CN107461039A - Down town lpg spherical tank method for dismounting - Google Patents
Down town lpg spherical tank method for dismounting Download PDFInfo
- Publication number
- CN107461039A CN107461039A CN201710848920.2A CN201710848920A CN107461039A CN 107461039 A CN107461039 A CN 107461039A CN 201710848920 A CN201710848920 A CN 201710848920A CN 107461039 A CN107461039 A CN 107461039A
- Authority
- CN
- China
- Prior art keywords
- spherical tank
- boiling
- subsidiary pipeline
- dismounting
- gas
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/08—Wrecking of buildings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/08—Wrecking of buildings
- E04G2023/086—Wrecking of buildings of tanks, reservoirs or the like
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
The present invention provides a kind of down town lpg spherical tank method for dismounting, liquefied petroleum gas in spherical tank and its subsidiary pipeline is forced to extract outward transport out, the liquefied petroleum gas that can not be extracted out enters line replacement with water and cleaned, gas leads to burner combustion caused by replacement process, liquid after the completion of displacement extracts outward transport out, replace the spherical tank cleaned up and its subsidiary pipeline purges boiling repeatedly using steam again, caused gas leads to burner combustion in purging digestion process, liquid after purging boiling is complete extracts outward transport out, until sample examination is qualified, again to purging boiling it is complete after spherical tank carry out residue cleaning, until removed after detection acceptance(check), whole process zero-emission, no pollution, it is a kind of safety, environmental protection, it is effective to remove mode.
Description
Technical field
The present invention relates to construction technology, more particularly to a kind of down town lpg spherical tank method for dismounting.
Background technology
Remove the spherical tank of storage liquefied petroleum gas, it is necessary to line replacement and cleaning first are entered to spherical tank and affiliated facility, its mesh
Be that will remain and the constantly liquefied petroleum gas thorough cleaning that escapes is clean, reach as defined in could implement to tear open after safety condition
Remove.
At present various regions safety and environmental protection department accreditation replacement in spherical tank mode be:Torch burning system+sewage disposal system
Tupe.This method is after exhausting the extraction raffinate in spherical tank, residual air, and the residual air that can not be extracted out is discharged into the combustion of torch burning system
Burn, the residual gas that can not be burnt is interrupted unlatching by atmospheric valve and is discharged into air, uncaps after soaking 48 hours, raffinate is discharged into oil refining
Factory's sewage disposal system is further handled, and this method substantially has certain influence to surrounding enviroment and air.
But last century eight, the liquefied petroleum-gas station of the nineties construction do not possess torch burning system substantially, more not
Put forward sewage disposal system.In urban renewal, these large-scale liquefied petroleum gas storage and distribution station soils are no timely after being imposed
Remove, can bring about potential safety hazard over time, therefore be often referred to as " city stealth bomb ".
These are opened for the last time in the recent period using the liquefied petroleum-gas station generally existing of time for a long time without gas station as-constructed drawing, nothing
Tank situation inspection record, extraction raffinate, residual air quantity fail to understand that top tank structure extent of corrosion is unclear in tank, gas station equipment state, lightning protection earthing
The problems such as whether intact system, safety alarm device be not clear, it directly affects the security evaluation of displacement early stage.It is clear to reach displacement
Wash journey zero-emission, the requirement of no pollution is nearly impossible thing.
The content of the invention
Based on this, it is necessary to for problem present in background technology, there is provided one kind can no pollution, zero-emission tear open safely
The down town lpg spherical tank method for dismounting removed.
A kind of down town lpg spherical tank method for dismounting, comprises the following steps:
Carry out preparation of construction, it is ensured that the safe and smooth progress of follow-up work;
Extract the liquefied petroleum gas in spherical tank and its subsidiary pipeline out outward transport;
The liquefied petroleum gas that can not be extracted out in spherical tank and its subsidiary pipeline enters line replacement with water and cleaned, caused gas in replacement process
Body leads to burner combustion, and the liquid after the completion of displacement extracts outward transport out;
Steam is passed through in the spherical tank and its subsidiary pipeline cleaned up to displacement and is purged boiling repeatedly, is purged in digestion process
Caused gas leads to burner combustion, and the liquid after purging boiling is complete extracts outward transport out, until caused by purging digestion process
Gas can not burn, and purge boiling it is complete after liquid sampling assay it is qualified;
Spherical tank after complete to purging boiling carries out residue cleaning, until detection acceptance(check);
The spherical tank for detecting acceptance(check) and its subsidiary pipeline are removed.
