RU2057845C1 - Method for installation of marine stationary platform with flat bottom and marine stationary platform - Google Patents
Method for installation of marine stationary platform with flat bottom and marine stationary platform Download PDFInfo
- Publication number
- RU2057845C1 RU2057845C1 RU93016103A RU93016103A RU2057845C1 RU 2057845 C1 RU2057845 C1 RU 2057845C1 RU 93016103 A RU93016103 A RU 93016103A RU 93016103 A RU93016103 A RU 93016103A RU 2057845 C1 RU2057845 C1 RU 2057845C1
- Authority
- RU
- Russia
- Prior art keywords
- platform
- panels
- bed
- hydraulic
- piles
- Prior art date
Links
- 238000009434 installation Methods 0.000 title abstract description 7
- 239000006096 absorbing agents Substances 0.000 claims description 5
- 230000035939 shock Effects 0.000 claims description 5
- 238000007654 immersion Methods 0.000 abstract description 10
- 239000002689 soil Substances 0.000 abstract description 7
- 230000003247 decreasing Effects 0.000 abstract description 3
- 230000000694 effects Effects 0.000 abstract description 3
- 239000000126 substances Substances 0.000 abstract 1
- 281999990635 Foundations companies 0.000 description 16
- 230000015572 biosynthetic process Effects 0.000 description 4
- 238000005755 formation reactions Methods 0.000 description 4
- 210000000188 Diaphragm Anatomy 0.000 description 3
- 280000930844 Mainland companies 0.000 description 3
- 240000006028 Sambucus nigra Species 0.000 description 3
- 238000004642 transportation engineering Methods 0.000 description 3
- 238000004873 anchoring Methods 0.000 description 2
- 238000005056 compaction Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000007710 freezing Methods 0.000 description 2
- 239000011901 water Substances 0.000 description 2
- 280000462449 B Platform companies 0.000 description 1
- 280000711007 Swivel companies 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 239000002184 metals Substances 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
Images
Abstract
Description
The invention relates to hydraulic structures of foundations and foundations, and in particular to the installation of offshore stationary platforms at the bottom and their structures.
Known offshore platforms installed in the North Sea, in particular, they include a stationary platform type "BERIL A" with a stepped surface of the bottom of the foundation slab, as well as "ECOFISK".
The disadvantage of these platforms is the presence of a protrusion on the lower surface of the foundation slab, as a result of which, when lowering to the seabed, the structure loosens it when it touches the bed, and also destroys the mainland soil, as a result of which caverns with voids are formed under the lower part of the structure, which require installation of the platform additional work on filling with cement-sand mortar.
Platforms such as "FRIG TR1", "STATFORD A", "NAYNIEN", as well as domestic ones installed in the North Sea, are also known. The indicated platforms for increasing braking forces have around the perimeter a “skirt” of a metal sheet pile 4.5 m high four corners of hollow piles with a diameter of 600.1200 mm and a height of 6.7 m.
The purpose of the "skirt" and piles is to quench the horizontal speed of the structure before landing on the bed and alert about the proximity of the ground. A common drawback of these platforms is the same violations of the bed and the structure of the natural occurrence of the soil, and this usually leads to cementation of caverns and uneven settlement of the structure as a whole due to additional influences in the form of lateral undercurrent or ice pressure.
In the design solutions of the platforms, there is also the danger of a part of the platform freezing due to the fact that, in one corner, the supporting pile may not reach the bedrock when planting on the bed, but stopped in the area with the sink, which is the main danger, since this leads to a redistribution of efforts, to a change in the design scheme of the base plate and the formation of cracks with destruction along the hover line. In addition, in these platforms, the installation of piles involves swiveling them with a foundation plate and a "skirt", which is less durable, since the first contact of the bed and soil occurs with a pile, and then with a "skirt", therefore, with significant effects when braking can significantly deviate from the design position due to the less rigid design of the "skirt", which will lead to the destruction of the site or damage to the pile.
A common drawback for these platforms is also an unsatisfactory adjustment of the speed of the construction approach to the design dive point. So the BERIL A platform, when approaching the calculated position at a wave height of 0.8 m and a wind of 2 points on the BORORT scale, had a miss of 84 m.
The Brent B platform with a 2-point wind had a miss of 25 m. The calculated phase of braking of the BERIL A platform was 54 m when the pile was deepened at the moment of stopping 1.62 m. The indicated data are given in the studies:
1) Hafner T. Rohrleitunger und Bahaltеr im Meer-mit Jnst Wasserbau Uniw Stuttgart, 1987, N 51230;
2) Chari TR Geotechnical aspects of icebery scour on ocean floors, Canadian geotechnical, 1979, N 16.
The purpose of the invention is to increase the accuracy of lowering the marine stationary platform to a selected bottom section by creating a stationary marine platform that provides independent regulation of the platform braking simultaneously with its immersion, compaction and leveling of the bed, preservation of the indestructibility of the bed and mainland soil, reliable fixing of the platform to the bottom of the sea with anchor piles, increase strength, crack resistance and durability of the base plate and platform.
This goal is achieved by the fact that the method of installing an offshore stationary platform with a flat bottom, including transporting the platform by tugboats afloat to the place of its placement and diving the platform to the bottom of the sea by filling the ballast compartments, includes a certain sequence of operations; with the formation of a bed, simultaneously with the immersion of the platform, the platform is braked by rotary panels mounted on the bottom of the platform, rejecting them gradually at an angle of 0 to 90 on its bottom, and in contact with a bed of panels angle of deflection decreased from 90 to 0, and after installation of the platform in the design position produce its fastening to the bottom of the sea anchor piles.
Additionally, the fixed offshore platforms, comprising a hollow floor slab with an upper structure, ballast compartments and a flat bottom, further provided with a swivel brake panels hinged one edge to the bottom of the foundation plate rotatably relative thereto at an angle of 90, and hydraulic jacks, the rod each of which is pivotally connected to the free edge of one of the panels, while the panels are installed horizontally flush with the bottom of the base plate and each hydrod the mkrat is equipped with a hydraulic shock absorber made with a spring, while the panels are located at a distance of 0.15 L from each other along a line perpendicular to the axis of the hinges and are equipped with bed contact sensors attached to the face of each panel along its height at a distance of 0.1 l from friend, where L is the length of the panel, m, l the height of the panel, m, and the base plate has cantilevered protrusions with vertical holes in which piles flush with the bottom of the plate are installed with hydraulic jacks or vibration devices connected to the top of the pile.
In FIG. 1 shows a general view of the platform during transportation to the destination; in FIG. 2 plan of the platform with the location of the supporting piles; in FIG. 3 first stage of immersion loading of ballast tanks and the beginning of braking by brake panels; in FIG. 4 second stage of immersion, the brake panels are in contact with the bed, friction forces arise; in FIG. 5 the third stage, the base plate has approached the theoretical immersion point, the base plate is anchored by pressing anchor piles into the ground; in FIG. 6 node I in FIG. 3; in FIG. 7 node II in FIG. 3; in FIG. 8 the position of the piles in the node of the platform after entering the ground; in FIG. 9 a way of fixing the "skirt" and piles to the slab in existing platforms.
Fixed offshore platform includes foundation plate 1, anchor piles 2, niches for pivot panels 3, pivot panels 4, first contact sensors 5, guide holes 6 for piling, hydraulic jack or vibration loader 7, rod 8, hydraulic jack 9, hydraulic shock absorber 10 s spring 11, movable diaphragm 12, fixed diaphragm 13, valves 14 and 15, pump station 16, bed 17, piston 18, rod 19, holder 20, console 21, head of pile 22, embedded part 23, hinges 24 and 25, secondary console 26 and the "skirt" 27.
The installation method of the offshore stationary platform includes a number of activities and is carried out in stages.
Preparatory stage.
According to the data of geological, meteorological, hydrological studies, as well as parameters that take into account design solutions for the proposed method of installing the platform, several design schemes are created and the theoretical design phase of the platform braking is determined on a computer basis. Simultaneously, modeling is carried out on the model of the task of immersing and braking the platform also taking into account the recommendations of the proposed solution in order to determine the experimental phase of braking of the platform. The design value of braking is defined as the average value of the calculated and experimental phases. The preparatory phase also includes the alignment of the bottom of the sea at the location of the platform with the formation of a bed.
Transportation of the offshore stationary platform is carried out in accordance with the known technological scheme by tugboats, as shown in FIG. 1. The transportation of the platform ends, not reaching the coordinate point of immersion by the value of the constructive phase of braking. After this, the first stage of immersion begins, platform braking occurs simultaneously with the loading of ballast tanks and the operation of the brake devices in two stages.
In the first stage (FIG. 3), before contact with the bed, the brake devices shown in FIG. 6, and as a result of this, the rotary panels 4 located in the niches 3 are turned off by an angle α.
As a result, we have
W q 1 + q 2 , where W is the towing force;
q 1 platform water resistance;
q 2 variable resistance (pressure) on the brake panels, depending on the angle of inclination α
The brake device operates as follows.
The pump station 16 is turned on. The valve 14 is closed. The valve 15 is turned on. As a result, the energy damper 10 is turned off and the rod 8 of the hydraulic jack 9 is lowered and all synchronously connected brake panels deviate. It is hereby foreseen that the platform moves from the right side to the left, as shown by the arrow in FIG. 3.
By increasing or decreasing the deflection angle of the panels 4, it is possible to adjust the amount of braking due to the friction forces and the pressure of the water on the brake panels. The braking phase is controlled from one control panel.
The moment of contact of the panels 4 with the bed of soil 16 is fixed by sensors 5 from this begins the second stage of the second stage of immersion of the platform (Fig. 4). Data from the sensors 5 is transmitted to a central point and from there a command is received in automatic mode to turn off the pump station 16 and valve 15 and open the valve 14. Under pressure of the ground, the rod 8 of the cylinder 9 deviates upward, as a result of braking, the fluid flows through the valve 14 into the chamber of the hydraulic shock absorber 10, presses on the piston 18 and then through the rod 19 to the diaphragm 20 and further to the spring 11. In this case, the rod 19 has free movement inside the spring 11 by Δ.
Under the action of the vertical force of the platform weight with the phased loading of ballast tanks, the panel 4 is smoothly pressed to the bed 17 with its alignment and compaction, while energy is extinguished during horizontal movement of the platform by the braking devices. As a result of this, the rod 8 enters the cylinder 9, which allows the brake panel 4 to enter the niche 3 and take its original position. As a result of this, the platform will lower to the coordinate point of the base of the platform.
After installing the platform on the bed in the design position, the foundation plate of the platform begins to be fixed to the bottom of the sea with anchor piles (Fig. 2 and 7). This is carried out as follows: in the cantilever part of the foundation plate 1, through holes 6 with a diameter greater than the diameter of piles by 30.40 mm are provided, into which hollow reinforced concrete piles 2 with a diameter of 3.6 m are inserted before the platform is immersed and secured in a vertical position by the holder 20, console 21. On the head end 22, a vibrating loader or hydraulic jack is attached 7. After that, the holders 4 are released, the vibrators or jacks are turned on and the piles 2 freely pass into the hole 6 and then goes deeper into the mainland the length of the anchoring zone. The final fastening of the piles in the vertical plane is carried out by the secondary console 28 attached to the part 25, with emphasis on the top of the piles after removing the vibrator. After that, fine-grained concrete is laid in the space between the pile along the outer perimeter and the inner perimeter of the opening of the foundation slab.
Using the proposed method for installing an offshore stationary platform and an offshore stationary platform provides the following advantages compared to existing methods and offshore stationary platforms: it improves the accuracy of installing the platform on the seabed by independently adjusting the speed of the construction approach by damping the energy of the structural elements of the platform; makes it possible to level and compact the bed; preserves the natural structure of the soil without the formation of cavities and voids under the foundation slab due to the absence of hanging supporting piles and a "skirt" on the bottom surface of the foundation slab; rejection of the cost of cementing caverns and voids under the foundation slab; reliable anchoring of the foundation plate with anchor piles to the bottom of the sea; increase in strength, crack resistance and durability of the foundation plate and platform due to the absence of freezing of one of the corners of the foundation plate; profitability by reducing the use of tug times and more accurate lowering of the platform to a selected section of the seabed.
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU93016103A RU2057845C1 (en) | 1993-03-29 | 1993-03-29 | Method for installation of marine stationary platform with flat bottom and marine stationary platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU93016103A RU2057845C1 (en) | 1993-03-29 | 1993-03-29 | Method for installation of marine stationary platform with flat bottom and marine stationary platform |
Publications (2)
Publication Number | Publication Date |
---|---|
RU2057845C1 true RU2057845C1 (en) | 1996-04-10 |
RU93016103A RU93016103A (en) | 1997-02-10 |
Family
ID=20139374
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU93016103A RU2057845C1 (en) | 1993-03-29 | 1993-03-29 | Method for installation of marine stationary platform with flat bottom and marine stationary platform |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2057845C1 (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2473739C1 (en) * | 2011-06-16 | 2013-01-27 | Алексей Владимирович Баранов | Foundation envelope of floating block installed at water area bottom using float-on method |
RU2473737C1 (en) * | 2011-06-06 | 2013-01-27 | Алексей Владимирович Баранов | Method of fitting floating body with funnel-like shell beds in unequipped bottom of water area |
RU2484206C1 (en) * | 2011-11-14 | 2013-06-10 | Алексей Владимирович Баранов | Method for coupling of floating caisson, having funnel-shaped foundation-shells, with base |
RU2502630C1 (en) * | 2012-06-26 | 2013-12-27 | Российская Федерация, От Имени Которой Выступает Министерство Промышленности И Торговли Российской Федерации | Sea gravity platform |
RU2543835C2 (en) * | 2009-02-12 | 2015-03-10 | Марин Каррент Тебинс Лимитед | Installation of submersible supporting structures |
RU2555721C2 (en) * | 2009-12-18 | 2015-07-10 | АЛЬСТОМ Риньюэбл Текнолоджиз | Padding structure |
RU2606484C1 (en) * | 2015-08-11 | 2017-01-10 | Общество с ограниченной ответственностью "Газпром добыча шельф Южно-Сахалинск" | Gravity-pile platform and method of its placement on sea bed |
RU2634143C1 (en) * | 2016-07-28 | 2017-10-24 | Федеральное государственное автономное образовательное учреждение высшего образования "Дальневосточный федеральный университет" (ДВФУ) | Marine ice-strengthened platform |
RU2719516C1 (en) * | 2016-05-26 | 2020-04-20 | Сембкорп Марин Интегрейтид Ярд Пте. Лтд. | Bottom-based platform and method of creating drilling terminal for drilling in shallow-water shelf |
-
1993
- 1993-03-29 RU RU93016103A patent/RU2057845C1/en active
Non-Patent Citations (2)
Title |
---|
Патент США N 4497594, кл. E 02B 17/00, 1985. * |
Патент США N 4666341, кл. E 02B 17/00, 1987. * |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2543835C2 (en) * | 2009-02-12 | 2015-03-10 | Марин Каррент Тебинс Лимитед | Installation of submersible supporting structures |
