CN108442362A - One kind passing through riprap layer drilled pile construction method for coastal - Google Patents

One kind passing through riprap layer drilled pile construction method for coastal Download PDF

Info

Publication number
CN108442362A
CN108442362A CN201810194480.8A CN201810194480A CN108442362A CN 108442362 A CN108442362 A CN 108442362A CN 201810194480 A CN201810194480 A CN 201810194480A CN 108442362 A CN108442362 A CN 108442362A
Authority
CN
China
Prior art keywords
steel pile
pile casting
casing
interior
coastal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810194480.8A
Other languages
Chinese (zh)
Other versions
CN108442362B (en
Inventor
邓安华
向继华
唐蔚东
涂伟成
丁碧珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201810194480.8A priority Critical patent/CN108442362B/en
Publication of CN108442362A publication Critical patent/CN108442362A/en
Application granted granted Critical
Publication of CN108442362B publication Critical patent/CN108442362B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/665Mould-pipes or other moulds for making piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Earth Drilling (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses one kind passing through riprap layer drilled pile construction method for coastal, it replaces pulping pore-forming in breakwater fill block stone throwing region by the sea using a kind of double steel pile casting respective outer side edges drilled pile equipment that can pass through riprap layer alternately operating, when drilling, the outer steel pile casting of double steel pile casting structures and the alternating pulping follow-up of interior steel pile casting.It is the configuration of the present invention is simple, easy to install and use, it constitutes double casing structures by designing an interior casing in casing outside tradition, double casing structures can realize bored piles diameter subsection hole-drilling molding, so as to avoid single casing structure sinking be obstructed, can not sink again steel pile casting the case where.

Description

One kind passing through riprap layer drilled pile construction method for coastal
Technical field
The present invention relates to a kind of coastal riprap layer is thicker, riprap layer drilled pile construction method is passed through, bridge method skill is belonged to Art field, and in particular to one kind being used for seashore hydraulic reclamation region, breakwater fill block stone throwing region drilled pile construction method.
Background technology
The development of reclaiming fields from the sea of southeastern coast is very fast at present, and the exploitation to reclaiming fields from the sea, all planning have bridge or water conservancy project code Head access bridge is connected with the breakwater for flood control of reclaiming fields from the sea, and for bridge foundation based on cast-in-situ bored pile, breakwater is all fill block stone throwing Basis, boulder manage slope mask, turn round king's block bank protection face.Big, the region influenced by sea wave as well as tide in this boulder, jackstone thickness Construction drill stake, since there are a large amount of holes between jackstone, and the tide type at the peninsulas Qi Sha of Port of Fangcheng belongs to regular full-time tide, when When whole medicine is notable, tidal range is big (extreme tide range >=4.5m), and drilled pile construction region is only than being higher by 1.5m, water when highest water level Flat distance is about 10m, and when being constructed using conventional bored pile construction method, greatly due to tidal level variation, seawater gushes at the incoming tide Into in hole, mud is lost in along hole with seawater in hole at ebb tide, can not both ensure head in hole, can not also ensure drilling slurry Performance leads to not creep into, and enrockment area is since stone is larger more, disposable injection casing can not be transferred to enrockment area and Neap is hereinafter, casing can not seriously use full casing to construct because of bottom wiredrawn edge or upper deformation.
Invention content
In view of the above-mentioned drawbacks of the prior art, present invention aim to solve the deficiency of above-mentioned background technology, One kind is provided and is used for coastal jackstone region drilled pile forming hole method, can instruct to bore on the breakwater pierre-perdue reclaimed fields from the sea Hole stake drilling construction.
In order to solve the above technical problems, present invention employs one kind riprap layer drilled pile drilling construction work is passed through for coastal Skill utilizes a kind of double steel pile casting respective outer side edges drilled pile equipment breakwater throwing by the sea that can pass through riprap layer alternately operating Alternately pulping pore-forming in block stone region, when drilling, the outer steel pile casting of double steel pile casting structures and the alternating pulping follow-up of interior steel pile casting.
In a kind of preferred embodiment of the present invention, specific steps include:(1) seashore breakwater is excavated using excavator The jackstone in fill block stone throwing region is until flood slack position;(2) it utilizes loop wheel machine that steel pile casting structure is installed, and is bored in high tide level Into after about 3m, the outer steel pile casting of steel pile casting structure is transferred, continues to creep into after ensureing its verticality;(3) in the outer of steel pile casting structure Mud is made in steel pile casting and is followed up outer steel pile casting using vibration hammer or drill hammer, when outer steel pile casting cannot follow up, using hanging Steel pile casting in below vehicle;(4) after interior steel pile casting decentralization in place, steel pile casting while side in vibration hammer or drill hammer follow-up are utilized Follow up side pulping, when interior steel pile casting cannot follow up, recycles vibration hammer or the outer steel pile casting of drill hammer follow-up, utilizes crane Interior casing is above carried into certain distance, interior casing is suspended on outer casing inner wall using hook, transfers drill hammer operation, impact After operation certain depth, release in casing and outer casing link up with, interior casing transfers to hole bottom, drill hammer job execution again, Alternately pulping follow-up is achieved;(5) enter the cylinder bottom absolute altitude of fine sand layer, interior steel pile casting low when outer casing penetrates riprap layer When can stablize pulping in position below tidal level and interior steel pile casting, stop double steel pile casting structure follow-ups, the stage crept into conventional, Outer steel pile casting is pulled out after the completion of to be onstructed and cuts off deformed part recycling, and interior steel pile casting is embedded in stake top area as permanent casing Domain.
In a kind of preferred embodiment of the present invention, outer steel pile casting follows up depth more than 5m every time, and interior steel pile casting is each Follow-up bottom end depth is 1-2m.
In a kind of preferred embodiment of the present invention, using loop wheel machine installation steel pile casting structure and in climax in step (2) The outer steel pile casting of decentralization after drilling 3m when position.
The invention also discloses such a double steel pile casting structures that can pass through riprap layer alternately operating simultaneously comprising outer Steel pile casting is provided with the first reinforcement sleeve and first basil on the outer steel pile casting, is provided with along its diameter on the outer steel pile casting To the first limit hole of arrangement, be coaxially arranged with interior steel pile casting in the outer steel pile casting, the outer diameter of the interior steel pile casting with it is described The internal diameter of first reinforcement sleeve is corresponding, and the second reinforcement sleeve and second basil, the interior steel are provided on the interior steel pile casting The second limit hole radially arranged is provided on casing, the internal diameter of first limit hole is interior with second limit hole Diameter is corresponding.
In a kind of preferred embodiment of the present invention, the basil is provided on the end inner ring of the first reinforcement sleeve.
In a kind of preferred embodiment of the present invention, the basil is provided on the end inner ring of the second reinforcement sleeve.
In a kind of preferred embodiment of the present invention, the other end of the outer steel pile casting has been removably installed impact Frame.
In a kind of preferred embodiment of the present invention, the shaped steel welding of the impact frame two groups of level crossings arrangement and At.
In a kind of preferred embodiment of the present invention, it is provided on the outer steel pile casting for installing the impact frame Mounting groove.
In a kind of preferred embodiment of the present invention, the first suspension hook is provided on the inner wall of the outer steel pile casting, it is described The second suspension hook is provided on the outer wall of interior steel pile casting, first suspension hook is connected with second suspension hook by suspension cable.
The beneficial effects of the invention are as follows:The configuration of the present invention is simple, easy to install and use, the present invention is by devising a kind of profit With the technique for replacing pulping pore-forming in double steel pile casting structures by the sea breakwater fill block stone throwing region, has effectively achieved and enclose sea and make Drilled pile drilling construction on the breakwater pierre-perdue on ground, by designed in casing outside tradition an interior casing constitute it is double Casing structure, which can realize the subsection hole-drilling molding of bored piles diameter, so as to avoid under single casing structure It is heavy to be obstructed, can not sink again steel pile casting the case where;The present invention by separately designing limit hole on outer casing and interior casing, to Realize the positioning and installation when double casing off working states, the present invention between double casings by being arranged suspension cable and suspension hook is effective Ground improves efficiency when double casings work alternatively.
Description of the drawings
Fig. 1 is that one kind of the embodiment of the present invention passing through riprap layer drilled pile pore-forming for coastal
The structural schematic diagram of double casing structures of construction;
Fig. 2 is that one kind of the embodiment of the present invention passing through riprap layer drilled pile pore-forming for coastal
The sectional view of double casing structures of construction;
Fig. 3 is that the embodiment of the present invention is a kind of for the outer of coastal double casing structures across riprap layer drilled pile drilling construction Casing front view;
Fig. 4 is that the embodiment of the present invention is a kind of for the outer of coastal double casing structures across riprap layer drilled pile drilling construction Casing front view sectional view A-A;
Fig. 5 is that the embodiment of the present invention is a kind of for the outer of coastal double casing structures across riprap layer drilled pile drilling construction Casing axis surveys view;
Fig. 6 is that the embodiment of the present invention is a kind of for the interior of coastal double casing structures across riprap layer drilled pile drilling construction Casing front view;
Fig. 7 is that the embodiment of the present invention is a kind of for the interior of coastal double casing structures across riprap layer drilled pile drilling construction Casing sectional view B-B;
Fig. 8 is that the embodiment of the present invention is a kind of for the interior of coastal double casing structures across riprap layer drilled pile drilling construction Casing front view axis surveys view;
Fig. 9 is that the embodiment of the present invention is a kind of for the outstanding of coastal double casing structures across riprap layer drilled pile drilling construction Rope, suspension hook cooperation schematic diagram;
Figure 10, which is that the embodiment of the present invention is a kind of, being used for coastal double casing structures across riprap layer drilled pile drilling construction Impact frame schematic diagram;
Figure 11, which is that the embodiment of the present invention is a kind of, being used for coastal double casing structures across riprap layer drilled pile drilling construction Work flow diagram;
In figure:The outer steel pile castings of 1-, first basils of 2-, 3- first reinforce sleeve, and steel pile casting in 4-, 5- second reinforces sleeve, Second basils of 6-, the first limit holes of 7-, the second limit holes of 8-, the 9- basils, 10- impact framves, 11- suspension cables, the first suspension hooks of 1.1-, The second suspension hooks of 4.1-.
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that described herein, specific examples are only used to explain the present invention, not For limiting the present invention.
Shown in description of the invention attached drawing, the invention discloses one kind to apply for coastal across riprap layer drilled pile pore-forming Work technique utilizes a kind of double steel pile casting respective outer side edges drilled pile equipment breakwater by the sea that can pass through riprap layer alternately operating Alternately pulping pore-forming in fill block stone throwing region, when drilling, the outer steel pile casting of double steel pile casting structures and interior steel pile casting alternating pulping with Into.
The present invention specific steps include:(1) jackstone that seashore breakwater fill block stone throwing region is excavated using excavator is straight Until flood slack position;(2) it utilizes loop wheel machine installation steel pile casting structure and is crept into high tide level, outside decentralization steel pile casting structure Steel pile casting continues to creep into after ensureing its verticality;(3) mud is made in the outer steel pile casting of steel pile casting structure and using vibration hammer or The outer steel pile casting of drill hammer follow-up utilizes steel pile casting in below crane when outer steel pile casting cannot follow up;(4) under interior steel pile casting After being put into position, using vibration hammer or drill hammer follow up in the steel pile casting pulping in follow-up simultaneously, when interior steel pile casting cannot be with Into when, recycle vibration hammer or drill hammer to follow up outer steel pile casting, or interior casing is above carried certain distance using crane, utilization Interior casing is suspended on outer casing inner wall by hook, transfers drill hammer operation, after impacting operation certain depth, releases interior casing It is linked up with outer casing, interior casing transfers to hole bottom, and alternately pulping follow-up is achieved in drill hammer job execution again;(5) when Outer casing penetrates riprap layer and enters the cylinder bottom absolute altitude of fine sand layer, the interior steel pile casting energy in position and interior steel pile casting below low tide When enough stablizing pulping, stops double steel pile casting structure follow-ups, crept into the stage into conventional, pull out outer steel pile casting after the completion of to be onstructed and cut Except deformed part reuses, interior steel pile casting is embedded in stake top region as permanent casing.The outer steel pile casting depth that follows up every time is more than 5m, interior steel pile casting follow up bottom end depth as 1-2m every time.Using loop wheel machine installation steel pile casting structure and in high tide level in step (2) Outer steel pile casting is transferred after creeping into 3m.
The a kind of of the present invention can pass through double steel pile casting structures of riprap layer alternately operating it is found that the utility model one kind is used for Coastal double casing structures across riprap layer drilled pile drilling construction, a kind of double steel pile castings that can pass through riprap layer alternately operating Structure, including outer steel pile casting 1 are provided with the first reinforcement sleeve 3 and first basil 2 on outer steel pile casting 1, are arranged on outer steel pile casting 1 Have the first limit hole 7 radially arranged, be coaxially arranged with interior steel pile casting 4 in outer steel pile casting 1, the outer diameter of interior steel pile casting 4 with The internal diameter of first reinforcement sleeve 3 is corresponding, and the second reinforcement sleeve 5 and second basil 6, interior steel pile casting 4 are provided on interior steel pile casting 4 On be provided with the second limit hole 8 radially arranged, the internal diameter of the first limit hole 7 is corresponding with the internal diameter of the second limit hole 8. It is provided with the basil 9 on the end inner ring of first reinforcement sleeve 3.It is provided with the basil 9 on the end inner ring of second reinforcement sleeve 5.Outside The other end of steel pile casting 1 has been removably installed impact frame 10.The shaped steel of impact 5 two groups of level crossings of frame arrangement is welded. The mounting groove for installing impact frame 5 is provided on outer steel pile casting 1.The first suspension hook 1.1 is provided on the inner wall of outer steel pile casting 1, The second suspension hook 4.1 is provided on the outer wall of interior steel pile casting 4, the first suspension hook 1.1 and the second suspension hook 4.1 are connected by suspension cable 11.
When novel using the present invention, after surveying setting-out, drilling machine, which is located in, to be put well at stake position, is crept into about in high tide level After 3m, outer casing is transferred, ensures its verticality, continued drilling and (there is the case where spillage in the process, clay need to be launched, mended Water pulping) at the same the casing that follows up (by pile monkey promoted be higher than casing mouth 1-2m, utilize the gravity of pile monkey itself, realize casing follow-up Or realize follow-up using DZ60 vibration hammers, and then weld spreading), when the follow-up of outer casing, which is obstructed, to follow up, then the interior shield that follows up Cylinder, interior casing, which is subject to, is no more than outer casing, and method follows up with outer casing (because casing inevitably occurs in decentralization process in outer casing The case where deformation, wiredrawn edge, ensures aperture etc. using interior casing), when interior casing can not follow up, utilize the outer shield of impact frame follow-up Cylinder recycles crane to carry and climbs interior casing height about 1m, interior casing is fixed temporarily using interim padlock in outer casing until stopping On, the percussive drill on interior casing makes drilling mud practice, and about 1m is crept into operation, releases the interim padlock of interior casing, and steel protects in lower section Cylinder, drilling 1-2m follow up outer casing again, and drilling (because mud can not recycle during this, to use fishing inder pot borehole cleaning) is so anti- Multiple, construction technology such as Fig. 1 shows, enters after fine sand layer that (casing bottom absolute altitude is less than most at this time until interior casing penetrates riprap layer Low tide about 2-3m) spillage no longer occurs in the case of, then enter the conventional drilling stage, pull out outer casing after the completion of to be onstructed and cut Except deformed part reuses, interior casing is embedded in stake top region as permanent casing.
More than it should be understood that, novel specific implementation mode only of the invention, but protection scope of the present invention is not It is confined to this, any technical person familiar with the field can readily occur in the technical scope disclosed by the utility model Change or replacement should be covered by the protection scope of the present invention.

Claims (10)

1. one kind passing through riprap layer drilled pile construction method for coastal, it is characterised in that:Jackstone can be passed through using a kind of Double steel pile casting respective outer side edges drilled pile equipment of layer alternately operating replace pulping pore-forming in breakwater fill block stone throwing region by the sea, When drilling, the outer steel pile casting of double steel pile casting structures and the alternating pulping follow-up of interior steel pile casting.
2. one kind according to claim 1 passes through riprap layer drilled pile construction method for coastal, it is characterised in that: Specific steps include:
(1) jackstone in seashore breakwater fill block stone throwing region is excavated until flood slack position using excavator;
(2) it utilizes loop wheel machine installation steel pile casting structure and is crept into high tide level, transfer the outer steel pile casting of steel pile casting structure, ensure it Continue to creep into after verticality;
(3) mud is made in the outer steel pile casting of steel pile casting structure and utilizes vibration hammer or the outer steel pile casting of drill hammer follow-up, when outer When steel pile casting cannot follow up, steel pile casting in crane lower section is utilized;
(4) after the decentralization in place of interior steel pile casting, using vibration hammer or drill hammer follow up in the steel pile casting pulping in follow-up simultaneously, When interior steel pile casting cannot follow up, vibration hammer or the outer steel pile casting of drill hammer follow-up are recycled, is above carried interior casing using crane Interior casing is suspended on outer casing inner wall using hook, transfers drill hammer operation, impact operation certain depth by certain distance Afterwards, casing is linked up with outer casing in releasing, and interior casing transfers to hole bottom, and alternating is achieved in drill hammer job execution again Pulping follows up;
(5) enter the cylinder bottom absolute altitude of fine sand layer, the interior steel pile casting position and interior below low tide when outer casing penetrates riprap layer When can stablize pulping in steel pile casting, stops double steel pile casting structure follow-ups, creep into the stage into conventional, pulled out after the completion of to be onstructed Outer steel pile casting cuts off deformed part recycling, and interior steel pile casting is embedded in stake top region as permanent casing.
3. one kind according to claim 2 passes through riprap layer drilled pile construction method for coastal, it is characterised in that: Outer steel pile casting follows up depth more than 5m every time, and interior steel pile casting follows up bottom end depth as 1-2m every time.
4. one kind according to claim 2 passes through riprap layer drilled pile construction method for coastal, it is characterised in that: Outer steel pile casting is transferred after creeping into 3m using loop wheel machine installation steel pile casting structure in step (2) and in high tide level.
5. one kind according to claim 1 passes through riprap layer drilled pile construction method for coastal, it is characterised in that: A kind of can include outer steel pile casting (1) across double steel pile casting structures of riprap layer alternately operating, be provided on the outer steel pile casting (1) First reinforces sleeve (3) and first basil (2), it is characterised in that:It is provided on the outer steel pile casting (1) and radially to arrange First limit hole (7), is coaxially arranged with interior steel pile casting (4) in the outer steel pile casting (1), the outer diameter of the interior steel pile casting (4) with The internal diameter of the first reinforcement sleeve (3) is corresponding, and the second reinforcement sleeve (5) and second are provided on the interior steel pile casting (4) The basil (6) is provided with the second limit hole (8) radially arranged, first limit hole (7) on the interior steel pile casting (4) Internal diameter it is corresponding with the internal diameter of the second limit hole (8).
6. one kind according to claim 5 passes through riprap layer drilled pile construction method for coastal, it is characterised in that: It is provided with the basil (9) on the end inner ring of the first reinforcement sleeve (3).
7. one kind according to claim 5 passes through riprap layer drilled pile construction method for coastal, it is characterised in that: It is provided with the basil (9) on the end inner ring of the second reinforcement sleeve (5).
8. one kind according to claim 5 passes through riprap layer drilled pile construction method for coastal, it is characterised in that: The other end of the outer steel pile casting (1) has been removably installed impact frame (10).
9. one kind according to claim 8 passes through riprap layer drilled pile construction method for coastal, it is characterised in that: The shaped steel of impact (10) two groups of level crossings of frame arrangement is welded;It is provided on the outer steel pile casting (1) for installing The mounting groove of the impact frame (10).
10. one kind according to claim 5 passes through riprap layer drilled pile construction method, feature to exist for coastal In:It is provided with the first suspension hook (1.1) on the inner wall of the outer steel pile casting (1), is provided on the outer wall of the interior steel pile casting (4) Two suspension hooks (4.1), first suspension hook (1.1) and second suspension hook (4.1) are connected by suspension cable (11).
CN201810194480.8A 2018-03-09 2018-03-09 Hole forming construction process for coastal drilled pile penetrating riprap layer Active CN108442362B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810194480.8A CN108442362B (en) 2018-03-09 2018-03-09 Hole forming construction process for coastal drilled pile penetrating riprap layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810194480.8A CN108442362B (en) 2018-03-09 2018-03-09 Hole forming construction process for coastal drilled pile penetrating riprap layer

