CN108499265A - A kind of dust-removal cloth-bag replacement lift - Google Patents
A kind of dust-removal cloth-bag replacement lift Download PDFInfo
- Publication number
- CN108499265A CN108499265A CN201810269062.0A CN201810269062A CN108499265A CN 108499265 A CN108499265 A CN 108499265A CN 201810269062 A CN201810269062 A CN 201810269062A CN 108499265 A CN108499265 A CN 108499265A
- Authority
- CN
- China
- Prior art keywords
- main body
- body frame
- dust
- removal cloth
- bag
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D46/00—Filters or filtering processes specially modified for separating dispersed particles from gases or vapours
- B01D46/88—Replacing filter elements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D46/00—Filters or filtering processes specially modified for separating dispersed particles from gases or vapours
- B01D46/02—Particle separators, e.g. dust precipitators, having hollow filters made of flexible material
- B01D46/023—Pockets filters, i.e. multiple bag filters mounted on a common frame
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D46/00—Filters or filtering processes specially modified for separating dispersed particles from gases or vapours
- B01D46/42—Auxiliary equipment or operation thereof
- B01D46/4227—Manipulating filters or filter elements, e.g. handles or extracting tools
Abstract
The invention discloses a kind of dust-removal cloth-bags to replace lift, including main body frame and several suspension centres for being set on main body frame, wherein main body frame is correspondingly arranged with dedusting cabin, and when lift work, dust-removal cloth-bag is fixed on suspension centre.A frame is welded with angle steel, then welds suspension centre, cloth bag is tied on suspension centre, crane is reused and once slings, save manpower and time, substantially increase overhaul efficiency.It is simple, easy to operation, at low cost it to be dusted cloth bag replacing options with the device, is suitable for various dust-removal cloth-bag liftings, can be used in each steel industry, there are good market prospects.
Description
Technical field
The invention belongs to factory floor deduster fields, and in particular to a kind of dust-removal cloth-bag replacement lift.
Background technology
Dust-removal cloth-bag is applied to the dust-extraction unit in the integrated mills workshops such as steel mill, and dust-extraction unit is using a period of time (about
4-5 months) after, dust-removal cloth-bag will deposit many flyash, be replaced.For example one dedusting cabin of 75t dry coke quenching is big
About 32 storehouse holes, there are about 160 cloth bags for the inside, are all to integrate many manpowers as shown in Figure 1, in existing maintenance replacement process
Cloth bag is pulled out, then puts together and is hung to ground with crane, several storehouses will waste many times under replacing, manpower,
Under causing overhaul efficiency very low.
Invention content
The technical problem to be solved by the present invention is to:A kind of dust-removal cloth-bag replacement lift is provided, solves existing skill
Dust-removal cloth-bag replaces the problem of waste of resource, inefficiency in art.
The present invention uses following technical scheme to solve above-mentioned technical problem:
A kind of dust-removal cloth-bag replaces lift, including main body frame and several suspension centres for being set on main body frame,
Wherein, main body frame is correspondingly arranged with dedusting cabin, and when lift works, dust-removal cloth-bag is fixed on suspension centre.
Main body frame is rectangle structure, and centre has transverse bar, and suspension centre is arranged on transverse bar.
The suspension hook of opening upwards is respectively provided on each suspension centre.
The size of main body frame is according to the structure determination of dedusting cabin.
Main body frame is welded using angle steel, and suspension centre is welded on main body frame.
The top of main body frame has hanging beam, for slinging main body frame.
Hanging beam uses steel cord structure, one end of steel wire rope to be fixed on main body frame, and Open Side Down for other end connection
Suspension hook.
Compared with prior art, the invention has the advantages that:
1, a frame is welded with angle steel, then welds suspension centre, cloth bag is tied on suspension centre, crane is reused and once slings,
Manpower and time are saved, overhaul efficiency is substantially increased.
2, the device angle steel in the present invention can make, easy to implement.
3, method is simple, easy to operation, at low cost, is suitable for various dust-removal cloth-bag liftings, can be in each steel industry
It uses, there is good market prospects.
Description of the drawings
Fig. 1 is the structure diagram of steel mill's workshop dedusting cabin in the prior art.
Fig. 2 is lift structure application front view of the present invention.
Fig. 3 is lift structure application vertical view of the present invention.
Fig. 4 is lift structure application left view of the present invention.
Fig. 5 is lift structure application of the present invention.
Wherein, being identified as in figure:1- dedusting cabins;2- dust-removal cloth-bags;3- main body frames;4- suspension centres;5- hanging beams;6- is hung
Hook.
Specific implementation mode
The structure and the course of work of the present invention are described further below in conjunction with the accompanying drawings.
A kind of dust-removal cloth-bag replaces lift, including main body frame and several suspension centres for being set on main body frame,
Wherein, main body frame is correspondingly arranged with dedusting cabin, and when lift works, dust-removal cloth-bag is fixed on suspension centre.
Specific embodiment one, as shown in Figure 1, Figure 2, Figure 3, Figure 4:
A kind of dust-removal cloth-bag replaces lift, including main body frame 3 and several suspension centres for being set on main body frame 3
4, wherein main body frame 3 is correspondingly arranged with dedusting cabin 1.Main body frame 3 is rectangle structure, and centre has transverse bar, set on transverse bar
Set suspension centre.Main body frame is arranged to the size of 1m*0.8m according to conventional dedusting chamber structure by the embodiment, and main body frame uses
5# angle steel welds, intermediate equidistantly two transverse bars parallel with any opposite side of main body frame of welding, four vertex of main body frame
Respectively one suspension centre of setting, transverse bar and main body frame pad are respectively provided with suspension centre, main body frame two opposite side parallel with transverse bar and
Respectively there are 12 suspension centres, suspension centre to be welded on main body frame for one suspension centre of setting, the main body frame being performed integrally at the midpoint of transverse bar
On.
When the lift work of the embodiment, dust-removal cloth-bag 2 is fixed on suspension centre 4, and dust-removal cloth-bag can pass through steel wire rope
It is tied on suspension centre, bolt hangs 5 dust-removal cloth-bags on each suspension centre, and the dust-removal cloth-bag number that bolt is hung on each suspension centre can be according to body frame
The load-bearing of frame and suspension centre is arranged, and is not limited only to five, at least can hang dust-removal cloth-bag with bolt.
Fig. 1 to Fig. 4 illustrates the concrete structure of the embodiment from each different angle.
Specific embodiment two,
The main body frame of the embodiment is similar with the main body frame of specific embodiment one, and distinctive points are on each suspension centre 4
It is respectively provided with the suspension hook of opening upwards.When lift works, dust-removal cloth-bag 2 bolts on a steel cord, then by the another of steel wire rope
One end is arranged circlewise, directly hangs on suspension hook, easy to disassemble.Bolt hangs at least one dust-removal cloth-bag, each suspension hook on each suspension hook
The dust-removal cloth-bag number that upper bolt is hung can be arranged according to field demand.
Specific embodiment three, as shown in Figure 5:
The main body frame of the embodiment is similar with the main body frame of specific embodiment one, and distinctive points are the upper of main body frame
Side has hanging beam 5, and for slinging main body frame, hanging beam 5 uses steel cord structure, and one end of steel wire rope is fixed on main body frame
On 3, the other end connection suspension hook 6 that Open Side Down.
When lift works, dust-removal cloth-bag 2 bolts on a steel cord, and cyclization then is arranged in the other end of steel wire rope
Shape is directly hung on suspension hook, easy to disassemble.Bolt hangs at least one dust-removal cloth-bag on each suspension hook, the dedusting that bolt is hung on each suspension hook
Cloth bag number can be arranged according to field demand.
Using four steel wire ropes as hanging beam, four steel wire ropes are separately fixed on transverse bar the embodiment, and every transverse bar is solid
Fixed two steel wire ropes so that main body frame can be balanced and be sling, and when pull-up dust-removal cloth-bag, suspension hook 6 is directly hung on crane, side
Convenient to operate.
Specific embodiment four,
The embodiment and the distinctive points of specific embodiment three are that four steel wire ropes of hanging beam are fixed on pair of main body frame
Two steel wire ropes are fixed on Bian Shang, each side so that main body frame can be balanced and be sling, when pull-up dust-removal cloth-bag, suspension hook 6 is direct
It is suspended on crane, is conveniently operated.
Specific embodiment five,
The embodiment and the distinctive points of specific embodiment three are that four steel wire ropes of hanging beam are fixed on the four of main body frame
On a side, steel cable is fixed on each side so that main body frame can be balanced and be sling, when pull-up dust-removal cloth-bag, by suspension hook 6
It is directly hung on crane, is conveniently operated.
Nylon rope or other, which can be used, in steel wire rope in above-described embodiment can realize the flexible connection that connection is sling
Component, steel wire rope are not limited only to use steel wire rope as just an example.
In above-described embodiment, the size of main body frame is determined according to the structure of dedusting cabin and the number of dust-removal cloth-bag, such as
More cloth bags need to be lifted, the frame of bigger can be made.
The manufacture craft of one described device of specific embodiment is as follows:
The first step:Using 5# angle steel welding production at the frame of the main body frame of a 0.8m*1m;
Second step:Intermediate in main body frame welds 2 transverse bars, and main body frame is divided into three by 2 transverse bar uniform weldings
A same rectangle;
Third walks:On four vertex of main body frame, on the pad of transverse bar and main body frame, the midpoint of transverse bar, with
A suspension centre is respectively welded at the midpoint of the parallel leg of frame of transverse bar, welds 12 suspension centres altogether, completes the making of the lift.
The manufacture craft of two described device of specific embodiment is further added by the after walking the welding for completing 12 suspension centres in third
Four steps weld the suspension hook of opening upwards on each suspension centre, facilitate suspension cloth bag.
The manufacture craft of three to five described device of specific embodiment is the dress in specific embodiment one or specific embodiment two
On the basis of setting completion, then weld hanging beam and suspension hook.
It is by the operating procedure that dust-removal cloth-bag lifting is got up using above-mentioned apparatus:
First, cloth bag is wound bolt on suspension centre with steel wire rope, each suspension centre can hang at least one cloth bag with bolt;
, etc. secondly after 12 suspension centre whole bolts hang up properly cloth bag, main body frame is entirely sling with crane;
Finally, etc. after cloth bags are all hung to appointed place, then steel wire rope unlocked;
It repeats the above steps and completes the lifting dismounting of all dust-removal cloth-bags.
It is mounted with the device of suspension hook, can directly be suspended on dust-removal cloth-bag on suspension hook by connecting components such as steel wire ropes,
The set time has been saved, has been improved work efficiency.
Connection relation, treating method between above-mentioned structure mounting means, component are merely possible to for an example
It is bright, must not believe that and only protect the scheme, it is every to the device to all may be used in the case of in dust-removal cloth-bag replacement process
With the methods with reference to this programme.
Those skilled in the art can make various modifications to described specific embodiment
Or supplement or substitute by a similar method, however, it does not deviate from the spirit of the invention or surmounts the appended claims determines
The range of justice.
Claims (7)
1. a kind of dust-removal cloth-bag replaces lift, it is characterised in that:Including main body frame and it is set on main body frame
Several suspension centres, wherein main body frame is correspondingly arranged with dedusting cabin, and when lift works, dust-removal cloth-bag is fixed on suspension centre.
2. dust-removal cloth-bag according to claim 1 replaces lift, it is characterised in that:Main body frame is rectangle knot
Structure, centre have transverse bar, suspension centre are arranged on transverse bar.
3. dust-removal cloth-bag according to claim 1 or 2 replaces lift, it is characterised in that:It is respectively provided on each suspension centre
The suspension hook of opening upwards.
4. dust-removal cloth-bag according to claim 1 replaces lift, it is characterised in that:The size of main body frame is according to removing
The structure determination in dirt storehouse.
5. dust-removal cloth-bag according to claim 1 replaces lift, it is characterised in that:Main body frame is welded using angle steel
It connects, suspension centre is welded on main body frame.
6. dust-removal cloth-bag according to any one of claim 1 to 5 replaces lift, it is characterised in that:Main body frame
Top have hanging beam, for main body frame to be sling.
7. dust-removal cloth-bag according to claim 6 replaces lift, it is characterised in that:Hanging beam uses steel cord structure,
One end of steel wire rope is fixed on main body frame, the other end connection suspension hook that Open Side Down.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810269062.0A CN108499265A (en) | 2018-03-29 | 2018-03-29 | A kind of dust-removal cloth-bag replacement lift |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810269062.0A CN108499265A (en) | 2018-03-29 | 2018-03-29 | A kind of dust-removal cloth-bag replacement lift |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108499265A true CN108499265A (en) | 2018-09-07 |
Family
ID=63379196
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810269062.0A Pending CN108499265A (en) | 2018-03-29 | 2018-03-29 | A kind of dust-removal cloth-bag replacement lift |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108499265A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109126309A (en) * | 2018-09-11 | 2019-01-04 | 中冶宝钢技术服务有限公司 | Dust-removal cloth-bag skeleton removes special hanger and its application method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2567192Y (en) * | 2002-08-22 | 2003-08-20 | 高永庠 | Hanging bracket capable of lifting three baged goods |
US6824346B2 (en) * | 2002-12-14 | 2004-11-30 | W. Sam Coblentz | Method and apparatus for handling bagged cargo |
CN201864449U (en) * | 2010-11-23 | 2011-06-15 | 中国海洋石油总公司 | Cement joint-row pressing block hoisting frame |
CN103100276A (en) * | 2012-12-21 | 2013-05-15 | 宁夏科行环保工程有限公司 | Dust collector filter bag frame hanging device |
CN203545443U (en) * | 2013-09-12 | 2014-04-16 | 漳平市万山竹业工贸有限公司 | Multiple-hook sling |
CN203593517U (en) * | 2013-11-19 | 2014-05-14 | 上海申花钢管有限公司 | Balanced and retractable batched lifting device |
CN107174877A (en) * | 2017-07-04 | 2017-09-19 | 艾尼科环保技术(安徽)有限公司 | A kind of inward flow filtration-type sack cleaner filter bag hanging and its dedusting and flapping device |
-
2018
- 2018-03-29 CN CN201810269062.0A patent/CN108499265A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2567192Y (en) * | 2002-08-22 | 2003-08-20 | 高永庠 | Hanging bracket capable of lifting three baged goods |
US6824346B2 (en) * | 2002-12-14 | 2004-11-30 | W. Sam Coblentz | Method and apparatus for handling bagged cargo |
CN201864449U (en) * | 2010-11-23 | 2011-06-15 | 中国海洋石油总公司 | Cement joint-row pressing block hoisting frame |
CN103100276A (en) * | 2012-12-21 | 2013-05-15 | 宁夏科行环保工程有限公司 | Dust collector filter bag frame hanging device |
CN203545443U (en) * | 2013-09-12 | 2014-04-16 | 漳平市万山竹业工贸有限公司 | Multiple-hook sling |
CN203593517U (en) * | 2013-11-19 | 2014-05-14 | 上海申花钢管有限公司 | Balanced and retractable batched lifting device |
CN107174877A (en) * | 2017-07-04 | 2017-09-19 | 艾尼科环保技术(安徽)有限公司 | A kind of inward flow filtration-type sack cleaner filter bag hanging and its dedusting and flapping device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109126309A (en) * | 2018-09-11 | 2019-01-04 | 中冶宝钢技术服务有限公司 | Dust-removal cloth-bag skeleton removes special hanger and its application method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203889877U (en) | Cage for overhead operation construction | |
CN201172574Y (en) | Precast beam reinforced bar hoisting rack | |
CN108915272A (en) | A kind of inclined-plane cell cube hanging method | |
CN207932894U (en) | Polar crane integral hoisting device for rapid | |
CN202465022U (en) | Hoisting tool | |
CN108499265A (en) | A kind of dust-removal cloth-bag replacement lift | |
CN106006365B (en) | A kind of suspender for being used to assemble heavy forklift tire | |
CN108083099A (en) | A kind of good welded suspending hook of anti-dropout | |
CN207774631U (en) | A kind of light-duty tunable capacitor attaching/detaching apparatus | |
CN106185597B (en) | A kind of large size Analytic Tower merogenesis special hanger for hoisting and hanging method | |
CN205916904U (en) | Activity hanging bracket | |
CN106744310B (en) | A kind of large-scale steel structure column hanging method | |
CN205397850U (en) | A hoist for heavy fork truck portal is transported | |
CN212916236U (en) | Multipurpose power and free chain suspension device | |
CN106629376A (en) | Angle-adjustable electromagnetic lifting appliance and adjusting method thereof | |
CN206307891U (en) | For the Lift-on/Lift-off System of large-scale wind electricity product | |
CN219408852U (en) | Device for covering tarpaulin by using travelling crane | |
CN206615932U (en) | A kind of detacher lifted for large-scale steel structure column | |
CN205709490U (en) | A kind of novel hoisting tool | |
CN208964382U (en) | A kind of hanging beam fixture | |
CN207903749U (en) | A kind of service sink suspender | |
CN107934744A (en) | Polar crane integral hoisting device for rapid | |
CN104512813A (en) | Electric engine cylinder milling bottom surface hoisting device | |
CN111774208B (en) | Multipurpose power and free chain suspension device and suspension method | |
CN210854980U (en) | Concrete prefabricated T-shaped beam hoisting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180907 |