Prior art keywords
face
adopt
width
earth
production
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711479469.8A
Other languages
Chinese (zh)
Other versions
CN108457650A (en
Inventor
李全生
郭俊廷
于瑞雪
曹志国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shenhua Energy Co Ltd
National Institute of Clean and Low Carbon Energy
Shenhua Shendong Coal Group Co Ltd
Original Assignee
China Shenhua Energy Co Ltd
National Institute of Clean and Low Carbon Energy
Shenhua Shendong Coal Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shenhua Energy Co Ltd, National Institute of Clean and Low Carbon Energy, Shenhua Shendong Coal Group Co Ltd filed Critical China Shenhua Energy Co Ltd
Priority to CN201711479469.8A priority Critical patent/CN108457650B/en
Publication of CN108457650A publication Critical patent/CN108457650A/en
Application granted granted Critical
Publication of CN108457650B publication Critical patent/CN108457650B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal

Abstract

The present invention proposes that wide harmonic extraction method, module, storage medium and system are adopted in a kind of change, and method includes: that the earth's surface of acquisition production zone allows to adopt dynamic deformation amount;Obtain the mining conditions value of production zone;The observation data of production zone are obtained, observation data include at least: subsidence coefficient, main influence angle tangent value, seam inclination and displacement factor;It obtains subsidence ratio and exploits the relation curve of breadth depth ratio;Allow maximum inclination according to earth's surface, adopt depth, subsidence coefficient, main influence angle tangent value and displacement factor calculates the jump of production zone and adopts face maximum width and production face minimum widith;Face maximum width is adopted according to jump and production face minimum widith determines that practical change adopts the jump used in wide harmonic extraction and adopts face width and production face width.The present invention solved in the prior art due to the problem of being exploited using identical working face size, caused earth's surface by the influence of Adjacent Working Face repeated mining, incrementally increase deflection.

