CN108416823A - A method of the making construction quality blank map based on ArcGIS - Google Patents

A method of the making construction quality blank map based on ArcGIS Download PDF

Info

Publication number
CN108416823A
CN108416823A CN201810052265.4A CN201810052265A CN108416823A CN 108416823 A CN108416823 A CN 108416823A CN 201810052265 A CN201810052265 A CN 201810052265A CN 108416823 A CN108416823 A CN 108416823A
Authority
CN
China
Prior art keywords
building
data
construction quality
arcgis
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810052265.4A
Other languages
Chinese (zh)
Other versions
CN108416823B (en
Inventor
李章平
温伟达
丘克涌
刘新波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MEIZHOU URBARN PLANNING & DESIGN INSTITUTE
Original Assignee
MEIZHOU URBARN PLANNING & DESIGN INSTITUTE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MEIZHOU URBARN PLANNING & DESIGN INSTITUTE filed Critical MEIZHOU URBARN PLANNING & DESIGN INSTITUTE
Priority to CN201810052265.4A priority Critical patent/CN108416823B/en
Publication of CN108416823A publication Critical patent/CN108416823A/en
Application granted granted Critical
Publication of CN108416823B publication Critical patent/CN108416823B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T11/002D [Two Dimensional] image generation
    • G06T11/40Filling a planar surface by adding surface attributes, e.g. colour or texture
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Processing Or Creating Images (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The method for making construction quality blank map based on ArcGIS that the invention discloses a kind of, based on planning region topographic map, the editor of data is carried out according to the characteristic of topographic map data, quickly provide construction quality paper fillers, the present invention carries out edit operation by the building data to topographic map, effectively improves the efficiency and accuracy of the construction quality blank map in working out regulatory plan.

Description

A method of the making construction quality blank map based on ArcGIS
Technical field
The present invention relates to urban planning technical field, specially a kind of making construction quality blank map based on ArcGIS Method.
Background technology
Regulatory plan is city, urban and rural planning authorities of the small towns People's Government according to city, town overall planning Requirement, to control construction land property, use intensity and the planning of space environment.Regulatory plan is mainly with over the ground The land used of block uses control and environmental carrying capacity control, architecture construction control and urban design guidance, municipal facilities and public The mating and traffic activity control of service facility and pollution control regulation are main contents, and are built for different plot, difference If project and different development processes, using quantification of targets, provision regulation, figure, then the modes such as calibration determine each controlling element Property, quantitative, positioning and the control and guiding delimited.
When working out city regulatory detailed planning, the construction quality filling for providing city present situation built-up areas is needed Figure, to indicate the construction quality distribution situation of the building structure of city present situation.Existing way is to wait filling out opening in software Wire frame in topographic map is completed to be closed one by one by the topographic map filled, then according to the single of topographic map data machinery to be filled The wire frame that filling is extremely closed.This operation needs draftsman to confirm the terrain data for being closed wire frame one by one and fills wire frame by hand, The efficiency not only to work is low but also is susceptible to mistake.
Invention content
The purpose of the present invention is improving in working out city regulatory detailed planning, improves and make construction quality blank map Working efficiency reduces the error caused by manual intervention.
To achieve the above object, the present invention provides the following technical solutions:A kind of making construction quality based on ArcGIS is filled out The method for filling figure, includes the following steps:
Step S1:Terrain data in geographic range to be filled is inputted into AutoCAD, wherein the terrain data packet Include building wire frame data, building structure data and building height data;
Step S2:According to the terrain data of input AutoCAD, it includes only the building wire frame data respectively to handle out Building line frame graph layer, the building structure figure layer comprising the building structure data and the building for including the building height data Height figure layer;
Step S3:By the building line frame graph layer and the building structure map overlay, the first dwg files are obtained;By institute Building line frame graph layer and the building height map overlay are stated, the 2nd dwg files are obtained;
Step S4:The first dwg files and the 2nd dwg files are loaded into ArcGIS softwares, to described The building wire frame data and the building structure data in one dwg files import the tables of data of ArcGIS softwares, and press According to building construction types classify, then by the 2nd dwg files the building wire frame data and the building height data The tables of data is imported, is classified according to building storey;Screening type is built by preset standard, is classified;After the completion of sifting sort With the automatic filling function of ArcGIS softwares, construction quality schematic diagram is automatically generated;
Step S5:It is construction quality blank map by construction quality schematic diagram output.
Preferably, in the step S2, with the quick selection tool in AutoCAD, by the concrete knot in the terrain data Structure, mixed structure, broken structure, builds structure and the data of temporary structure are built into building structure figure layer at brick structure, by described ground figurate number Number of plies information data in is built into building height figure layer.Being needed when building building structure figure layer will be in terrain data Building structure data be all put into building structure figure layer, need to build in terrain data when building building height figure layer Build number of plies data and be all put into building height figure layer, with the quick selection tool of AutoCAD, can not missing data, Er Qiexiao Rate is high.
Preferably, in the step S2, by the wire frame completion in the building line frame graph layer to closed state.Institute is wired To closed state, it is to be in closed state by whole wire frames that the characteristic panel inspection of AutoCAD, which is used in combination, for frame completion.By wire frame whole It is closed, the terrain data between wire frame and wire frame not will produce interference, harmful effect is caused to result.The function energy of characteristic panel It is enough quickly to check the closed state of wire frame, and can find the position not being closed.
Preferably, in the step S4, before the 2nd dwg files are imported the tables of data, with ArcGIS softwares Airlink function links the building wire frame data of the first dwg files and the 2nd dwg files.Passing through will The building wire frame data of two files carries out airlink, it is ensured that building structure data and building storey data can correspond to same A building wire frame.
Preferably, the preset standard is:The corresponding concrete structure of A classes building, 8 layers or more, the corresponding concrete structure of B classes building, 4-7 Layer, the concrete structure and mixed, brick structure that corresponding 1-3 layer of C classes building, D classes building correspond to break, build, temporary structure.It is advised according to city Building construction types in drawing define the standard of sifting sort, and the drawing provided more simply can be expressed clearly in topographic map The construction quality of building.
Compared with prior art, beneficial effects of the present invention:The present invention inputs the terrain data of topographic map to be filled Building structure data in terrain data, building storey data, building wire frame data are built into building structure number by AutoCAD According to figure layer, building storey figure layer and building line frame graph layer.This 3 figure layers are rapidly developed using the function of AutoCAD is enough.It will Line frame graph layer and building structure map overlay are built, the first dwg files are obtained;Building line frame graph layer is folded with building height figure layer Add, obtains the 2nd dwg files.Two dwg files are directed respectively into ArcGIS softwares, in ArcGIS softwares, by building structure Data and building storey data import tables of data, carry out sifting sort respectively, generate construction quality schematic diagram.In ArcGIS softwares In classify by preset standard to the type of terrain data, be rapidly completed using the automatic screening classification feature of ArcGIS softwares The building structure of topographic map and the screening of building storey and classification.In working out city regulatory detailed planning, the present invention can The construction quality blank map of city present situation built-up areas is rapidly completed.Method provided by the invention is built by the function completion of software Build mass charge figure, reduce artificial intervention and artificial repetitive operation, fill-error caused by avoiding manual intervention and Improve working efficiency.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with Obtain other attached drawings according to these attached drawings.
Fig. 1 is a kind of flow diagram of the method for the making construction quality blank map based on ArcGIS of the present invention.
Specific implementation mode
The technical scheme in the embodiments of the invention will be clearly and completely described below, it is clear that described implementation Example is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is common All other embodiment that technical staff is obtained without making creative work belongs to the model that the present invention protects It encloses.
The specific implementation mode of the present invention is described below in conjunction with attached drawing.
Embodiment:As shown in Figure 1, the present invention provides a kind of technical solution, a kind of making construction quality based on ArcGIS The method of blank map, includes the following steps:
Step S1:Terrain data in geographic range to be filled is inputted into AutoCAD, wherein the terrain data packet Include building wire frame data, building structure data and building height data;
Step S2:According to the terrain data of input AutoCAD, it includes only the building wire frame data respectively to handle out Building line frame graph layer, the building structure figure layer comprising the building structure data and the building for including the building height data Height figure layer;Whole building wire frame datas is put into a figure layer, is built into building line frame graph layer.By whole building structure Data are put into a figure layer, are built into building structure figure layer.Whole building storey data are put into a figure layer, is built into and builds Build number of plies figure layer.
Step S3:By the building line frame graph layer and the building structure map overlay, the first dwg files are obtained;By institute Building line frame graph layer and the building height map overlay are stated, the 2nd dwg files are obtained;The data original of building structure figure layer is sat Mark, which replicates, pastes building line frame graph layer, and the data original coordinate duplication of building height figure layer is pasted building line frame graph layer.It is former Coordinate, which replicates to paste, makes building structure data and building storey data be corresponded with building wire frame, and entanglement will not occur.
Step S4:The first dwg files and the 2nd dwg files are loaded into ArcGIS softwares, to described The building wire frame data and the building structure data in one dwg files import the tables of data of ArcGIS softwares, and press According to building construction types classify, then by the 2nd dwg files the building wire frame data and the building height data The tables of data is imported, is classified according to building storey;Screening type is built by preset standard, is classified;After the completion of sifting sort With the automatic filling function of ArcGIS softwares, construction quality schematic diagram is automatically generated;
Step S6:It is construction quality blank map by construction quality schematic diagram output.
Further, in the step S2, with the quick selection tool in AutoCAD, by the concrete in the terrain data Structure, brick structure, mixed structure, the data of broken structure and temporary structure are built into building structure figure layer, will be in the terrain data Number of plies information data be built into building height figure layer.It is needed building in terrain data when building building structure figure layer Building structure data are all put into building structure figure layer, are needed building storey in terrain data when building building height figure layer Number data are all put into building height figure layer, with the quick selection tool of AutoCAD, can not missing data, and it is efficient.
Further, in the step S2, by the wire frame completion in the building line frame graph layer to closed state.To own To closed state, it is to be in closed state by whole wire frames that the characteristic panel inspection of AutoCAD, which is used in combination, for wire frame completion.Wire frame is complete Portion is closed, and the terrain data between wire frame and wire frame not will produce interference, harmful effect is caused to result.The function of characteristic panel It can quickly check the closed state of wire frame, and can find the position not being closed.
Further, in the step S4, before the 2nd dwg files are imported the tables of data, with ArcGIS softwares Airlink function, the building wire frame data of the first dwg files and the 2nd dwg files is linked.Pass through The building wire frame data of two files is subjected to airlink, it is ensured that building structure data and building storey data can correspond to together One building wire frame.
Further, the preset standard is:The corresponding concrete structure of A classes building, 8 layers or more, the corresponding concrete structure of B classes building, 4-7 layers, the concrete structure and mixed, brick structure that corresponding 1-3 layer of C classes building, D classes building correspond to break, build, temporary structure.According to city Building construction types in city's planning define the standard of sifting sort, and the drawing provided more simply can clearly express topographic map In building construction quality.
The terrain data of topographic map to be filled is inputted AutoCAD, by the building structure number in terrain data by the present invention It is built into building structure data layer, building storey figure layer and building line frame graph according to, building storey data, building wire frame data Layer.This 3 figure layers are rapidly developed using the function of AutoCAD is enough.Line frame graph layer and building structure map overlay will be built, Obtain the first dwg files;Line frame graph layer and building height map overlay will be built, the 2nd dwg files are obtained.By two dwg texts Part is directed respectively into ArcGIS softwares, and in ArcGIS softwares, building structure data and building storey data are imported tables of data, into Row difference sifting sort, generates construction quality schematic diagram.In ArcGIS softwares to the type of terrain data by preset standard into Row classification, the building structure of topographic map and the sieve of building storey are rapidly completed using the automatic screening classification feature of ArcGIS softwares Choosing and classification.In working out city regulatory detailed planning, the building matter of city present situation built-up areas can be rapidly completed in the present invention Measure blank map.Method provided by the invention is to complete construction quality blank map by the function of software, reduce artificial intervention and Artificial repetitive operation, fill-error caused by avoiding manual intervention and raising working efficiency.
The above content is a further detailed description of the present invention in conjunction with specific preferred embodiments, and it cannot be said that The specific implementation of the present invention is confined to these explanations.For those of ordinary skill in the art to which the present invention belongs, exist Under the premise of not departing from present inventive concept, a number of simple deductions or replacements can also be made, all shall be regarded as belonging to the present invention's Protection domain.

Claims (5)

1. a kind of method of the making construction quality blank map based on ArcGIS, which is characterized in that include the following steps:
Step S1:Terrain data in geographic range to be filled is inputted into AutoCAD, wherein the terrain data includes building Build wire frame data, building structure data and building height data;
Step S2:According to the terrain data of input AutoCAD, it includes only building for the building wire frame data respectively to handle out Build wire frame figure layer, the building structure figure layer comprising the building structure data and the building height for including the building height data Figure layer;
Step S3:By the building line frame graph layer and the building structure map overlay, the first dwg files are obtained;It is built described Wire frame figure layer and the building height map overlay are built, the 2nd dwg files are obtained;
Step S4:The first dwg files and the 2nd dwg files are loaded into ArcGIS softwares, to the first dwg The building wire frame data and the building structure data in file import the tables of data of ArcGIS softwares, and according to building Structure type classify, then by the 2nd dwg files the building wire frame data and the building height data import institute Tables of data is stated, is classified according to building storey;Screening type is built by preset standard, is classified;After the completion of classification, ArcGIS is utilized The automatic filling function of software, automatically generates construction quality schematic diagram;
Step S5:It is construction quality blank map by construction quality schematic diagram output.
2. a kind of method of making construction quality blank map based on ArcGIS according to claim 1, which is characterized in that In the step S2, by the wire frame completion in the building line frame graph layer to closed state.
3. a kind of method of making construction quality blank map based on ArcGIS according to claim 1, which is characterized in that In the step S2, with the quick selection tool in AutoCAD, by the concrete structure in the terrain data, brick structure, mixed knot Structure, broken structure build structure and the data of temporary structure are built into building structure figure layer, by the number of plies information in the terrain data Data are built into building height figure layer.
4. a kind of method of making construction quality blank map based on ArcGIS according to claim 1, which is characterized in that It,, will with the airlink function of ArcGIS softwares before the 2nd dwg files are imported the tables of data in the step S4 The building wire frame data of the first dwg files and the 2nd dwg files is linked.
5. a kind of method of making construction quality blank map based on ArcGIS according to claim 1, which is characterized in that The preset standard is:The corresponding concrete structure of A classes building, 8 layers or more, the corresponding concrete structure of B classes building, 4-7 layers, C classes building corresponds to 1-3 layers of concrete structure and mixed, brick structure, D classes building is corresponding to break, builds, temporary structure.
CN201810052265.4A 2018-01-19 2018-01-19 ArcGIS-based method for manufacturing building quality filling map Active CN108416823B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810052265.4A CN108416823B (en) 2018-01-19 2018-01-19 ArcGIS-based method for manufacturing building quality filling map

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810052265.4A CN108416823B (en) 2018-01-19 2018-01-19 ArcGIS-based method for manufacturing building quality filling map

Publications (2)

Publication Number Publication Date
CN108416823A true CN108416823A (en) 2018-08-17
CN108416823B CN108416823B (en) 2022-01-18

Family

ID=63126116

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810052265.4A Active CN108416823B (en) 2018-01-19 2018-01-19 ArcGIS-based method for manufacturing building quality filling map

Country Status (1)

Country Link
CN (1) CN108416823B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101980291A (en) * 2010-11-03 2011-02-23 天津大学 Random micro-displacement-based super-resolution image reconstruction method
CN103150751A (en) * 2013-01-10 2013-06-12 江苏易图地理信息工程有限公司 Three-dimensional modeling method for achieving building inside and outside integration in digital map
CN105205283A (en) * 2015-10-14 2015-12-30 广西大学 Rule modeling method integrating city design indexes and construction control indexes
US20170046877A1 (en) * 2015-08-14 2017-02-16 Argis Technologies, LLC Augmented visualization system for hidden structures

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101980291A (en) * 2010-11-03 2011-02-23 天津大学 Random micro-displacement-based super-resolution image reconstruction method
CN103150751A (en) * 2013-01-10 2013-06-12 江苏易图地理信息工程有限公司 Three-dimensional modeling method for achieving building inside and outside integration in digital map
US20170046877A1 (en) * 2015-08-14 2017-02-16 Argis Technologies, LLC Augmented visualization system for hidden structures
CN105205283A (en) * 2015-10-14 2015-12-30 广西大学 Rule modeling method integrating city design indexes and construction control indexes

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
张丽君等: "基于ArcGIS的台州市环境功能区划研究――以声环境功能区划为例", 《华北农学报》 *
张琳等: "小河流域自动站降雨淹没三维分析系统研究", 《工程技术》 *
杨文婧: "大区域三维建筑白模建设及关键技术研究", 《测绘与空间地理信息》 *
薛亮等: "基于GIS的控制性详细规划成果数据入库", 《《规划师》论丛》 *

Also Published As

Publication number Publication date
CN108416823B (en) 2022-01-18

Similar Documents

Publication Publication Date Title
CN107038259A (en) A kind of operational method and its system for constructing traffic network data
CN112052547B (en) Automatic urban road network generation method based on artificial intelligence
CN111008742A (en) Carbon emission accounting and low-carbon optimization method for construction land planning scheme
CN109102193A (en) Geography designs ecological red line and delimit and management system and database, evaluation model
CN109635748B (en) Method for extracting road characteristics in high-resolution image
CN111080271A (en) System and method for land batch supervision
CN104392064B (en) Alleviate the Optimizing City form Design method of tropical island effect under a kind of medium measure
CN110472842A (en) A kind of nearly zero carbon emission garden assessment indicator system construction method
CN108491403B (en) ArcGIS-based site selection method for mountainous area construction land
CN108416823A (en) A method of the making construction quality blank map based on ArcGIS
CN110688443B (en) Annotation method based on map annotation model
CN109190940A (en) Consider the common road transport investigation website distribution method of zone boundary control
Pryor Parallel development of strategic land-use and transport planning: the case of the Territorial Development Strategy
Tsonkov et al. Adoption of information technologies for black sea region municipalities’ smart development
Cities Climate City Contract 2030
CN115544195A (en) ArcGIS-based site selection method for green funeral and interment facilities
Farber et al. The impacts of urban growth policies on transportation system usage and performance: a simulation approach
CN109299206A (en) A method of roading information management platform is visualized based on ArcGIS software building
Nielsen et al. The European TRANS-TOOLS transport model
De Ridder Benefits of urban green space (BUGS)
Thakkar Understanding the importance of people centric smart city initiatives
Sarasua A GIS‐Based Traffic Signal Coordination and Information Management System
Fiscal et al. Smart Cities’ Strategies to Ameliorate Environmental Impacts of Rapid Urbanization in Beijing, China
DE202024102086U1 (en) A sustainable building life cycle management system
Elsayed Towards Computational analysis methods and graphical displays in urban design education: case study site analysis course in Kafrelsheikh university

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 514000 planning and design building, No. 68-1, Meijiang Third Road, Meizhou City, Guangdong Province

Applicant after: Meizhou urban planning and Design Institute Co.,Ltd.

Address before: 514021 planning and design building, no.68-1, Meijiang Third Road, Meijiang district, Meizhou City, Guangdong Province

Applicant before: MEIZHOU URBAN PLANNING & DESIGN INSTITUTE

GR01 Patent grant
GR01 Patent grant