner bottom surface.
Further, the first construction illumination circuit for lamp device is equipped with the first control power pack, the connection of the first power pack
Conducting wire, the first control power pack are connected to by bolt riveted in the first spud pile control cabinet inner bottom surface, and described first
Power pack connecting wire is connected between the first control power pack and the first construction illumination lamp.
Further, the first anti-drop net head is equipped with anti-drop net winding post, the first fixing groove, the second fixation
Slot, the anti-drop net winding post are connected to by bolt riveted inside the first spud pile control cabinet, and first fixing groove is embedded
In on anti-drop net winding outer surface of column, second fixing groove is embedded at below the first fixing groove.
Further, the second anti-drop net fixing device is equipped with third and fixes kelly, the 4th fixation kelly, the third
Fixed kelly is connected to by bolt riveted in the second spud pile control cabinet inside top surface, and the 4th fixation kelly passes through bolt
Riveted is connected in the second spud pile control cabinet inner bottom surface.
Further, the second construction illumination circuit for lamp device is equipped with the second control power pack, the connection of second source box
Conducting wire, the second control power pack are connected to by bolt riveted in the second spud pile control cabinet inner bottom surface, and described second
Power pack connecting wire is connected between the second control power pack and the second construction illumination lamp.
Further, the second anti-drop net head is equipped with anti-drop net winding post, third fixing groove, the 4th fixation
Slot, the anti-drop net winding post are connected to by bolt riveted inside the second spud pile control cabinet, and the third fixing groove is embedded
In on anti-drop net winding outer surface of column, the 4th fixing groove is embedded at below third fixing groove.
Advantageous effect
When a kind of bridge construction anti-drop device of the present invention is worked, by being equipped with a kind of first anti-drop net fixation strut,
First anti-drop net fixes strut and is embedded slot equipped with the first kelly, consolidates into second when rotating the first anti-drop net and fixing strut and be embedded
After determining stake control cabinet, the second spud pile control cabinet is rotated back into original position, while the first kelly is embedded slot and is embedded at the first fixing card
On bar, so that the first anti-drop net is fixed strut and fixed;By being equipped with a kind of second anti-drop net fixation strut, described second is anti-fall
The fixed strut of net is embedded slot equipped with the second kelly, is embedded into the second spud pile control cabinet when rotating the second anti-drop net fixation strut
Afterwards, the second spud pile control cabinet is rotated back into original position, while the second kelly is embedded slot and is embedded on the second fixation kelly, makes second
Anti-drop net is fixed strut and is fixed;By being equipped with a kind of first anti-drop net head, the first anti-drop net head
Equipped with anti-drop net winding post, the first fixing groove, the second fixing groove, when pulling, the first anti-drop net fixes strut and the second anti-drop net is solid
When determining strut, anti-drop net main body is drawn out, and when the length for moving needs to, is pressed the first anti-drop net fixed fastener and second successively and is prevented
Net fixed fastener is fallen, so that the first anti-drop net fixed fastener and the second anti-drop net fixed fastener is embedded in the first fixing groove and second and fixes
In slot, anti-drop net is made to be fixed;By being equipped with a kind of second fixed hydraulic pedestal, the second fixed hydraulic pedestal is equipped with the
Two foldable walking universal wheels, the second raise-lower hydraulic mobile jib, the second raise-lower hydraulic strut, when needing to adjust anti-fall net height,
It can be adjusted by stretching the second raise-lower hydraulic mobile jib and the second raise-lower hydraulic strut, in mobile first removable fall arrest
When spud pile and the second removable fall arrest spud pile, foldable walking universal wheel is turned down out, you can to push spud pile
It is mobile, while after anti-drop net drawing is set to the length of needs, screw and bridge floor being fixed together, it is easy to after the completion of construction
Dismounting;By the mutual cooperation of apparatus above, it can be adjusted by the stretching of anti-drop net and draw the distance for setting safety net, passed through simultaneously
Anti-drop net is fixed at both ends, can mitigate the workload drawn when setting anti-drop net, also can be readily disassembled and be moved when dismounting,
Reduce the damage to bridge floor, installation is simple, time saving and energy saving.