Description

Wide harmonic extraction method, module, storage medium and system are adopted in change
Technical field
Wide harmonic extraction method, module, storage medium are adopted the present invention relates to coal mine field more particularly to a kind of change and are System.
Background technique
Ecological protection is one of the key problem considered in mining design, the main body of damage of the coal mining to environment The sinking and deformation of present earth's surface.Surface subsidence is excessive, may cause earth's surface large area ponding in the higher mining area of phreatic table;Deformation Measure it is excessive so that earth's surface is generated the Discontinuous Deformations such as crack, cause damage or the stream of vegetation, soil moisture content and content of mineral substances It loses.
In process of production, it should be noted that earth's surface ecology has certain self-reparing capability, that is, adopts and causes ecology one After the damage for determining degree, surface vegetation in short period of time can spontaneous recovery, will not cause ecology degeneration.Coal mining at present In, especially close horizontal and gently inclined seam is generally successively exploited using identical working face size, will cause earth's surface by The influence of Adjacent Working Face repeated mining, incrementally increases deflection.
The currently used method for reducing Mining subsidence has Striping noise, goaf filling exploitation, although these method energy Mining subsidence degree is reduced, but is unsuitable for modern production mine from resource recovery, production efficiency and cost-benefit etc. Well.
Summary of the invention
Based on problem above, the present invention proposes that wide harmonic extraction method, module, storage medium and system are adopted in a kind of change, solves It has determined in the prior art due to being exploited using identical working face size, has caused earth's surface by Adjacent Working Face repeated mining Influence, the problem of incrementally increasing deflection.
The present invention proposes that wide harmonic extraction method is adopted in a kind of change, comprising:
The earth's surface for obtaining production zone allows to adopt dynamic deformation amount, and earth's surface allows to adopt dynamic deformation amount and allows most including at least earth's surface Big tilt quantity;
The mining conditions value of production zone is obtained, mining conditions value includes: to adopt depth, adopt thick and overlying rock entirety lithology;
The observation data of production zone are obtained, observation data include at least: subsidence coefficient, main influence angle tangent Value, seam inclination and displacement factor;
It obtains subsidence ratio and exploits the relation curve of breadth depth ratio;
According to earth's surface allow maximum inclination, adopt depth, subsidence coefficient, it is main influence angle tangent value and move horizontally be Face maximum width and production face minimum widith are adopted in the jump that number calculates production zone;
Face maximum width is adopted according to jump and production face minimum widith determines that practical change is adopted the jump used in wide harmonic extraction and adopted Face width and production face width, and become and adopt wide harmonic extraction.
In addition, allowing maximum inclination according to earth's surface, adopting depth, subsidence coefficient, main influence angle tangent value and level The jump that transport coefficient calculates production zone adopts face maximum width and includes:
Earth's surface largest amount of subsidence is calculated, earth's surface largest amount of subsidence is equal to subsidence coefficient, displacement factor and coal seam The product of the cosine value three at inclination angle;
The maximum allowable deflection of earth's surface is calculated, the maximum allowable deflection of earth's surface, which is equal to adopt, is influencing angle just divided by main deeply Value and earth's surface after cutting value allow the product of maximum inclination;
Calculate subsidence ratio, subsidence ratio is equal to the maximum allowable deflection of earth's surface divided by earth's surface after abundant exploitation most Big deflection;
In subsidence ratio and exploits and find the corresponding breadth depth ratio of subsidence ratio and conduct on the relation curve of breadth depth ratio Maximum breadth depth ratio;
It calculates to jump and adopts face maximum width, jump adopts face maximum width and is equal to maximum breadth depth ratio and adopts deep product.
In addition, allowing maximum inclination according to earth's surface, adopting depth, subsidence coefficient, main influence angle tangent value and level Transport coefficient calculate production zone production face minimum widith include:
The abundant mining width of working face is calculated, the abundant mining width of working face is equal to maximum breadth depth ratio and adopts deep product;
Production face minimum widith is calculated, production face minimum widith is equal to the abundant mining width of working face and the maximum width in face is adopted in jump The difference of degree.
In addition, according to jump adopt face maximum width and production face minimum widith determine it is practical become to adopt used in wide harmonic extraction Face width is adopted in jump and production face width includes:
Face width is adopted using jumping to adopt face maximum width and adopt the jump used in wide harmonic extraction as practical change, and selection is greater than opening It adopts face minimum widith and meets the width of winning apparatus size to adopt the production face used in wide harmonic extraction as practical change wide Degree.
In addition, carrying out change to adopt wide harmonic extraction including: winning apparatus first with production face width into the progress of practical mining width Exploitation, then adopting face width again with jump is that practical mining width is exploited;Or winning apparatus first adopts face width to jump as in fact Border mining width is exploited, and is then exploited again with production face width for practical mining width.
In addition, subsidence ratio and subsidence ratio in the relation curve of exploitation breadth depth ratio are bigger, subsidence ratio is corresponding Recovery percent it is more abundant.
The present invention also proposes that wide harmonic extraction device is adopted in a kind of change, comprising:
First obtains module, and the earth's surface for obtaining production zone allows to adopt dynamic deformation amount, and earth's surface allows to adopt dynamic deformation amount Allow maximum inclination including at least earth's surface;
Second obtains module, for obtaining the mining conditions value of production zone, mining conditions value include: adopt depth, adopt it is thick and Overlying rock entirety lithology;
Third obtains module, and for obtaining the observation data of production zone, observation data are included at least: surface subsidence system Number, main influence angle tangent value, seam inclination and displacement factor;
Drafting module, for obtaining subsidence ratio and exploiting the relation curve of breadth depth ratio;
Computing module, for allowing maximum inclination according to earth's surface, adopting depth, subsidence coefficient, main influence angle tangent Face maximum width and production face minimum widith are adopted in the jump that value and displacement factor calculate production zone;
Selected module determines that practical become adopts wide harmonic extraction for adopting face maximum width and production face minimum widith according to jump Face width and production face width are adopted in the jump of middle use, and become and adopted wide harmonic extraction.
The present invention also proposes a kind of storage medium, comprising:
The storage medium stores computer instruction, above-mentioned for executing when computer executes the computer instruction Wide harmonic extraction method is adopted in described in any item changes.
The present invention also proposes that wide harmonic extraction system, including at least one processor are adopted in a kind of change;And with it is described at least The memory of one processor communication connection;Wherein, the memory is stored with the instruction that can be executed by one processor, Described instruction is executed by least one described processor so that at least one described processor can:
The earth's surface for obtaining production zone allows to adopt dynamic deformation amount, and earth's surface allows to adopt dynamic deformation amount and allows most including at least earth's surface Big tilt quantity;
The mining conditions value of production zone is obtained, mining conditions value includes: to adopt depth, adopt thick and overlying rock entirety lithology;
The observation data of production zone are obtained, observation data include at least: subsidence coefficient, main influence angle tangent Value, seam inclination and displacement factor;
It obtains subsidence ratio and exploits the relation curve of breadth depth ratio;
According to earth's surface allow maximum inclination, adopt depth, subsidence coefficient, it is main influence angle tangent value and move horizontally be Face maximum width and production face minimum widith are adopted in the jump that number calculates production zone;
Face maximum width is adopted according to jump and production face minimum widith determines that practical change is adopted the jump used in wide harmonic extraction and adopted Face width and production face width, and become and adopt wide harmonic extraction.
By using above-mentioned technical proposal, have the following beneficial effects:
The present invention is solved in the prior art due to being exploited using identical working face size, causes earth's surface by phase The influence of adjacent working face repeated mining, the problem of incrementally increasing deflection;Due to using become adopt it is wide by the way of so that exploitation Equipment no longer carries out order mining to production zone, so earth's surface substep is made to deform, change caused by avoiding because of order mining The cumulative larger damage for causing earth's surface ecology of shape.
Detailed description of the invention
Fig. 1 is the flow chart provided by one embodiment of the present invention for becoming and adopting wide harmonic extraction method;
Fig. 2 is the flow chart provided by one embodiment of the present invention for becoming and adopting wide harmonic extraction method;
Fig. 3 is the schematic diagram of the relation curve of subsidence ratio provided by one embodiment of the present invention and exploitation breadth depth ratio;
Fig. 4 is that wide cooperative recovery method and traditional order mining method are adopted in change provided by one embodiment of the present invention Comparative result schematic diagram;
Fig. 5 is design scheme provided by one embodiment of the present invention and mining sequence schematic diagram;
Fig. 6 is the module map provided by one embodiment of the present invention for becoming and adopting wide harmonic extraction device.
Specific embodiment
Below in conjunction with specific embodiment and attached drawing, the present invention is further described in detail.It is only intended to explain in detail Specific embodiments of the present invention are stated, any restrictions are not generated to the present invention, protection scope of the present invention is with claims Subject to.
Referring to Fig.1, the present invention proposes that wide harmonic extraction method is adopted in a kind of change, comprising:
Step S001, the earth's surface for obtaining production zone allow to adopt dynamic deformation amount, and earth's surface allows to adopt dynamic deformation amount and includes at least Earth's surface allows maximum inclination;
Step S002, obtains the mining conditions value of production zone, and mining conditions value includes: to adopt depth, adopt thick and overlying rock Whole lithology;
Step S003 obtains the observation data of production zone, and observation data include at least: subsidence coefficient, main shadow Ring angle tangent value, seam inclination and displacement factor;
Step S004 obtains subsidence ratio and exploits the relation curve of breadth depth ratio;
Step S005, according to earth's surface allow maximum inclination, adopt depth, subsidence coefficient, it is main influence angle tangent value and Face maximum width and production face minimum widith are adopted in the jump that displacement factor calculates production zone;
Step S006 adopts face maximum width according to jump and production face minimum widith determines that practical change is adopted in wide harmonic extraction and adopts Face width and production face width are adopted in jump, and become and adopted wide harmonic extraction.
Surface movement is one and is controlled the process gradually occurred by time and space, when exploitation size is smaller, surface subsidence It is smaller with deflection, and when exploit size it is very big when, earth's surface formed it is large range of flat, cause the deflection of earth's surface compared with It is small, so as to reduce the mining influence of earth's surface.In order to make full use of the selfreparing feature of earth's surface ecology, exploitation pair is reduced as far as possible The influence degree of ecology, the as far as possible deformation of control earth's surface can be in the threshold ranges of selfreparing, so the embodiment of the present invention in ecology Become and adopts wide cooperative exploitation.
The earth's surface for obtaining production zone in the embodiment of the present invention first allows to adopt dynamic deformation amount, and earth's surface allows to adopt dynamic deformation amount Dynamic deformation amount is adopted for earth's surface is maximum allowable, earth's surface allows to adopt dynamic deformation amount and obtains according to research data or experience, for determining The earth's surface that mining area's earth's surface ecology can be born allows to adopt dynamic deformation amount, and it includes maximum inclination and level that earth's surface, which allows to adopt dynamic deformation amount, Deflection etc.;The mining conditions value for obtaining production zone later, the geology by collecting mining Design region are exploited data and are obtained Mining conditions value;The observation data of production zone are obtained by collecting the previous terrene shift observing achievement in mining area, observation data are also Including terrene shift observing data etc.;It obtains subsidence ratio and exploits the relation curve of breadth depth ratio, according to terrene shift observing Achievement makes subsidence ratio and exploits the relation curve of breadth depth ratio or the relation curve of multiplexing drafting before, for similarly The production zone of matter condition and rock stratum, the relation curve of reusable subsidence ratio and exploitation breadth depth ratio, subsidence ratio Relation curve with exploitation breadth depth ratio is the relation curve that subsidence ratio follows exploitation breadth depth ratio variation.
After calculating jump and adopting the data acquisition of face maximum width and production face minimum widith, allowed according to earth's surface maximum Tilt quantity, the jump for adopting depth, subsidence coefficient, main influence angle tangent value and displacement factor calculating production zone adopt face most Big width and production face minimum widith.
Face maximum width and production face minimum widith are adopted when calculating jump, face maximum width and production face can be adopted according to jump The production face width used in wide harmonic extraction is adopted in the practical change of minimum widith selection and face width is adopted in jump.
In actually exploitation, the more abundant the adequacy degree for jumping face of adopting the better, i.e., production zone disposably adopt it is wide more big more Good, production efficiency is also higher, it is possible to select jump to adopt face maximum width as jump and adopt face width, in order to increase surface movement basin The area (i.e. the region of reduction earth's surface deformation) in the flat region in ground, jump, which adopts the sum of face width and production face width at least, should be such that jump adopts Area reaches abundant exploitation, so need first to calculate production face minimum widith, and the value for being greater than production face minimum widith is theoretical On can take and do production face width, but in practical exploitation, it is contemplated that ability, the working surface production ability of winning apparatus are wanted It asks, needs to select it according to the ability and actual production demand of winning apparatus.
Optionally, it should be made such as to reduce earth's surface deformation process with maximum recovery rate Fast Algorithm for Mining when production face is exploited Isostatic settling as elevator, so that large range of flat region is formed, to reduce exploitation to the influence degree of ecology.
The present embodiment is solved in the prior art by way of converting mining width due to using identical working face ruler Little progress row exploitation, the problem of causing earth's surface by the influence of Adjacent Working Face repeated mining, incrementally increase deflection;Due to adopting Wide mode is adopted with becoming, so that winning apparatus no longer carries out order mining to production zone, so becoming earth's surface substep Shape avoids deforming the cumulative larger damage for causing earth's surface ecology caused by because of order mining.
The present embodiment bears the new solution of the deformed selfreparing feature extraction of a degree of earth's surface based on earth's surface ecology Certainly scheme makes the nearly horizontal or gently inclined seam mining conditions that will not cause surface pond after surface subsidence, highly efficient and productive Under the premise of, it is ensured that ground ecology is by mining influence degree can be in the threshold value of selfreparing.
