CN108487222A - A kind of weight for tamping underwater dumped rockfill - Google Patents
A kind of weight for tamping underwater dumped rockfill Download PDFInfo
- Publication number
- CN108487222A CN108487222A CN201810238893.1A CN201810238893A CN108487222A CN 108487222 A CN108487222 A CN 108487222A CN 201810238893 A CN201810238893 A CN 201810238893A CN 108487222 A CN108487222 A CN 108487222A
- Authority
- CN
- China
- Prior art keywords
- gyrostat
- hammer body
- tamping
- slot
- weight
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/046—Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/10—Placing gravel or light material under water inasmuch as not provided for elsewhere
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Mining & Mineral Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Civil Engineering (AREA)
- Agronomy & Crop Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Underground Or Underwater Handling Of Building Materials (AREA)
Abstract
The present invention provides a kind of weights for tamping underwater dumped rockfill, by hammer body, hanging ring, inlet opening, upper cover, gyrostat, roller bearing, spiral page board, axis, rood beam, osculum, check valve, mesoporous, gyrostat slot, roller bearing slot, bolt forms, a kind of weight for tamping underwater dumped rockfill uses hammer bottom surface and opens up numerous inlet openings, gyrostat high speed rotation in hammer body is driven using water flow dynamic energy, it ensures and does not drift about after weight enters water, do not topple over, tamping point is accurate, therefore it is too small to change traditional weight ratio of height to diameter, hammer the excessive drawback of bottom resistance to water-flow into shape, improve weight ratio of height to diameter, greatly increase unit area tamping energy, in addition hammer body high-frequency vibration, the compacting effect of underwater dumped rockfill can be improved, it accelerates construction progress, reduce construction cost.
Description
Technical field
The invention belongs to hydraulic engineering technical field, specifically a kind of weight for tamping underwater dumped rockfill.
Background technology
In the process of construction of marine structure, the gravity-type structures such as some large-scale gravity type quay, shore protections are normal
Underwater dumped rockfill bedding can be used, underwater dumped rockfill bedding as a kind of foundation structure form, have large carrying capacity, antiskid, economy,
The advantages that durability is good, thus one of the preferred structure type for having become underwater foundation engineering;To ensure that underwater dumped rockfill bedding has
Prepare enough enough foundation bearing capacities and stability against sliding, it is necessary to be carried out to bedding closely knit;It is mainly used in domestic and international project at present
Densification process is heavy tamping method and tamping by explosion method;Heavy tamping method lifts by crane weight using lifting equipment, utilizes weight freedom
Generated tamping energy fall to tamp bedding;Heavy tamping method construction maneuverability, imitates the earthquake that surrounding building generates
Should influence it is small, construction interference it is small;When apart from adjacent harbour or too close residential block, quick-fried rammer method is limited to its technical characteristic, by quick-fried
The fried surge generated can threaten the safety of offshore terminal, the alternative quick-fried rammer method construction of heavy tamping method;Heavy tamping method is in land
Ground is widely used, the weight for having accumulated abundant experience, but falling in water, by the drag effect of surrounding water, compacting effect
Fruit tamps effect far below land, and due to toppling over when weight sinks in water in order to prevent, the weight of generally use in engineering
Height it is smaller with diameter ratio, highly with diameter ratio hereinafter referred to as ratio of height to diameter, generally 0.8 or so, due to weight floor space
Greatly, thus more exacerbating water body leads to the resistance of weight, reduction compacting efficiency to limit every layer of underwater dumped rockfill thickness
Jackstone accommodation is frequently mobile to consume the plenty of time, causes construction cost to significantly improve, construction efficiency is low;Chinese patent CN
A kind of underwater dumped rockfill bedding tamping units of 102877453 B, are felt free to try, in order to reduce water body to weight bottom surface
Resistance is mounted with that motor, driving propeller siphon away the water of weight bottom surface at the top of weight, and intention is worth affirming, but deficiency
Locate clearly, one:Motor is installed easily to damage on the weight with strong impact power;Secondly:Water hole area is only
The 1%~5% of weight floor space, siphoned away water is few, is unable to reach mesh of the abatement water body to the resistance of weight bottom surface at all
, therefore, it is badly in need of expanding, explores new compacting thinking, improves underwater dumped rockfill and tamp efficiency, reduce engineering economy cost.
Invention content
In order to solve the above technical problems existing in the prior art, the present invention provides one kind for tamping underwater dumped rockfill
Weight, by hammer body, hanging ring, inlet opening, upper cover, gyrostat, roller bearing, spiral page board, axis, rood beam, osculum, unidirectional
Valve, mesoporous, gyrostat slot, roller bearing slot, bolt composition, the hammer body bottom surface offers inlet opening, during hammer body middle and upper part opens up
Hole, inlet opening are connected to mesoporous, and osculum is offered on hammer body, and draining hole exits are provided with check valve;Top is offered on hammer body
Breechblock slot, upper cover are fixedly installed by bolt and hammer body;Gyrostat groove bottom, upper cover bottom surface, gyrostat bottom surface, gyrostat top surface
Offer roller bearing slot;Gyrostat is placed in gyrostat slot, and gyrostat is connect by roller bearing with hammer body, upper cover;Rood beam with
Gyrostat is fixedly installed, and axis upper end is fixedly installed with rood beam, and spiral page board is fixed on axis.
Further, the hanging ring is fixed at hammer body top surface, and whole inlet opening discharge areas are than mesoporous flow surface
Product is big by 10%, and osculum water outlet height is less than gyrostat slot lowest point, and horn mouth is arranged in the import of inlet opening.
A kind of advantageous effect of weight for tamping underwater dumped rockfill of the present invention is:It is numerous due to having been opened up in hammer bottom surface
Inlet opening is not drifted about after being driven gyrostat high speed rotation in hammer body, guarantee weight to enter water using water flow dynamic energy, is not toppled over, and is rammed
It hits that point is accurate, therefore the drawback that traditional weight ratio of height to diameter is too small, hammer bottom resistance to water-flow is excessive can be changed, improve weight height
Diameter ratio, increases unit area tamping energy, is accompanied by hammer body high-frequency vibration, can greatly improve the compacting effect of underwater dumped rockfill, add
Fast construction speed reduces construction cost.
Description of the drawings
Fig. 1 is traditional weight schematic diagram;
Fig. 2 is a kind of weight schematic diagram for tamping underwater dumped rockfill;
Fig. 3 is the weight diagrammatic cross-section;
Fig. 4 is hammer body diagrammatic cross-section;
Fig. 5 is gyrostat schematic diagram;
Fig. 6 is spiral page board, axis, rood beam relation schematic diagram;
Fig. 7 is head cover diagrammatic cross-section;
Fig. 8 is head cover schematic top plan view;
Fig. 9 is hammer body schematic bottom view.
Specific implementation mode
The invention will be further described below in conjunction with the accompanying drawings.
As shown in figs 1-9, a kind of weight for tamping underwater dumped rockfill of the invention, by hammer body 1, hanging ring 2, inlet opening 3,
Upper cover 4, gyrostat 5, roller bearing 6, spiral page board 7, axis 8, rood beam 9, osculum 10, check valve 11, mesoporous 12, gyrostat slot
13,14 bolt 15 of roller bearing slot forms, and 1 bottom surface of hammer body offers inlet opening 3, and 1 middle and upper part of hammer body opens up mesoporous 12, water inlet
Hole 3 is connected to mesoporous 12, and osculum 10 is offered on hammer body 1, and the outlet of osculum 10 is provided with check valve 11;It is opened up on hammer body 1
There are gyrostat slot 13, upper cover 4 to be fixedly installed by bolt 15 and hammer body 1;13 bottom surface of gyrostat slot, 4 bottom surface of upper cover, gyrostat 5
Bottom surface, 5 top surface of gyrostat offer roller bearing slot 14;Gyrostat 5 is placed in gyrostat slot 13, and gyrostat 5 passes through roller bearing 6
It is connect with hammer body 1, upper cover 4, when flow high speed is by mesoporous 12, drives spiral page board 7, axis 8,9 high-speed rotation of rood beam, drives
5 high speed rotation of dynamic gyrostat;Rood beam 9 is fixedly installed with gyrostat 5, and 8 upper end of axis is fixedly installed with rood beam 9, spiral page
Plate 7 is fixed on axis 8, and the purpose of spiral page board 7 is to drive 5 high speed rotation of gyrostat to obtain more flood, is made
Spiral page board 7 is replaced to fall in the scope of this patent with multi-layer impeller.