Description of the drawings
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other feature of the invention,
Objects and advantages will become more apparent upon:
Fig. 1 is a kind of structural schematic diagram of bridge construction anti-drop device of the present invention.
Fig. 2 is the structural schematic diagram under a kind of first spud pile control cabinet working condition of the present invention.
Fig. 3 is the structural schematic diagram under the second spud pile control cabinet stationary state of the invention.
Fig. 4 is the structural schematic diagram under the second spud pile control cabinet working condition of the invention.
In figure:First fixed hydraulic pedestal -1, the first removable fall arrest spud pile -2, anti-drop net device -3, second are solid
Determine hydraulic base -4, the second removable fall arrest spud pile -5, the first spud pile control cabinet -6, the second spud pile control cabinet -7,
First foldable walking universal wheel -10, the first raise-lower hydraulic mobile jib -11, the first raise-lower hydraulic strut -12, the first anti-drop net are solid
Determine snap-fastener -20, the second anti-drop net fixed fastener -21, the first construction illumination lamp control panel -22, the first control cabinet maintenance door -
23, the first construction illumination lamp holder -24, the first construction illumination lamp -25, the first control cabinet display board -26, the first anti-drop net fix branch
Bar -30, the first kelly are embedded slot -300, the second anti-drop net fixes strut -31, the second kelly is embedded slot -310, anti-drop net main body -
32, the second foldable walking universal wheel -40, the second raise-lower hydraulic mobile jib -41, the second raise-lower hydraulic strut -42, the second anti-drop net
Fixed fastener -50, the second anti-drop net fixed fastener -51, the second construction illumination lamp control panel -52, the second control cabinet maintenance door -
53, the second construction illumination lamp holder -54, the second construction illumination lamp -52, the second control cabinet display board -56, the first anti-drop net fix dress
Set the -60, first fixation kelly -600, the second fixation kelly -601, the first construction illumination circuit for lamp device -61, first control electricity
Source capsule -610, the first power pack connecting wire -611, the first anti-drop net head -62, anti-drop net winding post -620, first are solid
Determine slot -621, the second fixing groove -622, the second anti-drop net fixing device -70, third and fixes kelly -700, the 4th fixation kelly -
701, the second construction illumination circuit for lamp device -71, second control power pack -710, second source box connecting wire -711, second
Anti-drop net head -72, anti-drop net winding post -720, third fixing groove -721, the 4th fixing groove -722.
Specific implementation mode
To make the technical means, the creative features, the aims and the efficiencies achieved by the present invention be easy to understand, with reference to
Specific implementation mode, the present invention is further explained.
- Fig. 4 is please referred to Fig.1, the present invention provides a kind of bridge construction anti-drop device technical solution:Its structure includes first solid
It is removable to determine hydraulic base 1, the first removable fall arrest spud pile 2, anti-drop net device 3, the second fixed hydraulic pedestal 4, second
Fall arrest spud pile 5, the first spud pile control cabinet 6, the second spud pile control cabinet 7, the first fixed hydraulic pedestal 1 pass through spiral shell
Bolt riveted is connected to 2 lower section of the first removable fall arrest spud pile, and the first removable fall arrest spud pile 2 passes through bolt riveting
Conjunction is connected between the first fixed hydraulic pedestal 1 and the first construction illumination lamp 25, and it is removable that the anti-drop net device 3 is connected to first
It moves between fall arrest spud pile 2 and the second removable fall arrest spud pile 5, the second fixed hydraulic pedestal 4 passes through bolt riveting
Conjunction is connected to 5 lower section of the second removable fall arrest spud pile, and the second removable fall arrest spud pile 5 is connected by bolt riveted
It is connected between the second fixed hydraulic pedestal 4 and the second construction illumination lamp 55, the first spud pile control cabinet 6 is embedded at first can
Inside mobile fall arrest spud pile 2, the second spud pile control cabinet 7 is embedded inside the second removable fall arrest spud pile 5,
The first fixed hydraulic pedestal 1 is equipped with the first foldable walking universal wheel 10, the first raise-lower hydraulic mobile jib 11, first lifts liquid
Strut 12, the first foldable walking universal wheel 10 is pressed to be connected to 1 bottom of the first fixed hydraulic pedestal, institute by bolt riveted
It states the first raise-lower hydraulic mobile jib 11 and first fixed hydraulic pedestal, 1 upper surface, the first lifting liquid is connected to by bolt riveted
Press strut 12 by being excessively connected on the first raise-lower hydraulic mobile jib 11;The first removable fall arrest spud pile 2 is set
There are the first anti-drop net fixed fastener 20, the second anti-drop net fixed fastener 21, the control of the first construction illumination lamp control panel 22, first
Case maintenance door 23, the first construction illumination lamp holder 24, the first construction illumination lamp 25, the first control cabinet display board 26, described first is anti-
Pendant net fixed fastener 20 is embedded at 26 top of the first control cabinet display board, and the second anti-drop net fixed fastener 21 is embedded at first
23 lower section of control cabinet maintenance door, the first construction illumination lamp control panel 22 are embedded at the first removable fall arrest spud pile 2
On outer surface, the first control cabinet maintenance door 23 is embedded at 22 lower section of the first construction illumination lamp control panel, and described first applies
Work illuminating lamp holder 24 is connected to 2 top of the first removable fall arrest spud pile, the first construction illumination lamp by bolt riveted
25 by being electrically connected to 24 top of the first construction illumination lamp holder, and the first control cabinet display board 26 is embedded at the first construction illumination
22 top of lamp control panel;The anti-drop net device 3 is equipped with the first anti-drop net and fixes strut 30, the second anti-drop net fixation strut
31, anti-drop net main body 32, first anti-drop net are fixed strut 30 and are embedded inside the first removable fall arrest spud pile 2, institute
It states the second anti-drop net and fixes strut 31 and be embedded at the first anti-drop net and fix the lower section of strut 30, the anti-drop net main body 32 is connected to the
Between one removable fall arrest spud pile, 2 and second removable fall arrest spud pile 5;The second fixed hydraulic pedestal 4 is equipped with
Second foldable walking universal wheel 40, the second raise-lower hydraulic mobile jib 41, the second raise-lower hydraulic strut 42, the second foldable row
It walks universal wheel 40 and second fixed hydraulic pedestal, 4 bottom is connected to by bolt riveted, the second raise-lower hydraulic mobile jib 41 passes through
Bolt riveted is connected to 4 upper surface of the second fixed hydraulic pedestal, and the second raise-lower hydraulic strut 42 is by being excessively connected
In on the second raise-lower hydraulic mobile jib 41;The second removable fall arrest spud pile 5 is equipped with the second anti-drop net fixed fastener
50, the second anti-drop net fixed fastener 51, the second construction illumination lamp control panel 52, the construction of the second control cabinet maintenance door 53, second
Illuminating lamp holder 54, the second construction illumination lamp 52, the second control cabinet display board 56, the second anti-drop net fixed fastener 50 are embedded at
Second control cabinet display board, 56 top, the second anti-drop net fixed fastener 51 are embedded at 53 lower section of the second control cabinet maintenance door,
The second construction illumination lamp control panel 52 is embedded on the second removable 5 outer surface of fall arrest spud pile, second control
Case maintenance door 53 processed is embedded at 52 lower section of the second construction illumination lamp control panel, and the second construction illumination lamp holder 54 passes through bolt
Riveted is connected to 5 top of the second removable fall arrest spud pile, and the second construction illumination lamp 52 is applied by being electrically connected to second
54 top of work illuminating lamp holder, the second control cabinet display board 56 are embedded at 52 top of the second construction illumination lamp control panel;Institute
It is anti-fall equipped with the first anti-drop net fixing device 60, the first construction illumination circuit for lamp device 61, first to state the first spud pile control cabinet 6
Net head 62, the first anti-drop net fixing device 60 are connected to 6 inner wall of the first spud pile control cabinet by bolt riveted
On, the first construction illumination circuit for lamp device 61 is connected to by bolt riveted in 6 inner bottom surface of the first spud pile control cabinet,
The first anti-drop net head 62 is connected to by bolt riveted inside the first spud pile control cabinet 6;Described second fixes
Stake control cabinet 7 is equipped with the second anti-drop net fixing device 70, the second construction illumination circuit for lamp device 71, the second anti-drop net head
72, the second anti-drop net fixing device 70 is connected to by bolt riveted on 7 inner wall of the second spud pile control cabinet, and described second
Construction illumination circuit for lamp device 71 is connected to by bolt riveted in 7 inner bottom surface of the second spud pile control cabinet, and described second is anti-
Pendant net head 72 is connected to by bolt riveted inside the second spud pile control cabinet 7, and first anti-drop net fixes strut
30 are embedded slot 300 equipped with the first kelly, and first kelly is embedded slot 300 and is embedded at 30 upper surface of the first anti-drop net fixation strut
On, second anti-drop net fixes strut 31 and is embedded slot 310 equipped with the second kelly, and second kelly is embedded slot 310 and is embedded at
Second anti-drop net is fixed on 31 lower surface of strut, and the first anti-drop net fixing device 60 is equipped with first and fixes kelly 600, second
Fixed kelly 601, the first fixation kelly 600 are connected to by bolt riveted in 6 inside top surface of the first spud pile control cabinet,
The second fixation kelly 601 is connected to by bolt riveted in 6 inner bottom surface of the first spud pile control cabinet, first construction
Lighting lamp circuit device 61 is equipped with the first control power pack 610, the first power pack connecting wire 611, the first control power supply
Box 610 is connected to by bolt riveted in 6 inner bottom surface of the first spud pile control cabinet, the first power pack connecting wire 611
It is connected between the first control power pack 610 and the first construction illumination lamp 25, the first anti-drop net head 62 is equipped with anti-
Net winding post 620, the first fixing groove 621, the second fixing groove 622 are fallen, the anti-drop net winding post 620 is connected by bolt riveted
Inside the first spud pile control cabinet 6, first fixing groove 621 is embedded on 620 outer surface of anti-drop net winding post, and described
Two fixing grooves 622 are embedded at 621 lower section of the first fixing groove, and the second anti-drop net fixing device 70 is equipped with third and fixes kelly
700, the 4th kelly 701 is fixed, the third is fixed kelly 700 and is connected in the second spud pile control cabinet 7 by bolt riveted
On portion top surface, the 4th fixation kelly 701 is connected to by bolt riveted in 7 inner bottom surface of the second spud pile control cabinet, institute
The second construction illumination circuit for lamp device 71 is stated equipped with the second control power pack 710, second source box connecting wire 711, described the
Two control power packs 710 are connected to by bolt riveted in 7 inner bottom surface of the second spud pile control cabinet, and the second source box connects
It connects conducting wire 711 to be connected between the second control power pack 710 and the second construction illumination lamp 55, the second anti-drop net head
72 are equipped with anti-drop net winding post 720, third fixing groove 721, the 4th fixing groove 722, and the anti-drop net winding post 720 passes through bolt
Riveted is connected to inside the second spud pile control cabinet 7, and the third fixing groove 721 is embedded at 720 outer surface of anti-drop net winding post
On, the 4th fixing groove 722 is embedded at 721 lower section of third fixing groove.
User by this equipment carry out bridge construction when, can by anti-drop net stretching adjust draw set safety net away from
From, while anti-drop net is fixed by both ends, the workload drawn when setting anti-drop net can be mitigated, can be also easy to when dismounting
Dismounting and movement reduce the damage to bridge floor, and installation is simple, time saving and energy saving.
Anti-drop net main body of the present invention is a kind of web guard, in bridge construction for being mounted on bridge two
The safety measure of side, toughness is strong, is hardly damaged, while installing simple and convenient.
Problems solved by the invention is the prior art in use, because existing safety net is mostly by after bridge floor punches
Safety net supporting rack is fixed with swell fixture, when construction outside to bridge floor both sides, it is also necessary to which erecting scaffold is installed
Protection network needs to waste a large amount of time and manpower, and time-consuming and laborious when removing, while can be caused to bridge floor centainly
Damage, the present invention is combined with each other by above-mentioned component, can be adjusted by the stretching of anti-drop net and be drawn the distance that set safety net,
Anti-drop net is fixed by both ends simultaneously, the workload drawn when setting anti-drop net can be mitigated, also can be easy to tear open when dismounting
It unloads and moves, reduce the damage to bridge floor, installation is simple, time saving and energy saving.
In summary:When anti-drop net winding post material is stainless steel, the robustness of anti-drop net winding post material is most strong, resistance to
Corrosivity is best, therefore it is optimal selection to select stainless steel as anti-drop net winding post material.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention, for this field skill
For art personnel, it is clear that invention is not limited to the details of the above exemplary embodiments, and without departing substantially from the present invention spirit or
In the case of essential characteristic, the present invention can be realized in other specific forms.Therefore, in all respects, should all incite somebody to action
Embodiment regards exemplary as, and is non-limiting, the scope of the present invention by appended claims rather than on state
Bright restriction, it is intended that including all changes that come within the meaning and range of equivalency of the claims in the present invention
It is interior.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
The other embodiment being appreciated that.
Claims (9)
1. a kind of bridge construction anti-drop device, structure is fixed including the first fixed hydraulic pedestal (1), the first removable fall arrest
Stake (2), anti-drop net device (3), the second fixed hydraulic pedestal (4), the second removable fall arrest spud pile (5), the first spud pile
Control cabinet (6), the second spud pile control cabinet (7), the first fixed hydraulic pedestal (1) is connected to first by bolt riveted can
Below mobile fall arrest spud pile (2), the first removable fall arrest spud pile (2) is connected to first by bolt riveted and consolidates
Determine between hydraulic base (1) and the first construction illumination lamp (25), the anti-drop net device (3) is connected to the first removable fall arrest
Between spud pile (2) and the second removable fall arrest spud pile (5), the second fixed hydraulic pedestal (4) passes through bolt riveted
It is connected to below the second removable fall arrest spud pile (5), the second removable fall arrest spud pile (5) passes through bolt riveted
It is connected between the second fixed hydraulic pedestal (4) and the second construction illumination lamp (55), the first spud pile control cabinet (6) is embedded
Internal in the first removable fall arrest spud pile (2), the second spud pile control cabinet (7) is embedded at the second removable fall arrest
Spud pile (5) is internal, it is characterised in that:
The first fixed hydraulic pedestal (1) be equipped with the first foldable walking universal wheel (10), the first raise-lower hydraulic mobile jib (11),
First raise-lower hydraulic strut (12), the first foldable walking universal wheel (10) are connected to the first fixer by bolt riveted
Pedestal (1) bottom, the first raise-lower hydraulic mobile jib (11) is pressed to be connected on the first fixed hydraulic pedestal (1) by bolt riveted
Surface, the first raise-lower hydraulic strut (12) is by being excessively connected on the first raise-lower hydraulic mobile jib (11);
The first removable fall arrest spud pile (2) is equipped with the first anti-drop net fixed fastener (20), the fixation of the second anti-drop net is pressed
Detain (21), the first construction illumination lamp control panel (22), the first control cabinet maintenance door (23), the first construction illumination lamp holder (24),
First construction illumination lamp (25), the first control cabinet display board (26), the first anti-drop net fixed fastener (20) are embedded at first
Above control cabinet display board (26), the second anti-drop net fixed fastener (21) is embedded under the first control cabinet maintenance door (23)
Side, the first construction illumination lamp control panel (22) is embedded on the first removable fall arrest spud pile (2) outer surface, described
First control cabinet maintenance door (23) is embedded at below the first construction illumination lamp control panel (22), the first construction illumination lamp holder
(24) it is connected at the top of the first removable fall arrest spud pile (2) by bolt riveted, the first construction illumination lamp (25) is logical
It crosses and is electrically connected at the top of the first construction illumination lamp holder (24), the first control cabinet display board (26) is embedded at the first construction illumination
Above lamp control panel (22);
The anti-drop net device (3) is equipped with the first anti-drop net and fixes strut (30), the second anti-drop net fixation strut (31), anti-drop net
Main body (32), first anti-drop net fixes strut (30), and to be embedded at the first removable fall arrest spud pile (2) internal, and described the
Two anti-drop nets are fixed strut (31) and are embedded at below the first anti-drop net fixation strut (30), and the anti-drop net main body (32) is connected to
Between first removable fall arrest spud pile (2) and the second removable fall arrest spud pile (5);
The second fixed hydraulic pedestal (4) be equipped with the second foldable walking universal wheel (40), the second raise-lower hydraulic mobile jib (41),
Second raise-lower hydraulic strut (42), the second foldable walking universal wheel (40) are connected to the second fixer by bolt riveted
Pedestal (4) bottom, the second raise-lower hydraulic mobile jib (41) is pressed to be connected on the second fixed hydraulic pedestal (4) by bolt riveted
Surface, the second raise-lower hydraulic strut (42) is by being excessively connected on the second raise-lower hydraulic mobile jib (41);
It is solid that the second removable fall arrest spud pile (5) is equipped with the second anti-drop net fixed fastener (50), the second anti-drop net
Determine snap-fastener (51), the second construction illumination lamp control panel (52), the second control cabinet maintenance door (53), the second construction illumination lamp holder
(54), the second construction illumination lamp (52), the second control cabinet display board (56), the second anti-drop net fixed fastener (50) are embedded at
Above second control cabinet display board (56), the second anti-drop net fixed fastener (51) is embedded at the second control cabinet maintenance door (53)
Lower section, the second construction illumination lamp control panel (52) are embedded on the second removable fall arrest spud pile (5) outer surface, institute
It states the second control cabinet maintenance door (53) to be embedded at below the second construction illumination lamp control panel (52), the second construction illumination lamp
Seat (54) is connected to by bolt riveted at the top of the second removable fall arrest spud pile (5), the second construction illumination lamp (52)
By being electrically connected at the top of the second construction illumination lamp holder (54), the second control cabinet display board (56) is embedded at the second construction photograph
Above bright lamp control panel (52);
The first spud pile control cabinet (6) is equipped with the first anti-drop net fixing device (60), the first construction illumination circuit for lamp device
(61), the first anti-drop net head (62), the first anti-drop net fixing device (60) are connected to first by bolt riveted
On spud pile control cabinet (6) inner wall, the first construction illumination circuit for lamp device (61) is connected to first by bolt riveted and consolidates
Determine in stake control cabinet (6) inner bottom surface, the first anti-drop net head (62) is connected to the first fixation by bolt riveted
Stake control cabinet (6) is internal;
The second spud pile control cabinet (7) is equipped with the second anti-drop net fixing device (70), the second construction illumination circuit for lamp device
(71), the second anti-drop net head (72), the second anti-drop net fixing device (70) are connected to second by bolt riveted
On spud pile control cabinet (7) inner wall, the second construction illumination circuit for lamp device (71) is connected to second by bolt riveted and consolidates
Determine in stake control cabinet (7) inner bottom surface, the second anti-drop net head (72) is connected to the second fixation by bolt riveted
Stake control cabinet (7) is internal.
2. a kind of bridge construction anti-drop device according to claim 1, it is characterised in that:First anti-drop net fixes branch
Bar (30) is embedded slot (300) equipped with the first kelly, and first kelly is embedded slot (300) and is embedded at the first anti-drop net fixation strut
(30) on upper surface.
3. a kind of bridge construction anti-drop device according to claim 1, it is characterised in that:Second anti-drop net fixes branch
Bar (31) is embedded slot (310) equipped with the second kelly, and second kelly is embedded slot (310) and is embedded at the second anti-drop net fixation strut
(31) on lower surface.
4. a kind of bridge construction anti-drop device according to claim 1, it is characterised in that:First anti-drop net fixes dress
It sets (60) and fixes kelly (600), the second fixation kelly (601) equipped with first, the first fixation kelly (600) passes through bolt riveting
Conjunction is connected in first spud pile control cabinet (6) inside top surface, and the second fixation kelly (601) is connected to by bolt riveted
In first spud pile control cabinet (6) inner bottom surface.
5. a kind of bridge construction anti-drop device according to claim 1, it is characterised in that:The first construction illumination lamp electricity
Road device (61) is equipped with the first control power pack (610), the first power pack connecting wire (611), the first control power pack
(610) it is connected in first spud pile control cabinet (6) inner bottom surface by bolt riveted, the first power pack connecting wire
(611) it is connected between the first control power pack (610) and the first construction illumination lamp (25).
6. a kind of bridge construction anti-drop device according to claim 1, it is characterised in that:The first anti-drop net activity dress
(62) are set equipped with anti-drop net winding post (620), the first fixing groove (621), the second fixing groove (622), the anti-drop net winding post
(620) the first spud pile control cabinet (6) inside is connected to by bolt riveted, first fixing groove (621) is embedded at anti-fall
On net winding post (620) outer surface, second fixing groove (622) is embedded at below the first fixing groove (621).
7. a kind of bridge construction anti-drop device according to claim 1, it is characterised in that:Second anti-drop net fixes dress
It sets (70) and fixes kelly (700), the 4th fixation kelly (701) equipped with third, the third fixes kelly (700) and passes through bolt riveting
Conjunction is connected in second spud pile control cabinet (7) inside top surface, and the 4th fixation kelly (701) is connected to by bolt riveted
In second spud pile control cabinet (7) inner bottom surface.
8. a kind of bridge construction anti-drop device according to claim 1, it is characterised in that:The second construction illumination lamp electricity
Road device (71) is equipped with the second control power pack (710), second source box connecting wire (711), the second control power pack
(710) it is connected in second spud pile control cabinet (7) inner bottom surface by bolt riveted, the second source box connecting wire
(711) it is connected between the second control power pack (710) and the second construction illumination lamp (55).
9. a kind of bridge construction anti-drop device according to claim 1, it is characterised in that:The second anti-drop net activity dress
(72) are set equipped with anti-drop net winding post (720), third fixing groove (721), the 4th fixing groove (722), the anti-drop net winding post
(720) the second spud pile control cabinet (7) inside is connected to by bolt riveted, the third fixing groove (721) is embedded at anti-fall
On net winding post (720) outer surface, the 4th fixing groove (722) is embedded at below third fixing groove (721).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810222535.1A CN108505754A (en) | 2018-03-19 | 2018-03-19 | A kind of bridge construction anti-drop device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810222535.1A CN108505754A (en) | 2018-03-19 | 2018-03-19 | A kind of bridge construction anti-drop device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108505754A true CN108505754A (en) | 2018-09-07 |
Family
ID=63375862
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810222535.1A Pending CN108505754A (en) | 2018-03-19 | 2018-03-19 | A kind of bridge construction anti-drop device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108505754A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110820589A (en) * | 2019-11-30 | 2020-02-21 | 武汉瑞锦丰路桥设备股份有限公司 | Bridge construction safety anti-falling device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101534608B1 (en) * | 2014-12-30 | 2015-07-08 | (주)에스앤씨이엔지 | Safety porch constructing method |
CN204510018U (en) * | 2015-03-27 | 2015-07-29 | 段福强 | A kind of bridge construction anti-drop device |
CN205577456U (en) * | 2016-05-11 | 2016-09-14 | 姜云鹏 | Limit is faced with preventing guardrail bar device to building engineering construction |
CN205777625U (en) * | 2016-05-26 | 2016-12-07 | 佛山市业泽环保科技有限公司 | Building construction preventer |
CN206667918U (en) * | 2017-04-28 | 2017-11-24 | 青岛德泰建设工程有限公司 | A kind of construction guardrail using snap ring-type fixture |
-
2018
- 2018-03-19 CN CN201810222535.1A patent/CN108505754A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101534608B1 (en) * | 2014-12-30 | 2015-07-08 | (주)에스앤씨이엔지 | Safety porch constructing method |
CN204510018U (en) * | 2015-03-27 | 2015-07-29 | 段福强 | A kind of bridge construction anti-drop device |
CN205577456U (en) * | 2016-05-11 | 2016-09-14 | 姜云鹏 | Limit is faced with preventing guardrail bar device to building engineering construction |
CN205777625U (en) * | 2016-05-26 | 2016-12-07 | 佛山市业泽环保科技有限公司 | Building construction preventer |
CN206667918U (en) * | 2017-04-28 | 2017-11-24 | 青岛德泰建设工程有限公司 | A kind of construction guardrail using snap ring-type fixture |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110820589A (en) * | 2019-11-30 | 2020-02-21 | 武汉瑞锦丰路桥设备股份有限公司 | Bridge construction safety anti-falling device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106081995A (en) | A kind of electric power overhaul device | |
CN206060091U (en) | A kind of cable testing bridge | |
CN108505754A (en) | A kind of bridge construction anti-drop device | |
CN207176476U (en) | Removable boarding bridge | |
CN205742942U (en) | A kind of gardens special-purpose multifunctional construction platform | |
TWM615800U (en) | Solar panel fixing stand | |
CN106959096A (en) | A kind of moving seesaw-type measuring instrument self-level(l)ing device | |
CN209419156U (en) | A kind of cable testing bridge suspension and support convenient for cable laying | |
CN204005140U (en) | Outdoor electronic display screen support | |
CN108193586B (en) | Camouflage type large-span automatic quick-connection type extension emergency bridge | |
CN218406823U (en) | Protective rain shed | |
CN205401945U (en) | Modular trench cable support | |
CN207553565U (en) | A kind of crosshead of truss | |
CN205899985U (en) | Multi -functional solar energy electronic information brand | |
CN214662525U (en) | Lifting type pipeline installation device | |
CN113482008B (en) | Foundation pit inner supporting device for transformer substation construction | |
CN201339311Y (en) | Turning plate device of hanging rack | |
CN205916967U (en) | Electric power overhaul device | |
CN2871634Y (en) | Bridge maintaining equipment | |
CN212250138U (en) | Construction operation vehicle in railway tunnel | |
CN212296237U (en) | Side slope drilling trolley | |
CN209545491U (en) | A kind of photovoltaic power generation structure waterborne | |
CN208762885U (en) | A kind of construction of railways Bridge Erector | |
CN214573516U (en) | Foldable indication board for road traffic construction | |
CN207673052U (en) | A kind of modularization assembling bathroom |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180907 |
|
WD01 | Invention patent application deemed withdrawn after publication |