Referring to Fig. 2, the embodiment of the present invention proposes that wide harmonic extraction method is adopted in a kind of change, comprising:
Step S201, the earth's surface for obtaining production zone allow to adopt dynamic deformation amount, and earth's surface allows to adopt dynamic deformation amount and includes at least Earth's surface allows maximum inclination;Such as earth's surface allows maximum inclination 4mm/m.
Step S202, obtains the mining conditions value of production zone, and mining conditions value includes: to adopt depth, adopt thick and overlying rock Whole lithology;
Step S203 obtains the observation data of production zone, and observation data include at least: subsidence coefficient, main shadow Ring angle tangent value, seam inclination and displacement factor;
Step S204 obtains subsidence ratio and exploits the relation curve of breadth depth ratio;
Subsidence ratio and subsidence ratio in the relation curve of exploitation breadth depth ratio are bigger, the corresponding exploitation of subsidence ratio Degree is more abundant;The value interval sufficiently exploited can be found by the relation curve of subsidence ratio and exploitation breadth depth ratio.
Step S205, according to earth's surface allow maximum inclination, adopt depth, subsidence coefficient, it is main influence angle tangent value and The jump that displacement factor calculates production zone adopts face maximum width and includes:
Earth's surface largest amount of subsidence is calculated, earth's surface largest amount of subsidence is equal to subsidence coefficient, displacement factor and coal seam The product of the cosine value three at inclination angle;
The maximum allowable deflection of earth's surface is calculated, the maximum allowable deflection of earth's surface, which is equal to adopt, is influencing angle just divided by main deeply Value and earth's surface after cutting value allow the product of maximum inclination;
Calculate subsidence ratio, subsidence ratio is equal to the maximum allowable deflection of earth's surface divided by earth's surface after abundant exploitation most Big deflection;
In subsidence ratio and exploits and find the corresponding breadth depth ratio of subsidence ratio and conduct on the relation curve of breadth depth ratio Maximum breadth depth ratio;
It calculates to jump and adopts face maximum width, jump adopts face maximum width and is equal to maximum breadth depth ratio and adopts deep product.Pass through calculating Jump adopts face maximum width and obtains jumping the maximum value for adopting face width, gives the value upper limit jumped and adopt face width.
Step S206, according to earth's surface allow maximum inclination, adopt depth, subsidence coefficient, it is main influence angle tangent value and Displacement factor calculate production zone production face minimum widith include:
The abundant mining width of working face is calculated, the abundant mining width of working face is equal to maximum breadth depth ratio and adopts deep product;
Production face minimum widith is calculated, production face minimum widith is equal to the abundant mining width of working face and the maximum width in face is adopted in jump The difference of degree.The minimum value of production face width is obtained by calculating production face minimum widith, as long as production face width is greater than most Small value.
Step S207 adopts face maximum width according to jump and production face minimum widith determines that practical change is adopted in wide harmonic extraction and adopts Face width is adopted in jump and production face width includes:
Face width is adopted using jumping to adopt face maximum width and adopt the jump used in wide harmonic extraction as practical change, and selection is greater than opening It adopts face minimum widith and meets the width of winning apparatus size to adopt the production face used in wide harmonic extraction as practical change wide Degree.
Step S208 carries out change and adopts wide harmonic extraction to include: that winning apparatus first adopts face width to jump as practical mining width It is exploited, is then exploited again with production face width for practical mining width;Or winning apparatus is first with production face width It is exploited for practical mining width, then adopting face width again with jump is that practical mining width is exploited.
Concrete example is illustrated the above process below:
Certain well work produces mine, above covers for medium ground, and flat seam, that is, seam inclination is 0 degree, adopts deep 300m, adopts thickness 3.0m, the mining area surface subsidence factor 0.8 is main to influence angle tangent value 2.0, and displacement factor 0.3 designs production zone 2000mx3000m.It is exploited using comprehensive mechanization caving method, average daily maximum fltting speed is 20m/d.Regional vegetation can bear ground Table maximum inclination is 4mm/m.
Adopt that wide cooperative recovery method adopts face width to the jump in the region and production face is wide using change provided in this embodiment Degree design is as follows:
(1) earth's surface largest amount of subsidence, the earth's surface largest amount of subsidence=coal seam subsidence coefficient x displacement factor x are calculated The cosine value at inclination angle substitutes into data and obtains: 0.8x3.0xcos0 °=2400mm, earth's surface largest amount of subsidence is 2400mm.
The maximum allowable deflection of earth's surface is calculated, the maximum allowable deflection of earth's surface=adopting deep/mainly influences angle tangent value Value x earth's surface afterwards allows maximum inclination, substitutes into data and obtains: 4x (300/2.0)=600mm, the maximum allowable sinking of earth's surface Amount is 600mm, which is calculated when maximum inclination is 5mm/m.