The hanging ring 2 is fixed at 1 top surface of hammer body, and 3 discharge area of whole inlet openings is bigger than 12 discharge area of mesoporous
10%, 10 water outlet height of osculum is less than 13 lowest point of gyrostat slot, and if there is water enters in gyrostat slot 13, weight 1 proposes
After the water surface, water can exclude from check valve 11, and the import of inlet opening 3 is arranged horn mouth, and water can quickly enter inlet opening 3, fast
Speed reduces hammer body bottom surface water resistance.
In use, lifting by crane weight using lifting equipment, weight exists a kind of weight for tamping underwater dumped rockfill of the present invention
Free-falling under Gravitative Loads, bottom surface contacts hammer with the water surface, water can quickly enter inlet opening, quickly reduces hammer body bottom surface water resistance
Power, flow import mesoporous by inlet opening, and spiral page board, axis, rood beam high-speed rotation, driving gyrostat high speed is driven to revolve
Turn because the movement of gyro be by around axis rotation and axis around the counter motion of vertical line, therefore can guarantee weight in water
Vertical stabilization in dropping process, does not topple over, does not shift, and weight accurately falls into the tamping point of design;One kind is for tamping underwater throwing
During the weight use of stone, 1, multiple inlet openings can reduce hammer body bottom surface water resistance;2, gyrostat high speed rotation can be with
It ensures that weight vertical landing, hammer body ratio of height to diameter are increased, unit area tamping energy can be increased;3, heavy tamping point is accurate;
4, gyrostat high speed rotation in hammer body will produce high-frequency vibration, be conducive to underwater dumped rockfill vibratory compaction, and several factors determine
Using the weight of the present invention, the compacting effect of underwater dumped rockfill is more preferable.
Claims (2)
1. a kind of weight for tamping underwater dumped rockfill, by hammer body (1), hanging ring (2), inlet opening (3), upper cover(4), gyrostat
(5), roller bearing (6), spiral page board(7), axis (8), rood beam (9), osculum (10), check valve(11), mesoporous (12), gyro
Body slot(13), roller bearing slot (14), bolt (15) composition, it is characterised in that:Described hammer body (1) bottom surface offers inlet opening (3),
Hammer body (1) middle and upper part opens up mesoporous (12), and inlet opening (3) are connected to mesoporous (12), osculum (10) is offered on hammer body (1),
Osculum (10) outlet is provided with check valve(11);Hammer body offers gyrostat slot on (1)(13), upper cover(4) pass through bolt
(15) it is fixedly installed with hammer body (1);Gyrostat slot(13)Bottom surface, upper cover(4) bottom surface, gyrostat (5) bottom surface, gyrostat (5)
Top surface offers roller bearing slot (14);Gyrostat (5) is placed on gyrostat slot(13)It is interior, gyrostat (5) by roller bearing (6) with
Hammer body (1), upper cover(4) it connects;Rood beam (9) is fixedly installed with gyrostat (5), and axis (8) upper end is fixed with rood beam (9)
Setting, spiral page board(7)It is fixed on axis (8).
2. the weight as described in claim 1 for tamping underwater dumped rockfill, it is characterised in that:Hanging ring (2) fixation is set
It sets in hammer body (1) top surface, whole inlet opening (3) discharge areas are bigger by 10% than mesoporous (12) discharge area, osculum (10) water outlet
Height is less than gyrostat slot(13)Horn mouth is arranged in the import of lowest point, inlet opening (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810238893.1A CN108487222B (en) | 2018-03-22 | 2018-03-22 | It is a kind of for tamping the weight of underwater dumped rockfill |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810238893.1A CN108487222B (en) | 2018-03-22 | 2018-03-22 | It is a kind of for tamping the weight of underwater dumped rockfill |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108487222A true CN108487222A (en) | 2018-09-04 |
CN108487222B CN108487222B (en) | 2019-11-12 |
Family
ID=63319069
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810238893.1A Active CN108487222B (en) | 2018-03-22 | 2018-03-22 | It is a kind of for tamping the weight of underwater dumped rockfill |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108487222B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111945701A (en) * | 2019-05-15 | 2020-11-17 | 中交四航工程研究院有限公司 | Disposal drainage consolidation treatment system and method for hydraulic filling deep and thick soft foundation |
CN113432588A (en) * | 2021-06-23 | 2021-09-24 | 河北如成建筑工程有限公司 | Stable drop wire capable of avoiding long-time swinging and operation method thereof |
CN113529652A (en) * | 2021-07-16 | 2021-10-22 | 江苏筑港建设集团有限公司 | Energy-saving and environment-friendly foundation bed tamping construction process |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10266181A (en) * | 1997-03-28 | 1998-10-06 | Kiyoshi Saito | Underwater ground improvement work and its improved underwater bottom |
CN102877453A (en) * | 2011-07-12 | 2013-01-16 | 同济大学 | Tamping device of underwater rubble-mound foundation |
CN105179594A (en) * | 2014-05-26 | 2015-12-23 | 卢赐武 | Self-balancing stabilizer |
CN206777946U (en) * | 2017-06-08 | 2017-12-22 | 林平 | A kind of improved circulatior clarifier of structure |
-
2018
- 2018-03-22 CN CN201810238893.1A patent/CN108487222B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10266181A (en) * | 1997-03-28 | 1998-10-06 | Kiyoshi Saito | Underwater ground improvement work and its improved underwater bottom |
CN102877453A (en) * | 2011-07-12 | 2013-01-16 | 同济大学 | Tamping device of underwater rubble-mound foundation |
CN105179594A (en) * | 2014-05-26 | 2015-12-23 | 卢赐武 | Self-balancing stabilizer |
CN206777946U (en) * | 2017-06-08 | 2017-12-22 | 林平 | A kind of improved circulatior clarifier of structure |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111945701A (en) * | 2019-05-15 | 2020-11-17 | 中交四航工程研究院有限公司 | Disposal drainage consolidation treatment system and method for hydraulic filling deep and thick soft foundation |
CN113432588A (en) * | 2021-06-23 | 2021-09-24 | 河北如成建筑工程有限公司 | Stable drop wire capable of avoiding long-time swinging and operation method thereof |
CN113432588B (en) * | 2021-06-23 | 2022-11-11 | 河北如成建筑工程有限公司 | Stable drop wire capable of avoiding long-time swinging and operation method thereof |
CN113529652A (en) * | 2021-07-16 | 2021-10-22 | 江苏筑港建设集团有限公司 | Energy-saving and environment-friendly foundation bed tamping construction process |
Also Published As
Publication number | Publication date |
---|---|
CN108487222B (en) | 2019-11-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108487222B (en) | It is a kind of for tamping the weight of underwater dumped rockfill | |
CN203007918U (en) | Self-lifting type drilling platform based on truss-type stake legs | |
CN204040050U (en) | Mixed type offshore wind power foundation structure | |
CN113530761B (en) | Floating type foundation of offshore wind turbine generator set with grid type structure and construction method | |
JP3230883U (en) | Combined single pile foundation structure for offshore wind power generation | |
CN105133558B (en) | Deep water drift net platform and its construction method | |
CN112627225A (en) | Composite foundation structure of offshore wind power single pile, supporting disc and small suction bucket and construction method thereof | |
CN1318123A (en) | Middle armor block for coastal structure and method for placement of its block | |
CN107401177A (en) | A kind of suction caisson foundation of bottom plate with squeezing unit | |
CN107792306A (en) | A kind of buoyant tower platform | |
CN103866817A (en) | Water intake pumping station | |
CN102296629B (en) | Tower-drum structure suitable for ocean engineering and installation method thereof | |
CN105986576B (en) | A kind of dry operation cast-in-situ bored pile air-flowing type bottom cleaning method | |
CN101348164A (en) | Mudflat operation platform | |
CN101314942A (en) | Wave breaker of inverse T shaped pipe wall pile | |
CN214401870U (en) | Composite foundation structure of offshore wind power single pile, supporting disc and small suction bucket | |
CN106964834A (en) | A kind of bridge construction Steel Tubes For Bridge Application cutter device for being easy to adjust | |
CN111560942B (en) | Rammed stone pier reinforcement structure supported by closely-spaced three-dimensional grids and construction method thereof | |
CN110055994A (en) | A kind of suction cylindrical structure | |
TWI653376B (en) | Water work platform | |
CN213267820U (en) | Rammed broken stone pier reinforcement structure supported by close-packed three-dimensional grid | |
CN206052761U (en) | A kind of marine wind electric field single-pile foundation | |
RU2057845C1 (en) | Method for installation of marine stationary platform with flat bottom and marine stationary platform | |
CA1228990A (en) | Off-shore platform structure | |
CN206784310U (en) | A kind of bulwark |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |