CN108392761A - A kind of construction method of fire fighting device about scenic spot - Google Patents

A kind of construction method of fire fighting device about scenic spot Download PDF

Info

Publication number
CN108392761A
CN108392761A CN201810190428.5A CN201810190428A CN108392761A CN 108392761 A CN108392761 A CN 108392761A CN 201810190428 A CN201810190428 A CN 201810190428A CN 108392761 A CN108392761 A CN 108392761A
Authority
CN
China
Prior art keywords
construction
pipe
fire
pipeline
scenic spot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810190428.5A
Other languages
Chinese (zh)
Inventor
赵新会
孙丽萍
胡晓林
李颖
王帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Crown Liuyuan Tourism Development Co
Original Assignee
Shandong Crown Liuyuan Tourism Development Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Crown Liuyuan Tourism Development Co filed Critical Shandong Crown Liuyuan Tourism Development Co
Priority to CN201810190428.5A priority Critical patent/CN108392761A/en
Publication of CN108392761A publication Critical patent/CN108392761A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A62LIFE-SAVING; FIRE-FIGHTING
    • A62CFIRE-FIGHTING
    • A62C8/00Hand tools or accessories specially adapted for fire-fighting, e.g. tool boxes

Landscapes

  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

The invention discloses a kind of construction methods of the fire fighting device about scenic spot, including construct to fire engineering spraying fire-extinguishing system, specifically include following steps:One, preparation of construction;Two, construction arranges;Three, steel pipe is secretly matched;Four, pipeline and valve installation;Five, hydraulic test of pipeline;Flushing pipe;Water source control valve installation;Pipeline is debugged in water flowing.The construction method reasonable design of the fire fighting device about scenic spot of the present invention, easy for construction, construction quality is good, and speed of application is fast, and favorable anti-corrosion effect, construction quality is safe and reliable, can effectively improve scenic spot safety, avoid the Loss of Life and property of people, be conducive to promote.

Description

A kind of construction method of fire fighting device about scenic spot
Technical field
The present invention relates to a kind of construction method, the construction method of specifically a kind of fire fighting device about scenic spot.
Background technology
Building fire protection facility, which refers to, to be built(Structure)It builds the automatic fire alarm system being arranged in object, automatic sprinkler system, disappear Fire ties system etc. and is built for taking precautions against and putting out a fire to save life and property(Structure)Build the general name of the installations and facilities of object fire.There are commonly automatic fire alarm systems System, automatic sprinkler system, hydrant system, gas extinguishing system, froth fire extinguishing system, powder extinguishing system, Smoke prevention row Cigarette system, safe evacuation system etc..It is the critical facility for ensureing building's fire safety and evacuating personnel safety, is to build in the modern times The important component built.It plays an important role to protection building, is effectively protected life security and the country of citizen The safety of property.
Spraying system of fire fighting is a kind of fire fighting extinguisher, is to apply a kind of very extensive fixed fire protection system, it has There is the features such as cheap, fire-fighting efficiency is high.It can be divided into manual control according to function difference and automatically control two kinds of forms.System System installation warning device can send out alarm automatically when fire occurs, and the spraying system of fire fighting of automatic control type can also be certainly It is dynamic to spray water and work with other fire fighting device synchronous interactions, therefore can effectively control, put out initial fire disaster.
Tourist attraction(tourist attraction), refer to using tourism and its correlated activation as major function or main work( The region place of one of energy, disclosure satisfy that the tourism demands such as tourist's visit and sightseeing, vacation tourism, health and happiness body-building, have corresponding Tourist facilities and provide corresponding tourist service manage area independently.Scenic spot flow of the people is big, the reasonable construction of scenic spot fire fighting device, It is the important leverage to scenic spot human life and property.With the presence of scenic spot spraying system of fire fighting unreasonable allocation the shortcomings of, need Want further specification management of fire safety, the security against fire consciousness of enhancing scenic spot personnel " checking oneself safely, hidden danger self-picketing " and strick precaution Self-saving ability has improvement to require fire prevention.Therefore, the present invention provides a kind of construction party of the fire fighting device about scenic spot Method.
Invention content
The purpose of the present invention is to provide a kind of construction methods of the fire fighting device about scenic spot, to solve above-mentioned background skill The problem of being proposed in art.
To achieve the above object, the present invention provides the following technical solutions:
A kind of construction method of fire fighting device about scenic spot, including construct to fire engineering spraying fire-extinguishing system, specifically Include the following steps:
One, preparation of construction:Be familiar with drawing first, verify device therefor material, beam worker equipment in figure, arranged according to the duration and into Degree requires reasonable disposition labour, proposes stock and adopts for plan;Then fire product is purchased, fire product there should be product qualified Card, production licence, selling license, and approach facility material specification, model should meet design requirement;To tubing, nozzle and alarm Valve is tested one by one;
Two, construction arranges:Set aside pre-embedded coordinates civil engineering pre- by figure in construction with civil engineering and finishing close fit, construction personnel It boxes out hole, service sleeve, wooden box insertion reserving hole is fixed, next procedure construction is continued;
Three, steel pipe is secretly matched:Embedded steel tube first carries out presentation quality inspection, steel pipe inner wall Glabrous thorn, and nozzle scrapes light, outside steel pipe Portion is arranged ceramic jacket, inner wall of welded pipe brush antirust paint;
Four, pipeline and valve installation:It should be straightened pipe before Pipe installing and remove internal sundries, stop mounted pipe when installation Road opening should block;Pipe level installs the gradient for preferably setting 0.006-0.009, slope aspect water draw-off;Pipeline adds anti-shake branch Frame, every section of main pipe should set at least two anti-shake holder, and the installation site of anti-shake holder should not hinder the water spray effect of nozzle;
Five, hydraulic test of pipeline, the water pressure test should be layered progress, to pinpoint the problems in time;Flushing pipe:In flushing pipe, spray It spills pipeline and continuously does flushing work hydraulic pressure pressure testing is complete;Water source control valve installation:In the installation of water source control valve, alarm valve group with match The connection of water pipe main pipe should make water (flow) direction consistent;Pipeline is debugged in water flowing:Water flowing debug pipeline in, sprinkling system install into Row entirety water flowing makes system reach service pressure and prepares debugging.
As a further solution of the present invention:Pipe level installs the gradient for preferably setting 0.007-0.008.
As a further solution of the present invention:Antirust paint uses iron oxide red phenolic paint.
Compared with prior art, the beneficial effects of the invention are as follows:
The construction method reasonable design of the fire fighting device about scenic spot of the present invention, easy for construction, construction quality is good, speed of application Soon, favorable anti-corrosion effect, construction quality is safe and reliable, can effectively improve scenic spot safety, avoid the Loss of Life and property of people, have Conducive to popularization.
Specific implementation mode
The technical solution of this patent is described in more detail With reference to embodiment.
Embodiment 1
A kind of construction method of fire fighting device about scenic spot, including construct to fire engineering spraying fire-extinguishing system, specifically Include the following steps:
One, preparation of construction:Be familiar with drawing first, verify device therefor material, beam worker equipment in figure, arranged according to the duration and into Degree requires reasonable disposition labour, proposes stock and adopts for plan;Then fire product is purchased, fire product there should be product qualified Card, production licence, selling license, and approach facility material specification, model should meet design requirement;To tubing, nozzle and alarm Valve is tested one by one;
Two, construction arranges:Set aside pre-embedded coordinates civil engineering pre- by figure in construction with civil engineering and finishing close fit, construction personnel It boxes out hole, service sleeve, wooden box insertion reserving hole is fixed, next procedure construction is continued;
Three, steel pipe is secretly matched:Embedded steel tube first carries out presentation quality inspection, steel pipe inner wall Glabrous thorn, and nozzle scrapes light, outside steel pipe Portion is arranged ceramic jacket, inner wall of welded pipe brush antirust paint;Preferably, antirust paint uses iron oxide red phenolic paint;
Four, pipeline and valve installation:It should be straightened pipe before Pipe installing and remove internal sundries, stop mounted pipe when installation Road opening should block;Pipe level installs the gradient for preferably setting 0.006-0.009, slope aspect water draw-off;Preferably, pipe level Installation preferably sets the gradient of 0.007-0.008;Pipeline adds anti-shake holder, and every section of main pipe should set at least two anti-shake holder, anti-shake branch The installation site of frame should not hinder the water spray effect of nozzle;
Five, hydraulic test of pipeline, the water pressure test should be layered progress, to pinpoint the problems in time;Flushing pipe:In flushing pipe, spray It spills pipeline and continuously does flushing work hydraulic pressure pressure testing is complete;Water source control valve installation:In the installation of water source control valve, alarm valve group with match The connection of water pipe main pipe should make water (flow) direction consistent;Pipeline is debugged in water flowing:Water flowing debug pipeline in, sprinkling system install into Row entirety water flowing makes system reach service pressure and prepares debugging.
The construction method reasonable design of the fire fighting device about scenic spot of the present invention, easy for construction, construction quality is good, construction Speed is fast, and favorable anti-corrosion effect, construction quality is safe and reliable, can effectively improve scenic spot safety, avoids the life and property damage of people It loses, is conducive to promote.
The better embodiment of this patent is explained in detail above, but this patent is not limited to above-mentioned embodiment party Formula, one skilled in the relevant art within the scope of knowledge, can also be under the premise of not departing from this patent objective Various changes can be made.

Claims (3)

1. a kind of construction method of fire fighting device about scenic spot, which is characterized in that including to fire engineering spraying fire-extinguishing system It constructs, specifically includes following steps:
One, preparation of construction:Be familiar with drawing first, verify device therefor material, beam worker equipment in figure, arranged according to the duration and into Degree requires reasonable disposition labour, proposes stock and adopts for plan;Then fire product is purchased, fire product there should be product qualified Card, production licence, selling license, and approach facility material specification, model should meet design requirement;To tubing, nozzle and alarm Valve is tested one by one;
Two, construction arranges:Set aside pre-embedded coordinates civil engineering pre- by figure in construction with civil engineering and finishing close fit, construction personnel It boxes out hole, service sleeve, wooden box insertion reserving hole is fixed, next procedure construction is continued;
Three, steel pipe is secretly matched:Embedded steel tube first carries out presentation quality inspection, steel pipe inner wall Glabrous thorn, and nozzle scrapes light, outside steel pipe Portion is arranged ceramic jacket, inner wall of welded pipe brush antirust paint;
Four, pipeline and valve installation:It should be straightened pipe before Pipe installing and remove internal sundries, stop mounted pipe when installation Road opening should block;Pipe level installs the gradient for preferably setting 0.006-0.009, slope aspect water draw-off;Pipeline adds anti-shake branch Frame, every section of main pipe should set at least two anti-shake holder, and the installation site of anti-shake holder should not hinder the water spray effect of nozzle;
Five, hydraulic test of pipeline, the water pressure test should be layered progress, to pinpoint the problems in time;Flushing pipe:In flushing pipe, spray It spills pipeline and continuously does flushing work hydraulic pressure pressure testing is complete;Water source control valve installation:In the installation of water source control valve, alarm valve group with match The connection of water pipe main pipe should make water (flow) direction consistent;Pipeline is debugged in water flowing:Water flowing debug pipeline in, sprinkling system install into Row entirety water flowing makes system reach service pressure and prepares debugging.
2. the construction method of the fire fighting device according to claim 1 about scenic spot, which is characterized in that pipe level is installed Preferably set the gradient of 0.007-0.008.
3. the construction method of the fire fighting device according to claim 1 about scenic spot, which is characterized in that antirust paint uses iron Red phenolic paint.
CN201810190428.5A 2018-03-08 2018-03-08 A kind of construction method of fire fighting device about scenic spot Pending CN108392761A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810190428.5A CN108392761A (en) 2018-03-08 2018-03-08 A kind of construction method of fire fighting device about scenic spot

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810190428.5A CN108392761A (en) 2018-03-08 2018-03-08 A kind of construction method of fire fighting device about scenic spot

Publications (1)

Publication Number Publication Date
CN108392761A true CN108392761A (en) 2018-08-14

Family

ID=63092151

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810190428.5A Pending CN108392761A (en) 2018-03-08 2018-03-08 A kind of construction method of fire fighting device about scenic spot

Country Status (1)

Country Link
CN (1) CN108392761A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060053083A (en) * 2004-11-13 2006-05-19 주식회사청원테크 Structure and construction method of fireplug lay under the ground
CN106178323A (en) * 2016-07-29 2016-12-07 广西安讯科技投资有限公司 Library fire system construction method of installation
CN106223618A (en) * 2016-07-29 2016-12-14 广西安讯科技投资有限公司 A kind of construction method of fire engineering spraying fire-extinguishing system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060053083A (en) * 2004-11-13 2006-05-19 주식회사청원테크 Structure and construction method of fireplug lay under the ground
CN106178323A (en) * 2016-07-29 2016-12-07 广西安讯科技投资有限公司 Library fire system construction method of installation
CN106223618A (en) * 2016-07-29 2016-12-14 广西安讯科技投资有限公司 A kind of construction method of fire engineering spraying fire-extinguishing system

Similar Documents

Publication Publication Date Title
CN109701194A (en) A kind of construction method of fire engineering spraying fire-extinguishing system
CN108392761A (en) A kind of construction method of fire fighting device about scenic spot
CN213852881U (en) Underground comprehensive pipe gallery high-pressure water mist system
CN208243947U (en) A kind of heat-engine plant desulfurized tower maintenance fire-fighting system
CN203750079U (en) Suspended automatic fine water mist fire extinguishment device
CN205759213U (en) A kind of oblique tensile tower end fire-fighting system
CN105944258B (en) Stay cable tower end fire extinguishing system
CN206880970U (en) A kind of novel road tunnel water base foam integrated synthesis fire-fighting system
US9022052B2 (en) Standpipe emergency bypass method and kit for firefighters
CN109758696A (en) A method of the fire-fighting O&M terminal system based on BIM application
CN106178323A (en) Library fire system construction method of installation
CN204275340U (en) A kind of post a tree, used in making timber for boats extinction by automatic sprinkling structure modelled after an antique
CN107174777A (en) Indoor fireplug visualizes hydraulic pressure alarming device
CN206688068U (en) High-pressure aerial fog linkage automatic fire extinguishing system
RU2442623C1 (en) The methods of firefighting in forest and peat areas
CN114360307A (en) Mobile training equipment
CN106215357A (en) Community automatic fire extinguishing system construction method of installation
CN113129724A (en) Simulation system for emergency disposal of leakage of dangerous chemicals
CN105617587A (en) Automatic spraying type pressure switch control apparatus and control method thereof
CN205391523U (en) Concrete feeding pump truck formula fire control unit
JPS6348287Y2 (en)
CN106223618A (en) A kind of construction method of fire engineering spraying fire-extinguishing system
CN106286405A (en) A kind of processing technology of the fire pump guide wheel of coating
CN107461039A (en) Down town lpg spherical tank method for dismounting
CN115212493B (en) Fire extinguishing system and method suitable for oil immersed transformer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180814

RJ01 Rejection of invention patent application after publication