In one of the embodiments, the preparation of construction includes technique preparation, Farm Planning, personnel's preparation, work equipment
Prepare and measure prepares.
In one of the embodiments, the liquefied petroleum gas by spherical tank and its subsidiary pipeline extracts the step of outward transport out
Specially:The liquefied petroleum gas in spherical tank and its subsidiary pipeline is extracted out outward transport, until the pressure in spherical tank and its subsidiary pipeline
In below 0.05MPa.
In one of the embodiments, the liquefied petroleum gas that can not be extracted out in the spherical tank and its subsidiary pipeline is carried out with water
The step of displacement is cleaned, and caused gas leads to burner combustion in replacement process, and the liquid after replacing extracts outward transport out is specific
For:The water filling into the subsidiary pipeline of spherical tank, subsidiary pipeline is entered line replacement cleaning, displacement cleaning after be discharged into spherical tank with water after take out
Go out outward transport;
The water filling into spherical tank, to liquid level peak after suspend water filling, caused gas in the injecting process is led into burner combustion,
Continue interruption after having burnt and be filled to water spill-over to go out, stop water filling, after immersion 1 ~ 2 day, extract outward transport out.
In one of the embodiments, steam progress is passed through in the spherical tank and its subsidiary pipeline cleaned up to displacement
Repeatedly purge boiling the step of be specially:Steam is passed through into the subsidiary pipeline of spherical tank and is purged boiling repeatedly, purges boiling
Liquid is all flowed into spherical tank afterwards;
Steam is passed through into spherical tank and is purged boiling repeatedly, temperature control purges boiling each time below 60 DEG C in spherical tank
Time is more than 24 hours.
In one of the embodiments, described the step of removing the spherical tank for detecting acceptance(check) and its subsidiary pipeline, is specific
For:
The subsidiary pipeline of spherical tank is removed;
Multiple hangers are set respectively on top crown, upper temperature zone plate, equatorial plate, lower temperate zone plate and bottom crown in spherical tank;
Cutting hangs top crown, bottom crown, upper temperature zone plate, lower temperate zone plate and the equatorial plate of spherical tank successively;
Transported outward after the top crown for hanging onto bottom surface, bottom crown, upper temperature zone plate, lower temperate zone plate and equatorial plate are decomposed, clear out a gathering place and hand over.
In one of the embodiments, it is described in the top crown of spherical tank, upper temperature zone plate, equatorial plate, lower temperate zone plate and lower pole
Set respectively on plate the step of multiple hangers and be specially:
Respectively spherical tank top crown surface and bottom crown directly over be uniformly arranged four hangers;
Respectively four hangers are uniformly arranged in side, the side of lower temperate zone plate and the side of equatorial plate of the upper temperature zone plate of spherical tank.
In one of the embodiments, in described the step of removing the spherical tank for detecting acceptance(check) and its subsidiary pipeline also
Comprise the following steps:
The gas in spherical tank is monitored at any time, completed until removing.
Above-mentioned down town lpg spherical tank method for dismounting is strong by the liquefied petroleum gas in spherical tank and its subsidiary pipeline
System extracts outward transport out, and the liquefied petroleum gas that can not be extracted out enters line replacement with water and cleaned, and gas leads to burner caused by replacement process
Burning, the liquid after the completion of displacement are extracted out outward transport, replace the spherical tank cleaned up and its subsidiary pipeline and blown repeatedly using steam again
Boiling to be swept, caused gas in digestion process is purged and leads to burner combustion, the liquid after purging boiling is complete extracts outward transport out, until
Sample examination is qualified, then carries out residue cleaning to spherical tank of the purging boiling after complete, until being removed after detection acceptance(check), whole mistake
Journey zero-emission, no pollution, it is that one kind is safe and environment-friendly, effectively removes mode.
