CN108397197A - A kind of suppleing level super thick soil property country rock shaft excavation method - Google Patents

A kind of suppleing level super thick soil property country rock shaft excavation method Download PDF

Info

Publication number
CN108397197A
CN108397197A CN201810181858.0A CN201810181858A CN108397197A CN 108397197 A CN108397197 A CN 108397197A CN 201810181858 A CN201810181858 A CN 201810181858A CN 108397197 A CN108397197 A CN 108397197A
Authority
CN
China
Prior art keywords
soil property
country rock
guide hole
property country
shaft excavation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810181858.0A
Other languages
Chinese (zh)
Inventor
杨玉银
左祥
刘志辉
张健鹏
王先浩
韩静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 5 Co Ltd
Original Assignee
Sinohydro Bureau 5 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 5 Co Ltd filed Critical Sinohydro Bureau 5 Co Ltd
Priority to CN201810181858.0A priority Critical patent/CN108397197A/en
Publication of CN108397197A publication Critical patent/CN108397197A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D1/00Sinking shafts
    • E21D1/03Sinking shafts mechanically, e.g. by loading shovels or loading buckets, scraping devices, conveying screws
    • E21D1/06Sinking shafts mechanically, e.g. by loading shovels or loading buckets, scraping devices, conveying screws with shaft-boring cutters
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D7/00Shaft equipment, e.g. timbering within the shaft

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of suppleing level super thick soil property country rock shaft excavation methods, include the following steps:Step 1:Excavate draining guide hole, draining guide hole connection lower part construction channel downwards from earth's surface along vertical shaft central axis;Step 2:Carry out shaft excavation supporting operation;When the present invention solves suppleing level soil property country rock shaft excavation, soil property country rock covers thickness, soil body bad hydraulic permeability, undesirable using well-points dewatering method effect and the problems such as cost is excessively high;A kind of simple and easy to do, of low cost, effective precipitation method is formd, entire soil property country rock shaft excavation work can be made to carry out in anhydrous conditions, and achieve good economic benefit.

