CN108411945A
CN108411945A CN201810100016.8A CN201810100016A CN108411945A CN 108411945 A CN108411945 A CN 108411945A CN 201810100016 A CN201810100016 A CN 201810100016A CN 108411945 A CN108411945 A CN 108411945A
Authority
CN
China
Prior art keywords
post
water
cast strip
steel wire
close hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810100016.8A
Other languages
Chinese (zh)
Inventor
王明超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201810100016.8A priority Critical patent/CN108411945A/en
Publication of CN108411945A publication Critical patent/CN108411945A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Building Environments (AREA)

Abstract

The present invention provides a kind of post-cast strip anti-cracking waterproof structure construction technique, and construction technology includes the following steps:Microlith water-proof concrete item pours the → close hole steel wire net rack installation of reinforcement binding → lower layer → close hole steel wire net rack installation in steel plate for sealing water installation → upper layer, and → plate top reinforcing bar is bound, and → hanging mould, → → form removal conserves → removing close hole steel wire net rack → pours post-cast strip inner concrete (reach design requirement time limit can pour post-cast strip inner concrete) to the concreting of post-cast strip both sides;The problem of purpose is to solve in traditional handicraft between steel wire and base there are gap, and concrete vibrating often flows into post-cast strip from gap in the process, post-cast strip inner concrete is caused to deposit.

Description

A kind of post-cast strip anti-cracking waterproof structure construction technique
Technical field
The present invention relates to technical field of buildings, and in particular to a kind of post-cast strip anti-cracking waterproof structure construction technique.
Background technology
Often pour slightly expanded concrete in post empiricism in post-cast strip at home, slightly expanded concrete can be poured with after Concrete with both sides is linked to be an entirety and plays good waterproof effect.
But for many years show that post-cast strip position is still the multiple position for occurring percolating water phenomenon through engineering practice, it is main The reason is that the effects that uneven settlement of foundation and sole plate anti-floating influences, concrete generation sedimentation in post-cast strip both sides is excessive to be caused Cracking is to generate leakage phenomenon.
There are gaps between steel wire and base in traditional handicraft simultaneously, and concrete vibrating is in the process often from gap It flows into post-cast strip, post-cast strip inner concrete is caused to deposit, not only need to increase recruitment cleaning post-cast strip inner concrete but also shadow Ring post empiricism quality.
Based on problem above, the present invention is desirable to provide a kind of post-cast strip anti-cracking waterproof structure construction technique, improves post-cast strip Construction quality.
Invention content
The present invention provides a kind of post-cast strip anti-cracking waterproof structure construction technique, it is therefore intended that solves to carry in above-mentioned background technology There are gaps, concrete vibrating often to be poured after being flowed into gap in the process between steel wire and base in the traditional handicraft gone out Band in, cause post-cast strip inner concrete deposit the problem of.
To achieve the above object, the present invention provides a kind of post-cast strip anti-cracking waterproof structure construction technique, Specific construction step To be as follows,
Step 1, material prepare:
Prepare construct common water-proof concrete, microdilatancy water-proof concrete, steel plate for sealing water, structure reinforcing bars, microlith waterproof Concrete, B reinforcing bars, close hole wire netting and flitch etc.;
Step 2, microlith water-proof concrete item pour:
After base cleaning is clean, mold is made with flitch in post-cast strip both sides, pours wide 3cm, is highly protected with lower layer's reinforcing bar Covering thickness, microlith water-proof concrete item of the length along the elongated setting in post-cast strip;
Step 3, post-cast strip steel bar binding, close hole steel wire, hang mould at steel plate for sealing water installation:
Microlith water-proof concrete item starts to bind the structure reinforcing bars 6 of board bottom, structure reinforcing bars after maintenance reaches some strength After the completion of binding, close hole steel wire net rack is made using B reinforcing bars and close hole wire netting, the close hole steel wire net rack of lower layer is installed, then will Steel plate for sealing water is fixed on the close hole steel wire net rack of lower layer, then installs the close hole steel wire net rack on upper layer, the structural steel on binding plate top Plate top is finally put into above structure reinforcing bars and hangs mould with flitch by muscle;
Step 4, post-cast strip both sides water-proof concrete pour:
Hang mould complete it is qualified by inspection after, common water-proof concrete is cast in post-cast strip both sides, it is desirable that concrete vibrating It is closely knit, cover water seasoning after the completion of concreting;
Step 5, microdilatancy water-proof concrete pours in post-cast strip:
It waits for that common water-proof concrete maintenance is completed and reaches the design requirement time limit, starts to pour post-cast strip inner concrete, pour Rubbish in the close hole steel wire net rack and post-cast strip of post-cast strip both sides should be first cleared up before building, and is cut loose concrete and rushed with clear water Wash clean adjusts structure reinforcing bars.It is anti-with the microdilatancy of a grade higher than common water-proof concrete intensity after the completion of preparation Water coagulation soil is poured, it is desirable that vibration compacting, water seasoning after the completion of microdilatancy water-proof concrete pours.
Preferably, in step 3, the close hole steel wire net rack surrounding is the B8 reinforcing bars of welding, midfeather welding support B8 reinforcing bars constitute framework of steel reinforcement, and close hole steel wire is fixed on framework of steel reinforcement with tied silk and constitutes close hole steel wire net rack.
Preferably, in step 3, steel plate for sealing water is fixed on the method for the close hole steel wire net rack of lower layer using spot welding, and Welding, which cannot weld, hinders burn-through steel plate for sealing water.
Preferably, in step 4, after common water-proof concrete casting complete, close hole steel wire net rack and water-stopping steel are checked Whether plate is reinforced because concreting generates movement if any movement at any time.
Preferably, in step 5, layer pico- arch camber highest point in microdilatancy water-proof concrete face is than common waterproof when receiving light Concrete, which is higher by 3~5cm, to be advisable.
Preferably, the thickness of the steel plate for sealing water is 3mm.
As can be seen from the above technical solutions, compared with prior art, the present invention has the following technical effects:
1) microlith water-proof concrete item is arranged between base and lower layer's reinforcing bar, highly with lower layer's thickness of protection tier, Length along the elongated setting in post-cast strip, can prevent the concrete of post-cast strip both sides from due to structure reinforcing bars separate close hole steel wire without Method is installed in place and is flowed into post-cast strip in gap between the bed course and structure reinforcing bars that generate, also serves as the protective layer of lower layer's reinforcing bar Cushion block.
2) it microlith water-proof concrete item, close hole steel wire net rack and hangs mould one and works after tunneling boring has blocked from top to bottom and pour With the excessive of both sides concrete, it is effectively guaranteed the construction quality of post-cast strip.
3) steel plate for sealing water be arranged among structural slab to the microdilatancy water-proof concrete in post-cast strip can and post-cast strip two The connection of the common water-proof concrete of side plays booster action, can be effective against uneven settlement of foundation and sole plate is anti- The effects that floating, influences post-cast strip and both sides concrete generates differential settlement, while steel plate for sealing water is arranged in post empiricism seam portion Position substantially prolongs infiltration circuit.
4) concrete of two layers of steel plate for sealing water and post-cast strip is combined closely, and to play the role of good cracking resistance impervious.
5) layer pico- arch camber in post-cast strip inner concrete face when receiving light after the completion of the concreting of post-cast strip, in this way can be on top Water can quickly flow away in the case of meeting water, play good drainage.
Description of the drawings
Fig. 1 illustrates the post-cast strip anti-cracking waterproof structure construction technique construction schematic diagram of the present invention;
It illustrates:1. waterproof slightly expanded concrete, 2. common water-proof concretes, 3. microlith water-proof concrete items, 4. are stopped Water steel plate, 5. close hole steel wire frame structures, 6. structure reinforcing bars.
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to embodiments, to the present invention It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to Limit the present invention.
Below in conjunction with the accompanying drawings and specific embodiment is further described the application principle of the present invention.
Embodiment one
A kind of post-cast strip anti-cracking waterproof structure construction technique as shown in Figure 1, Specific construction step be it is as follows,
Step 1, material prepare:
Prepare construction common water-proof concrete 2, microdilatancy water-proof concrete 1, steel plate for sealing water 4, structure reinforcing bars 6, microlith Water-proof concrete, B reinforcing bars, close hole wire netting, flitch etc.;
Step 2, microlith water-proof concrete item pour:
After base cleaning is clean, mold is made with flitch in post-cast strip both sides, pours wide 3cm, is highly protected with lower layer's reinforcing bar Covering thickness, microlith water-proof concrete item 3 of the length along the elongated setting in post-cast strip;
Step 3, post-cast strip steel bar binding, close hole steel wire, hang mould at steel plate for sealing water installation:
Microlith water-proof concrete item 3 starts to bind the structure reinforcing bars 6 of board bottom, structure reinforcing bars after maintenance reaches some strength After the completion of 6 bindings, close hole steel wire net rack 5 is made using B reinforcing bars and close hole wire netting, the close hole steel wire net rack 5 of lower layer is installed, then Steel plate for sealing water 4 is fixed on the close hole steel wire net rack 5 of lower layer, then the close hole steel wire net rack 5 on upper layer is installed, the knot on binding plate top Plate top is finally put into 6 top of structure reinforcing bars and hangs mould with flitch by structure reinforcing bar 6;
Step 4, post-cast strip both sides water-proof concrete pour:
Hang mould complete it is qualified by inspection after, common water-proof concrete 2 is cast in post-cast strip both sides, it is desirable that concrete vibrating It is closely knit, cover water seasoning after the completion of concreting;
Step 5, microdilatancy water-proof concrete pours in post-cast strip:
It waits for that the maintenance of common water-proof concrete 2 is completed and reaches the design requirement time limit, starts to pour post-cast strip inner concrete, pour Rubbish in the close hole steel wire net rack 5 and post-cast strip of post-cast strip both sides should be first cleared up before building, and cuts loose concrete clear water It rinses well, adjusts structure reinforcing bars 6.It is micro- swollen with a grade higher than 2 intensity of common water-proof concrete after the completion of preparation Swollen water-proof concrete 1 is poured, it is desirable that vibration compacting, water seasoning after the completion of microdilatancy water-proof concrete 1 pours.
Wherein, in step 3, close 5 surrounding of hole steel wire net rack is the B8 reinforcing bars of welding, midfeather welding support B8 reinforcing bars constitute framework of steel reinforcement, and close hole steel wire is fixed on framework of steel reinforcement with tied silk and constitutes close hole steel wire net rack 5;In step In three, steel plate for sealing water 4 is fixed on the method for the close hole steel wire net rack 5 of lower layer using spot welding, and welding cannot weld and hinder burn-through and stop Water steel plate 4;In step 4, after common 2 casting complete of water-proof concrete, check that close hole steel wire net rack 5 and steel plate for sealing water 4 are It is no to be moved because concreting generates, it is reinforced at any time if any movement;In step 5, microdilatancy water-proof concrete 1 when receiving light Layer pico- arch camber highest point in face is higher by 3~5cm than common water-proof concrete 2 to be advisable;The thickness of the steel plate for sealing water 4 is 3mm.
Construction technology includes the following steps:Microlith water-proof concrete item 3 pours → reinforcement binding → close Kong Gang of lower layer Mould → post-cast strip is hung in 5 installations of screen frame → 4 installations of steel plate for sealing water → upper layer, 5 installations of close hole steel wire net rack → plate top reinforcing bar is bound → Both sides concreting → form removal conserves → removes close hole steel wire net rack 5 → pour post-cast strip inner concrete and (reaches design requirement Time limit can pour post-cast strip inner concrete).
A kind of construction technology provided by the present invention is examined through implementing, reasonable in design, and cracking resistance, waterproof effect It is good.
It should be noted that herein, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that the process, method, article or equipment including a series of elements includes not only those elements, and And further include other elements that are not explicitly listed, or further include for this process, method, article or equipment institute it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including institute State in the process, method, article or equipment of element that there is also other identical elements.
The above is only the specific implementation mode of the present invention, is made skilled artisans appreciate that or realizing this hair It is bright.Various modifications to these embodiments will be apparent to one skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest range caused.

Claims (6)

1. a kind of post-cast strip anti-cracking waterproof structure construction technique, which is characterized in that Specific construction step be it is as follows,
Step 1, material prepare:
Prepare construction with common water-proof concrete (2), microdilatancy water-proof concrete (1), steel plate for sealing water (4), structure reinforcing bars (6), Microlith water-proof concrete, B reinforcing bars, close hole wire netting, flitch etc.;
Step 2, microlith water-proof concrete item pour:
After base cleaning is clean, mold is made with flitch in post-cast strip both sides, wide 3cm is poured, highly with lower layer's cover to reinforcement Thickness, microlith water-proof concrete item (3) of the length along the elongated setting in post-cast strip;
Step 3, post-cast strip steel bar binding, close hole steel wire, hang mould at steel plate for sealing water installation:
Microlith water-proof concrete item (3) starts to bind the structure reinforcing bars (6) of board bottom, structure reinforcing bars after maintenance reaches some strength (6) after the completion of binding, close hole steel wire net rack (5) is made using B reinforcing bars and close hole wire netting, the close hole steel wire net rack of lower layer is installed (5), it then by steel plate for sealing water (4) is fixed on the close hole steel wire net rack (5) of lower layer, then the close hole steel wire net rack (5) on upper layer is installed, The structure reinforcing bars (6) on plate top are bound, finally plate top is put into above structure reinforcing bars (6) and hangs mould with flitch;
Step 4, post-cast strip both sides water-proof concrete pour:
Hang mould complete it is qualified by inspection after, common water-proof concrete (2) is cast in post-cast strip both sides, it is desirable that concrete vibrating is close It is real, cover water seasoning after the completion of concreting;
Step 5, microdilatancy water-proof concrete pours in post-cast strip:
It waits for that common water-proof concrete (2) maintenance is completed and reaches the design requirement time limit, starts to pour post-cast strip inner concrete, pour Before should first clear up rubbish in the close hole steel wire net rack (5) and post-cast strip of post-cast strip both sides, and cut loose concrete clear water It rinses well, adjustment structure reinforcing bars (6).With a grade higher than common water-proof concrete (2) intensity after the completion of preparation Microdilatancy water-proof concrete (1) is poured, it is desirable that vibration compacting, microdilatancy water-proof concrete (1) water after the completion of pouring and support Shield.
2. a kind of post-cast strip anti-cracking waterproof structure construction technique according to claim 1, which is characterized in that in step 3 In, close hole steel wire net rack (5) surrounding is the B8 reinforcing bars of welding, and midfeather welding support B8 reinforcing bars constitute framework of steel reinforcement, Close hole steel wire is fixed on framework of steel reinforcement with tied silk and constitutes close hole steel wire net rack (5).
3. a kind of post-cast strip anti-cracking waterproof structure construction technique according to claim 1, which is characterized in that in step 3 In, steel plate for sealing water (4) is fixed on the method for the close hole steel wire net rack (5) of lower layer using spot welding, and welding cannot weld and hinder burn-through Steel plate for sealing water (4).
4. a kind of post-cast strip anti-cracking waterproof structure construction technique according to claim 1, which is characterized in that in step 4 In, after common water-proof concrete (2) casting complete, check close hole steel wire net rack (5) and steel plate for sealing water (4) whether because of coagulation Soil pours generation movement, is reinforced at any time if any movement.
5. a kind of post-cast strip anti-cracking waterproof structure construction technique according to claim 1, which is characterized in that in step 5 In, microdilatancy water-proof concrete (1) face pico- arch camber highest point of layer is higher by 3~5cm than common water-proof concrete (2) and is when receiving light Preferably.
6. a kind of post-cast strip anti-cracking waterproof structure construction technique according to claim 1 or 3 or 4, which is characterized in that described The thickness of steel plate for sealing water (4) is 3mm.
CN201810100016.8A 2018-02-01 2018-02-01 A kind of post-cast strip anti-cracking waterproof structure construction technique Pending CN108411945A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810100016.8A CN108411945A (en) 2018-02-01 2018-02-01 A kind of post-cast strip anti-cracking waterproof structure construction technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810100016.8A CN108411945A (en) 2018-02-01 2018-02-01 A kind of post-cast strip anti-cracking waterproof structure construction technique

Publications (1)

Publication Number Publication Date
CN108411945A true CN108411945A (en) 2018-08-17

Family

ID=63127520

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810100016.8A Pending CN108411945A (en) 2018-02-01 2018-02-01 A kind of post-cast strip anti-cracking waterproof structure construction technique

Country Status (1)

Country Link
CN (1) CN108411945A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577377A (en) * 2018-11-29 2019-04-05 成都建工第二建筑工程有限公司 Basement post-pouring zone structure and its construction method
CN109594683A (en) * 2019-01-18 2019-04-09 深圳市天健坪山建设工程有限公司 A kind of construction method and structure of ultra-long concrete wall
CN112854491A (en) * 2021-01-05 2021-05-28 中国十七冶集团有限公司 Waterproof construction method for post-cast strip of planted roof
CN113137062A (en) * 2021-05-10 2021-07-20 山西四建集团有限公司 High-rise residential expansion type reinforcing belt construction method for replacing post-cast strip
CN113622464A (en) * 2021-08-19 2021-11-09 中国十七冶集团有限公司 Anti-cracking waterproof construction process for basement outer wall post-cast strip
CN113863519A (en) * 2021-11-16 2021-12-31 中建八局第二建设有限公司 Water pipe intercepting construction joint device and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080086805A (en) * 2007-03-29 2008-09-26 김기철 Expansion joint waterprooping system and method using self-adhesive waterproof sheet
CN204059419U (en) * 2014-08-20 2014-12-31 山东莱钢建设有限公司 A kind of ater-casting
CN105649113A (en) * 2015-02-05 2016-06-08 中国建筑第四工程局有限公司 Structure and construction method of basement post-cast strip
CN106337443A (en) * 2016-08-25 2017-01-18 中国十七冶集团有限公司 Jointless construction structure combining SCC (self-compacting concrete) and common concrete

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080086805A (en) * 2007-03-29 2008-09-26 김기철 Expansion joint waterprooping system and method using self-adhesive waterproof sheet
CN204059419U (en) * 2014-08-20 2014-12-31 山东莱钢建设有限公司 A kind of ater-casting
CN105649113A (en) * 2015-02-05 2016-06-08 中国建筑第四工程局有限公司 Structure and construction method of basement post-cast strip
CN106337443A (en) * 2016-08-25 2017-01-18 中国十七冶集团有限公司 Jointless construction structure combining SCC (self-compacting concrete) and common concrete

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577377A (en) * 2018-11-29 2019-04-05 成都建工第二建筑工程有限公司 Basement post-pouring zone structure and its construction method
CN109594683A (en) * 2019-01-18 2019-04-09 深圳市天健坪山建设工程有限公司 A kind of construction method and structure of ultra-long concrete wall
CN109594683B (en) * 2019-01-18 2024-04-02 深圳市天健坪山建设工程有限公司 Construction method and structure of ultra-long concrete wall
CN112854491A (en) * 2021-01-05 2021-05-28 中国十七冶集团有限公司 Waterproof construction method for post-cast strip of planted roof
CN113137062A (en) * 2021-05-10 2021-07-20 山西四建集团有限公司 High-rise residential expansion type reinforcing belt construction method for replacing post-cast strip
CN113622464A (en) * 2021-08-19 2021-11-09 中国十七冶集团有限公司 Anti-cracking waterproof construction process for basement outer wall post-cast strip
CN113863519A (en) * 2021-11-16 2021-12-31 中建八局第二建设有限公司 Water pipe intercepting construction joint device and construction method thereof

Similar Documents

Publication Publication Date Title
CN108411945A (en) A kind of post-cast strip anti-cracking waterproof structure construction technique
CN105649113B (en) The structure and construction method of a kind of basement post-pouring zone
CN109057338A (en) A kind of post-cast strip anti-cracking waterproof construction method
CN207512697U (en) Post-cast strip antipriming
CN106284427B (en) A kind of basement post-pouring zone temporary leaking water earth-retaining construction method
CN104153508B (en) The constructing structure and its construction method of floor
CN109183825A (en) The construction method of raft board post poured band side form
CN109577377A (en) Basement post-pouring zone structure and its construction method
CN104831932B (en) A kind of construction technology of high-grade concrete suspension column
CN108505805A (en) Large-scale cast-in-place pond and its construction method are split in expansion reinforcing band control
CN204456224U (en) A kind of structure of basement post-pouring zone
CN108442543A (en) A kind of the staged reinforcing strip system and construction method of continuous concreting
CN104790436B (en) Basement in high rise building top board pouring after settlement advance water stop construction method
CN106760050A (en) The attachment structure and through processing method of shear wall and after-pouring concrete frame beam
CN107012893A (en) A kind of basement bottom wall board post poured band waterproof construction and its construction method
CN108978729A (en) A kind of subway station hole for hoist method for blocking
CN106592645A (en) Super-thick base plate post-cast strip formwork construction method
CN110295630A (en) The late poured band structure of multilayer constraint antiseep
CN105756100B (en) Basement post-pouring zone system and preparation method thereof
CN102936953B (en) Construction method of a bridging-arm stiffened steel structure template
CN210766821U (en) Engineering side slope seepage-proofing structural style
CN209413060U (en) A kind of built-in heat insulation cast-in-place concrete composite shear wall
CN104213728A (en) Oblique beam for grandstand of stadium and construction process for oblique beam
CN208918266U (en) One kind exempting from support formula steel plate post-cast strip template structure system
CN106337443A (en) Jointless construction structure combining SCC (self-compacting concrete) and common concrete

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180817