US9133597B2 (en) | 2009-12-18 | 2015-09-15 | Alstom Renewable Technologies | Foundation structure |
RU2555721C2 (en) * | 2009-12-18 | 2015-07-10 | АЛЬСТОМ Риньюэбл Текнолоджиз | Padding structure |
RU2473737C1 (en) * | 2011-06-06 | 2013-01-27 | Алексей Владимирович Баранов | Method of fitting floating body with funnel-like shell beds in unequipped bottom of water area |
RU2473739C1 (en) * | 2011-06-16 | 2013-01-27 | Алексей Владимирович Баранов | Foundation envelope of floating block installed at water area bottom using float-on method |
RU2484206C1 (en) * | 2011-11-14 | 2013-06-10 | Алексей Владимирович Баранов | Method for coupling of floating caisson, having funnel-shaped foundation-shells, with base |
RU2502630C1 (en) * | 2012-06-26 | 2013-12-27 | Российская Федерация, От Имени Которой Выступает Министерство Промышленности И Торговли Российской Федерации | Sea gravity platform |
RU2606484C1 (en) * | 2015-08-11 | 2017-01-10 | Общество с ограниченной ответственностью "Газпром добыча шельф Южно-Сахалинск" | Gravity-pile platform and method of its placement on sea bed |
RU2719516C1 (en) * | 2016-05-26 | 2020-04-20 | Сембкорп Марин Интегрейтид Ярд Пте. Лтд. | Bottom-based platform and method of creating drilling terminal for drilling in shallow-water shelf |
RU2634143C1 (en) * | 2016-07-28 | 2017-10-24 | Федеральное государственное автономное образовательное учреждение высшего образования "Дальневосточный федеральный университет" (ДВФУ) | Marine ice-strengthened platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104196034B (en) | A kind of utilize steel sheet pile as the foundation ditch construction method in supporting cofferdam | |
CA1246440A (en) | Undersea template for the drilling of wells for the exploitation of hydrocarbon pools under the sea | |
US4720214A (en) | Mudmat design | |
US3962878A (en) | Stabilization of maritime structures | |
CA2828079C (en) | Skirted foundation for penetrating soft material | |
US4440527A (en) | Marine structure | |
US20120243943A1 (en) | Offshore Station, Foundation for an Offshore Station, and Method for Building an Offshore Station | |
CN101864773B (en) | Deep foundation pit support process | |
US4843785A (en) | Anchoring and foundation support apparatus and method | |
US2334992A (en) | Floating drilling barge | |
CN102094425B (en) | Foundation pit construction method adopting shallow buried depth Larsen steel plate pile as protective cofferdam | |
Mendoza et al. | The Mexico earthquake of September 19, 1985—behavior of building foundations in Mexico City | |
US20060067794A1 (en) | Method and apparatus for raising, leveling, and supporting displaced foundation allowing for readjustment after installation | |
CA1251939A (en) | Subsea foundation element and applications thereof | |
CN101139838B (en) | Construction method for high artesian area ultra-deep foundation pit | |
CN102953341B (en) | A kind of high-order trestle work structure be arranged in deep water torrent intectate steep bare rock | |
US3896628A (en) | Marine structures | |
CN101838993A (en) | Construction technology of steel sheet pile cofferdam for Yellow River Channel internal support table construction | |
OA6851A (en) | Platform, particularly of the self-elevating type, and its method of anchoring and releasing, and foundation device for such a platform. | |
CN103806464B (en) | Large-scale high ferro station and subway cross top-down construction method up and down | |
US8297885B2 (en) | Method of erecting a building structure in a water basin | |
CN1982546A (en) | Direct local skirt border reversing construction for central island | |
CN102979039B (en) | Elevated trestle bridge construction method on covering-free steep bare rock in deepwater and rapid stream | |
CN106758841B (en) | A kind of whole construction process of the double rope face low-pylon cable-stayed bridges of double tower | |
JP3979466B2 (en) | Temporary closing method |