CN108487245A - A kind of piling machine built a dam - Google Patents
A kind of piling machine built a dam Download PDFInfo
- Publication number
- CN108487245A CN108487245A CN201810367961.4A CN201810367961A CN108487245A CN 108487245 A CN108487245 A CN 108487245A CN 201810367961 A CN201810367961 A CN 201810367961A CN 108487245 A CN108487245 A CN 108487245A
- Authority
- CN
- China
- Prior art keywords
- piling machine
- pile
- connect
- pile monkey
- controlling device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/02—Placing by driving
- E02D7/06—Power-driven drivers
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
- E02D13/04—Guide devices; Guide frames
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
- E02D13/06—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers for observation while placing
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/02—Placing by driving
- E02D7/06—Power-driven drivers
- E02D7/14—Components for drivers inasmuch as not specially for a specific driver construction
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The present invention discloses a kind of piling machine built a dam, including piling machine ontology, pile frame, pile monkey and intelligent controlling device, the intelligent controlling device is located on piling machine ontology, the piling machine ontology is connect with pile frame, the pile frame is connect by angle regulator with pile monkey, the pile monkey is connect with metallic plate, the end of the pile monkey is provided with velocity sensor and supersonic generator, the velocity sensor and supersonic generator are connect with intelligent controlling device, and the intelligent controlling device is connect by second switch with power supply.The piling machine can calculate the angle of inclination of influence data of the water impact to piling and corresponding piling, so as to by the accurate injection stratum of metallic plate, prevent flow from flowing, to achieve the purpose that flood fighting.
Description
Technical field
The present invention relates to a kind of machine, especially a kind of piling machine built a dam.
Background technology
In various natural calamities, flood is most common and endangers maximum one kind again.The flood frequency of occurrences is high, involves model
It encloses extensively, breaks with tremendous force, it is destructive very big.Flood not only floods house and population, causes a tremendous loss of lives, but also sweeps away people
The all goods of the place of residence, including grain are produced, and flood farmland, crop is damaged, leads to the grain significantly underproduction, to cause famine
It is waste.Flood can also destroy industrial building, communication and means of transportation, to cause the destruction to national economy.Since this century, generation
Nearly 40 catastrophic flood damages occurred once for various countries of boundary, resulted in the death of people up to ten thousand and the mistake of wandering about as a refugee of " millions of people every time
Institute.In recent decades, the frequency occurs for flood and casualty loss is all increasing year by year.The best approach of our flood fightings is exactly to build
Dam, in the case of most of, we are built a dam with sand hill, but the sand hill being packed together still be easy to it is rapid
Flow washed away because very insecure.
Invention content
It is an object of the invention to overcome problem above of the existing technology, a kind of piling machine built a dam, this dozen are provided
Stake machine can calculate the angle of inclination of influence data of the water impact to piling and corresponding piling, so as to which metallic plate is accurate
True injection stratum prevents flow from flowing, to achieve the purpose that flood fighting.
A kind of piling machine built a dam, including piling machine ontology, pile frame, pile monkey and intelligent controlling device, the intelligent control
Device is located on piling machine ontology, and the piling machine ontology is connect with pile frame, and the pile frame passes through angle regulator and pile monkey
Connection, the pile monkey are connect with metallic plate, and the end of the pile monkey is provided with velocity sensor and supersonic generator, the speed
Degree sensor and supersonic generator are connect with intelligent controlling device, and the intelligent controlling device is connected by second switch and power supply
It connects, the power supply is located on piling machine ontology, and the intelligent controlling device is connect with the second driving motor, the second driving electricity
Machine is connect with angle regulator, controls the angle of inclination of pile monkey, the piling machine ontology is connect with the first driving motor, described
First driving motor is connect by first switch with power supply, and first driving motor is connect with pile frame, control pile frame movement, will
Pile monkey is placed into water, and situation in water, the pile monkey and third driving electricity are measured convenient for velocity sensor and supersonic generator
Machine connects, and the third driving motor is switched by third and connect with power supply.
Further, the angle regulator includes the first guide rod and the second guide rod, and first guide rod controls X-direction
Movement, the movement of second guide rod control Y-direction, first guide rod and the second guide rod form leading truck, to control
The direction of pile monkey makes stake according to the accurate injection stratum of design orientation to control the direction of piling.
Further, the pile monkey is connect by clip and/or sucker with metallic plate.
Further, the intelligent controlling device includes calculating analysis circuit plate and control circuit board, the velocity pick-up
Device and supersonic generator are connect with analysis circuit plate is calculated, and the calculating analysis circuit plate is connect with control circuit board, described
Control circuit board is connect with the second driving motor.
Further, the velocity sensor measures water velocity distribution, and the supersonic generator measures water-bed dynamic
Depth, water velocity distributed data that the intelligent controlling device is transmitted respectively according to velocity sensor and supersonic generator and
Water-bed dynamic depth data carry out analysis calculating, show that angle regulator adjusts data accordingly, control the inclination angle of pile monkey
Degree.
Further, the calculating analysis circuit plate in the intelligent controlling device occurs according to velocity sensor and ultrasonic wave
The water velocity distributed data and water-bed dynamic depth data that device transmits respectively carry out analysis calculating, obtain angle regulator phase
The adjusting data answered, and the second driving motor driving angle regulating device is controlled by control circuit board and adjusts corresponding mobile number
According to, to control the angle of inclination of pile monkey, when pile monkey stops tilting, presses the third and switch, the third driving motor
Start to drive pile monkey work, by the accurate injection stratum of metallic plate.
Further, the outer surface of the velocity sensor and supersonic generator is provided with waterproof membrane.
Further, the power supply includes accumulator and/or rechargeable battery and/or solar panel, the power supply
It can dismantle or replace.
Further, the pile frame is made of multilayer sleeve, and the pile frame can be extended or be shunk.
The beneficial effects of the invention are as follows:
The piling machine can calculate the angle of inclination of influence data of the water impact to piling and correspondence piling, so as to incite somebody to action
The accurate injection stratum of metallic plate prevents flow from flowing, to achieve the purpose that flood fighting.
Description of the drawings
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is the structural schematic diagram of the present invention.
In figure:Piling machine ontology 1, pile frame 2, angle regulator 3, pile monkey 4, metallic plate 5, intelligent controlling device 6, speed
Sensor 7, supersonic generator 8.
Specific implementation mode
Below in conjunction with the accompanying drawings to further description of the present invention
As shown in Figure 1, a kind of piling machine built a dam, including piling machine ontology 1, pile frame 2, pile monkey 4 and intelligent controlling device 6, institute
It states intelligent controlling device 6 to be located on piling machine ontology 1, the piling machine ontology 1 is connect with pile frame 2, and the pile frame 2 passes through angle
Regulating device 3 is connect with pile monkey 4, and the pile monkey 4 is connect with metallic plate 5, and the end of the pile monkey 4 is provided with velocity sensor 7
With supersonic generator 8, the velocity sensor 7 and supersonic generator 8 are connect with intelligent controlling device 6, the intelligence control
Device 6 processed is connect by second switch with power supply, and the power supply is located on piling machine ontology 1, the intelligent controlling device 6 and
Two driving motors connect, and second driving motor is connect with angle regulator 3, control the angle of inclination of pile monkey 4, described to beat
Stake machine ontology 1 is connect with the first driving motor, and first driving motor is connect by first switch with power supply, and described first drives
Dynamic motor is connect with pile frame 2, and control pile frame 2 moves, and pile monkey 4 is placed into water, occurs convenient for velocity sensor 7 and ultrasonic wave
Device 8 measures situation in water, and the pile monkey 4 is connect with third driving motor, and the third driving motor passes through third switch and electricity
Source connects.
Further, the angle regulator 3 includes the first guide rod and the second guide rod, and first guide rod controls the side X
To movement, the movement of second guide rod control Y-direction, first guide rod and the second guide rod form leading truck, to control
The direction of pile monkey 4 processed makes stake according to the accurate injection stratum of design orientation to control the direction of piling.
Further, the pile monkey 4 is connect by clip and/or sucker with metallic plate 5.
Further, the intelligent controlling device 6 includes calculating analysis circuit plate and control circuit board, the velocity pick-up
Device 7 and supersonic generator 8 are connect with analysis circuit plate is calculated, and the calculating analysis circuit plate is connect with control circuit board, institute
Control circuit board is stated to connect with the second driving motor.
Further, the velocity sensor 7 measures water velocity distribution, and the supersonic generator 8 measures water-bed dynamic
State depth, the intelligent controlling device 6 are distributed according to the water velocity that velocity sensor 7 and supersonic generator 8 transmit respectively
Data and water-bed dynamic depth data carry out analysis calculating, show that angle regulator 3 adjusts data accordingly, control pile monkey 4
Angle of inclination.
Further, the calculating analysis circuit plate in the intelligent controlling device 6 is sent out according to velocity sensor 7 and ultrasonic wave
The water velocity distributed data and water-bed dynamic depth data that raw device 8 transmits respectively carry out analysis calculating, show that angular adjustment fills
3 corresponding adjusting data are set, and the second driving motor driving angle regulating device 3 is controlled by control circuit board and is adjusted accordingly
Mobile data, when pile monkey 4 stops tilting, presses the third switch, the third to control the angle of inclination of pile monkey 4
Driving motor starts that pile monkey 4 is driven to work, by 5 accurate injection stratum of metallic plate.
Further, the outer surface of the velocity sensor 7 and supersonic generator 8 is provided with waterproof membrane.
Further, the power supply includes accumulator and/or rechargeable battery and/or solar panel, the power supply
It can dismantle or replace.
Further, the pile frame 2 is made of multilayer sleeve, and the pile frame 2 can be extended or be shunk.
Specific embodiment:
When user needs to build a dam, the length of pile frame can be elongated or shrink according to the demand of oneself, then user beats
The first switch of piling machine is opened, at this moment the first driving motor driving pile frame movement, to drive pile monkey also and then to move, until will
Pile monkey is put into river water, and then user opens second switch again so that intelligent controlling device, velocity sensor and ultrasonic wave hair
Raw device is started to work, and velocity sensor can measure water velocity distribution, and supersonic generator is allowed to measure water-bed dynamic depth, this
When intelligent controlling device in the water flow velocity that is transmitted respectively according to velocity sensor and supersonic generator of calculating analysis circuit plate
Degree distributed data and water-bed dynamic depth data carry out analysis calculating, show that angle regulator adjusts data accordingly(I.e.
The data that one guide rod and the second guide rod are moved in X-direction and Y-direction, to control the inclined direction of pile monkey, to control piling
Direction), then control circuit board will be according to data control the second driving motor driving angle regulating device adjusting obtained
Corresponding mobile data, to control the angle of inclination of pile monkey, when pile monkey stops tilting, at this moment user, which needs to press third, opens
It closes, at this moment third driving motor starts to drive pile monkey work, will clip or inhales the metallic plate on pile monkey with sucker and accurately passes through
Enter stratum, to achieve the purpose that prevent water movement, improves working efficiency.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any
Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain
Lid is within protection scope of the present invention.Therefore, protection scope of the present invention is subject to the protection scope in claims.
Claims (9)
1. a kind of piling machine built a dam, including piling machine ontology(1), pile frame(2), pile monkey(4)And intelligent controlling device(6),
It is characterized in that:The intelligent controlling device(6)Positioned at piling machine ontology(1)On, the piling machine ontology(1)With pile frame(2)Even
It connects, the pile frame(2)Pass through angle regulator(3)With pile monkey(4)Connection, the pile monkey(4)With metallic plate(5)Connection, institute
State pile monkey(4)End be provided with velocity sensor(7)And supersonic generator(8), the velocity sensor(7)And ultrasonic wave
Generator(8)With intelligent controlling device(6)Connection, the intelligent controlling device(6)It is connect with power supply by second switch, it is described
Power supply is located at piling machine ontology(1)On, the intelligent controlling device(6)It is connect with the second driving motor, the second driving electricity
Machine and angle regulator(3)Connection controls pile monkey(4)Angle of inclination, the piling machine ontology(1)With the first driving motor
Connection, first driving motor are connect by first switch with power supply, first driving motor and pile frame(2)Connection, control
Pile frame processed(2)Movement, by pile monkey(4)It is placed into water, is convenient for velocity sensor(7)And supersonic generator(8)It measures in water
Situation, the pile monkey(4)It is connect with third driving motor, the third driving motor is switched by third and connect with power supply.
2. a kind of piling machine built a dam according to claim 1, it is characterised in that:The angle regulator(3)Including
One guide rod and the second guide rod, the movement of the first guide rod control X-direction, the movement of the second guide rod control Y-direction are described
First guide rod and the second guide rod form leading truck, to control pile monkey(4)Direction, to control the direction of piling, make stake by
According to the accurate injection stratum of design orientation.
3. a kind of piling machine built a dam according to claim 1, it is characterised in that:The pile monkey(4)Pass through clip and/or suction
Disk and metallic plate(5)Connection.
4. a kind of piling machine built a dam according to claim 1, it is characterised in that:The intelligent controlling device(6)Including meter
Circuit board and control circuit board, the velocity sensor are analysed in point counting(7)And supersonic generator(8)Connect with analysis circuit plate is calculated
It connects, the calculating analysis circuit plate is connect with control circuit board, and the control circuit board is connect with the second driving motor.
5. according to a kind of piling machine built a dam of claim 1 or 4, it is characterised in that:The velocity sensor(7)Measure water
Flow VELOCITY DISTRIBUTION, the supersonic generator(8)Measure water-bed dynamic depth, the intelligent controlling device(6)It is passed according to speed
Sensor(7)And supersonic generator(8)The water velocity distributed data and water-bed dynamic depth data transmitted respectively is analyzed
It calculates, obtains angle regulator(3)It is corresponding to adjust data, control pile monkey(4)Angle of inclination.
6. according to a kind of piling machine built a dam of claim 1 or 5, it is characterised in that:The intelligent controlling device(6)Interior
Analysis circuit plate is calculated according to velocity sensor(7)And supersonic generator(8)The water velocity distributed data that transmits respectively and
Water-bed dynamic depth data carry out analysis calculating, obtain angle regulator(3)It is corresponding to adjust data, and pass through control circuit
Plate controls the second driving motor driving angle regulating device(3)Corresponding mobile data is adjusted, to control pile monkey(4)Inclination
Angle works as pile monkey(4)When stopping tilting, the third switch is pressed, the third driving motor starts to drive pile monkey(4)Work
Make, by metallic plate(5)Accurate injection stratum.
7. a kind of piling machine built a dam according to claim 1, it is characterised in that:The velocity sensor(7)And ultrasonic wave
Generator(8)Outer surface be provided with waterproof membrane.
8. a kind of piling machine built a dam according to claim 1, it is characterised in that:The power supply includes accumulator and/or can
Rechargeable battery and/or solar panel, the power supply can be dismantled or be replaced.
9. a kind of piling machine built a dam according to claim 1, it is characterised in that:The pile frame(2)It is by multilayer sleeve group
At the pile frame(2)It can extend or shrink.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810367961.4A CN108487245A (en) | 2018-04-23 | 2018-04-23 | A kind of piling machine built a dam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810367961.4A CN108487245A (en) | 2018-04-23 | 2018-04-23 | A kind of piling machine built a dam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108487245A true CN108487245A (en) | 2018-09-04 |
Family
ID=63312912
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810367961.4A Pending CN108487245A (en) | 2018-04-23 | 2018-04-23 | A kind of piling machine built a dam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108487245A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH093895A (en) * | 1995-06-20 | 1997-01-07 | Ohbayashi Corp | Device for controlling penetration amount of pile driving |
CN201003167Y (en) * | 2006-11-23 | 2008-01-09 | 邓长峰 | Multi-functional pile driver |
JP2010185204A (en) * | 2009-02-12 | 2010-08-26 | Nippon Sharyo Seizo Kaisha Ltd | Device and method for measuring stability of pile driver |
CN203080524U (en) * | 2013-02-28 | 2013-07-24 | 徐州万盛工程设备有限公司 | Forward-backward inclining device for hydraulic pile driver |
CN203546721U (en) * | 2013-11-01 | 2014-04-16 | 董泽瑞 | Intelligent pile driver |
CN104314077A (en) * | 2014-10-21 | 2015-01-28 | 郭永 | Automatic drop hammer pile driver |
-
2018
- 2018-04-23 CN CN201810367961.4A patent/CN108487245A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH093895A (en) * | 1995-06-20 | 1997-01-07 | Ohbayashi Corp | Device for controlling penetration amount of pile driving |
CN201003167Y (en) * | 2006-11-23 | 2008-01-09 | 邓长峰 | Multi-functional pile driver |
JP2010185204A (en) * | 2009-02-12 | 2010-08-26 | Nippon Sharyo Seizo Kaisha Ltd | Device and method for measuring stability of pile driver |
CN203080524U (en) * | 2013-02-28 | 2013-07-24 | 徐州万盛工程设备有限公司 | Forward-backward inclining device for hydraulic pile driver |
CN203546721U (en) * | 2013-11-01 | 2014-04-16 | 董泽瑞 | Intelligent pile driver |
CN104314077A (en) * | 2014-10-21 | 2015-01-28 | 郭永 | Automatic drop hammer pile driver |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5295502B2 (en) | Active impedance matching system and method for wave energy converter | |
AU643018B2 (en) | Energy-generating plant, particularly propeller-type ship's propulsion plant, supplied by a solar generator | |
CN106950832A (en) | A kind of ultrasonic disperse control device and method of utilization cavitation intensity feedback | |
CN101694973B (en) | Portable giant magnetostriction seismic source device | |
US20110012368A1 (en) | Energy converting device | |
NZ594041A (en) | Wave power capture system using pressurised fluid via a control valve to apply variable torque to move a pelton turbine | |
KR101085907B1 (en) | Wave power generating apparatus of Oscillating water column type | |
JPH0217712B2 (en) | ||
CN103953598B (en) | A kind of levelling control system of land leveller land level scraper and method | |
CN104218733A (en) | Vibrating energy collecting device | |
CN108487245A (en) | A kind of piling machine built a dam | |
KR101306857B1 (en) | Apparatus and method for hydraulic power-take of wave energy converter | |
CN108505518A (en) | A kind of dykes and dams piling machine | |
CN201532384U (en) | Portable giant magnetostrictive seismic source device | |
CN108547296A (en) | A kind of piling machine quickly built a dam | |
CN106940524A (en) | A kind of vibration of piezoelectric positioning device and non-linear inhibition method | |
CN108589643A (en) | A kind of electromagnetic type sand hill transmitter | |
CN108557665A (en) | A kind of sand hill hoisting machine | |
CN108547252A (en) | A kind of sand hill flinger | |
CN208816842U (en) | Push-bench | |
CN203896918U (en) | Water lifting irrigation system | |
CN108589642A (en) | Sand hill flinger | |
CN108609401A (en) | A kind of sand hill conveying device | |
CN108824437A (en) | A kind of sand hill transmitter | |
Yadav et al. | Green Energy Generation using Single and Double parallel circuit configuration of PZT piezoelectric patch by application of Hydro Dynamism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |