CN108491939A - A kind of Transit Equipment Intelligent Maintenance management method - Google Patents

A kind of Transit Equipment Intelligent Maintenance management method Download PDF

Info

Publication number
CN108491939A
CN108491939A CN201810262076.XA CN201810262076A CN108491939A CN 108491939 A CN108491939 A CN 108491939A CN 201810262076 A CN201810262076 A CN 201810262076A CN 108491939 A CN108491939 A CN 108491939A
Authority
CN
China
Prior art keywords
module
work order
fill
maintenance
dismounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810262076.XA
Other languages
Chinese (zh)
Inventor
于正河
石云鹏
刘风仪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao River Intellectual Property Ltd
Original Assignee
Qingdao River Intellectual Property Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao River Intellectual Property Ltd filed Critical Qingdao River Intellectual Property Ltd
Priority to CN201810262076.XA priority Critical patent/CN108491939A/en
Publication of CN108491939A publication Critical patent/CN108491939A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/40Business processes related to the transportation industry

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Data Mining & Analysis (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention belongs to transit equipment administrative skill fields,It is related to a kind of Transit Equipment Intelligent Maintenance management method,The work order for needing to provide is found by the lookup submodule of repair schedule arranging module,Then pass through assembly line and safeguard and change the maintenance that teams and groups' submodule carries out work order teams and groups,Module is provided by work order granting finally by work order and generates the output result of material billboard,Work order module can be entered at this time,The work order for needing to operate is found by inquiring submodule,The maintenance of object is repaired by changing maintenance objects submodule,Then according to the dismounting installation requirements of work order,Dismounting installation operation is carried out by dismounting/installation submodule,Completion module, which is triggered, finally by completion puies forward report approval module with working hour,Generate output result upload server,This method design concept is ingenious,It is safe and convenient to use,Greatly improve the efficiency of management,And convenient for safeguarding and recording,Application environment is friendly,Wide market.

Description

A kind of Transit Equipment Intelligent Maintenance management method
Technical field:
The invention belongs to transit equipment administrative skill fields, and in particular to a kind of Transit Equipment Intelligent Maintenance management Method.
Background technology:
With the fast development of rail traffic, the usage quantity of motor-car increases sharply, and the products such as EMU are largely delivered and entered With maintenance phase, but in the prior art, the utilization overhaul information of each vehicle mostly uses paper document or electronic document It is recorded, there is record dispersion, imperfect, not in time defects, and do not form structuring, real-time electronic record, It is difficult to realize the whole-life cycle fee of motor-car set product, also easily data is caused to lose in management process, is seriously constrained The working efficiency of overhaul service business cannot meet ever-increasing market demand.Overhaul service operational plate is handed over as track The important support of logical Sustainable Development in Future, quickly becomes the new source of economic growth developed in the industry, to domestic increasingly perfect Product technology and quality level, foundation tallies with the national condition and plays an important roll with the rail traffic maintenance system of road feelings.For This must be support with information-based means, with organization mechanism, pipe diameter design innovation to ensure, during formation is with overhaul service cause The heart, establish cover product life cycels, overall process rail traffic maintenance operation business system, from point of economic increase to economy Fulcrum converts.And motor-car is as a kind of complex large-sized equipment, it is high to safety requirements, and component costs are high, it requires maintenance Process more fine-grained management and record.If realizing the management of configuration and critical component, unified update is unrealistic later for maintenance , still more there was only paper document before, effective way to manage can not be formed, and identity function mould is had no in similar product Block, can only larger dimension completion material claim and cancelling stocks, be unable to meet production requirement.Therefore, design prepares a kind of track Transit equipment Intelligent Maintenance management method can record service information, synchronized update to row by field worker in every procedure In vehicle resume, realize that the maintenance of real-time synchronization and fining executes management, security performance, the problem in maintenance process are traced, Component tracking, life-span management, cost control etc., which can be played, to be obviously improved.
Invention content:
It is an object of the invention to overcome the deficiencies of existing technologies, seeks design and a kind of Transit Equipment intelligence is provided Maintenance management method, the angle which can apply from actual management, according to the record of practical operation, to complex device Critical component is tracked and records in maintenance process, and can carry out real-time update management to configuration resume, realizes material The working procedure level of demand don't bother about reason, and realize the GradeNDivision of process, while realize the fine-grained management of people and object.
To achieve the goals above, the present invention realizes by following technical solution:
A kind of Transit Equipment Intelligent Maintenance manager of the present invention operates according to the sequence of each module, first The work order for needing to provide is found by the lookup submodule of repair schedule arranging module, then passes through assembly line and safeguards and change Teams and groups' submodule carries out the maintenance of work order teams and groups, and providing module finally by work order by work order granting and generates material billboard Output into work order module as a result, can finding the work order for needing to operate by inquiring submodule, being repaired by changing at this time Object submodule repairs the maintenance of object, then according to the dismounting installation requirements of work order, by dismounting/installation submodule into Row dismounting installation operation triggers completion module finally by completion and puies forward report approval module with working hour, generates output result and upload clothes Business device, or cancel module by cancelling triggering, corresponding work order is cancelled, generation exports result and returns to notice single module.
When in use, concrete operations mode carries out work order module of the present invention in accordance with the following steps:
Repair schedule arranging module by enquiry module according to overhauling project, department, row only, rise only, meter Draw the time started from, planned start time only, planned end time rise, planned end time only, work order state, work order number, Partial query condition in maintenance mode, maintenance notification sheet, maintenance level finds corresponding overhaul process, chooses what needs executed Process row, completes assembly line and safeguards, teams and groups are changed after choosing again and are safeguarded, work order are finally provided, by field worker according to work order Service information is recorded to every procedure;
Maintenance work order execute interface by teams and groups in enquiry module, overhauling project, row, process, production number, Work order state, maintenance mode, technique notice odd numbers, work order number, work order type, maintenance level, production WBS, dismounting/installation, The partial condition progress of Start Date, target date, maintenance sequence number, vehicle, maintenance objects, design notice number, acknowledgement state Inquiry, operated according to the work order inquired, if the maintenance objects inaccuracy of work order can use update maintenance objects for The work order chosen is updated, if maintenance objects are consistent, judges whether work order executes dismounting/installation:Execute the work of dismounting After single-click dismounting, check whether disassembly sequence number consistent with physical unit at work order dismounting interface, it is inconsistent, it chooses Dismounting row clicks resume initialization, is updated to sequence number, and dismounting row is chosen after update and is dismantled, if dismounting mistake, It can then choose dismounting row to click the current dismounting of revocation, be dismantled again after changing component information, for needing to print Quick Response Code Component can be printed by Quick Response Code and be realized;After the work order click installation for executing installation, the basis in work order attaching/detaching module Actual installation component information select corresponding sequence number, fill in component repair journey, component round, the repair time, manufacturing firm, production when Between, it then chooses installation row and is installed, if setup error, installation row can be chosen to click revocation and be currently installed on, again It is installed after selection sequence number, for executing the work order of software version, confirms software in the software version function in work order Edition upgrading.
When in use, concrete operations mode carries out work order completion module of the present invention in accordance with the following steps:
When clicking completion button, the working condition of dismounting/installation module of work order main body is judged, if without dismounting/installation mould Block or all dismountings/dismounting of installation module executes/install in execution module dismantled/installed module all by judge, It then completes and operates successfully, data upload server;If dismounting/installation module is not by judging but work order main body does not dismantle installation Reason module has been filled in, and completion operation can also succeed and data upload server.
Working hour of the present invention puies forward report and approval module when in use, and concrete operations mode carries out in accordance with the following steps:
The working hour of regular inspection work order is fixed, in work order complete working hour, the working hour synchronism output of regular inspection work order, even inspection work order Working hour is that can fill out item, is correctly filled according to actually used working hour, work order complete working hour, and it is to put forward report state in working hour that working hour dress state, which synchronizes, When occasionally inspection work order triggering working hour puies forward report module, output result, which arrives first at, is provided with the submodule that subsidiary factory's approval is retracted with subsidiary factory Block, subsidiary factory's approval module can continue to output result into next module, and subsidiary factory retracts then can output result be returned to work Single module, result is input to by subsidiary factory's approval module is provided with the submodule that manpower approval is retracted with manpower, and manpower approval can will Working hour module exports port identical to regular inspection work order working hour, and manpower is retracted, can by result return be provided with subsidiary factory approval with The submodule that subsidiary factory retracts.
Work order of the present invention cancels module when in use, and concrete operations mode carries out in accordance with the following steps:
The work order for needing to cancel first is chosen, is filled in and is cancelled material requirement reason, cancels reason, the cancellation in click tools column Material requirement, when triggering, first judge whether the cancellation material requirement reason module of work order main body fills in, after the completion, click tools column In cancellation work order, when triggering first judges whether the cancellation reason module of work order main body fills in, by being triggered after judgement filling out It writes and whether in this selection that can continue to execute of access cancels mark module, data upload server and by cancellation after operate successfully Mark notifies single module as output write-back.
Realize that the agent structure of the device of technical scheme of the present invention includes:It is login interface module, data memory module, defeated Enter module, output module, repair schedule arranging module, work order module, work order attaching/detaching module, working hour carry report and examination & approval mould Block, cancels work order module at work order completion module;The login interface module includes Account Logon interface, passes through the interface energy It enough realizes Account Logon, repair schedule arranging module, work order module, work order attaching/detaching module, working hour can be carried after logging in Report is operated with approval module, work order completion module and cancellation work order module;Data memory module is storing value list number According to the data of, formats such as watch data, fast code data, conveniently directly invoke;The input module support is manually entered, equipment is defeated Enter, batch Excel file import etc. modes carry out data input;Output data can be shown or transmitted by the output module To downstream module;
Repair schedule arranging module includes searching plan sub-module, change teams and groups' submodule and granting work order submodule, Middle lookup plan sub-module is input module, is sequence operation module with change teams and groups' submodule and granting work order submodule, The operation of repair schedule arranging module is completed in the operation for being sequentially completed above three module.
It searches and is provided with to input the overhauling project module of overhauling project number in plan sub-module, showing account The door module of affiliated function, to input arranged arranged module, stop module to input the row of row only, risen to input Rise module, to input only module only, inputting the planned start time of earliest planned start time from mould Block, to input the planned start time of planned start time the latest to module, inputting the meter of earliest plan end time Draw the end time from module, to input the planned end time of planned end time the latest to module, inputting work order shape The work order block of state of state, the work order number module to input work order number, inputting the maintenance mode mould of maintenance mode Block notifies single module, the maintenance level module to input maintenance level, removing to input the maintenance of maintenance notification sheet The removing module of all input informations and to enter next submodule searching module;Wherein all input modules are optional Whether module, all modules searched in plan sub-module need to fill in by R/O/C patterns to the content of each input module Be identified, wherein R representative have to fill out, O represent it is optional fill in, C represent according to actual conditions selection fills in, when enter it is next When submodule, output data is to meet all work forms datas for filling in rear module contents, is not filled in when fully entering module And when entering next submodule, the whole work forms datas of acquiescence output.
It is provided with assembly line maintenance module in change teams and groups submodule, the module is safeguarding that assembly line, assembly line are safeguarded Module has correspondence, a teams and groups that can correspond to multiple assembly lines in a storage module with teams and groups' submodule, but same The same procedure of assembly line only corresponds to a teams and groups, and the following information mould of technique network is provided in repair schedule arranging module Block:Project number module accesses name module, row number module, number module, door module, network numbering module, network name Module, end position module and producing line module, memory module of the content from technique network, technique network can regard certain dimension as The set of the lower process of degree is additionally provided with to fill in the pipeline module of assembly line in the module, the module be must mold filling block, fill out Complete assembly line attended operation after writing, can change teams and groups' operation in technique network, change teams and groups module theme remove comprising Outside the module that above-mentioned assembly line maintenance module is included, the module of also following technique network internal storage storage, describing module, plan are opened Beginning date module, planned start time module, plan Close Date module, planned end time module, remarks module, monthly meter Scratch beginning date module, monthly plan time started module, monthly plan target date module, monthly plan deadline mould Whether block changes teams and groups' mark module;Further include having positive row's module, the row's of falling two modules of module, is arranged to the date according to schedule Sequence checks technique network, and positive row's module checks that sequence is that the more early sequence of scheduled start date is more forward, arranges checking for module Sequence is more forward for the more late sequence of plan Close Date;The network of needs is chosen, can be carried out after completing the operation of change teams and groups Next module, that is, provide the operation of work order submodule, this operation can be adjusted the corresponding teams and groups of technique network.
The interface subject for providing work order submodule shows that dimension is received text code, can be understood as lower stroke of technique network Divide thinner process set, is the smallest dimension of technique network, which includes the module of following received text code storage, Project number, access number, access title, row number, number, department, end position, producing line, received text code, received text code retouch State, scheduled start date, planned start time, the plan Close Date, planned end time, choosing corresponding network, to enter work order detailed Thin module is provided with the following information chosen and stored in the work order that network includes, work order number, work order explanation, project Number, row number, number, department, teams and groups, end position, scheduled start date, planned start time, plan the Close Date, plan terminate Time, maintenance objects, platform position, technique notice odd numbers, producing line, work order type, maintenance mode, state, working hour, access number, visit Ask title, monthly plan Start Date, monthly plan time started, monthly plan target date, monthly plan deadline, hair State, error message are put, Time Of Release is executed, the practical time started, actual finish time, cancels reason;Choose corresponding work order After provide work order operation, work order state can be that the work order that do not provide is changed into work order state and provided by this operation, and It is carried out generating automatically according to the storage information of work order mould material requirement submodule in the block and proposes material billboard operation, material requirement meeting As the output of this operation, storage, which enters, sees plate module.
Work order module is provided with work order enquiry module, is provided with to show account affiliated function in work order enquiry module Door module, teams and groups' module to fill in teams and groups, the overhauling project module numbered to entry item, filling in row number Row module, the module to fill in number, the process module to fill in process, filling in the production number of production number Module, the work order block of state to fill in work order state, the maintenance mode module to fill in maintenance mode, filling in work The technique notice odd numbers module of skill notice odd numbers, the work order number module to fill in work order number, filling in work order type Work order type block, the maintenance level module to fill in maintenance level, to fill in production WBS production WBS modules, To fill in dismounting dismounting/installation module of installation requirement, the Start Date module to fill in early start date, filling out Write the target date module of Late Finish Date, the maintenance sequence number module to fill in maintenance sequence number, filling in vehicle Model module, the maintenance objects module to fill in maintenance objects, to fill in design notice number design notice module, To fill in the confirmation block of state of acknowledgement state;All could fill out module is optional module, all modules in work order module Whether the content of each input module is needed to fill in be identified by R/O/C patterns, wherein R representatives have to fill out, and O is represented Optional to fill in, C is represented to be filled according to actual conditions selection;Also have to remove the removing mould of the above fill message in work order module Block and to start a query at and show the searching module of work order module bodies data;Work order main body shows that above-mentioned enquiry module is looked into The all of the work order gone out are stored in the memory module of work order table, it includes module it is as follows:Serial number, notice odd numbers, work order are compiled Number, work order explanation, design notice odd numbers, maintenance objects, traffic flag, position, working hour, COM code, production number, maintenance sequence Row number, practical row, practical, row, acknowledgement state, dismounting, installation, planned start time, planned end time, teams and groups, work Single type, project name, unit configuration, accesses title, production WBS, clearing WBS, work order report work state, makees in the industry station Whether appearance producing line, technique notice odd numbers, needs quality inspection, quality inspection state, maintenance mode, train coherence, train maintenance level, portion Door description, department, the practical time started, actual finish time, to fill in cancellation material requirement reason cancellation material requirement Reason, to fill in cancel work order reason cancellations reason, to fill in do not dismantle installation reason do not dismantle installation reason, temporary It hangs, be associated between notification sheet, report working hour, subsidiary factory's acknowledging time, manpower examine time, Time Of Release;The module bodies are additionally provided with To change the update maintenance objects module of maintenance objects production number, it is provided with and may choose whether change COM code Change COM code module can choose whether that alternation of signs production number module is compiled in change production, display work order raw material is compiled The raw material coding module of code, the new COM code module to fill in new COM code, display work order original overhaul sequence number Former maintenance sequence number module, the original production number module of display work order original production number newly overhaul the new of sequence number to fill in Maintenance sequence number module, filling in the new production number module of new production number;Work order main body further includes being dismantled to enter The dismounting of module, to enter installation module installation, to enter software version module software version, to enter complete The completion of module, the cancellation to enter cancellation module carry report to carry the working hour of report module into working hour.
Work order dismounting module includes dismounting execution module and two submodules of material requirement module, dismounting execution module note Recorded need dismantle material from resume module and notice single module in material requirement submodule stored with lower module Information:Position, service identification, COM code, sequence number, material description, route, figure number, warehouse, manufacturing firm, the production time, It has dismantled mark, take-down time, main body also includes that material can will be chosen to execute dismounting as what output was removed from resume The material of having dismantled chosen is reinstalled back the revocation of resume original position and currently dismantles module, will choose detachable object by module The resume initialization module that is modified of material sequence number and to print the Quick Response Code print module for choosing material to print Quick Response Code; Material requirement module information all from notice single module material requirement submodule memory module, including with lower module, object Expect coding, material explanation, unit, quantity required, stock locations, evaluation type, level of factory route, maintenance source, Quantity Shipped, library Deposit WBS, association notification sheet;Wherein quantity required is negative, and the material for enabling sequence number management can form dismounting execution row and show Show in above-mentioned work order dismantles module.
Work order attaching/detaching module includes installation two submodules of execution module and material requirement module, and installation executes Module has recorded the following module information that material requirement submodule is stored in notice single module for needing to install material:Position Set, service identification, COM code, material description, route, figure number, warehouse, mark, set-up time be installed, further include it is following must Modeling block, to fill in the spare part sequence number module of installation material sequence number, the component that journey is repaiied to fill in component repaiies journey module, To fill in the component wheel secondary module of component round, to fill in the repair time module of repair time, to fill in manufactory Manufacturing firm's module of family, to fill in the production time module of production time, wherein manufacturing firm's module and production time mould It if block can read value from the memory module of stock model, can be automatically entered as default value, further include according to reality Situation fill in filling in the wheel footpath value module of wheel footpath value;Work order attaching/detaching mould all modules in the block pass through R/O/C moulds Whether formula needs to fill in be identified to the content of each input module, wherein R representative have to fill out, O represent it is optional fill in, C It represents and is filled according to actual conditions selection, work order attaching/detaching module also includes that material can will be chosen to be installed to as output The revocation that material is dismantled again of having installed chosen is currently installed on module by the installation execution module of resume module corresponding position; Material requirement module information all from notice single module material requirement submodule memory module, including with lower module, object Expect coding, material explanation, unit, quantity required, stock locations, evaluation type, level of factory route, maintenance source, Quantity Shipped, library Deposit WBS, association notification sheet;Wherein quantity required is positive number, and the material for enabling sequence number management can form installation execution row and show Show in above-mentioned work order attaching/detaching module.
Working hour carries report and is triggered by completion module with approval module, using the working hour module of regular inspection work order as output when triggering, The working hour module output that could fill out of even inspection work order is entered into even inspection working hour confirmation module, it is even to examine working hour confirmation module main body and work Single module is identical, but continues without work order module to trigger the input/output module of other modules, and different according to door module value Can have more subsidiary factory approval, subsidiary factory retract or manpower approval, manpower retract module, when occasionally inspection work order triggering working hour carry report module when, It exports result and arrives first at the submodule for being provided with that subsidiary factory ratifies and subsidiary factory retracts, and subsidiary factory's approval module can continue result defeated Go out enter next module, and subsidiary factory retract then can will output result return work order module, subsidiary factory approval module result be inputted Ratify the submodule retracted with manpower to manpower is provided with, manpower approval can export working hour module identical to regular inspection work order working hour Port, and manpower is retracted, and can be returned to result and is provided with the submodule that subsidiary factory's approval is retracted with subsidiary factory.
Work order completes module by operation triggering of completing, and when triggering first judges the work of dismounting/installation module of work order main body Make state, if installed in execution module without dismounting/installation module or all dismountings/dismounting of installation module executes/dismantled/ Module is installed all by judgement, then completes and operates successfully, data upload server;If dismounting/installation module does not pass through judgement But the installation reason module of not dismantling of work order main body has been filled in, and completion operation can also succeed and data upload server.
Work order cancels module and first judges that the cancellation material requirement of work order main body is former by cancelling work order operation triggering, when triggering Because of module and cancel whether reason module fills in, whether can be continued to execute in this access by being triggered after judgement to fill in Selection cancel mark module, after operate successfully data upload server and by cancel mark as export write-back notice single module.
Transit Equipment Intelligent Maintenance management method is operated according to the sequence of each module, is arranged first by repair schedule The lookup submodule of journey module finds the work order for needing to provide, and then passes through assembly line and safeguards and change teams and groups' submodule progress The maintenance of work order teams and groups provides module finally by work order and by work order granting and generates the output of material billboard as a result, at this time Work order module can be entered, need the work order that operates by inquiring submodule and find, by change maintenance objects submodule into The maintenance of row maintenance objects carries out dismounting installation behaviour then according to the dismounting installation requirements of work order by dismounting/installation submodule Make, trigger completion module finally by completion puies forward report approval module with working hour, generates output result upload server, or pass through Cancel triggering and cancel module, corresponding work order is cancelled, generates output result and return to notice single module.
Compared with prior art, the present invention what is obtained has the beneficial effect that:
1, it is support with information-based means, it is established that cover the rail traffic inspection of product life cycels, overall process Operation business system is repaiied, high degree of automation can realize management and the record of more fining and full name simultaneously;It improves Transit Equipment maintenance executes the efficiency and quality of management, can continuously be recorded to Transit Equipment record of examination, Continuity is good,
2, it can realize the management of configuration and critical component, service information can be recorded in every procedure by field worker, In synchronized update to train resume, realize that the maintenance of real-time synchronization and fining executes management, to the safety in maintenance process Can, problem is traced, component track, life-span management, cost control etc. can be played and be obviously improved, and in maintenance later system One update, and timely and effectively electronic document is formed, convenient for management and consult.
3, critical component in complex device maintenance process can be tracked and be recorded according to the record of practical operation, And real-time update management can be carried out to configuration resume, realize that the working procedure level of material requirement don't bother about reason, and realize process GradeNDivision, while realizing the fine-grained management of people and object.
4, its Design of Main Structure is skillfully constructed, safe and convenient to use, greatly improves the efficiency of management, and convenient for dimension Shield and record, application environment is friendly, wide market.
Description of the drawings:
Fig. 1 is the lookup submodule of repair schedule arranging module of the present invention.
Fig. 2 is that the assembly line of repair schedule arranging module of the present invention safeguards submodule.
Fig. 3 is repair schedule arranging module main body of the present invention.
Fig. 4 is the detailed submodule of work order of repair schedule arranging module of the present invention.
Fig. 5 is work order module bodies of the present invention.
Fig. 6 is that work order of the present invention dismantles module.
Fig. 7 is that work order of the present invention installs module.
Fig. 8 is the change maintenance objects submodule of work order of the present invention.
Fig. 9 is repair schedule scheduling flow chart of the present invention.
Figure 10 is maintenance work order execution flow chart of the present invention.
Figure 11 is maintenance work order of the present invention completion flow chart.
Figure 12 is that maintenance work order of the present invention cancels flow chart.
Specific implementation mode:
The invention will be further described by way of example and in conjunction with the accompanying drawings.
Embodiment 1
In a kind of Transit Equipment Intelligent Maintenance management method example that the present embodiment is related to, according to the suitable of each module Sequence operates, and finds the work order for needing to provide by the lookup submodule of repair schedule arranging module first, then passes through assembly line The maintenance that teams and groups' submodule carries out work order teams and groups is safeguarded and changed, module is provided by work order granting and life finally by work order At the output of material billboard as a result, work order module can be entered at this time, the work order that operates is needed by inquiring submodule and find, Repair the maintenance of object by changing maintenance objects submodule, then according to the dismounting installation requirements of work order, by dismounting/ Installation submodule carries out dismounting installation operation, and trigger completion module finally by completion puies forward report approval module with working hour, generates defeated Go out result upload server, or cancel module by cancelling triggering, corresponding work order is cancelled, generates output result and return to notice Single module.
When in use, concrete operations mode carries out the work order module that the present embodiment is related in accordance with the following steps:
Repair schedule arranging module by enquiry module according to overhauling project, department, row only, rise only, meter Draw the time started from, planned start time only, planned end time rise, planned end time only, work order state, work order number, Partial query condition in maintenance mode, maintenance notification sheet, maintenance level finds corresponding overhaul process, chooses what needs executed Process row, completes assembly line and safeguards, teams and groups are changed after choosing again and are safeguarded, work order are finally provided, by field worker according to work order Service information is recorded to every procedure;
Maintenance work order execute interface by teams and groups in enquiry module, overhauling project, row, process, production number, Work order state, maintenance mode, technique notice odd numbers, work order number, work order type, maintenance level, production WBS, dismounting/installation, The partial condition progress of Start Date, target date, maintenance sequence number, vehicle, maintenance objects, design notice number, acknowledgement state Inquiry, operated according to the work order inquired, if the maintenance objects inaccuracy of work order can use update maintenance objects for The work order chosen is updated, if maintenance objects are consistent, judges whether work order executes dismounting/installation:Execute the work of dismounting After single-click dismounting, check whether disassembly sequence number consistent with physical unit at work order dismounting interface, it is inconsistent, it chooses Dismounting row clicks resume initialization, is updated to sequence number, and dismounting row is chosen after update and is dismantled, if dismounting mistake, It can then choose dismounting row to click the current dismounting of revocation, be dismantled again after changing component information, for needing to print Quick Response Code Component can be printed by Quick Response Code and be realized;After the work order click installation for executing installation, the basis in work order attaching/detaching module Actual installation component information select corresponding sequence number, fill in component repair journey, component round, the repair time, manufacturing firm, production when Between, it then chooses installation row and is installed, if setup error, installation row can be chosen to click revocation and be currently installed on, again It is installed after selection sequence number, for executing the work order of software version, confirms software in the software version function in work order Edition upgrading.
When in use, concrete operations mode carries out the work order completion module that the present embodiment is related in accordance with the following steps:
When clicking completion button, the working condition of dismounting/installation module of work order main body is judged, if without dismounting/installation mould Block or all dismountings/dismounting of installation module executes/install in execution module dismantled/installed module all by judge, It then completes and operates successfully, data upload server;If dismounting/installation module is not by judging but work order main body does not dismantle installation Reason module has been filled in, and completion operation can also succeed and data upload server.
The working hour that the present embodiment is related to puies forward report and approval module when in use, concrete operations mode in accordance with the following steps into Row:
The working hour of regular inspection work order is fixed, in work order complete working hour, the working hour synchronism output of regular inspection work order, even inspection work order Working hour is that can fill out item, is correctly filled according to actually used working hour, work order complete working hour, and it is to put forward report state in working hour that working hour dress state, which synchronizes, When occasionally inspection work order triggering working hour puies forward report module, output result, which arrives first at, is provided with the submodule that subsidiary factory's approval is retracted with subsidiary factory Block, subsidiary factory's approval module can continue to output result into next module, and subsidiary factory retracts then can output result be returned to work Single module, result is input to by subsidiary factory's approval module is provided with the submodule that manpower approval is retracted with manpower, and manpower approval can will Working hour module exports port identical to regular inspection work order working hour, and manpower is retracted, can by result return be provided with subsidiary factory approval with The submodule that subsidiary factory retracts.
The work order that the present embodiment is related to cancels module when in use, and concrete operations mode carries out in accordance with the following steps:
The work order for needing to cancel first is chosen, is filled in and is cancelled material requirement reason, cancels reason, the cancellation in click tools column Material requirement, when triggering, first judge whether the cancellation material requirement reason module of work order main body fills in, after the completion, click tools column In cancellation work order, when triggering first judges whether the cancellation reason module of work order main body fills in, by being triggered after judgement filling out It writes and whether in this selection that can continue to execute of access cancels mark module, data upload server and by cancellation after operate successfully Mark notifies single module as output write-back.
Transit Equipment Intelligent Maintenance management method described in embodiment realized by following device, the dress The agent structure set includes:Login interface module, data memory module, input module, output module, repair schedule scheduling mould Block, work order module, work order attaching/detaching module, working hour put forward report and approval module, work order completion module, cancel work order module;Institute It includes Account Logon interface to state login interface module, and Account Logon can be realized by the interface, can be to maintenance after logging in Plan scheduling module, work order module, work order attaching/detaching module, working hour propose report and approval module, work order completion module and cancellation Work order module is operated;Data memory module to store the data of the formats such as value list data, watch data, fast code data, Conveniently directly invoke;The modes such as input module support is manually entered, equipment input, batch Excel file are imported are into line number According to input;Output data can be shown or be transmitted to downstream module by the output module;
Repair schedule arranging module includes searching plan sub-module, change teams and groups' submodule and granting work order submodule, Middle lookup plan sub-module is input module, is sequence operation module with change teams and groups' submodule and granting work order submodule, The operation of repair schedule arranging module is completed in the operation for being sequentially completed above three module.
It searches and is provided with to input the overhauling project module of overhauling project number in plan sub-module, showing account The door module of affiliated function, to input arranged arranged module, stop module to input the row of row only, risen to input Rise module, to input only module only, inputting the planned start time of earliest planned start time from mould Block, to input the planned start time of planned start time the latest to module, inputting the meter of earliest plan end time Draw the end time from module, to input the planned end time of planned end time the latest to module, inputting work order shape The work order block of state of state, the work order number module to input work order number, inputting the maintenance mode mould of maintenance mode Block notifies single module, the maintenance level module to input maintenance level, removing to input the maintenance of maintenance notification sheet The removing module of all input informations and to enter next submodule searching module;Wherein all input modules are optional Whether module, all modules searched in plan sub-module need to fill in by R/O/C patterns to the content of each input module Be identified, wherein R representative have to fill out, O represent it is optional fill in, C represent according to actual conditions selection fills in, when enter it is next When submodule, output data is to meet all work forms datas for filling in rear module contents, is not filled in when fully entering module And when entering next submodule, the whole work forms datas of acquiescence output.
It is provided with assembly line maintenance module in change teams and groups submodule, the module is safeguarding that assembly line, assembly line are safeguarded Module has correspondence, a teams and groups that can correspond to multiple assembly lines in a storage module with teams and groups' submodule, but same The same procedure of assembly line only corresponds to a teams and groups, and the following information mould of technique network is provided in repair schedule arranging module Block:Project number module accesses name module, row number module, number module, door module, network numbering module, network name Module, end position module and producing line module, memory module of the content from technique network, technique network can regard certain dimension as The set of the lower process of degree is additionally provided with to fill in the pipeline module of assembly line in the module, the module be must mold filling block, fill out Complete assembly line attended operation after writing, can change teams and groups' operation in technique network, change teams and groups module theme remove comprising Outside the module that above-mentioned assembly line maintenance module is included, the module of also following technique network internal storage storage, describing module, plan are opened Beginning date module, planned start time module, plan Close Date module, planned end time module, remarks module, monthly meter Scratch beginning date module, monthly plan time started module, monthly plan target date module, monthly plan deadline mould Whether block changes teams and groups' mark module;Further include having positive row's module, the row's of falling two modules of module, is arranged to the date according to schedule Sequence checks technique network, and positive row's module checks that sequence is that the more early sequence of scheduled start date is more forward, arranges checking for module Sequence is more forward for the more late sequence of plan Close Date;The network of needs is chosen, can be carried out after completing the operation of change teams and groups Next module, that is, provide the operation of work order submodule, this operation can be adjusted the corresponding teams and groups of technique network.
The interface subject for providing work order submodule shows that dimension is received text code, can be understood as lower stroke of technique network Divide thinner process set, is the smallest dimension of technique network, which includes the module of following received text code storage, Project number, access number, access title, row number, number, department, end position, producing line, received text code, received text code retouch State, scheduled start date, planned start time, the plan Close Date, planned end time, choosing corresponding network, to enter work order detailed Thin module is provided with the following information chosen and stored in the work order that network includes, work order number, work order explanation, project Number, row number, number, department, teams and groups, end position, scheduled start date, planned start time, plan the Close Date, plan terminate Time, maintenance objects, platform position, technique notice odd numbers, producing line, work order type, maintenance mode, state, working hour, access number, visit Ask title, monthly plan Start Date, monthly plan time started, monthly plan target date, monthly plan deadline, hair State, error message are put, Time Of Release is executed, the practical time started, actual finish time, cancels reason;Choose corresponding work order After provide work order operation, work order state can be that the work order that do not provide is changed into work order state and provided by this operation, and It is carried out generating automatically according to the storage information of work order mould material requirement submodule in the block and proposes material billboard operation, material requirement meeting As the output of this operation, storage, which enters, sees plate module.
Work order module is provided with work order enquiry module, is provided with to show account affiliated function in work order enquiry module Door module, teams and groups' module to fill in teams and groups, the overhauling project module numbered to entry item, filling in row number Row module, the module to fill in number, the process module to fill in process, filling in the production number of production number Module, the work order block of state to fill in work order state, the maintenance mode module to fill in maintenance mode, filling in work The technique notice odd numbers module of skill notice odd numbers, the work order number module to fill in work order number, filling in work order type Work order type block, the maintenance level module to fill in maintenance level, to fill in production WBS production WBS modules, To fill in dismounting dismounting/installation module of installation requirement, the Start Date module to fill in early start date, filling out Write the target date module of Late Finish Date, the maintenance sequence number module to fill in maintenance sequence number, filling in vehicle Model module, the maintenance objects module to fill in maintenance objects, to fill in design notice number design notice module, To fill in the confirmation block of state of acknowledgement state;All could fill out module is optional module, all modules in work order module Whether the content of each input module is needed to fill in be identified by R/O/C patterns, wherein R representatives have to fill out, and O is represented Optional to fill in, C is represented to be filled according to actual conditions selection;Also have to remove the removing mould of the above fill message in work order module Block and to start a query at and show the searching module of work order module bodies data;Work order main body shows that above-mentioned enquiry module is looked into The all of the work order gone out are stored in the memory module of work order table, it includes module it is as follows:Serial number, notice odd numbers, work order are compiled Number, work order explanation, design notice odd numbers, maintenance objects, traffic flag, position, working hour, COM code, production number, maintenance sequence Row number, practical row, practical, row, acknowledgement state, dismounting, installation, planned start time, planned end time, teams and groups, work Single type, project name, unit configuration, accesses title, production WBS, clearing WBS, work order report work state, makees in the industry station Whether appearance producing line, technique notice odd numbers, needs quality inspection, quality inspection state, maintenance mode, train coherence, train maintenance level, portion Door description, department, the practical time started, actual finish time, to fill in cancellation material requirement reason cancellation material requirement Reason, to fill in cancel work order reason cancellations reason, to fill in do not dismantle installation reason do not dismantle installation reason, temporary It hangs, be associated between notification sheet, report working hour, subsidiary factory's acknowledging time, manpower examine time, Time Of Release;The module bodies are additionally provided with To change the update maintenance objects module of maintenance objects production number, it is provided with and may choose whether change COM code Change COM code module can choose whether that alternation of signs production number module is compiled in change production, display work order raw material is compiled The raw material coding module of code, the new COM code module to fill in new COM code, display work order original overhaul sequence number Former maintenance sequence number module, the original production number module of display work order original production number newly overhaul the new of sequence number to fill in Maintenance sequence number module, filling in the new production number module of new production number;Work order main body further includes being dismantled to enter The dismounting of module, to enter installation module installation, to enter software version module software version, to enter complete The completion of module, the cancellation to enter cancellation module carry report to carry the working hour of report module into working hour.
Work order dismounting module includes dismounting execution module and two submodules of material requirement module, dismounting execution module note Recorded need dismantle material from resume module and notice single module in material requirement submodule stored with lower module Information:Position, service identification, COM code, sequence number, material description, route, figure number, warehouse, manufacturing firm, the production time, It has dismantled mark, take-down time, main body also includes that material can will be chosen to execute dismounting as what output was removed from resume The material of having dismantled chosen is reinstalled back the revocation of resume original position and currently dismantles module, will choose detachable object by module The resume initialization module that is modified of material sequence number and to print the Quick Response Code print module for choosing material to print Quick Response Code; Material requirement module information all from notice single module material requirement submodule memory module, including with lower module, object Expect coding, material explanation, unit, quantity required, stock locations, evaluation type, level of factory route, maintenance source, Quantity Shipped, library Deposit WBS, association notification sheet;Wherein quantity required is negative, and the material for enabling sequence number management can form dismounting execution row and show Show in above-mentioned work order dismantles module.
Work order attaching/detaching module includes installation two submodules of execution module and material requirement module, and installation executes Module has recorded the following module information that material requirement submodule is stored in notice single module for needing to install material:Position Set, service identification, COM code, material description, route, figure number, warehouse, mark, set-up time be installed, further include it is following must Modeling block, to fill in the spare part sequence number module of installation material sequence number, the component that journey is repaiied to fill in component repaiies journey module, To fill in the component wheel secondary module of component round, to fill in the repair time module of repair time, to fill in manufactory Manufacturing firm's module of family, to fill in the production time module of production time, wherein manufacturing firm's module and production time mould It if block can read value from the memory module of stock model, can be automatically entered as default value, further include according to reality Situation fill in filling in the wheel footpath value module of wheel footpath value;Work order attaching/detaching mould all modules in the block pass through R/O/C moulds Whether formula needs to fill in be identified to the content of each input module, wherein R representative have to fill out, O represent it is optional fill in, C It represents and is filled according to actual conditions selection, work order attaching/detaching module also includes that material can will be chosen to be installed to as output The revocation that material is dismantled again of having installed chosen is currently installed on module by the installation execution module of resume module corresponding position; Material requirement module information all from notice single module material requirement submodule memory module, including with lower module, object Expect coding, material explanation, unit, quantity required, stock locations, evaluation type, level of factory route, maintenance source, Quantity Shipped, library Deposit WBS, association notification sheet;Wherein quantity required is positive number, and the material for enabling sequence number management can form installation execution row and show Show in above-mentioned work order attaching/detaching module.
Working hour carries report and is triggered by completion module with approval module, using the working hour module of regular inspection work order as output when triggering, The working hour module output that could fill out of even inspection work order is entered into even inspection working hour confirmation module, it is even to examine working hour confirmation module main body and work Single module is identical, but continues without work order module to trigger the input/output module of other modules, and different according to door module value Can have more subsidiary factory approval, subsidiary factory retract or manpower approval, manpower retract module, when occasionally inspection work order triggering working hour carry report module when, It exports result and arrives first at the submodule for being provided with that subsidiary factory ratifies and subsidiary factory retracts, and subsidiary factory's approval module can continue result defeated Go out enter next module, and subsidiary factory retract then can will output result return work order module, subsidiary factory approval module result be inputted Ratify the submodule retracted with manpower to manpower is provided with, manpower approval can export working hour module identical to regular inspection work order working hour Port, and manpower is retracted, and can be returned to result and is provided with the submodule that subsidiary factory's approval is retracted with subsidiary factory.
Work order completes module by operation triggering of completing, and when triggering first judges the work of dismounting/installation module of work order main body Make state, if installed in execution module without dismounting/installation module or all dismountings/dismounting of installation module executes/dismantled/ Module is installed all by judgement, then completes and operates successfully, data upload server;If dismounting/installation module does not pass through judgement But the installation reason module of not dismantling of work order main body has been filled in, and completion operation can also succeed and data upload server.
Work order cancels module and first judges that the cancellation material requirement of work order main body is former by cancelling work order operation triggering, when triggering Because of module and cancel whether reason module fills in, whether can be continued to execute in this access by being triggered after judgement to fill in Selection cancel mark module, after operate successfully data upload server and by cancel mark as export write-back notice single module.

Claims (10)

1. a kind of Transit Equipment Intelligent Maintenance management method, it is characterised in that this method is realized by following device, is somebody's turn to do The agent structure of device includes:Login interface module, data memory module, input module, output module, repair schedule scheduling mould Block, work order module, work order attaching/detaching module, working hour put forward report and approval module, work order completion module, cancel work order module;Institute It includes Account Logon interface to state login interface module, and Account Logon can be realized by the interface, can be to maintenance after logging in Plan scheduling module, work order module, work order attaching/detaching module, working hour propose report and approval module, work order completion module and cancellation Work order module is operated;Data memory module to store the data of the formats such as value list data, watch data, fast code data, Conveniently directly invoke;The modes such as input module support is manually entered, equipment input, batch Excel file are imported are into line number According to input;Output data can be shown or be transmitted to downstream module by the output module;Repair schedule arranging module includes It searches plan sub-module, change teams and groups' submodule and provides work order submodule, wherein it is input module to search plan sub-module, It is sequence operation module with change teams and groups' submodule and granting work order submodule, the operation for being sequentially completed above three module is i.e. complete At the operation of repair schedule arranging module;
It searches and is provided with to input the overhauling project module of overhauling project number in plan sub-module, showing belonging to account The door module of department, to input arranged arranged module, stop module, to input the row of row only inputting risen Rise module, to input only module only, to input the planned start time of earliest planned start time from module, use Planned start time to input planned start time the latest terminates to module, to input the plan of earliest plan end time Time from module, to input the planned end time of planned end time the latest to module, inputting the work of work order state Single block of state, the work order number module to input work order number, the maintenance mode module to input maintenance mode, to The maintenance of input maintenance notification sheet notifies single module, the maintenance level module to input maintenance level, all defeated to remove Enter the removing module of information and to enter the searching module of next submodule;Wherein all input modules are optional module, Whether all modules searched in plan sub-module need to fill in into rower by R/O/C patterns to the content of each input module Know, wherein R representative have to fill out, O represent it is optional fill in, C represent according to actual conditions selection fills in, when enter next submodule When, output data is to meet all work forms datas for filling in rear module contents, does not fill in and enters when fully entering module When next submodule, the whole work forms datas of acquiescence output;
It is provided with assembly line maintenance module in change teams and groups submodule, the module is safeguarding assembly line, assembly line maintenance module There is correspondence in a storage module with teams and groups submodules, a teams and groups can correspond to multiple assembly lines, but the same flowing water The same procedure of line only corresponds to a teams and groups, and the following information module of technique network is provided in repair schedule arranging module: Project number module accesses name module, row number module, number module, door module, network numbering module, network name mould Block, end position module and producing line module, memory module of the content from technique network, technique network can regard certain dimension as The set of lower process is additionally provided with to fill in the pipeline module of assembly line in the module, the module be must mold filling block, fill in Assembly line attended operation is completed afterwards, teams and groups' operation can be changed in technique network, and change teams and groups module theme is removed comprising upper It states outside the module that assembly line maintenance module is included, the module of also following technique network internal storage storage, describing module, plan start Date module, planned start time module, plan Close Date module, planned end time module, remarks module, monthly plan Start Date module, monthly plan time started module, monthly plan target date module, monthly plan deadline module, Whether teams and groups mark module is changed;Further include having positive row's module, the row's of falling two modules of module, is looked into the sequence of date according to schedule See technique network, positive row's module checks that sequence is that the more early sequence of scheduled start date is more forward, arranges checking sequentially for module It is more forward for the more late sequence of plan Close Date;The network of needs is chosen, completes to can be carried out after change teams and groups operate next A module, that is, provide the operation of work order submodule, this operation can be adjusted the corresponding teams and groups of technique network.
2. a kind of Transit Equipment Intelligent Maintenance management method according to claim 1, it is characterised in that:Provide work The interface subject of form sub-module shows that dimension is received text code, can be understood as dividing thinner process collection under technique network It closes, is the smallest dimension of technique network, which includes the module of following received text code storage, project number, access Number, access title, row number, number, department, end position, producing line, received text code, received text code description, plan start day Phase, planned start time, plan Close Date, planned end time, choose corresponding network and enter the detailed module of work order, wherein setting Be equipped with the following information stored in the work order that chosen network includes, work order number, work order explanation, project number, row number, Number, department, teams and groups, end position, scheduled start date, planned start time, plan the Close Date, planned end time, repair pair As, platform position, technique notice odd numbers, producing line, work order type, maintenance mode, state, working hour, access number, access title, monthly Scheduled start date, the monthly plan target date, the monthly plan deadline, provides state, mistake at the monthly plan time started Message executes Time Of Release, the practical time started, actual finish time, cancels reason;Granting work is carried out after choosing corresponding work order Work order state can be that the work order that do not provide is changed into work order state and provided by single operation, this operation, and according to work order module In the storage information of material requirement submodule carry out generating automatically and propose material billboard operation, material requirement can be used as this operation Output, storage, which enters, sees plate module.
3. a kind of Transit Equipment Intelligent Maintenance management method according to claim 1, it is characterised in that:Work order mould Block is provided with work order enquiry module, be provided with to show in work order enquiry module the door module of account affiliated function, to Fill in teams and groups' module of teams and groups, the overhauling project module numbered to entry item, the row module to fill in row number, filling out The module write number, the process module to fill in process, the production number module to fill in production number, filling in The work order block of state of work order state, the maintenance mode module to fill in maintenance mode notify odd numbers to fill in technique Technique notice odd numbers module, the work order number module to fill in work order number, filling in the work order class pattern of work order type Block, the maintenance level module to fill in maintenance level, to fill in production WBS production WBS modules, to fill in dismounting peace The dismounting of reload request/installation module, the Start Date module to fill in early start date, filling in Late Finish Date Target date module, to fill in the maintenance maintenance sequence number module of sequence number, the model module to fill in vehicle, to Fill in the maintenance objects module of maintenance objects, the design notice module to fill in design notice number, filling in confirmation shape The confirmation block of state of state;Module all be could fill out as optional module, all modules pass through R/O/C patterns pair in work order module Whether the content of each input module, which needs to fill in, is identified, wherein R representative have to fill out, O represent it is optional fill in, C represent It is filled according to actual conditions selection;Also have to remove the removing module of the above fill message and to start in work order module Inquire and show the searching module of work order module bodies data;Work order main body shows all of the work order that above-mentioned enquiry module is found Be stored in the memory module of work order table, it includes module it is as follows:Serial number, work order number, work order explanation, is set notice odd numbers It counts and odd numbers, maintenance objects, traffic flag, position, working hour, COM code, production number, maintenance sequence number, reality is notified to arrange, is real Border, row, acknowledgement state, dismounting, installation, planned start time, planned end time, teams and groups, work order type, station, item Mesh title, unit configuration access title, production WBS, clearing WBS, work order report work state, job content, producing line, technique notice Whether odd numbers needs quality inspection, quality inspection state, maintenance mode, train coherence, train maintenance level, department's description, department, reality Time started, actual finish time, to fill in cancel material requirement reason cancellation material requirement reason, to fill in cancel The cancellation reason of work order reason, to fill in do not dismantle installation reason do not dismantle installation reason, it is pending, association notification sheet, report Between working hour, subsidiary factory's acknowledging time, manpower examination & approval the time, Time Of Release;The module bodies are additionally provided with to change maintenance objects The update maintenance objects module for producing number is provided with the change COM code mould that may choose whether change COM code Block can choose whether the raw material coding that change production compiles alternation of signs production number module, shows work order raw material coding The former maintenance sequence number mod of module, the new COM code module to fill in new COM code, display work order original maintenance sequence number Block, display work order original production number original production number module, to fill in newly overhaul sequence number new maintenance sequence number module, To fill in the new production number module of new production number;Work order main body further include to enter dismounting module dismounting, to Into installation module installation, to enter software version module software version, to enter completion module completion, to Report is carried into the cancellation of cancellation module, to carry the working hour of report module into working hour.
4. a kind of Transit Equipment Intelligent Maintenance management method according to claim 3, it is characterised in that:Work order is torn open It includes dismounting execution module and two submodules of material requirement module to unload module, and dismounting execution module, which has recorded, to be needed to dismantle object The following module information that material requirement submodule is stored in resume module and notice single module of material:Position, business Mark, sequence number, material description, route, figure number, warehouse, manufacturing firm, the production time, has dismantled mark, has torn open COM code It unloads the time, main body also includes that the execution that material is removed as output from resume can will be chosen to dismantle module, by what is chosen It has dismantled material and reinstalls back the revocation of resume original position and currently dismantled module, detachable material sequence number will be chosen to carry out more The resume initialization module that changes and to print the Quick Response Code print module for choosing material to print Quick Response Code;Material requirement module is believed The memory module all from notice single module material requirement submodule is ceased, including with lower module, COM code, material are said Bright, unit, quantity required, stock locations, evaluation type, level of factory route, maintenance source, Quantity Shipped, inventory WBS, association are logical Know list;Wherein quantity required is negative, and the material for enabling sequence number management can form dismounting execution row and be shown in above-mentioned work order It dismantles in module;Installation execution module, which has recorded, needs the material requirement submodule in notice single module of installation material to be deposited The following module information of storage:Mark, peace, COM code, material description, route, figure number, warehouse, have been installed at service identification in position ETL estimated time of loading further includes following essential module, to fill in the spare part sequence number module of installation material sequence number, to fill in component The component for repairing journey repaiies journey module, to fill in the component wheel secondary module of component round, to fill in the repair time of repair time Module, to fill in manufacturing firm's module of manufacturing firm, to fill in the production time module of production time, wherein manufactory If family's module can read value with production time module from the memory module of stock model, default value can be used as automatically defeated Enter, further include according to actual conditions fill in filling in the wheel footpath value module of wheel footpath value;Work order attaching/detaching mould institute in the block Have whether module needs to fill in be identified by R/O/C patterns to the content of each input module, wherein R representatives must fill out Write, O represent it is optional fill in, C represent according to actual conditions selection fills in, work order attaching/detaching module also include can will choose Material is installed to the installation execution module of resume module corresponding position as output, has installed what material was dismantled again by what is chosen Revocation is currently installed on module;Storage mould of the material requirement module information all from notice single module material requirement submodule Block, including with lower module, COM code, material explanation, unit, quantity required, stock locations, evaluation type, level of factory route, inspection Cultivate source, Quantity Shipped, inventory WBS, association notification sheet;Wherein quantity required is positive number, and enables the material of sequence number management Installation can be formed and execute capable be shown in above-mentioned work order attaching/detaching module.
5. a kind of Transit Equipment Intelligent Maintenance management method according to claim 1, it is characterised in that:Working hour carries Report is triggered with approval module by completion module, using the working hour module of regular inspection work order as exporting when triggering, by idol examine work order can The working hour module output filled in enters even inspection working hour confirmation module, and even working hour confirmation module main body of examining is identical as work order module, but No work order module continues to trigger the input/output module of other modules, and can have more subsidiary factory batch according to door module value difference Accurate, subsidiary factory retracts or module is retracted in manpower approval, manpower, and when occasionally inspection work order triggering working hour puies forward report module, output result is first It first reaches and is provided with the submodule that subsidiary factory's approval is retracted with subsidiary factory, subsidiary factory's approval module can continue to output result into next Module, and subsidiary factory retracts then can output result be returned to work order module, result is input to and is provided with manpower by subsidiary factory's approval module Working hour module can be exported port identical to regular inspection work order working hour by the submodule that approval is retracted with manpower, manpower approval, and people Power is retracted, and can be returned to result and is provided with the submodule that subsidiary factory's approval is retracted with subsidiary factory.
6. a kind of Transit Equipment Intelligent Maintenance management method according to claim 1, it is characterised in that:Work order is complete Work module first judges the working condition of dismounting/installation module of work order main body by operation triggering of completing, when triggering, if without tearing open It unloads/installs module or all dismountings/dismounting of installation module executes/install in execution module and dismantled/installed module whole By judgement, then completes and operate successfully, data upload server;If dismounting/installation module is not by judging but work order main body It does not dismantle installation reason module to have filled in, completion operation can also succeed and data upload server;Work order is cancelled module and is passed through Cancel work order operation triggering, when triggering first judges the cancellation material requirement reason module of work order main body and whether cancels reason module Fill in, whether cancel mark module in this selection that can continue to execute of access by being triggered after judgement to fill in, operation at After work(data upload server and by cancel identify as output write-back notify single module.
7. a kind of Transit Equipment Intelligent Maintenance management method according to any claim in claim 1-6, It is characterized in that:When in use, concrete operations mode carries out work order module in accordance with the following steps:
Repair schedule arranging module by enquiry module according to overhauling project, department, row only, rise only, plan open Begin the time from, planned start time only, planned end time rise, planned end time only, work order state, work order number, maintenance Partial query condition in mode, maintenance notification sheet, maintenance level finds corresponding overhaul process, chooses the process for needing to execute Row, completes assembly line and safeguards, teams and groups are changed after choosing again and are safeguarded, work order are finally provided, by field worker according to work order to every Procedure records service information;
Maintenance work order execute interface by teams and groups in enquiry module, overhauling project, row, process, production number, work order State, maintenance mode, technique notice odd numbers, work order number, work order type, maintenance level, production WBS, dismounting/installation, beginning Date, target date, maintenance sequence number, vehicle, maintenance objects, design notice number, the partial condition of acknowledgement state are inquired, It is operated according to the work order inquired, if the maintenance objects inaccuracy of work order can be with update maintenance objects for choosing Work order is updated, if maintenance objects are consistent, judges whether work order executes dismounting/installation:The work order for executing dismounting is clicked After dismounting, check whether disassembly sequence number consistent with physical unit at work order dismounting interface, it is inconsistent, choose dismounting row Resume initialization is clicked, sequence number is updated, dismounting row is chosen after update and is dismantled, it, can be with if dismounting mistake It chooses dismounting row to click the current dismounting of revocation, is dismantled again after changing component information, for needing the component for printing Quick Response Code can It is realized with being printed by Quick Response Code;After the work order click installation for executing installation, according to practical peace in work order attaching/detaching module It fills component information and selects corresponding sequence number, fill in component and repair journey, component round, repair time, manufacturing firm, production time, so After choose installation row installed, if setup error, can choose installation row click revocation be currently installed on, reselect sequence It is installed after row number, for executing the work order of software version, confirms software version liter in the software version function in work order Grade.
8. a kind of Transit Equipment Intelligent Maintenance management method according to any claim in claim 1 or 6, It is characterized in that:When in use, concrete operations mode carries out work order completion module of the present invention in accordance with the following steps:
When clicking completion button, judge the working condition of dismounting/installation module of work order main body, if without dismounting/installation module or All dismountings/dismounting of installation module executes/install in execution module dismantled/installed module all by judge, then it is complete Work operates successfully, data upload server;If dismounting/installation module is not by judging but work order main body does not dismantle installation reason Module has been filled in, and completion operation can also succeed and data upload server.
9. a kind of Transit Equipment Intelligent Maintenance management method according to any claim in claim 1 or 5, It is characterized in that:Working hour puies forward report and approval module when in use, and concrete operations mode carries out in accordance with the following steps:
The working hour of regular inspection work order is fixed, in work order complete working hour, the working hour synchronism output of regular inspection work order, and the even working hour for examining work order It for item can be filled out, is correctly filled according to actually used working hour, work order complete working hour, it is to put forward report state in working hour that working hour dress state, which synchronizes, works as idol When inspection work order triggering working hour puies forward report module, output result, which arrives first at, is provided with the submodule that subsidiary factory's approval is retracted with subsidiary factory, Subsidiary factory's approval module can continue to output result into next module, and subsidiary factory retracts then can output result be returned to work order mould Block, result is input to by subsidiary factory's approval module is provided with the submodule that manpower approval is retracted with manpower, and manpower approval can be by working hour Module exports port identical to regular inspection work order working hour, and manpower is retracted, and can return to result and be provided with subsidiary factory's approval and subsidiary factory The submodule retracted.
10. a kind of Transit Equipment Intelligent Maintenance management method according to claim 6, it is characterised in that:Work order Cancel module when in use, concrete operations mode carries out in accordance with the following steps:
The work order for needing to cancel first is chosen, is filled in and is cancelled material requirement reason, cancels reason, the cancellation material in click tools column Demand, when triggering, first judge whether the cancellation material requirement reason module of work order main body fills in, after the completion, in click tools column Cancel work order, when triggering first judges whether the cancellation reason module of work order main body fills in, and is by being triggered after judgement to fill in It is no to cancel mark module in this selection that continue to execute of access, data upload server and by cancellation mark after operate successfully Single module is notified as output write-back.
CN201810262076.XA 2018-03-28 2018-03-28 A kind of Transit Equipment Intelligent Maintenance management method Withdrawn CN108491939A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810262076.XA CN108491939A (en) 2018-03-28 2018-03-28 A kind of Transit Equipment Intelligent Maintenance management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810262076.XA CN108491939A (en) 2018-03-28 2018-03-28 A kind of Transit Equipment Intelligent Maintenance management method

Publications (1)

Publication Number Publication Date
CN108491939A true CN108491939A (en) 2018-09-04

Family

ID=63316897

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810262076.XA Withdrawn CN108491939A (en) 2018-03-28 2018-03-28 A kind of Transit Equipment Intelligent Maintenance management method

Country Status (1)

Country Link
CN (1) CN108491939A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110688125A (en) * 2019-08-28 2020-01-14 北京浪潮数据技术有限公司 Deployment method and system of big data platform
CN111091352A (en) * 2019-12-23 2020-05-01 青岛东方深蓝信息科技股份有限公司 High-end equipment manufacturing process data management system
CN111311099A (en) * 2020-02-18 2020-06-19 中车贵阳车辆有限公司 Railway wagon quality inspection information system
CN111709631A (en) * 2020-06-05 2020-09-25 航电建筑科技(深圳)有限公司 Property equipment maintenance work order auditing method
CN113407783A (en) * 2021-05-13 2021-09-17 中车太原机车车辆有限公司 Electric locomotive overhaul record management system
CN113642912A (en) * 2021-08-23 2021-11-12 重庆允成互联网科技有限公司 Method, system, equipment and storage medium for reporting labor and preventing mistake
CN114493065A (en) * 2020-11-11 2022-05-13 中核核电运行管理有限公司 Preventive maintenance work order batch triggering method based on grouping mode
CN115965362A (en) * 2023-03-16 2023-04-14 北京国信会视科技有限公司 Component disassembling method and device based on train maintenance
CN116167591A (en) * 2023-04-19 2023-05-26 北京国信会视科技有限公司 Scheduling method, system, equipment and medium based on process network
CN116681263A (en) * 2023-07-28 2023-09-01 国网湖北省电力有限公司超高压公司 Electric power data management method and system based on internal model market

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102117444A (en) * 2011-01-07 2011-07-06 北京三博中自科技有限公司 System for comprehensive arrangement and execution management of production equipment maintenance plan
CN102142112A (en) * 2010-02-03 2011-08-03 上海市电力公司 Data processing method for equipment overhauling cost
CN201974848U (en) * 2011-01-07 2011-09-14 北京三博中自科技有限公司 Management system for comprehensively arranging and executing maintenance plan of production equipment
CN104637021A (en) * 2013-11-08 2015-05-20 广州市地下铁道总公司 Condition-maintenance-mode city rail vehicle auxiliary maintenance system
CN106203640A (en) * 2016-07-06 2016-12-07 中车青岛四方机车车辆股份有限公司 A kind of O&M configuration management method and device based on EMU
CN106611398A (en) * 2015-10-27 2017-05-03 苏州华兴致远电子科技有限公司 Train overhaul operation monitoring method and system
CN107392531A (en) * 2017-07-06 2017-11-24 中铁第四勘察设计院集团有限公司 A kind of depot of urban railway transit vehicles maintenance logistics system simulation and method
CN107506860A (en) * 2017-08-25 2017-12-22 宁波灵云科技信息服务有限公司 System and implementation method are realized in lean production plan
CN107844907A (en) * 2017-11-08 2018-03-27 厦门市再丰运动器材有限公司 A kind of production schedule and the production management method for sending work examination progress

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102142112A (en) * 2010-02-03 2011-08-03 上海市电力公司 Data processing method for equipment overhauling cost
CN102117444A (en) * 2011-01-07 2011-07-06 北京三博中自科技有限公司 System for comprehensive arrangement and execution management of production equipment maintenance plan
CN201974848U (en) * 2011-01-07 2011-09-14 北京三博中自科技有限公司 Management system for comprehensively arranging and executing maintenance plan of production equipment
CN104637021A (en) * 2013-11-08 2015-05-20 广州市地下铁道总公司 Condition-maintenance-mode city rail vehicle auxiliary maintenance system
CN106611398A (en) * 2015-10-27 2017-05-03 苏州华兴致远电子科技有限公司 Train overhaul operation monitoring method and system
CN106203640A (en) * 2016-07-06 2016-12-07 中车青岛四方机车车辆股份有限公司 A kind of O&M configuration management method and device based on EMU
CN107392531A (en) * 2017-07-06 2017-11-24 中铁第四勘察设计院集团有限公司 A kind of depot of urban railway transit vehicles maintenance logistics system simulation and method
CN107506860A (en) * 2017-08-25 2017-12-22 宁波灵云科技信息服务有限公司 System and implementation method are realized in lean production plan
CN107844907A (en) * 2017-11-08 2018-03-27 厦门市再丰运动器材有限公司 A kind of production schedule and the production management method for sending work examination progress

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110688125A (en) * 2019-08-28 2020-01-14 北京浪潮数据技术有限公司 Deployment method and system of big data platform
CN111091352A (en) * 2019-12-23 2020-05-01 青岛东方深蓝信息科技股份有限公司 High-end equipment manufacturing process data management system
CN111311099A (en) * 2020-02-18 2020-06-19 中车贵阳车辆有限公司 Railway wagon quality inspection information system
CN111709631A (en) * 2020-06-05 2020-09-25 航电建筑科技(深圳)有限公司 Property equipment maintenance work order auditing method
CN114493065A (en) * 2020-11-11 2022-05-13 中核核电运行管理有限公司 Preventive maintenance work order batch triggering method based on grouping mode
CN113407783A (en) * 2021-05-13 2021-09-17 中车太原机车车辆有限公司 Electric locomotive overhaul record management system
CN113642912A (en) * 2021-08-23 2021-11-12 重庆允成互联网科技有限公司 Method, system, equipment and storage medium for reporting labor and preventing mistake
CN113642912B (en) * 2021-08-23 2024-05-28 重庆允丰科技有限公司 Method, system, equipment and storage medium for preventing work error
CN115965362A (en) * 2023-03-16 2023-04-14 北京国信会视科技有限公司 Component disassembling method and device based on train maintenance
CN116167591A (en) * 2023-04-19 2023-05-26 北京国信会视科技有限公司 Scheduling method, system, equipment and medium based on process network
CN116681263A (en) * 2023-07-28 2023-09-01 国网湖北省电力有限公司超高压公司 Electric power data management method and system based on internal model market
CN116681263B (en) * 2023-07-28 2023-11-07 国网湖北省电力有限公司超高压公司 Electric power data management method and system based on internal model market

Similar Documents

Publication Publication Date Title
CN108491939A (en) A kind of Transit Equipment Intelligent Maintenance management method
Sishi et al. Implementation of Industry 4.0 technologies in the mining industry-a case study
CN102509181B (en) Computer network system for enterprise purchasing management
CN101403964B (en) Integration type software configuration management method based on transaction management
US20140278712A1 (en) Asset tracking in asset intensive enterprises
CN111091352B (en) High-end equipment manufacturing industry process data management system
CN108460538A (en) A kind of operation of manned underwater vehicle with ensure Information Management System
CN107563627A (en) Workshop MES management methods and system based on bar codes technique
CN107292393A (en) A kind of portable maintenance aids system
CN109636156A (en) A kind of digital management system and method for multi-code unification
CN101727386A (en) Method for processing BUG in software procedure
CN102541022B (en) Intelligent road tunnel overhaul and management system based on Internet of things and three-dimensional (3D) geographic information system (GIS)
CN106203640A (en) A kind of O&M configuration management method and device based on EMU
CN113537720A (en) Full-line automatic tracking method for wide and thick plates
Du Construction of enterprises’ financial knowledge management system (EFKMS)
CN104065510A (en) PetriNet-based system operation and maintenance monitoring method and PetriNet-based system operation and maintenance monitoring system
Liu et al. Research and Application of Software-reuse
Clash et al. New York State’s Approach to Asset Management: A Case Study
CN110555218A (en) Production model update system, apparatus, method, and computer-readable medium
Jun et al. System architecture for closed-loop PLM
CN111160670A (en) Deep sea detection equipment disassembly, maintenance, assembly and debugging engineering execution method
Huang Design of Logistics Economic Management Measures System in the Era of Internet of Things
Golovatchev et al. Next Generation Plm-An Integrated Approach For The Development And Management Of The Product Service Systems In The Telecommunications Industry
Chengmeng An analysis of the cost of the application of ERP system
JP2002157360A (en) Information processor and network system and facility maintenance method and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20180904