Description

A kind of suppleing level super thick soil property country rock shaft excavation method
Technical field
The present invention relates to a kind of shaft excavation methods, and in particular to a kind of suppleing level super thick soil property country rock shaft excavation side Method.
Background technology
Soil property country rock typically refers to include that the soil body, completely decomposed rock, strong-weathered rock etc. are not required to explosion, can be straight with equipment such as backhoes Connect the country rock for digging dress;It is domestic at present to have had highly developed experience for shaft excavation;But it is extremely rich in rainwater such as Africa Abundant area, level of ground water is very high, and the soil body is nearly at saturation state;With the increase of cutting depth, shaft bottom will appear largely Ponding easily causes the sediment failure of the borehole wall to destroy, and is created great difficulties to shaft excavation work;What we were usually most readily conceivable that Method is that well-points dewatering is used around vertical shaft;But since African Territories soil property country rock ground mulching layer is generally thicker;It is reachable To 30~60m, and soil body water penetration is very poor;The problems such as undesirable and cost is excessively high there are dewatering effect.
In May, 2015,1# air shaft of the power stations Uganda Ka Luma for underground power house ventilation smoke exhaust proceed by It excavates;Excavation supporting finishes for its underpart ventilation at that time and safe hole, has lower part construction channel;Vertical shaft depth 90.2m, soil property Country rock section designs digging diameter 5.3m, is shown through hole drilling of nearby ventilating:Soil property country rock thickness 34.0m;It is deep when being excavated to 9.5m When, the borehole wall starts to seep water;When being excavated to 12.0m depths, since soil layer entirety water content is big, the borehole wall starts larger ooze occur Water, soil body self-stable ability are deteriorated, and cave-in is serious after excavation;When to 13.4m depths, borehole wall soil layer without self-stable ability, is opened substantially After digging cave-in and cavity is formed after extending upwardly to the borehole wall of supporting;When to 13.9m depth, there is upward water burst in shaft bottom And take a large amount of silts out of, borehole wall soil layer is in semi liquid state, no self-stable ability;When continuing to be excavated to 14.4m depths downwards, borehole wall outflow Silt is full of shaft bottom again, can not carry out excavating and supporting construction, vertical shaft are stopped work nearly one month;For lowering of watertable, as early as possible Restart 1# air shafts excavation, takes well-points dewatering measure well week, but due to soil layer bad hydraulic permeability, dewatering effect is not It is slow to excavate progress for ideal.
Invention content
The present invention provides a kind of simple and easy to do, of low cost, significant effect, and entire soil property country rock shaft excavation can be made to work The suppleing level super thick soil property country rock shaft excavation method carried out in anhydrous conditions.
The technical solution adopted by the present invention is:A kind of suppleing level super thick soil property country rock shaft excavation method, including it is following Step:
Step 1:Excavate draining guide hole, draining guide hole connection lower part construction channel downwards from earth's surface along vertical shaft central axis;
Step 2:Carry out shaft excavation supporting operation.
Further, the construction method that guide hole is drained in the step 1 is as follows:
S1:The excavation that soil property country rock section drains guide hole is carried out according to design diameter, until being excavated to bedrock surface;
S2:Reaming is carried out to soil property country rock section draining guide hole from top to bottom;
S3:Temporary casing is installed in soil property country rock section draining guide hole after reaming;
S4:It carries out rock section draining guide hole to excavate, until with lower part construction channel perforation;
S5:The permanent water-permeable pipe that diameter is less than temporary casing is installed in temporary casing;
S6:Casting resin backfill is carried out between hole wall after permanent water-permeable pipe and reaming and takes out temporary casing, the row of completion Water guide hole excavates.
Further, in the casting resin after the permanent water-permeable pipe and reaming between hole wall, lower part casting resin grain size is more than Top casting resin;Temporary casing is taken out after the completion of the casting resin filling of lower part, is then further filled with top casting resin.
Further, the permanent water-permeable pipe upper edge its be arranged circumferentially permeable gap.
Further, the lower part casting resin be 5~10mm of grain size gravel or well cuttings, top casting resin be 2~ The sand of 5mm.
Further, the soil property country rock section draining guide hole diameter is less than rock section draining guide hole diameter;Soil property country rock section The a diameter of 140mm of guide hole is drained, rock section drains a diameter of 155mm of guide hole.
Further, the excavation of soil property country rock section draining guide hole is carried out by drilling tool in the step S1, according to drilling speed Degree and the landwaste returned judge whether to be drilled into bedrock surface.
Further, reaming is carried out using drag bit in the step S2.
Further, four groups of gaps are provided on the permanent water-permeable pipe, circumferential spacing is 35mm, and single gap is long 75mm, slit width 1.5mm, spacing 8.5mm.
Further, the installation process of permanent water-permeable pipe is installed for merogenesis in the step S5, is led close to rock section draining Bottom is expanded into caliber first before Kong Yijie installations;Its caliber is expanded to drains guide hole diameter more than rock section.
The beneficial effects of the invention are as follows:
(1) when the present invention solves suppleing level soil property country rock shaft excavation, soil property country rock covering thickness, bad hydraulic permeability, Problem undesirable using well-points dewatering method effect and that cost is excessively high;
(2) simple and practicable, of low cost, significant effect of the invention;
(3) present invention can ensure that entire soil property country rock shaft excavation work carries out in anhydrous conditions, achieve good Economic benefit.
Description of the drawings
Fig. 1 is operation principle schematic diagram of the present invention.
Fig. 2 is that guide hole structure schematic diagram is drained in the present invention.
Specific implementation mode
The present invention will be further described in the following with reference to the drawings and specific embodiments.
As shown in Figure 1 and Figure 2, a kind of suppleing level super thick soil property country rock shaft excavation method, includes the following steps:
Step 1:Excavate draining guide hole 1 downwards from earth's surface along vertical shaft central axis, it is logical that draining guide hole 1 is connected to lower part construction Road;
Step 2:Carry out shaft excavation supporting operation.
It is downward from earth's surface along vertical shaft central axis for lowering of watertable when suppleing level soil property country rock shaft excavation It bores vertical centre and drains guide hole 1 to lower part construction channel, as shown in Figure 1;Guide hole 1 is drained by center earth's surface and lower part are constructed Channel connection allows the interior infiltration of well, ponding to drain guide hole 1 by center and flows into lower part construction channel, then constructed in channel by lower part Special pumping equipment be pumped to outside hole, carried out to ensure that shaft excavation is operated in water-less environment;Then according to conventional perpendicular Well excavation method carries out excavation supporting operation.
Detailed process is as follows:Center is bored to lower part construction channel (connection hole) drain guide hole 1 from earth's surface along vertical shaft center line; AperturePermanent water-permeable pipe is set in hole;Well internal water accumulation or construction water are led by center draining when shaft excavation Hole 1 flows into the catch pit in lower part construction channel;Simultaneously as setting permanent water-permeable pipe 2 in center draining guide hole 1, underground water exists Under gravity, oblique flow is generated, dropdown curve as shown in Figure 1 is formed, level of ground water is made to be less than shaft excavation work surface; Underground water converges in center draining guide hole 1, flows into the catch pit in lower part construction channel;The mine water that catchments passes through lower part The drainage system constructed in channel, is pumped to through working tunnel outside hole.
Further, the construction method that guide hole 1 is drained in the step 1 is as follows:
S1:The excavation that soil property country rock section draining guide hole 1-1 is carried out according to design diameter, until being excavated to bedrock surface;
S2:Reaming is carried out to soil property country rock section draining guide hole 1-1 from top to bottom;
S3:Temporary casing 3 is installed in soil property country rock section draining guide hole 1-1 after reaming;
S4:It carries out rock section draining guide hole 1-2 to excavate, until with lower part construction channel perforation;
S5:Installation diameter is less than the permanent water-permeable pipe 2 of temporary casing 3 in temporary casing 3;
S6:Casting resin backfill is carried out between hole wall after permanent water-permeable pipe 2 and reaming and takes out temporary casing 3, is completed Guide hole 1 is drained to excavate.
Further, in the casting resin after the permanent water-permeable pipe 2 and reaming between hole wall, lower part casting resin grain size is more than Top casting resin;Temporary casing 3 is taken out after the completion of the casting resin filling of lower part, is then further filled with top casting resin.
Further, 2 upper edge of permanent water-permeable pipe its be arranged circumferentially permeable gap.
Further, the lower part casting resin be 5~10mm of grain size gravel or well cuttings, top casting resin be 2~ The sand of 5mm.
Further, the soil property country rock section draining guide hole 1-1 diameters are less than rock section draining guide hole 1-2 diameters;Soil property Country rock section drains the guide hole a diameter of 140mm of 1-1, and rock section drains a diameter of 155mm of guide hole 1-2.
Further, the excavation of soil property country rock section draining guide hole 1-1 is carried out by drilling tool in the step S1, according to drilling Speed and the landwaste of return judge whether to be drilled into bedrock surface.
Further, reaming is carried out using drag bit in the step S2.
Further, four groups of gaps are provided on the permanent water-permeable pipe 2, circumferential spacing is 35mm, and single gap is long 75mm, slit width 1.5mm, spacing 8.5mm.
Further, the installation process of permanent water-permeable pipe 2 is installed for merogenesis in the step S5, is led close to rock section draining Bottom is expanded into caliber first before the section installations of hole 1-2 mono-;Its caliber is expanded to drains guide hole 1-2 diameters more than rock section.
Ka Luma tailwater tunnels are equipped with 4#, 5# air shaft, and the 8# working tunnels between the main hole 1#, 2# connect respectively for bottom Logical hole, 9# working tunnels connection hole communicate;It is mainly used for wide open digging stage ventilation smoke exhaust;The soil of underground power house 1# air shafts Matter country rock section excavates the problem of groundwater encountered, and an important topic is proposed to tailwater tunnel project scientific research personnel:How When 4#, 5# air shaft excavate, as possible under the premise of not increasing excavation cost, realizes the decline of level of ground water, ensure the borehole wall Stablize and excavation is made to be operated under water-less environment and carries out, the key that just can be smoothly excavated at two air shafts.
Guide hole is drained in Ka Luma hydropower projects to be mainly used for excluding well internal water accumulation and collect draining guide hole peripherally Lower water infiltration;Large aperture should not be selected, 4#, 5# air shaft top soil property country rock section in the practice of Ka Luma Hydropower Projects D=140mm, lower part rock section is taken to take D=155mm;Draining guide hole depth H, that is, vertical shaft center ground to lower part is constructed channel The depth at top namely the depth of vertical shaft;In the construction of 4# air shafts, H=95.78m, 5# vertical shafts is taken to take H=93.40m.
Permanent water-permeable pipe is mainly used for soil property country rock section, selects the permeable casing of PVC plastic;Sleeve outer and guide hole diameter phase Together;Its diameter d=140mm is taken in the construction of 4#, 5# air shaft;Tubing depth h is i.e. within the scope of from earth's surface to basement rock, i.e. soil property Country rock vertical shaft section is required to that permeable casing is arranged;In the construction of 4# air shafts, h=35.20m, 5# vertical shafts h=49.07m;Thoroughly Jacket pipe single-unit clear length L=290cm, outer diameter φ=140mm, casing wall thickness δ=7mm, internal thread length and outer filament length degree are 6mm;It is 35mm, the long 75mm in single gap, slit width 1.5mm, spacing that casing has four groups of gaps, circumferential spacing along conduit circumferential direction 8.5mm。
Guide hole structure is drained as shown in Fig. 2, guide hole construction uses vehicle-mounted well rig, Specific construction process as follows:
Soil property country rock thickness is verified first, using φ 152mm drilling tools, is drilled down into from vertical shaft central axis, until boring Until basement rock;It can judge whether to be drilled into bedrock surface from rate of penetration and the landwaste situation of return;It constructs in 4# air shafts In, verify soil property country rock thickness h=35.20m;5# air shaft soil property country rocks thickness h=49.07m;φ 152mm drilling tools are got into It after basement rock, falls back on ground and removes drilling tool, change φ 228mm drag bits, carry out reaming from top to bottom to bedrock surface;Reaming metapore Diameter reaches φ 250mm, and temporary casing is installed after reaming, using φ 200mmPVC plastic tubes, wall thickness 9mm;Temporary casing installs Cheng Hou rechanges φ 152mm drilling tools, is drilled down into from bedrock surface, is penetrated through until with lower part construction channel (being connected to hole), to It forms φ 155mm rock sections and drains guide hole;Soil property country rock section drains the permanent water-permeable pipe in guide hole and uses φ 140mmPVC plastics Water-permeable pipe, wall thickness 7mm, tube wall are equipped with permeable gap;Bottom casing joint is before being put into draining guide hole, first by bottom Heating expands caliber to φ 165mm;Then it is put into hole section by section, until installation is complete for permanent water-permeable pipe in draining guide hole;It will set It is that can its bottom be sleeved on base in order to which its base diameter drains guide hole diameter slightly larger than rock section that bottom of the tube, which carries out heating expander, Rock section drains outside guide hole, and permanent water-permeable pipe is avoided to sink;Permanent water-permeable pipe is after installation is complete, hole wall after permanent water-permeable pipe and reaming Between backfilled using casting resin and extract temporary casing;The effect of casting resin is to filter out the mud particles carried in underground water, is prevented Only permanent water-permeable pipe gap blocks;Casting resin earth-filling method:It is deep that 1.0m is inserted first between permanent water-permeable pipe and temporary casing Well cuttings and the gravel that grain size is 5~10mm, then extract temporary casing, then it is 5~10mm slowly to insert grain size with spade Sand;Casting resin can not be too fast when inserting, to prevent pore plugging between casing and hole wall.
Shaft excavation construction is finally carried out, the upper and lower two parts of work point is excavated and carries out;Top soil property country rock, which excavates, to be used 0.11m3Mini-excavator directly digs dress 1.2m in well3Hanging basket, hand fit fill slag;Gantry crane promotes hanging basket to ground, slag charge Transport Dumping Sites to;Using steel ring beam combination anchor, net, spray supporting;Lower part basement rock shaft excavation uses anti-well drilling machine construction φ 1.4m Slag well is slipped, as slipping slag channel;Vertical hole, photoface exploision are bored using YT28 hand air drills;Slag charge enters lower part company by slipping slag well In logical hole, slagged tap by 8#, 9# working tunnel, slag charge transports Dumping Sites to.
Method using the present invention drains guide hole precipitation technology by center and uses well-points dewatering technology, carries out respectively The economic efficiency contrast situation that 4#, 5# air shaft soil property country rock section are excavated, as shown in table 1.
1. two methods Economic and Efficiency Analysis of table compares
From table 1 it follows that using the method for the present invention compared with being excavated using well-points dewatering technology, it is cost-saved altogether 65.67 ten thousand yuan;Economic and Efficiency Analysis estimation conditions are as follows:(1) drilling of center osculum and well-points dewatering drilling are all made of locality Working sources;(2) 4# air shafts soil property country rock thickness 35.20m, 5# air shafts soil property country rock thickness 49.07m, Construction of Silo are accurate The standby phase is 1 month, and soil layer construction speed is 0.8m/ days;(3) actual measurement 4#, 5# air shaft center draining guide hole infiltration flow point It Wei not 5.28m3/h、4.85m3/h;(4) sump lift is respectively outside catch pit to hole in 8#, 9# working tunnel connection hole 101.5m, 68.0m, sump to sedimentation basin lift is respectively 8.0m, 12.0m outside hole;(5) according to soil depth, spray should be used Well-points dewatering technology is penetrated, by double well-point arrangement;With reference to quota, people, material, machine are adjusted according to actual cost and field condition, Middle power supply for construction is self power generation, and cost is 3 yuan/Kwh, calculates the deviation between depth in well-points dewatering depth and quota, presses Interpolation method exploitation.
When the present invention solves suppleing level soil property country rock shaft excavation, soil property country rock covers thickness, soil body bad hydraulic permeability, It is undesirable using well-points dewatering method effect and the problems such as cost is excessively high;Form a kind of simple and easy to do, of low cost, significant effect Precipitation method, entire soil property country rock shaft excavation work can be made to carry out in anhydrous conditions, and achieve good economic effect Benefit.

Claims (10)

1. a kind of suppleing level super thick soil property country rock shaft excavation method, which is characterized in that include the following steps:
Step 1:Draining guide hole (1) is excavated downwards from earth's surface along vertical shaft central axis, and it is logical that draining guide hole (1) is connected to lower part construction Road;
Step 2:Carry out shaft excavation supporting operation.
2. a kind of suppleing level super thick soil property country rock shaft excavation method according to claim 1, which is characterized in that described The construction method that guide hole (1) is drained in step 1 is as follows:
S1:The excavation that soil property country rock section draining guide hole (1-1) is carried out according to design diameter, until being excavated to bedrock surface;
S2:Reaming is carried out to soil property country rock section draining guide hole (1-1) from top to bottom;
S3:Installation temporary casing (3) in soil property country rock section draining guide hole (1-1) after reaming;
S4:It carries out rock section draining guide hole (1-2) to excavate, until with lower part construction channel perforation;
S5:Installation diameter is less than the permanent water-permeable pipe (2) of temporary casing (3) in temporary casing (3);
S6:Casting resin backfill is carried out between hole wall after permanent water-permeable pipe (2) and reaming and takes out temporary casing (3), is completed Guide hole (1) is drained to excavate.
3. a kind of suppleing level super thick soil property country rock shaft excavation method according to claim 2, which is characterized in that described In casting resin after permanent water-permeable pipe (2) and reaming between hole wall, casting resin grain size in lower part is more than top casting resin;Lower part is filled Temporary casing (3) is taken out after the completion of filler filling, is then further filled with top casting resin.
4. a kind of suppleing level super thick soil property country rock shaft excavation method according to claim 2, which is characterized in that described On permanent water-permeable pipe (2), permeable gap has been arranged circumferentially along it.
5. a kind of suppleing level super thick soil property country rock shaft excavation method according to claim 3, which is characterized in that described Lower part casting resin is the gravel or well cuttings of 5~10mm of grain size, and top casting resin is the sand of 2~5mm.
6. a kind of suppleing level super thick soil property country rock shaft excavation method according to claim 2, which is characterized in that described Soil property country rock section drains guide hole (1-1) diameter and is less than rock section draining guide hole (1-2) diameter;Soil property country rock section drains guide hole (1- 1) a diameter of 140mm, rock section drain guide hole (1-2) a diameter of 155mm.
7. a kind of suppleing level super thick soil property country rock shaft excavation method according to claim 2, which is characterized in that described The excavation of soil property country rock section draining guide hole (1-1) is carried out by drilling tool in step S1, is sentenced according to rate of penetration and the landwaste of return It is disconnected whether to be drilled into bedrock surface.
8. a kind of suppleing level super thick soil property country rock shaft excavation method according to claim 2, which is characterized in that described Reaming is carried out using drag bit in step S2.
9. a kind of suppleing level super thick soil property country rock shaft excavation method according to claim 4, which is characterized in that described Four groups of gaps are provided on permanent water-permeable pipe (2), circumferential spacing is 35mm, the long 75mm in single gap, slit width 1.5mm, spacing 8.5mm。
10. a kind of suppleing level super thick soil property country rock shaft excavation method according to claim 2, which is characterized in that institute It states the installation process of permanent water-permeable pipe (2) in step S5 to install for merogenesis, close to rock section draining guide hole (1-2) section installation It is preceding that bottom is expanded into caliber first;Its caliber is expanded to drains guide hole (1-2) diameter more than rock section.
CN201810181858.0A 2018-03-05 2018-03-05 A kind of suppleing level super thick soil property country rock shaft excavation method Pending CN108397197A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810181858.0A CN108397197A (en) 2018-03-05 2018-03-05 A kind of suppleing level super thick soil property country rock shaft excavation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810181858.0A CN108397197A (en) 2018-03-05 2018-03-05 A kind of suppleing level super thick soil property country rock shaft excavation method

Publications (1)

Publication Number Publication Date
CN108397197A true CN108397197A (en) 2018-08-14

Family

ID=63091874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810181858.0A Pending CN108397197A (en) 2018-03-05 2018-03-05 A kind of suppleing level super thick soil property country rock shaft excavation method

Country Status (1)

Country Link
CN (1) CN108397197A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111577330A (en) * 2020-05-08 2020-08-25 平煤神马建工集团有限公司 Construction method for open channel section of large-section inclined shaft and high-strength combined template thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105201513A (en) * 2015-09-11 2015-12-30 重庆工程职业技术学院 Shaft construction method for rail transit
CN204940315U (en) * 2015-09-28 2016-01-06 北京城建道桥建设集团有限公司 A kind of water-stopping system for the large-scale vertical shaft of region of FuShui
CN105507336A (en) * 2015-11-27 2016-04-20 上海长凯岩土工程有限公司 Method for forming composite foundation by using dewatering well
CN105587320A (en) * 2016-01-29 2016-05-18 中铁第一勘察设计院集团有限公司 Water-rich sandy cobble ground heteromorphosis deep shaft structural system and construction method thereof
CN205369281U (en) * 2015-12-29 2016-07-06 浙江大学城市学院 Radial precipitation structure
CN107035376A (en) * 2017-05-19 2017-08-11 陕西长武亭南煤业有限责任公司 One kind common law in huge thick bedrock aquifer digs shaft construction method
CN107387090A (en) * 2017-09-10 2017-11-24 沈阳建筑大学 Deep layer tunnel shaft is accessed with water purification desilting function

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105201513A (en) * 2015-09-11 2015-12-30 重庆工程职业技术学院 Shaft construction method for rail transit
CN204940315U (en) * 2015-09-28 2016-01-06 北京城建道桥建设集团有限公司 A kind of water-stopping system for the large-scale vertical shaft of region of FuShui
CN105507336A (en) * 2015-11-27 2016-04-20 上海长凯岩土工程有限公司 Method for forming composite foundation by using dewatering well
CN205369281U (en) * 2015-12-29 2016-07-06 浙江大学城市学院 Radial precipitation structure
CN105587320A (en) * 2016-01-29 2016-05-18 中铁第一勘察设计院集团有限公司 Water-rich sandy cobble ground heteromorphosis deep shaft structural system and construction method thereof
CN107035376A (en) * 2017-05-19 2017-08-11 陕西长武亭南煤业有限责任公司 One kind common law in huge thick bedrock aquifer digs shaft construction method
CN107387090A (en) * 2017-09-10 2017-11-24 沈阳建筑大学 Deep layer tunnel shaft is accessed with water purification desilting function

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111577330A (en) * 2020-05-08 2020-08-25 平煤神马建工集团有限公司 Construction method for open channel section of large-section inclined shaft and high-strength combined template thereof

Similar Documents

Publication Publication Date Title
CN100480475C (en) Controllable one-well lamina precipitation construction method
CN104694746B (en) A kind of method of ion adsorption type re in_situ leaching and leaching ore deposit system thereof
CN101176400B (en) New process for recultivating glebe in mine subsidence area
CN103643918B (en) A kind of searching for Ordovician limestone mining area and the method preventing mine from seeping water
CN107489159A (en) Deep & thick silt matter Soft Soil Layer vacuum tube well dewatering construction structure and its construction
CN105863648B (en) A kind of tunneling is shallow to cover large-section tunnel construction method
KR101403041B1 (en) Open type geothermal system unit
CN102400713B (en) Method for auxiliary construction of water falling in tunnel by communicated channel
CN109026010B (en) A kind of mine seepage well slip casting type sinking shaft construction method
CN109736338A (en) A kind of hydraulic engineering foundation pit pipe well combination light well point Yield rainfall relation method
CN207526480U (en) A kind of heavy caliber reducing type fills out gravel drawing liquid well
CN105064336A (en) Hole forming construction method for three-section type pedestal pile
CN108797618A (en) One kind being used for Urban Underground pipe gallery drainage of foundation pit structure and its construction method
CN109339080A (en) A kind of open-cut foundation ditch deep slob region vacuum precipitation system and construction method
CN103088836A (en) Sedimentation control method for pumping water and performing reinjection in well casing simultaneously
CN105239564A (en) Construction method of cast-in-place pile with combination of full-sleeve and mud protecting wall
CN108643827B (en) A kind of hole structure construction method increasing ground-dipping uranium extraction pumping liquid measure
CN110424430A (en) Deep basal pit powder land floor Deep Pumped Wells construction method and its application
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
CN106245621B (en) A kind of electric osmose inverted well construction method
CN108397197A (en) A kind of suppleing level super thick soil property country rock shaft excavation method
CN209798792U (en) open cut foundation pit deep silt layer vacuum dewatering system
CN206957712U (en) A kind of anti-well rig guide hole construction system of unfavorable geology layer vertical shaft
KR100284857B1 (en) Gathering Method of Underground Water
CN206034466U (en) Foundation ditch or basic groove precipitation system for construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180814

RJ01 Rejection of invention patent application after publication