(2) subsidence ratio, the maximum allowable deflection of subsidence ratio=earth's surface/earth's surface largest amount of subsidence, generation are calculated Enter data are as follows: 600/2400=0.25, subsidence ratio 0.25.
(3) it calculates to jump and adopts face maximum width, jump adopts face maximum width=maximum breadth depth ratio x and adopts depth, substitutes into data are as follows: 0.5x300=150m, it is 150m that face maximum width is adopted in jump.
(4) the abundant mining width of working face is calculated, the abundant mining width of working face=maximum breadth depth ratio x adopts depth, substitutes into number According to are as follows: 1.1x300=330m, the abundant mining width of working face are 330m.In curve shown in Fig. 3, subsidence ratio is found Corresponding breadth depth ratio, the breadth depth ratio are maximum breadth depth ratio.
(5) production face minimum widith is calculated, it is maximum wide that face is adopted in the abundant mining width-jump of production face minimum widith=working face Degree substitutes into data are as follows: 330-150=180m.
According to the mine actual production conditions, fltting speed maximum is up to 20m/d, therefore, selects to jump and adopts face maximum width 150m is to jump to adopt face width, selects 300m as production face width, with guarantee production face day fltting speed for 20m/d,
It in permanent productive limit, is manually repaired, flat region selfreparing.Specific size design is as shown in Figure 5.
In the present embodiment using become adopt it is wide by the way of exploited, due to interval exploit, no longer it is carried out in sequence Exploitation avoids and carries out the problem of exploitation causes deformation gradually to be accumulated to it in sequence.
It is as shown in Figure 4 with traditional order mining comparison result that wide cooperative exploitation is adopted in change.
According to comparing result it is found that in addition to Striping noise, it is suitable to adopt wide cooperative production ratio for change in terms of controlling earth's surface deformation Sequence exploitation and whole filling minings have superiority, and surface subsidence is as order mining, although Striping noise is in control earth's surface Sink and deformation aspect all has good effect, but its rate of extraction is low, production efficiency, the production for being unsuitable for modernization needs It asks.
Referring to shown in Fig. 6, the present invention proposes that wide harmonic extraction device is adopted in a kind of change, comprising:
First obtains module 601, and the earth's surface for obtaining production zone allows to adopt dynamic deformation amount, and earth's surface allows to adopt dynamic deformation Amount, which includes at least earth's surface, allows maximum inclination;
Second obtains module 602, and for obtaining the mining conditions value of production zone, mining conditions value includes: to adopt depth, adopt thickness With overlying rock entirety lithology;
Third obtains module 603, and for obtaining the observation data of production zone, observation data are included at least: surface subsidence Coefficient, main influence angle tangent value, seam inclination and displacement factor;
Drafting module 604, for obtaining subsidence ratio and exploiting the relation curve of breadth depth ratio;
Computing module 605, for allowing maximum inclination according to earth's surface, adopting depth, subsidence coefficient, main influence angle just Face maximum width and production face minimum widith are adopted in the jump for cutting value and displacement factor calculating production zone;
Selected module 606 determines that practical become adopts wide coordination for adopting face maximum width and production face minimum widith according to jump Face width and production face width are adopted in the jump used in exploitation, and become and adopted wide harmonic extraction.
The present invention also proposes a kind of storage medium, comprising:
The storage medium stores computer instruction, above-mentioned for executing when computer executes the computer instruction Wide harmonic extraction method is adopted in change described in any embodiment.
The present invention also proposes that wide harmonic extraction system, including at least one processor are adopted in a kind of change;And with it is described at least The memory of one processor communication connection;Wherein, the memory is stored with the instruction that can be executed by one processor, Described instruction is executed by least one described processor so that at least one described processor can:
The earth's surface for obtaining production zone allows to adopt dynamic deformation amount, and earth's surface allows to adopt dynamic deformation amount and allows most including at least earth's surface Big tilt quantity;
The mining conditions value of production zone is obtained, mining conditions value includes: to adopt depth, adopt thick and overlying rock entirety lithology;
The observation data of production zone are obtained, observation data include at least: subsidence coefficient, main influence angle tangent Value, seam inclination and displacement factor;
It obtains subsidence ratio and exploits the relation curve of breadth depth ratio;
According to earth's surface allow maximum inclination, adopt depth, subsidence coefficient, it is main influence angle tangent value and move horizontally be Face maximum width and production face minimum widith are adopted in the jump that number calculates production zone;
Face maximum width is adopted according to jump and production face minimum widith determines that practical change is adopted the jump used in wide harmonic extraction and adopted Face width and production face width, and become and adopt wide harmonic extraction.
Above-described is only the principle of the present invention and preferred embodiment.It should be pointed out that for the common skill of this field For art personnel, on the basis of the principle of the invention, several other modifications can also be made, also should be regarded as protection model of the invention It encloses.