Publications (2)

Publication Number Publication Date
CN108442362A true CN108442362A (en) 2018-08-24
CN108442362B CN108442362B (en) 2020-07-07

Family

ID=63194253

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810194480.8A Active CN108442362B (en) 2018-03-09 2018-03-09 Hole forming construction process for coastal drilled pile penetrating riprap layer

Country Status (1)

Country Link
CN (1) CN108442362B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208594A (en) * 2018-08-29 2019-01-15 中铁大桥局集团有限公司 Processing method, steel pile casting structure and the drilled pile of sinking steel protecting canister chance boulder
CN109723059A (en) * 2018-11-16 2019-05-07 上海建工二建集团有限公司 A kind of improved full casing and its application method for sand-gravel foundation construction
CN111926808A (en) * 2020-07-31 2020-11-13 中国建筑土木建设有限公司 Detachable casing structure of deepwater pile foundation and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1140697A (en) * 1966-05-24 1969-01-22 Taisei Corp Method of building underground concrete walls
CN201068569Y (en) * 2007-03-02 2008-06-04 周祥 Pile-driving machine
CN103485336A (en) * 2013-09-30 2014-01-01 中铁二十局集团有限公司 Drilling pile drilling construction method of bead-type karst area
CN103967032A (en) * 2014-04-16 2014-08-06 青岛理工大学 Double-protective-cylinder cast-in-situ bored pile used for highly-corrosive salty soil and construction method of double-protective-cylinder cast-in-situ bored pile
CN104514219A (en) * 2014-12-12 2015-04-15 中铁十九局集团有限公司 In-water drilled pile foundation construction system capable of recovering steel protective barrels and construction method thereof
CN104988913A (en) * 2015-05-29 2015-10-21 王继忠 Construction method for carrier pile of major diameter long pile
CN105970918A (en) * 2016-03-23 2016-09-28 中铁四局集团钢结构有限公司 Pile foundation hole forming construction process under large-particle-size cobble sandy soil and severe water seepage geological condition

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1140697A (en) * 1966-05-24 1969-01-22 Taisei Corp Method of building underground concrete walls
CN201068569Y (en) * 2007-03-02 2008-06-04 周祥 Pile-driving machine
CN103485336A (en) * 2013-09-30 2014-01-01 中铁二十局集团有限公司 Drilling pile drilling construction method of bead-type karst area
CN103967032A (en) * 2014-04-16 2014-08-06 青岛理工大学 Double-protective-cylinder cast-in-situ bored pile used for highly-corrosive salty soil and construction method of double-protective-cylinder cast-in-situ bored pile
CN104514219A (en) * 2014-12-12 2015-04-15 中铁十九局集团有限公司 In-water drilled pile foundation construction system capable of recovering steel protective barrels and construction method thereof
CN104988913A (en) * 2015-05-29 2015-10-21 王继忠 Construction method for carrier pile of major diameter long pile
CN105970918A (en) * 2016-03-23 2016-09-28 中铁四局集团钢结构有限公司 Pile foundation hole forming construction process under large-particle-size cobble sandy soil and severe water seepage geological condition

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨宏兵: ""冲孔灌注桩施工工艺在抛石棱体中的应用"", 《水运工程》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208594A (en) * 2018-08-29 2019-01-15 中铁大桥局集团有限公司 Processing method, steel pile casting structure and the drilled pile of sinking steel protecting canister chance boulder
CN109723059A (en) * 2018-11-16 2019-05-07 上海建工二建集团有限公司 A kind of improved full casing and its application method for sand-gravel foundation construction
CN111926808A (en) * 2020-07-31 2020-11-13 中国建筑土木建设有限公司 Detachable casing structure of deepwater pile foundation and construction method thereof

Also Published As

Publication number Publication date
CN108442362B (en) 2020-07-07

Similar Documents

Publication Publication Date Title
WO2022096024A1 (en) Construction method for super-long small-diameter hole bored pile
CN108442362A (en) One kind passing through riprap layer drilled pile construction method for coastal
CN103046931B (en) Method for forming holes of vertical shaft/pilot shaft through impact type drilling machine in impacting mode
CN109487807A (en) A kind of steel pipe pile cofferdam pilot hole altering fill method
CN110735600B (en) Mechanical pore-forming pile construction process for karst geology
CN104612179B (en) Through the construction method of the diaphram wall of super thick silty sand ground
CN111827275A (en) Karst area pile foundation construction system and construction method
CN104532853B (en) Deep foundation pit supporting method and system characterized by steel reinforced cement-soil piles, bolts easy to detach and automatic monitoring and early warning
CN113605434A (en) Bridge pile foundation construction method for high-speed railway karst
CN112761644A (en) Suspension sinking vertical shaft well completion process
CN108049395A (en) A kind of anti-collapse impact holing construction method in complex karst place
CN209538258U (en) A kind of construction equipment for replacing bored concrete pile
CN106930274B (en) A kind of a full set of cylinder rotatory boring castinplace pile construction method that reinforcing bar cage location is fixed
CN112554176B (en) Full-casing twisted pipe follow-up rotary drilling pore-forming construction method
CN109024638A (en) The hardened stiff plastic argillic horizon excavation construction method of deep water in a kind of steel cofferdam
CN105862862A (en) Salvage method for large-diameter pile buried hammer
CN108179759A (en) The underwater drill core slotting of driftway is without bottom sealing method
CN208088289U (en) A kind of double steel pile casting structures that can pass through riprap layer alternately operating
CN113090192B (en) Complex stratum rotary drilling steel sleeve matched hole forming method
CN214784305U (en) High-efficient safe tailing storehouse radiation well device of digging a well
CN109989346A (en) Bridge major diameter precast concrete tubular column basis and its construction method
CN110528497A (en) A kind of construction method of hidden hole drilling cooperation impact drill continuous wall trench underground
CN107476293A (en) A kind of quick spreading structure of soft soil foundation bored concrete pile configures and its spreading method
CN211037023U (en) Pipe well dewatering well arranged at bottom of underground diaphragm wall
CN113404045A (en) Pile foundation construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220221

Address after: No.430011, Jinyinhu Road, Wuhan, Hubei Province

Patentee after: CCCC SECOND HARBOR ENGINEERING Co.,Ltd.

Patentee after: CCCC Wuhan harbor engineering design and Research Institute Co., Ltd

Address before: No.430011, Jinyinhu Road, Wuhan, Hubei Province

Patentee before: CCCC SECOND HARBOR ENGINEERING Co.,Ltd.

TR01 Transfer of patent right