Above-mentioned down town lpg spherical tank method for dismounting, compared to " torch burning system+sewage disposal system "
Tupe, 600,000 yuan or so of escapable cost.
Brief description of the drawings
Fig. 1 is the structural representation of the spherical tank of an embodiment.
Embodiment
In order to facilitate the understanding of the purposes, features and advantages of the present invention, below in conjunction with the accompanying drawings to the present invention
Embodiment be described in detail.Many details are elaborated in the following description in order to fully understand this hair
It is bright.But the invention can be embodied in many other ways as described herein, those skilled in the art can be not
Similar improvement is done in the case of running counter to intension of the present invention, therefore the present invention is not limited to the specific embodiments disclosed below.
Referring to Fig. 1, the spherical tank of an embodiment, tank body is followed successively by top crown 10, upper temperature zone plate 12, equator from top to bottom
Plate 14, lower temperate zone plate 16 and bottom crown 18.
A kind of down town lpg spherical tank method for dismounting, comprises the following steps:
S110, carry out preparation of construction, it is ensured that the safe and smooth progress of follow-up work.
Above-mentioned preparation of construction includes technique preparation, Farm Planning, personnel prepare, work equipment prepares and measure prepares.
Wherein, technique preparation includes:
(1)Before going into operation with local government safety supervision, fire-fighting, environmental protection, special safety equipment supervision and management Section report, handle and put on record
With the formality that goes into operation, comprehensive understanding government part obtains the support of each functional department of government to the relevant requirement of the engineering and standard
And supervision, formulate linkage scheme jointly with fire department.
(2)After replacement in spherical tank Demolition Scheme, safe plans, emergency preplan authorization approval, phase is targetedly carried out
Close technical preparation, including the searching of the selected of technical staff, technical data, the difficult point of replacement in spherical tank, dangerous spot, technology are arranged
Apply(Construct, be safe and environment-friendly)Analyze again.
(3)The marshalling plan of the various resources of production, including each work post worker selected and dispatch, the inquiry of measure means materials
Valency and purchase, the preparation of construction machinery, the inspection of equipment and outfit and safety fire fighting goods and materials, instrument, equipment etc..
(4)Comprehensively it is careful carry out participate in the construction safety education of personnel, safe practice is told somebody what one's real intentions are, pre-job training etc.
Work.
(5)Gas station firsthand information is consulted, understands technological process and spherical tank relevant parameter, understands fully the displacement inside and outside situation in battery limit (BL).
(6)Consult spherical tank the last time survey report, spherical tank down time and the recent maintenance condition of spherical tank.
(7)Determine replacement in spherical tank Detailed operating procedures, raffinate, the collection transport of residue and treating method.
(8)Condition of getting angry confirmation form, the detection of inflammable, explosive, poisonous gas etc..
Farm Planning includes:
(1)Arrangement meets that the job site of process is removed in displacement, cleans out place needed for displacement, is parked for plant equipment, is reserved
Access way passes in and out for fire-fighting vehicle, it may be necessary to builds occasional passage to meet security against fire requirement.
(2)Displacement steam boiler is installed in former boiler room, water, electricity, gas contact and connection are set, carries out related functionality
Test.
(3)Liquefied petroleum gas residual gas burner is installed in fire water pool side open field, the device possesses gaseous-pressure
Function of preventing back-fire can be reconciled, gaseous-pressure modification scope is 0.1kPa ~ 15kPa, and the outdoor arrangement in burner bottom surface, both sides set 6
Rice is long, 2 meters of height, 0.38 meter of thick firebreak, horizontal firing.
Personnel prepare:According to the situation of job site and construction period establishment officer, it is responsible for calling in custodian by project management department
Member and workmen, determine respective post and responsibility, special operation workers(Play heavy industry, welder, electrician, scaffolder, gas station
Operative employee etc.)It must take appointment with certificate.
Work equipment prepares to include:
(1)It is equipped with abundant explosion-proof communication tool and inflammable, explosive, poisonous gas portable instrumentation.
(2)Call in associated construction machinery, work equipment, circulation material are marched into the arena, and carry out functional check to it, prepare explosion-proof work
Tool(Copper instrument and the suspender belt such as copper spanner, copper shovel, wooden rake, besom), and match somebody with somebody and get all the spark arrester and hand fire extinguisher ready.
(3)Instrument and personal protective equipment before welding and cutting permit approval use, and make with reference to existing liquefied gas station checking maintenance instrument
With administrative provisions, welding and cutting permit is handled rear work equipment use and can constructed according to a conventional method.
Measure prepares to include:
(1)Water, electricity, steam prepare, and contact access fire water and three phase mains with relevant departments, check that original distribution system is intact
Degree, missing element need to be supplemented, and the selection of anti-explosion product should have original design unit's accreditation, and steam is by the fuel oil pot newly purchased
Stove provides, and is connected with original jet chimney.
(2)Earthed system inspection, tank field lightning protection earthing, electrostatic grounding, working earthing systems inspection are detected, the construction stage
It should remain intact.
(3)Floor drain, sewerage closure, before fire operation, all closure finishes for floor drain, sewerage, can use water seal
Well envelope, sand hill add cement envelope, blind plate envelope etc., depending on field condition.
S120, the liquefied petroleum gas in spherical tank and its subsidiary pipeline is extracted out and transported outward.
Specifically, the liquefied petroleum gas in spherical tank and its subsidiary pipeline is extracted out outward transport, until spherical tank and its subsidiary pipeline
Interior pressure is in below 0.05MPa.
The liquefied petroleum gas that can not be extracted out in S130, spherical tank and its subsidiary pipeline enters line replacement with water and cleaned, replacement process
In caused gas lead to burner combustion, liquid after the completion of displacement extracts outward transport out.
Specifically, the water filling into the subsidiary pipeline of spherical tank, line replacement cleaning is entered to subsidiary pipeline, water is used after displacement cleaning
Be discharged into after spherical tank and extract outward transport out, then the water filling into spherical tank, to liquid level peak after suspend water filling, by caused gas in the injecting process
Body leads to burner combustion, continues interruption after having burnt and be filled to water spill-over to go out, and stops water filling, after immersion 1 ~ 2 day, extracts out outer
Fortune.
Steam is passed through in S140, the spherical tank and its subsidiary pipeline that are cleaned up to displacement and is purged boiling repeatedly, is purged
Caused gas leads to burner combustion in digestion process, and the liquid after purging boiling is complete extracts outward transport out, until purging digested
Caused gas can not burn in journey, and purge boiling it is complete after liquid sampling assay it is qualified.
Specifically, steam is passed through into the subsidiary pipeline of spherical tank is purged boiling repeatedly, liquid is whole after purging boiling
Flow into spherical tank, then be passed through steam into spherical tank and purged boiling repeatedly, temperature control is below 60 DEG C in spherical tank, each time
Digestion time is purged more than 24 hours.
S150, to purging boiling it is complete after spherical tank carry out residue cleaning, until detection acceptance(check).
It is appreciated that if carrying out artificial residue cleaning, before step S150 is carried out, it is complete to purging boiling after ball
Tank is also needed to be aerated processing, and the oxygen content in spherical tank is monitored, to ensure personal security.
Specifically, residue cleaning can use fire water combination copper shovel, the cleaning of the instrument such as wooden rake, besom, clear up less than
Position can set up fixed scaffold.
It should be noted that detecting acceptance(check) in step S150, including carry out Sample point collection in tank(Upper, middle and lower)With
Pipeline is analyzed, and is signed and confirmed by owner, management, unit in charge of construction tripartite after all qualified, label are got angry ticket.
S160, spherical tank and its subsidiary pipeline dismounting that acceptance(check) will be detected.
The spherical tank for detecting acceptance(check) and its subsidiary pipeline are removed and specifically include following steps:
S1601, the subsidiary pipeline dismounting by spherical tank.
Specifically, it should be noted following item:
(1)Spherical tank and its subsidiary pipeline have completed displacement cleaning and detection work before dismounting, reach the condition of getting angry.
(2)First off device interface and valve, pipeline deviate equipment interface 200mm or so at equipment interface before dismounting,
If activity surplus is small, plus the blind plate that about 10mm is thick at equipment interface, equipment side adds asbestos board sealing gasket.
(3)After pipeline disconnects with equipment, pipeline is first removed, then removes equipment, can be detachable pipe in flange disconnection
Do not cut as far as possible in road.
(4)First power supply is disconnected before dynamic equipment Removal, cable connector carries out equipment Removal again after carrying out insulation processing, removes
Equipment and pipeline need to be placed on ventilation.
(5)Pipeline is removed terminal and specified by gas station administration unit, and carries out mark with red paint, by gas station before removing
Management unit, the cosignatory confirmation of unit in charge of construction, for pay special attention to other non-pipelines for being connected of equipment of removing, during dismounting
There must be gas station administration personnel confirmation on the scene.
(6)For flammable explosive gas and liquid medium pipeline, the detection unit that dismounting must be designated before getting angry is to pipe
Road carries out fuel gas detection, it is ensured that after blast dangerous situation will not occur, gas station administration unit, supervisor, unit in charge of construction, detection
The cosignatory confirmation in unit four directions, can carry out fire operation.
On S1602, the top crown 10 in spherical tank, upper temperature zone plate 12, equatorial plate 14, lower temperate zone plate 16 and bottom crown 18 respectively
Multiple hangers are set.
Specifically, four hangers are uniformly arranged directly over the upper and lower pole plate of spherical tank respectively, respectively spherical tank it is upper,
The side of lower temperate zone plate and the side of equatorial plate are uniformly arranged four hangers.
Preferably, hanger uses board-like hanger.
S1603, cutting hangs the upper and lower pole plate of spherical tank, upper and lower temperate plate and equatorial plate successively.
Specifically, first cutting the upper and lower pole plate of spherical tank and hanging onto ground, then cut upper and lower temperate plate and hang onto ground
Face, finally cut equatorial plate and hang onto ground.
S1604, the upper and lower pole plate that will hang onto ground, upper and lower temperate plate and equatorial plate are transported outward after decomposing, friendship of clearing out a gathering place
Work.
It should be noted that during the spherical tank for detecting acceptance(check) and its subsidiary pipeline are removed, it is also necessary at any time
Gas in spherical tank is monitored, completed until removing.
Above-mentioned down town lpg spherical tank method for dismounting is strong by the liquefied petroleum gas in spherical tank and its subsidiary pipeline
System extracts outward transport out, and the liquefied petroleum gas that can not be extracted out enters line replacement with water and cleaned, and gas leads to burner caused by replacement process
Burning, the liquid after the completion of displacement are extracted out outward transport, replace the spherical tank cleaned up and its subsidiary pipeline and blown repeatedly using steam again
Boiling to be swept, caused gas in digestion process is purged and leads to burner combustion, the liquid after purging boiling is complete extracts outward transport out, until
Sample examination is qualified, then carries out residue cleaning to spherical tank of the purging boiling after complete, until being removed after detection acceptance(check), whole mistake
Journey zero-emission, no pollution, it is that one kind is safe and environment-friendly, effectively removes mode.
Above-mentioned down town lpg spherical tank method for dismounting, compared to " torch burning system+sewage disposal system "
Tupe, 600,000 yuan or so of escapable cost.
Embodiment described above only expresses the several embodiments of the present invention, and its description is more specific and detailed, but simultaneously
Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art
For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the guarantor of the present invention
Protect scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (8)
1. a kind of down town lpg spherical tank method for dismounting, it is characterised in that comprise the following steps:
Carry out preparation of construction, it is ensured that the safe and smooth progress of follow-up work;
Extract the liquefied petroleum gas in spherical tank and its subsidiary pipeline out outward transport;
The liquefied petroleum gas that can not be extracted out in spherical tank and its subsidiary pipeline enters line replacement with water and cleaned, caused gas in replacement process
Body leads to burner combustion, and the liquid after the completion of displacement extracts outward transport out;
Steam is passed through in the spherical tank and its subsidiary pipeline cleaned up to displacement and is purged boiling repeatedly, is purged in digestion process
Caused gas leads to burner combustion, and the liquid after purging boiling is complete extracts outward transport out, until caused by purging digestion process
Gas can not burn, and purge boiling it is complete after liquid sampling assay it is qualified;
Spherical tank after complete to purging boiling carries out residue cleaning, until detection acceptance(check);
The spherical tank for detecting acceptance(check) and its subsidiary pipeline are removed.
2. lpg spherical tank method for dismounting in down town according to claim 1, it is characterised in that the construction is accurate
It is standby to include technique preparation, Farm Planning, personnel's preparation, the preparation of work equipment and measure preparation.
3. lpg spherical tank method for dismounting in down town according to claim 1, it is characterised in that described by spherical tank
And its liquefied petroleum gas in subsidiary pipeline extracts the step of outward transport out and is specially:By the liquefied petroleum in spherical tank and its subsidiary pipeline
Gas extracts outward transport out, until the pressure in spherical tank and its subsidiary pipeline is in below 0.05MPa.
4. lpg spherical tank method for dismounting in down town according to claim 1, it is characterised in that the spherical tank and
The liquefied petroleum gas that can not be extracted out in its subsidiary pipeline enters line replacement with water and cleaned, and caused gas leads to burning in replacement process
Device burns, and the liquid after replacing extracts the step of transporting outward out and is specially:The water filling into the subsidiary pipeline of spherical tank, enters to subsidiary pipeline
Line replacement clean, displacement cleaning after be discharged into spherical tank with water after extract out outward transport;
The water filling into spherical tank, to liquid level peak after suspend water filling, caused gas in the injecting process is led into burner combustion,
Continue interruption after having burnt and be filled to water spill-over to go out, stop water filling, after immersion 1 ~ 2 day, extract outward transport out.
5. lpg spherical tank method for dismounting in down town according to claim 1, it is characterised in that described to displacement
The step of steam carries out and purges boiling repeatedly is passed through in the spherical tank and its subsidiary pipeline cleaned up is specially:To the attached of spherical tank
Steam is passed through in pipeline and is purged boiling repeatedly, liquid is all flowed into spherical tank after purging boiling;
Steam is passed through into spherical tank and is purged boiling repeatedly, temperature control purges boiling each time below 60 DEG C in spherical tank
Time is more than 24 hours.
6. lpg spherical tank method for dismounting in down town according to claim 1, it is characterised in that described to detect
The step of spherical tank and its subsidiary pipeline of acceptance(check) are removed be specially:
The subsidiary pipeline of spherical tank is removed;
Multiple hangers are set respectively on top crown, upper temperature zone plate, equatorial plate, lower temperate zone plate and bottom crown in spherical tank;
Cutting hangs top crown, bottom crown, upper temperature zone plate, lower temperate zone plate and the equatorial plate of spherical tank successively;
Transported outward after the top crown for hanging onto bottom surface, bottom crown, upper temperature zone plate, lower temperate zone plate and equatorial plate are decomposed, clear out a gathering place and hand over.
7. lpg spherical tank method for dismounting in down town according to claim 6, it is characterised in that described in spherical tank
Top crown, upper temperature zone plate, equatorial plate, the step of multiple hangers are set respectively on lower temperate zone plate and bottom crown be specially:
Respectively spherical tank top crown surface and bottom crown directly over be uniformly arranged four hangers;
Respectively four hangers are uniformly arranged in side, the side of lower temperate zone plate and the side of equatorial plate of the upper temperature zone plate of spherical tank.
8. lpg spherical tank method for dismounting in down town according to claim 6, it is characterised in that described to detect
It is further comprising the steps of in the step of spherical tank and its subsidiary pipeline of acceptance(check) are removed:
The gas in spherical tank is monitored at any time, completed until removing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710848920.2A CN107461039A (en) | 2017-09-20 | 2017-09-20 | Down town lpg spherical tank method for dismounting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710848920.2A CN107461039A (en) | 2017-09-20 | 2017-09-20 | Down town lpg spherical tank method for dismounting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107461039A true CN107461039A (en) | 2017-12-12 |
Family
ID=60551626
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710848920.2A Pending CN107461039A (en) | 2017-09-20 | 2017-09-20 | Down town lpg spherical tank method for dismounting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107461039A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114178263A (en) * | 2021-12-14 | 2022-03-15 | 中国核工业二四建设有限公司 | Cleaning device and method for high-precision penetration assembly |
-
2017
- 2017-09-20 CN CN201710848920.2A patent/CN107461039A/en active Pending
Non-Patent Citations (4)
Title |
---|
佚名: "XX油库区废弃储罐拆除工程置换及拆除施工方案", 《百度文库》 * |
佚名: "球罐设施拆除方案", 《百度文库》 * |
杨晨艺等: "浅析油罐拆迁施工现场火灾危险性及防火对策", 《科学管理》 * |
王可栋: "闵行LPG储罐场400m3球罐拆除简介", 《输配》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114178263A (en) * | 2021-12-14 | 2022-03-15 | 中国核工业二四建设有限公司 | Cleaning device and method for high-precision penetration assembly |
CN114178263B (en) * | 2021-12-14 | 2023-03-07 | 中国核工业二四建设有限公司 | Cleaning device and method for high-precision penetration assembly |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104200319B (en) | Oil-gas Pipeline Construction data supervision method based on pipeline integrity administrative skill | |
CN106628011B (en) | A kind of harbour ship-to-shore interface safety device | |
CN111013049A (en) | Intelligent superfine dry powder fire extinguishing system and method for cable for urban comprehensive pipe gallery | |
CN107461039A (en) | Down town lpg spherical tank method for dismounting | |
CN205360311U (en) | Fire control unit is used in thermal power plant's desulfurizing tower construction | |
CN205575620U (en) | Explosion -proof skid -mounted formula filling station of separation | |
Rana et al. | Neighborhood—An Influential Factor for Material Damages | |
Nivolianitou et al. | A methodology for the hazard assessment in large hydrocarbon fuel tanks | |
CN114870315A (en) | Fire-fighting equipment detection system of transformer substation | |
Bradley et al. | Fires, explosions and related incidents at work in Great Britain in 1998/1999 and 1999/2000 | |
Huang et al. | Technical aspects of storage tank loss prevention | |
CN213236546U (en) | Pipeline is leaked and is spouted back and prevent spouting cover for petrochemical plant | |
CN113216239A (en) | Construction method for laying dry sand leveling layer of bottom plate of LNG (liquefied natural gas) bimetallic full-capacity storage tank | |
CN101286223A (en) | Canister kind facilities inspection maintenance and fee calculating method | |
CN209612048U (en) | The fire-fighting system of fire between a kind of fighting instrument control electronic control cabinet | |
CN208291975U (en) | A kind of gas station's manhole well and well lid bindiny mechanism | |
Shamsutdinova et al. | Ensuring safety in gas mine development | |
Afonso | DESIGN OF A FIRE PROTECTION SYSTEM FOR AN INDUSTRIAL CHEMICAL PLANT WITH AUTOSPRINK-CASE STUDY | |
CN105627098A (en) | Unattended security type half-underground pressure adjusting system | |
Allford et al. | Corrosion under insulation—case studies. | |
CN204781291U (en) | A raffinate collecting system for petrochemical equipment | |
Spalding et al. | Site Safety and Health Plan (Phase 3) for the treatability study for in situ vitrification at Seepage Pit 1 in Waste Area Grouping 7, Oak Ridge National Laboratory, Oak Ridge, TN | |
Dobson et al. | Fire protection review revisit No. 2, Paducah Gaseous Diffusion Plant, Paducah, Kentucky | |
Lv et al. | Safety control of dangerous operation in gas holder maintenance | |
CN114700691A (en) | Technology for opening aviation kerosene pipeline with oil |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171212 |