Claims (7)

1. wide harmonic extraction method is adopted in a kind of change characterized by comprising
The earth's surface for obtaining production zone allows to adopt dynamic deformation amount, and earth's surface allows to adopt dynamic deformation amount allows maximum to incline including at least earth's surface Gradient;
The mining conditions value of production zone is obtained, mining conditions value includes: to adopt depth, adopt thick and overlying rock entirety lithology;
The observation data of production zone are obtained, observation data include at least: subsidence coefficient, main influence angle tangent value, coal Inclination layer and displacement factor;
It obtains subsidence ratio and exploits the relation curve of breadth depth ratio;
Allow maximum inclination according to earth's surface, adopt depth, subsidence coefficient, main influence angle tangent value and displacement factor meter Face maximum width and production face minimum widith are adopted in the jump for calculating production zone;
It adopts face maximum width and production face minimum widith according to jumping and determines that practical become adopts the jump used in wide harmonic extraction to adopt face wide Degree and production face width, and become and adopt wide harmonic extraction;
Allow maximum inclination according to earth's surface, adopt depth, subsidence coefficient, main influence angle tangent value and displacement factor meter The jump for calculating production zone adopts face maximum width and includes:
Earth's surface largest amount of subsidence is calculated, earth's surface largest amount of subsidence is equal to subsidence coefficient, displacement factor and seam inclination Cosine value three product;
The maximum allowable deflection of earth's surface is calculated, the maximum allowable deflection of earth's surface, which is equal to adopt, influences angle tangent value divided by main deeply Value and earth's surface afterwards allows the product of maximum inclination;
Subsidence ratio is calculated, subsidence ratio is equal to the maximum allowable deflection of earth's surface divided by under earth's surface maximum after abundant exploitation Heavy amount;
In subsidence ratio and exploits and find the corresponding breadth depth ratio of subsidence ratio on the relation curve of breadth depth ratio and as maximum Breadth depth ratio;
It calculates to jump and adopts face maximum width, jump adopts face maximum width and is equal to maximum breadth depth ratio and adopts deep product;
Allow maximum inclination according to earth's surface, adopt depth, subsidence coefficient, main influence angle tangent value and displacement factor meter Calculate production zone production face minimum widith include:
The abundant mining width of working face is calculated, the abundant mining width of working face is equal to maximum breadth depth ratio and adopts deep product;
Calculate production face minimum widith, production face minimum widith be equal to the abundant mining width of working face and jump adopt face maximum width it Difference.
2. wide harmonic extraction method is adopted in change according to claim 1, which is characterized in that
It adopts face maximum width and production face minimum widith according to jumping and determines that practical become adopts the jump used in wide harmonic extraction to adopt face wide Degree and production face width include:
Face width is adopted using jumping to adopt face maximum width and adopt the jump used in wide harmonic extraction as practical change, selection is greater than production face Minimum widith and the width for meeting winning apparatus size become as reality adopts the production face width used in wide harmonic extraction.
3. wide harmonic extraction method is adopted in change according to claim 1, which is characterized in that
It carries out change and adopts wide harmonic extraction to include: that winning apparatus is first exploited with production face width into practical mining width, then Adopting face width again with jump is that practical mining width is exploited;Or winning apparatus first adopts face width to jump as practical mining width It is exploited, is then exploited again with production face width for practical mining width.
4. wide harmonic extraction method is adopted in change according to any one of claims 1 to 3, which is characterized in that
Subsidence ratio and subsidence ratio in the relation curve of exploitation breadth depth ratio are bigger, the corresponding recovery percent of subsidence ratio It is more abundant.
5. wide harmonic extraction device is adopted in a kind of change characterized by comprising
First obtains module, and the earth's surface for obtaining production zone allows to adopt dynamic deformation amount, and earth's surface allows to adopt dynamic deformation amount at least Allow maximum inclination including earth's surface;
Second obtains module, for obtaining the mining conditions value of production zone, mining conditions value include: adopt depth, adopt it is thick and on cover Rock stratum entirety lithology;
Third obtains module, and for obtaining the observation data of production zone, observation data are included at least: subsidence coefficient, master Influence angle tangent value, seam inclination and displacement factor;
Drafting module, for obtaining subsidence ratio and exploiting the relation curve of breadth depth ratio;
Computing module, for according to earth's surface allow maximum inclination, adopt depth, subsidence coefficient, it is main influence angle tangent value and Face maximum width and production face minimum widith are adopted in the jump that displacement factor calculates production zone;
Selected module, for according to jump adopt face maximum width and production face minimum widith determine it is practical become to adopt in wide harmonic extraction adopt Face width and production face width are adopted in jump, and become and adopted wide harmonic extraction.
6. a kind of storage medium characterized by comprising
The storage medium stores computer instruction, when computer executes the computer instruction, requires 1 for perform claim Wide harmonic extraction method is adopted to change described in any one of 4.
7. wide harmonic extraction system is adopted in a kind of change, which is characterized in that including at least one processor;And with described at least one The memory of a processor communication connection;Wherein, the memory is stored with the instruction that can be executed by one processor, institute State instruction by least one described processor execute so that at least one described processor can:
The earth's surface for obtaining production zone allows to adopt dynamic deformation amount, and earth's surface allows to adopt dynamic deformation amount allows maximum to incline including at least earth's surface Gradient;
The mining conditions value of production zone is obtained, mining conditions value includes: to adopt depth, adopt thick and overlying rock entirety lithology;
The observation data of production zone are obtained, observation data include at least: subsidence coefficient, main influence angle tangent value, coal Inclination layer and displacement factor;
It obtains subsidence ratio and exploits the relation curve of breadth depth ratio;
Allow maximum inclination according to earth's surface, adopt depth, subsidence coefficient, main influence angle tangent value and displacement factor meter Face maximum width and production face minimum widith are adopted in the jump for calculating production zone;
It adopts face maximum width and production face minimum widith according to jumping and determines that practical become adopts the jump used in wide harmonic extraction to adopt face wide Degree and production face width, and become and adopt wide harmonic extraction.
CN201711479469.8A 2017-12-29 2017-12-29 Wide harmonic extraction method, module, storage medium and system are adopted in change Active CN108457650B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711479469.8A CN108457650B (en) 2017-12-29 2017-12-29 Wide harmonic extraction method, module, storage medium and system are adopted in change

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711479469.8A CN108457650B (en) 2017-12-29 2017-12-29 Wide harmonic extraction method, module, storage medium and system are adopted in change

Publications (2)

Publication Number Publication Date
CN108457650A CN108457650A (en) 2018-08-28
CN108457650B true CN108457650B (en) 2019-11-15

Family

ID=63221221

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711479469.8A Active CN108457650B (en) 2017-12-29 2017-12-29 Wide harmonic extraction method, module, storage medium and system are adopted in change

Country Status (1)

Country Link
CN (1) CN108457650B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4155595A (en) * 1975-07-22 1979-05-22 Kaiser Resources, Ltd. Mining method and apparatus
US4195886A (en) * 1977-01-24 1980-04-01 Roye Henry L Radial mining method
CN1032378A (en) * 1987-09-26 1989-04-12 抚顺矿务局 Slow down the method and the facilities and equipments thereof of bank surface subsidence
CN1213738A (en) * 1998-04-06 1999-04-14 何纯耀 Method of determination of reasonable mining width under strip coal layer

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4155595A (en) * 1975-07-22 1979-05-22 Kaiser Resources, Ltd. Mining method and apparatus
US4195886A (en) * 1977-01-24 1980-04-01 Roye Henry L Radial mining method
CN1032378A (en) * 1987-09-26 1989-04-12 抚顺矿务局 Slow down the method and the facilities and equipments thereof of bank surface subsidence
CN1213738A (en) * 1998-04-06 1999-04-14 何纯耀 Method of determination of reasonable mining width under strip coal layer

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
基于"采-充-留"技术的岩层控制效果和机理研究;阎跃观;《煤矿开采》;20160415(第2期);第64页第1栏第1段-第68页第2栏最后一段 *
峰峰矿区不同开采条件下地表沉陷规律;郝延绵等;《煤矿安全》;20070210(第2期);第33页第1栏第1段-35页第2栏最后一段 *

Also Published As

Publication number Publication date
CN108457650A (en) 2018-08-28

Similar Documents

Publication Publication Date Title
CN106593524B (en) A kind of solid filling apparent mining damage Dynamic prediction method
CN104653224B (en) The method that open-air pit tailing cemented filling is administered
WO2019149146A1 (en) Grading method of mines/mining areas for water-preserved mining
CN106640076A (en) Water-retention coal mining method for cooperatively controlling water level and water quantity of unconfined aquifer
CN102862775A (en) Distributed storage method of underground water of mine
CN103235853A (en) Earthwork balance based dike-pond layout method used for coal mining while refilling in coal-mining subsidence
Hwang et al. Evaluation of CO 2 storage capacity and injectivity using a relief well in a saline aquifer in Pohang basin, offshore South Korea
CN104484713B (en) A kind of filling mining water conducted zone Height Prediction method
CN108457650B (en) Wide harmonic extraction method, module, storage medium and system are adopted in change
CN106354911B (en) Pre- thin drop safety level determines method before a kind of top plate water-bearing layer is adopted
Hanfu et al. Water protection in the western semiarid coal mining regions of China: a case study
CN102777205B (en) Method for determining spatial position of horizontal well for gas drainage in worked-out area
CN106649953A (en) Optimization arrangement method for cavern groups of underground water sealed caverns
CN111400659A (en) Method for calculating farmland protection rate of mining-selecting-charging integrated mining technology
Lee et al. Regional CO 2 solubility trapping potential of a deep saline aquifer in Pohang basin, Korea
CN108505980B (en) Underground energy utilization level evaluation method for water-flooding oil reservoir
CN108320074A (en) Judgment method, device, storage medium and the system of production zone mining degree
CN104355324A (en) Lake salt lean ore mining process
CN203782727U (en) Soft soil foundation combined pile mesh structure
CN202482980U (en) Storage afforesting system applicable to coastal areas
CN205134355U (en) A foundation structure for shallow overburden wind generating set
CN116384166B (en) Gas reservoir gas injection extraction and collaborative database establishment optimization method, system, equipment and medium
CN107085632A (en) Underground engineering water buoyancy computational methods under the conditions of weak/impermeable stratum
Fan et al. Seepage Characteristics and Stability Analysis of Transmission Line Tower Bank Slope Under the Action of Reservoir Water
Kong et al. Study on Artificial Dam Thickness of Underground Reservoir in Wulanmulun Mine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant