CN108412683A - A method of it carries out continuing power generation using tide - Google Patents
A method of it carries out continuing power generation using tide Download PDFInfo
- Publication number
- CN108412683A CN108412683A CN201810341022.2A CN201810341022A CN108412683A CN 108412683 A CN108412683 A CN 108412683A CN 201810341022 A CN201810341022 A CN 201810341022A CN 108412683 A CN108412683 A CN 108412683A
- Authority
- CN
- China
- Prior art keywords
- water level
- gulf
- tide
- dam
- power generation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03B—MACHINES OR ENGINES FOR LIQUIDS
- F03B13/00—Adaptations of machines or engines for special use; Combinations of machines or engines with driving or driven apparatus; Power stations or aggregates
- F03B13/12—Adaptations of machines or engines for special use; Combinations of machines or engines with driving or driven apparatus; Power stations or aggregates characterised by using wave or tide energy
- F03B13/26—Adaptations of machines or engines for special use; Combinations of machines or engines with driving or driven apparatus; Power stations or aggregates characterised by using wave or tide energy using tide energy
- F03B13/268—Adaptations of machines or engines for special use; Combinations of machines or engines with driving or driven apparatus; Power stations or aggregates characterised by using wave or tide energy using tide energy making use of a dam
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/02—Stream regulation, e.g. breaking up subaqueous rock, cleaning the beds of waterways, directing the water flow
- E02B3/023—Removing sediments
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/30—Energy from the sea, e.g. using wave energy or salinity gradient
Abstract
The invention discloses a kind of methods using tide continue power generation, select high water level gulf and low water level gulf of the tidal range for 59 meters;The automatic dam of setting water inlet at the tidewater water inlet in high water level gulf, the automatic dam of setting water outlet, dam is arranged between high water level gulf and low water level gulf, water flow generator is uniformly provided on dam at the tidewater water outlet in low water level gulf;Using high water level gulf and low water level gulf water-head, the water flow generator on dam generates electricity;Flood tide, ebb, the withered time of tide, realizes lasting power generation at full sea.Generating dutation of the present invention is lasting, power quality is good, low cost, efficient, energy saving, environmental protection.
Description
Technical field:
The present invention relates to a kind of electricity-generating method more particularly to a kind of methods using tide continue power generation.
Background technology:
Traditional tidal power generation mostly builds a dam in bay tidewater inlet and power generator is arranged, and it is short, electric that there is only generating dutations
Of poor quality, the high cost drawback of energy, and cannot start power generation when withered tide and full sea, efficiency is low, influences generating effect, wave
Take the energy.
Invention content:
It is an object of the invention to overcome the shortcomings of above-mentioned prior art and provide a kind of generating dutation is lasting, power quality is good,
Low cost, efficient, energy saving, the environmentally friendly method for using tide continue power generation.
The purpose of the present invention can be reached by following measure:A method of it carries out continuing power generation using tide,
It is characterized in that it specifically comprises the following steps:
Step 1:It selects two bays of high tide-difference zone or a bay is divided into two, one is used as high water level gulf, separately
One as low water level gulf;The tidal range in high water level gulf and low water level gulf is 5-9 meters;
Step 2:The automatic dam of setting water inlet at the tidewater water inlet in high water level gulf ensures that time of tide water inlet is carried out in high water level gulf, at ebb tide
It is not discharged;
Step 3:Setting is discharged automatic dam at the tidewater water outlet in low water level gulf, ensures that low water level gulf is discharged at ebb tide, carrys out the time of tide
It does not intake;
Step 4:Dam is set between high water level gulf and low water level gulf, water flow generator is uniformly provided on dam;
Step 5:The withered time of tide, low water level gulf is zero level when the water level in high water level gulf is the 1/3 of tidal height H, using high water level gulf and
Low water level gulf water-head, the water flow generator power generation on dam;
Step 6:At the incoming tide, the water level in low water level gulf is the 1/3 of tidal height H when the water level in high water level gulf is the 2/3 of tidal height H, profit
With high water level gulf and low water level gulf water-head, the water flow generator power generation on dam;
Step 7:When full sea, the water level in low water level gulf is the 2/3 of tidal height H when the water level in high water level gulf is tidal height H, utilizes Gao Shui
Position gulf and low water level gulf water-head, the water flow generator power generation on dam;
Step 8:At ebb tide, the water level in low water level gulf is the 1/3 of tidal height H when the water level in high water level gulf is the 2/3 of tidal height H, profit
With high water level gulf and low water level gulf water-head, the water flow generator power generation on dam;
Step 9:The withered time of tide, low water level gulf is zero level when the water level in high water level gulf is the 1/3 of tidal height H, using high water level gulf and
Low water level gulf water-head, the water flow generator power generation on dam;
Step 10:Until at the incoming tide, repeating the above steps, so recycle, realizes lasting power generation.
In order to further realize the purpose of the present invention, the area in the high water level gulf and low water level gulf is 2000*
2000 square metres, 10 water flow generators are uniformly provided on dam.
The present invention can generate following good effect compared with the prior art:The present invention water flow generator flood tide, full sea,
The withered time of tide can start power generation, the unidirectionally lasting power generation of long stream may be implemented, and sewage, the dead dirt accumulated throughout the year can be washed away
Totally, the pollution problem in coastal stagnant water gulf is solved, generating dutation of the present invention is lasting, power quality is good, low cost, efficient, section
The about energy, environmental protection.
Description of the drawings:
Fig. 1 is the analysis schematic diagram of the various tidal level states of the present invention.
Specific implementation mode:The specific implementation mode of the present invention below in conjunction with the accompanying drawings elaborates:
Embodiment:A method of it carries out continuing power generation using tide(Referring to Fig. 1), specifically comprise the following steps:
Step 1:It selects two bays of high tide-difference zone or a bay is divided into two, one is used as high water level gulf, separately
One as low water level gulf;The area in each bay is 2000*2000 square metres, and high water level gulf and the tidal range in low water level gulf are
5-9 meters;
Step 2:The automatic dam of setting water inlet at the tidewater water inlet in high water level gulf ensures that time of tide water inlet is carried out in high water level gulf, at ebb tide
It is not discharged;
Step 3:Setting is discharged automatic dam at the tidewater water outlet in low water level gulf, ensures that low water level gulf is discharged at ebb tide, carrys out the time of tide
It does not intake;
Step 4:Dam is set between high water level gulf and low water level gulf, 10 water flow generators are uniformly provided on dam;
Step 5:The withered time of tide, low water level gulf is zero level when the water level in high water level gulf is the 1/3 of tidal height H, using high water level gulf and
Low water level gulf water-head, the water flow generator power generation on dam;
Step 6:At the incoming tide, the water level in low water level gulf is the 1/3 of tidal height H when the water level in high water level gulf is the 2/3 of tidal height H, profit
With high water level gulf and low water level gulf water-head, the water flow generator power generation on dam;
Step 7:When full sea, the water level in low water level gulf is the 2/3 of tidal height H when the water level in high water level gulf is tidal height H, utilizes Gao Shui
Position gulf and low water level gulf water-head, the water flow generator power generation on dam;
Step 8:At ebb tide, the water level in low water level gulf is the 1/3 of tidal height H when the water level in high water level gulf is the 2/3 of tidal height H, profit
With high water level gulf and low water level gulf water-head, the water flow generator power generation on dam;
Step 9:The withered time of tide, low water level gulf is zero level when the water level in high water level gulf is the 1/3 of tidal height H, using high water level gulf and
Low water level gulf water-head, the water flow generator power generation on dam;
Step 10:Until at the incoming tide, repeating the above steps, so recycle, realizes lasting power generation.
It should be understood that the part that this specification does not elaborate belongs to the prior art.It is above-mentioned to implement for preferable
The description of example is more careful, but cannot be therefore, it is considered that being the limitation to scope of patent protection of the present invention.
A method of it carries out continuing power generation using tide
Technical field:
The present invention relates to a kind of electricity-generating method more particularly to a kind of methods using tide continue power generation.
Background technology:
Traditional tidal power generation mostly builds a dam in bay tidewater inlet and power generator is arranged, and it is short, electric that there is only generating dutations
Of poor quality, the high cost drawback of energy, and cannot start power generation when withered tide and full sea, efficiency is low, influences generating effect, wave
Take the energy.
Invention content:
It is an object of the invention to overcome the shortcomings of above-mentioned prior art and provide a kind of generating dutation is lasting, power quality is good,
Low cost, efficient, energy saving, the environmentally friendly method for using tide continue power generation.
The purpose of the present invention can be reached by following measure:A method of it carries out continuing power generation using tide,
It is characterized in that it specifically comprises the following steps:
Step 1:It selects two bays of high tide-difference zone or a bay is divided into two, one is used as high water level gulf, separately
One as low water level gulf;The tidal range in high water level gulf and low water level gulf is 5-9 meters;
Step 2:The automatic dam of setting water inlet at the tidewater water inlet in high water level gulf ensures that time of tide water inlet is carried out in high water level gulf, at ebb tide
It is not discharged;
Step 3:Setting is discharged automatic dam at the tidewater water outlet in low water level gulf, ensures that low water level gulf is discharged at ebb tide, carrys out the time of tide
It does not intake;
Step 4:Dam is set between high water level gulf and low water level gulf, water flow generator is uniformly provided on dam;
Step 5:The withered time of tide, low water level gulf is zero level when the water level in high water level gulf is the 1/3 of tidal height H, using high water level gulf and
Low water level gulf water-head, the water flow generator power generation on dam;
Step 6:At the incoming tide, the water level in low water level gulf is the 1/3 of tidal height H when the water level in high water level gulf is the 2/3 of tidal height H, profit
With high water level gulf and low water level gulf water-head, the water flow generator power generation on dam;
Step 7:When full sea, the water level in low water level gulf is the 2/3 of tidal height H when the water level in high water level gulf is tidal height H, utilizes Gao Shui
Position gulf and low water level gulf water-head, the water flow generator power generation on dam;
Step 8:At ebb tide, the water level in low water level gulf is the 1/3 of tidal height H when the water level in high water level gulf is the 2/3 of tidal height H, profit
With high water level gulf and low water level gulf water-head, the water flow generator power generation on dam;
Step 9:The withered time of tide, low water level gulf is zero level when the water level in high water level gulf is the 1/3 of tidal height H, using high water level gulf and
Low water level gulf water-head, the water flow generator power generation on dam;
Step 10:Until at the incoming tide, repeating the above steps, so recycle, realizes lasting power generation.
In order to further realize the purpose of the present invention, the area in the high water level gulf and low water level gulf is 2000*
2000 square metres, 10 water flow generators are uniformly provided on dam.
The present invention can generate following good effect compared with the prior art:The present invention water flow generator flood tide, full sea,
The withered time of tide can start power generation, the unidirectionally lasting power generation of long stream may be implemented, and sewage, the dead dirt accumulated throughout the year can be washed away
Totally, the pollution problem in coastal stagnant water gulf is solved, generating dutation of the present invention is lasting, power quality is good, low cost, efficient, section
The about energy, environmental protection.
Description of the drawings:
Fig. 1 is the analysis schematic diagram of the various tidal level states of the present invention.
Specific implementation mode:The specific implementation mode of the present invention below in conjunction with the accompanying drawings elaborates:
Embodiment:A method of it carries out continuing power generation using tide(Referring to Fig. 1), specifically comprise the following steps:
Step 1:It selects two bays of high tide-difference zone or a bay is divided into two, one is used as high water level gulf, separately
One as low water level gulf;The area in each bay is 2000*2000 square metres, and high water level gulf and the tidal range in low water level gulf are
5-9 meters;
Step 2:The automatic dam of setting water inlet at the tidewater water inlet in high water level gulf ensures that time of tide water inlet is carried out in high water level gulf, at ebb tide
It is not discharged;
Step 3:Setting is discharged automatic dam at the tidewater water outlet in low water level gulf, ensures that low water level gulf is discharged at ebb tide, carrys out the time of tide
It does not intake;
Step 4:Dam is set between high water level gulf and low water level gulf, 10 water flow generators are uniformly provided on dam;
Step 5:The withered time of tide, low water level gulf is zero level when the water level in high water level gulf is the 1/3 of tidal height H, using high water level gulf and
Low water level gulf water-head, the water flow generator power generation on dam;
Step 6:At the incoming tide, the water level in low water level gulf is the 1/3 of tidal height H when the water level in high water level gulf is the 2/3 of tidal height H, profit
With high water level gulf and low water level gulf water-head, the water flow generator power generation on dam;
Step 7:When full sea, the water level in low water level gulf is the 2/3 of tidal height H when the water level in high water level gulf is tidal height H, utilizes Gao Shui
Position gulf and low water level gulf water-head, the water flow generator power generation on dam;
Step 8:At ebb tide, the water level in low water level gulf is the 1/3 of tidal height H when the water level in high water level gulf is the 2/3 of tidal height H, profit
With high water level gulf and low water level gulf water-head, the water flow generator power generation on dam;
Step 9:The withered time of tide, low water level gulf is zero level when the water level in high water level gulf is the 1/3 of tidal height H, using high water level gulf and
Low water level gulf water-head, the water flow generator power generation on dam;
Step 10:Until at the incoming tide, repeating the above steps, so recycle, realizes lasting power generation.
It should be understood that the part that this specification does not elaborate belongs to the prior art.It is above-mentioned to implement for preferable
The description of example is more careful, but cannot be therefore, it is considered that being the limitation to scope of patent protection of the present invention.
Claims (2)
1. a kind of method using tide continue power generation, it is characterised in that it specifically comprises the following steps:
Step 1:It selects two bays of high tide-difference zone or a bay is divided into two, one is used as high water level gulf, separately
One as low water level gulf;The tidal range in high water level gulf and low water level gulf is 5-9 meters;
Step 2:The automatic dam of setting water inlet at the tidewater water inlet in high water level gulf ensures that time of tide water inlet is carried out in high water level gulf, at ebb tide
It is not discharged;
Step 3:Setting is discharged automatic dam at the tidewater water outlet in low water level gulf, ensures that low water level gulf is discharged at ebb tide, carrys out the time of tide
It does not intake;
Step 4:Dam is set between high water level gulf and low water level gulf, water flow generator is uniformly provided on dam;
Step 5:The withered time of tide, low water level gulf is zero level when the water level in high water level gulf is the 1/3 of tidal height H, using high water level gulf and
Low water level gulf water-head, the water flow generator power generation on dam;
Step 6:At the incoming tide, the water level in low water level gulf is the 1/3 of tidal height H when the water level in high water level gulf is the 2/3 of tidal height H, profit
With high water level gulf and low water level gulf water-head, the water flow generator power generation on dam;
Step 7:When full sea, the water level in low water level gulf is the 2/3 of tidal height H when the water level in high water level gulf is tidal height H, utilizes Gao Shui
Position gulf and low water level gulf water-head, the water flow generator power generation on dam;
Step 8:At ebb tide, the water level in low water level gulf is the 1/3 of tidal height H when the water level in high water level gulf is the 2/3 of tidal height H, profit
With high water level gulf and low water level gulf water-head, the water flow generator power generation on dam;
Step 9:The withered time of tide, low water level gulf is zero level when the water level in high water level gulf is the 1/3 of tidal height H, using high water level gulf and
Low water level gulf water-head, the water flow generator power generation on dam;
Step 10:Until at the incoming tide, repeating the above steps, so recycle, realizes lasting power generation.
2. a kind of method using tide continue power generation according to claim 1, it is characterised in that the Gao Shui
Position gulf and the area in low water level gulf are 2000*2000 square metres, and 10 water flow generators are uniformly provided on dam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810341022.2A CN108412683A (en) | 2018-04-17 | 2018-04-17 | A method of it carries out continuing power generation using tide |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810341022.2A CN108412683A (en) | 2018-04-17 | 2018-04-17 | A method of it carries out continuing power generation using tide |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108412683A true CN108412683A (en) | 2018-08-17 |
Family
ID=63135595
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810341022.2A Pending CN108412683A (en) | 2018-04-17 | 2018-04-17 | A method of it carries out continuing power generation using tide |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108412683A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1776217A (en) * | 2005-12-05 | 2006-05-24 | 董兰田 | Electric generating equipment utilizing seatide |
CN101314943A (en) * | 2008-07-14 | 2008-12-03 | 浙江大学 | Double-reservoir self-adjusting tidal power generation method and system |
JP2012145091A (en) * | 2011-01-11 | 2012-08-02 | Hiromi Haraguchi | Tidal difference power generation |
CN102828893A (en) * | 2011-06-14 | 2012-12-19 | 吴宸至 | Tidal power plant which can replace nuclear power plant |
CN106854863A (en) * | 2015-12-08 | 2017-06-16 | 郝佳莹 | Tide gravity flow desilting and gravity flow washed-out sand dredging technology system in bay |
-
2018
- 2018-04-17 CN CN201810341022.2A patent/CN108412683A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1776217A (en) * | 2005-12-05 | 2006-05-24 | 董兰田 | Electric generating equipment utilizing seatide |
CN101314943A (en) * | 2008-07-14 | 2008-12-03 | 浙江大学 | Double-reservoir self-adjusting tidal power generation method and system |
JP2012145091A (en) * | 2011-01-11 | 2012-08-02 | Hiromi Haraguchi | Tidal difference power generation |
CN102828893A (en) * | 2011-06-14 | 2012-12-19 | 吴宸至 | Tidal power plant which can replace nuclear power plant |
CN106854863A (en) * | 2015-12-08 | 2017-06-16 | 郝佳莹 | Tide gravity flow desilting and gravity flow washed-out sand dredging technology system in bay |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Behrouzi et al. | Global renewable energy and its potential in Malaysia: A review of Hydrokinetic turbine technology | |
Waters et al. | Tidal range technologies and state of the art in review | |
Kofoed et al. | Prototype testing of the wave energy converter wave dragon | |
CN204402744U (en) | A kind of flowing water type electricity generating device | |
CN203412693U (en) | Tidal current energy power generation device | |
WO2020083013A1 (en) | Method and submersible equipment for electricity generation with marine energy | |
WO2020010872A1 (en) | Ultralow-head hydroelectric generator | |
CN201372885Y (en) | Horizontal hydro-generator used in rivers | |
CN210087532U (en) | Ocean energy water turbine power generation system | |
Bevilacqua et al. | Overtopping Wave Energy Converters: general aspects and stage of development | |
CN104791178A (en) | Flowing water power generation device achieving automatic pitch varying and pitch varying method thereof | |
JP4998813B1 (en) | Wave and hydro power generation method using rectifying plate and float | |
CN215907989U (en) | Tidal power generation device built at reclaimed beach gate | |
CN101083441A (en) | Floating board type electric generating apparatus using solar energy, wind power and waterpower | |
CN216008750U (en) | Ocean tide multidirectional flow driving all-weather hydraulic generator | |
CN108412683A (en) | A method of it carries out continuing power generation using tide | |
CN1811165B (en) | Electricity generating techn with marine energy, water energy and wind energy | |
CN105156263A (en) | Power generating system using ocean tides | |
CN109989868B (en) | Hydroelectric power generation device | |
Mohamed | Hydropower | |
CN209083460U (en) | A kind of combined multi-stage capacitation marine tidal-current energy generation platform | |
CN208845299U (en) | Hydraulic energy conversion power generation equipment and its system | |
CN201224880Y (en) | Water level regulating apparatus | |
CN101625574A (en) | Water level regulating device | |
Halder et al. | Efficient hydroenergy conversion technologies, challenges, and policy implication |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180817 |
|
RJ01 | Rejection of invention patent application after publication |