CN108425377A - A kind of offshore steel structure high-rise pile cap blower foundation and its construction method - Google Patents

A kind of offshore steel structure high-rise pile cap blower foundation and its construction method Download PDF

Info

Publication number
CN108425377A
CN108425377A CN201810477860.2A CN201810477860A CN108425377A CN 108425377 A CN108425377 A CN 108425377A CN 201810477860 A CN201810477860 A CN 201810477860A CN 108425377 A CN108425377 A CN 108425377A
Authority
CN
China
Prior art keywords
pile
cushion cap
central tube
cap
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810477860.2A
Other languages
Chinese (zh)
Inventor
周全智
刘金全
迟洪明
吴永祥
李红有
丁伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longyuan Beijing Wind Power Engineering Design and Consultation Co Ltd
Original Assignee
Longyuan Beijing Wind Power Engineering Design and Consultation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longyuan Beijing Wind Power Engineering Design and Consultation Co Ltd filed Critical Longyuan Beijing Wind Power Engineering Design and Consultation Co Ltd
Priority to CN201810477860.2A priority Critical patent/CN108425377A/en
Publication of CN108425377A publication Critical patent/CN108425377A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure

Abstract

The invention discloses a kind of offshore steel structure high-rise pile cap blower foundation and its construction methods, offshore steel structure high-rise pile cap blower foundation, and using Prefabricated steel construction, it includes central tube, pile pile, sleeve and bearing sheet;Cylindric central tube is located at the middle position of entire high-rise pile cap blower foundation;Flange is provided at the top of central tube;Central tube is connected by flange with offshore wind turbine;The side of central tube is vertically connected with cushion cap riser;Cushion cap riser is right-angled trapezium;Cushion cap riser upper vertical is connected with circular cushion cap top plate;The inner ring of cushion cap top plate is disposed around the side of central tube;The lower section of central tube and cushion cap riser is connected with cushion cap bottom plate jointly;The bevel edge of cushion cap riser is connected with sleeve;Pile pile is fixed in sleeve;Pile pile is the piling bar of tubulose;The top of pile pile and sleeve are internally provided with shear key;Sleeve is connected as one with pile pile.Offshore construction of the present invention is simple and practicable, and duty cycle is short, and weight is low, economic and reliable.

Description

A kind of offshore steel structure high-rise pile cap blower foundation and its construction method
Technical field
The present invention relates to a kind of blower foundation more particularly to a kind of offshore steel structure high-rise pile cap blower foundation and its constructions Method.
Background technology
Current stage, in Europe and domestic marine wind electric field development process, offshore wind turbine foundation structure type is main Including single-pile foundation, spider basis, jacket basis, High-Rise Pile Cap Foundation, gravity type foundation and buoyant foundation and suction Cartridge type basis etc..Wherein, High-Rise Pile Cap Foundation mostly uses the form of taper pile, that is, multiple piling bars are each passed through outside cushion cap foundation The sleeve of side, and piling is tilted successively to projected depth, it is in the trend of outside side diffusion to make the lower end of piling bar, plays support effect Fruit.
Existing offshore wind turbine high-rise pile cap is reinforced concrete structure, and the steel reinforcement cage of cushion cap part generally requires scene Binding, workload is larger, and cushion cap concreting carries out usually in steel jacket box, therefore, has operation procedure complexity, duration Longer, the higher defect of cost.In addition, the high-rise pile cap of reinforced concrete structure since own wt is heavier, is relatively suitable for water Deep shallower waters.As marine wind electric field gradually develops toward deep water and high-power blower unit direction, weather window of constructing Phase is shorter, and the high-rise pile cap of reinforced concrete structure duty cycle can be longer, and cushion cap weight can be heavier, this gives existing offshore steel The application of reinforced concrete high-rise pile cap structure brings challenge.
Invention content
In order to solve the shortcoming present in above-mentioned technology, the present invention provides a kind of offshore steel structure high-rise pile cap wind Machine basis and its construction method.
In order to solve the above technical problems, the technical solution adopted by the present invention is:A kind of offshore wind turbine High-Rise Pile Cap Foundation, Using Prefabricated steel construction, it includes central tube, pile pile, sleeve and bearing sheet;Central tube is located at entire high-rise pile cap blower foundation Middle position;Central tube is cylindrical shape;Flange is provided at the top of central tube;Central tube is connected by flange with offshore wind turbine It connects;The side surface of central tube is vertically connected with cushion cap riser;Cushion cap riser is right-angled trapezium;It hangs down the top of cushion cap riser It is direct-connected to be connected to circular cushion cap top plate;The inner ring of cushion cap top plate is disposed around the side of central tube;Central tube and cushion cap riser Lower section is connected with cushion cap bottom plate jointly;The bevel edge of cushion cap riser is connected with sleeve;Pile pile is fixed in sleeve;Pile pile is tubulose Piling bar;The top of pile pile and sleeve are internally provided with shear key;Sleeve is connected as one with pile pile.
Further, the right-angle side of cushion cap riser is by being welded on central tube;Cushion cap riser is symmetrically equidistant to be welded on On the surface of central tube.
Further, it is provided with lightening hole on cushion cap riser;Lightening hole is the hole of quadrangle or circle.
Further, the inner ring of cushion cap top plate is welded on the side of central tube 1;Cushion cap top plate 3 is welded on cushion cap riser 4 Top.
Further, cushion cap bottom plate is welded on central tube and cushion cap riser.
Further, sleeve weld is on cushion cap riser, cushion cap top plate and cushion cap bottom plate.
Further, pile pile is welded together with sleeve by the connecting plate at top.
Further, it is become one structure by cement injection mortar between sleeve and pile pile.
Further, present disclosure further includes the construction method of above-mentioned offshore steel structure high-rise pile cap blower foundation, Specific construction step is:
One, by stake pile sinking in place to mud face projected depth below;
Two, the offshore steel structure high-rise pile cap blower foundation is put down from top to bottom, so that central tube is passed through stake in place, and solid It is scheduled on stake epimere in place;
Three, each pile pile is each passed through each sleeve, driven piles to projected depth by root;
Four, stake in place is extracted;
Five, leveling is carried out to the offshore steel structure high-rise pile cap blower foundation, welds top connecting plate, be in the milk, completed Installation.
Further, the offshore steel structure high-rise pile cap blower foundation is arranged more than water surface splash zone.
The present invention proposes a kind of novel offshore wind turbine High-Rise Pile Cap Foundation and its construction method, is held with armored concrete Platform is compared, which uses prefabrication steel construction, passes through reasonable setting structure form so that fan loads rationally effectively pass It is handed to pile foundation, realizes the positioning accuracy for improving pile pile, offshore construction device resource is saved, shortens construction period, reduces cushion cap Weight and operating cost, while operation on the sea safety is improved, breach the weather window phase of High-Rise Pile Cap Foundation form Limitation.
Description of the drawings
Fig. 1 is the side sectional view of the present invention.
Fig. 2 is the section plan of the present invention.
Fig. 3 is the schematic diagram one of the construction method of the present invention.
Fig. 4 is the schematic diagram two of the construction method of the present invention.
In figure:1, central tube;2, flange;3, cushion cap top plate;4, cushion cap riser;5, lightening hole;6, cushion cap bottom plate;7, it manages Stake;8, sleeve;9, connecting plate;10, stake in place;11, mud face;12, steel cushion cap.
Specific implementation mode
The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
Offshore wind turbine High-Rise Pile Cap Foundation shown in Fig. 1-2, it uses Prefabricated steel construction, including central tube 1, pile pile 7, set Cylinder 8 and bearing sheet;Compared with reinforced concrete pile cap, the structure offshore construction is simple and practicable, and pile pile positioning accuracy is high, operation week Phase is short, and weight is low, economic and reliable.
Central tube 1 is located at the middle position of entire high-rise pile cap blower foundation;Central tube 1 is cylindrical shape;The top of central tube 1 Portion is provided with flange 2;Flange 2 with blower fan tower barrel connecting.
The side of central tube 1 is vertically connected with cushion cap riser 4;Cushion cap riser 4 is right-angled trapezium;Cushion cap riser 4 Right-angle side be welded on the side of central tube 1;Cushion cap riser 4 is symmetrically equidistant to be welded on the surface of central tube 1;Cushion cap is vertical 4 upper vertical of plate is connected with circular cushion cap top plate 3;The inner ring of cushion cap top plate 3 is disposed around the side of central tube 1;Cushion cap top The inner ring of plate 3 is welded on the side of central tube 1;Cushion cap top plate 3 is welded on the top of cushion cap riser 4;3 central tube 1 of cushion cap top plate It is connected with cushion cap bottom plate 6 jointly with the lower section of cushion cap riser 4.
It is provided with lightening hole on cushion cap riser;Lightening hole is the hole of quadrangle or circle;To mitigate weight and facilitate weldering Connect construction.
The bevel edge of cushion cap riser 4 is connected with sleeve 8;Sleeve 8 is welded on cushion cap riser 4, cushion cap top plate 3 and cushion cap bottom plate 6 On.
Pile pile 7 is fixed in sleeve 8;Pile pile 7 is the piling bar of tubulose;Pile pile 7 is welded with sleeve 8 by the connecting plate 9 at top It is connected together.The positioning and required precision of each pile pile 7 are realized by the sleeve 8 of steel.
The top of pile pile 7 and sleeve 8 are internally provided with shear key;Pass through cement injection mortar between sleeve 8 and pile pile 7 It becomes one structure.
In the present embodiment, fan loads reach central tube 1 by flange 2, then by cushion cap riser 4, cushion cap top plate 3, Cushion cap bottom plate 6 reaches sleeve 8, and pile pile 7 is passed to finally by connecting plate 9, shear key and cement mortar.Total force flow passes It passs simple clear.The cushion cap foundation of steel is completed in factory process in advance, after being transported to operation marine site, carries out construction operation.
As shown in Figure 3, Figure 4, the construction operation the specific steps are:
One, after positioning cushion cap, by 10 pile sinking of stake in place to 11 or less certain projected depth of mud face;
Two, decentralization steel cushion cap 12, makes cushion cap central tube 1 be fixed in stake 10 in place across stake 10 in place, and is arranged in water It is more than face splash zone;
Three, sleeve 8 that each pile pile 7 is sequentially passed through to 12 outside of steel cushion cap, drives piles by root to projected depth;
Four, stake 10 in place is extracted using pile extractor, is reused;
Five, leveling is carried out to steel cushion cap 12, welds top connecting plate, installation is completed in grouting.
Pile pile 7 squeezes into seabed by each sleeve 8, realizes that pile pile 7 is accurately positioned, ensures required precision.After the completion of piling, Sea only needs top connecting plate welding 9 and grouting operation, construction is simple, activity duration short.
Offshore steel structure high-rise pile cap can be prefabricated in the factory in the present invention, and own wt is light, and workmanship is easy It is guaranteed, is quickly and expediently installed.Compared to traditional reinforced concrete pile cap, need not use steel jacket box, reinforcing bar binding and Mass concrete stirring pours operation, and operation ship equipment is simple, the offshore construction period can be made to reduce 60% or more, cushion cap weight Amount mitigates 80% or more, can greatly save offshore construction duration and operating cost.
The above embodiment is not limitation of the present invention, and the present invention is also not limited to the example above, this technology neck The variations, modifications, additions or substitutions that the technical staff in domain is made within the scope of technical scheme of the present invention, also belong to this hair Bright protection domain.

Claims (10)

1. a kind of offshore wind turbine High-Rise Pile Cap Foundation, it is characterised in that:The offshore wind turbine High-Rise Pile Cap Foundation uses pre-manufactured steel Structure, it includes central tube (1), pile pile (7), sleeve (8) and bearing sheet;The central tube (1) is located at entire high-rise pile cap wind The middle position on machine basis;The central tube (1) is cylindrical shape;It is provided with flange (2) at the top of the central tube (1);It is described Central tube (1) is connected by flange (2) with wind turbine;It is vertical that the side surface of the central tube (1) is vertically connected with cushion cap Plate (4);The cushion cap riser (4) is right-angled trapezium;The upper vertical of the cushion cap riser (4) is connected with circular cushion cap top Plate (3);The inner ring of the cushion cap top plate (3) is disposed around the side of central tube (1);The central tube (1) and cushion cap riser (4) Lower section is connected with cushion cap bottom plate (6) jointly;The bevel edge of the cushion cap riser (4) is connected with sleeve (8);It is solid in the sleeve (8) Surely there is pile pile (7);The pile pile (7) is the piling bar of tubulose;Being internally provided with for the top of the pile pile (7) and sleeve (8) is anti- Cut key;The sleeve (8) is connected as one with pile pile (7).
2. offshore wind turbine High-Rise Pile Cap Foundation according to claim 1, it is characterised in that:The cushion cap riser (4) it is straight The arm of angle is welded on central tube (1);The cushion cap riser (4) is symmetrically equidistant to be welded on the surface of central tube (1).
3. offshore wind turbine High-Rise Pile Cap Foundation according to claim 2, it is characterised in that:It is set on the cushion cap riser (4) It is equipped with lightening hole (5);The lightening hole (5) is the hole of quadrangle or circle.
4. offshore wind turbine High-Rise Pile Cap Foundation according to claim 3, it is characterised in that:The cushion cap top plate (3) it is interior Lap welding is connected on the side of central tube (1);The cushion cap top plate (3) is welded on the top of cushion cap riser (4).
5. offshore wind turbine High-Rise Pile Cap Foundation according to claim 4, it is characterised in that:Cushion cap bottom plate (6) welding On central tube (1) and cushion cap riser (4).
6. offshore wind turbine High-Rise Pile Cap Foundation according to claim 5, it is characterised in that:The sleeve (8), which is welded on, holds On platform riser (4), cushion cap top plate (3) and cushion cap bottom plate (6).
7. offshore wind turbine High-Rise Pile Cap Foundation according to claim 1 or 6, it is characterised in that:The pile pile (7) and sleeve (8) welded together by the connecting plate at top (9).
8. offshore wind turbine High-Rise Pile Cap Foundation according to claim 7, it is characterised in that:The sleeve (8) and pile pile (7) Between become one structure by cement injection mortar.
9. a kind of construction method of offshore steel structure high-rise pile cap blower foundation as claimed in claim 5, it is characterised in that:Institute The Specific construction step for stating method is:
One, by stake in place (10) pile sinking to mud face projected depth below;
Two, the offshore steel structure high-rise pile cap blower foundation is put down from top to bottom, and central tube (1) is made to pass through stake in place (10), And it is fixed on stake in place (10) epimere;
Three, each pile pile (7) is each passed through each sleeve (8), driven piles to projected depth by root;
Four, stake in place (10) are extracted;
Five, leveling is carried out to the offshore steel structure high-rise pile cap blower foundation, welds top connecting plate, installation is completed in grouting.
10. the construction method of offshore steel structure high-rise pile cap blower foundation according to claim 9, it is characterised in that:Institute Offshore steel structure high-rise pile cap blower foundation is stated to be arranged more than water surface splash zone.
CN201810477860.2A 2018-05-18 2018-05-18 A kind of offshore steel structure high-rise pile cap blower foundation and its construction method Pending CN108425377A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810477860.2A CN108425377A (en) 2018-05-18 2018-05-18 A kind of offshore steel structure high-rise pile cap blower foundation and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810477860.2A CN108425377A (en) 2018-05-18 2018-05-18 A kind of offshore steel structure high-rise pile cap blower foundation and its construction method

Publications (1)

Publication Number Publication Date
CN108425377A true CN108425377A (en) 2018-08-21

Family

ID=63163565

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810477860.2A Pending CN108425377A (en) 2018-05-18 2018-05-18 A kind of offshore steel structure high-rise pile cap blower foundation and its construction method

Country Status (1)

Country Link
CN (1) CN108425377A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593298A (en) * 2019-09-30 2019-12-20 天津大学 Composite foundation for improving bearing performance of cylindrical foundation by using auxiliary piles and construction method thereof
CN110644471A (en) * 2019-10-18 2020-01-03 中国铁路设计集团有限公司 Staple bolt formula precast tubular pile and connection structure of prefabricated cushion cap
CN113622453A (en) * 2021-08-19 2021-11-09 福建省宏闽电力工程监理有限公司 Offshore wind power bearing platform foundation construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201538971U (en) * 2009-10-23 2010-08-04 中国水电顾问集团华东勘测设计研究院 Basic structure of high-rise pile cap type offshore wind driven generator
CN102296624A (en) * 2011-05-19 2011-12-28 中国水电顾问集团华东勘测设计研究院 Lattice pile type foundation structure of offshore wind driven generator
CN104088292A (en) * 2014-08-05 2014-10-08 熊翱 Axis single-pile multi-tripod foundation and construction method thereof
CN105201010A (en) * 2015-09-30 2015-12-30 浙江大学 Assembled inclined-pile foundation for offshore wind turbine
CN106013212A (en) * 2016-07-25 2016-10-12 福建永福电力设计股份有限公司 Offshore wind turbine tower foundation structure and installation method
CN107090844A (en) * 2017-05-19 2017-08-25 中交第三航务工程局有限公司 Offshore wind farm grouped piles cap composite foundation and construction method
CN208441126U (en) * 2018-05-18 2019-01-29 龙源(北京)风电工程设计咨询有限公司 A kind of offshore steel structure high-rise pile cap blower foundation

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201538971U (en) * 2009-10-23 2010-08-04 中国水电顾问集团华东勘测设计研究院 Basic structure of high-rise pile cap type offshore wind driven generator
CN102296624A (en) * 2011-05-19 2011-12-28 中国水电顾问集团华东勘测设计研究院 Lattice pile type foundation structure of offshore wind driven generator
CN104088292A (en) * 2014-08-05 2014-10-08 熊翱 Axis single-pile multi-tripod foundation and construction method thereof
CN105201010A (en) * 2015-09-30 2015-12-30 浙江大学 Assembled inclined-pile foundation for offshore wind turbine
CN106013212A (en) * 2016-07-25 2016-10-12 福建永福电力设计股份有限公司 Offshore wind turbine tower foundation structure and installation method
CN107090844A (en) * 2017-05-19 2017-08-25 中交第三航务工程局有限公司 Offshore wind farm grouped piles cap composite foundation and construction method
CN208441126U (en) * 2018-05-18 2019-01-29 龙源(北京)风电工程设计咨询有限公司 A kind of offshore steel structure high-rise pile cap blower foundation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593298A (en) * 2019-09-30 2019-12-20 天津大学 Composite foundation for improving bearing performance of cylindrical foundation by using auxiliary piles and construction method thereof
CN110644471A (en) * 2019-10-18 2020-01-03 中国铁路设计集团有限公司 Staple bolt formula precast tubular pile and connection structure of prefabricated cushion cap
CN110644471B (en) * 2019-10-18 2024-04-05 中国铁路设计集团有限公司 Connection structure of staple bolt formula precast tubular pile and prefabricated cushion cap
CN113622453A (en) * 2021-08-19 2021-11-09 福建省宏闽电力工程监理有限公司 Offshore wind power bearing platform foundation construction method

Similar Documents

Publication Publication Date Title
CN107299643B (en) Steel lattice column combined type tower crane foundation structure in foundation pit and construction method
CN108643221B (en) Offshore wind power assembled bearing platform foundation and construction method thereof
US9567720B2 (en) Offshore platform for a marine environment
CN108425377A (en) A kind of offshore steel structure high-rise pile cap blower foundation and its construction method
CN107059773A (en) Assembled integral revetment structure and its construction method on a kind of soft soil foundation
LU102092B1 (en) Newly-built or expanded wind power foundation structure on soft ground and construction method thereof
CN208441126U (en) A kind of offshore steel structure high-rise pile cap blower foundation
CN109024660B (en) Pile foundation dismantling method for offshore foundation and offshore foundation dismantling method
KR101173029B1 (en) Under Water Structure Building and Maintenance and Reinforce Method Using Water Tightened Caisson
CN102220764B (en) Construction method of deep foundation pit bracing system
CN113047330A (en) Assembled high-rise pile cap for offshore wind power
CN206769047U (en) A kind of steel lattice column and bored concrete pile attachment structure
CN209795746U (en) novel assembled is tied and is leaned on ship device
EP3904674A1 (en) Floating platform for high-power wind turbines
JPH08105054A (en) Construction of shaft
RU89543U1 (en) ANCHORED METAL HEAD OF REINFORCED CONCRETE BASE
CN106703023B (en) A kind of four wing prefabricated pile of hydraulic paddle type mill and its construction method
CN210827534U (en) Integral installation offshore wind power multi-pile foundation structure system
CN205776152U (en) Prestressed anchor waveform sheet pile retaining structure
CN110258612B (en) Integral type offshore wind power multi-pile foundation structure system
CN210737452U (en) Waterborne assembled berthing pier
CN210049264U (en) Assembled foundation
CN209779672U (en) Offshore wind power rock-socketed area fan foundation
CN202520315U (en) Tunnel ventilation shaft wall lining-supporting system
CN112160325A (en) Composite supporting structure for enhancing rigidity of prestressed pipe pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180821