CN1083895A - The laneway support method that is used for recovery operation face support and equipment - Google Patents

The laneway support method that is used for recovery operation face support and equipment Download PDF

Info

Publication number
CN1083895A
CN1083895A CN 93108832 CN93108832A CN1083895A CN 1083895 A CN1083895 A CN 1083895A CN 93108832 CN93108832 CN 93108832 CN 93108832 A CN93108832 A CN 93108832A CN 1083895 A CN1083895 A CN 1083895A
Authority
CN
China
Prior art keywords
support
supporting
equipment
steel band
supporting method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 93108832
Other languages
Chinese (zh)
Other versions
CN1026605C (en
Inventor
徐丙庚
卜庆先
顾则仁
黄国民
许生荣
成济徽
姜贻权
舒培生
陈鸿章
黄建岳
孙海
谭江江
吴文赋
贾敬新
邹永华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PANGZHUANG COAL MINE XUZHOU MINING ADMINISTRATION
Original Assignee
PANGZHUANG COAL MINE XUZHOU MINING ADMINISTRATION
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PANGZHUANG COAL MINE XUZHOU MINING ADMINISTRATION filed Critical PANGZHUANG COAL MINE XUZHOU MINING ADMINISTRATION
Priority to CN 93108832 priority Critical patent/CN1026605C/en
Publication of CN1083895A publication Critical patent/CN1083895A/en
Application granted granted Critical
Publication of CN1026605C publication Critical patent/CN1026605C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The present invention relates to a kind of laneway support method that is used for down-hole recovery operation face support and equipment.Reclaim the many unfavorable of fully-mechanized mining equipment in order to overcome the frame canopy, this method adopt lay the metal roof net in good time and be equipped with steel band, supporting plate according to certain arrangement mode by fixedly supporting of anchor pole.Its effect is that the usefull space in tunnel increases, and is very easy to tearing open of working face equipment and moves, and has improved downhole safety situation and working environment, has improved work efficiency; Simultaneously, adopt this method supporting effect good, technology is simple, and consumable material is few, and support cost is low, has good economic and social benefit.

Description

The laneway support method that is used for recovery operation face support and equipment
The present invention relates to a kind of supporting method in tunnel when being used for that comprehensive mechanical coal mining force piece and equipment are removed under the coal mine.
In the roadway support that fully-mechanized mining working equipment is removed, adopt shed ding support usually, especially based on log hut.Its supporting method is: when work plane from stop adopting line 10~15m apart from the time, beginning reduces the mining height exploitation gradually to stopping adopting line 2.5m place apart from work plane, adopts the segmentation big gun to adopt and hold up the log hut supporting roof at this moment.In the support demolishing process, make beam with long i iron, the frame canopy is reach alternately, removes by frame.This method is because timber is difficult to reclaim, and waste of material is many, the cost height; And, influenced the recovery of coal resources because the log hut supporting need reduce mining height; Particularly when recovery operation face equipment, because the usefull space of log hut supporting is little, log hut is easily knocked down, and is unfavorable to keeping the safety in production, and working strength of workers is big in the work progress, and it is low that the tearing open of equipment moved efficient.
In order to overcome above-mentioned defective, the objective of the invention is to provides a kind of supporting method that compared with prior art can increase the usefull space to this tunnel.
The objective of the invention is to realize by following measure:
A kind of laneway support method that is used for recovery operation face support and equipment comprises:
A, when stopping adopting line 10~15m, on set cap, lays the distance work plane wire lath;
B, when when stopping adopting line 2~3m, support stops reach, in the mode of drilling and blasting piecemeal coal is adopted down also and in time top board is carried out temporary lining;
C, produce coal piecemeal and successively top board, lateral wall are carried out combined bolt support from top to bottom.
Described to top board carry out combined bolt support be adopt with support on the wire lath overlap joint continue to lay the metal roof net, and be equipped with steel band with anchor metal, rolling anchoring agent and metal supporting plate by fixedly supporting of nut.
Described supporting to lateral wall is fixed as one wire lath, steel band by wood bolt, cement supporting plate and voussoir.
Array pitch is 0.6~1.0m between above-mentioned anchor pole.Above-mentioned steel band is to weld little horizontal bar according to the anchor pole spacing to form on two main reinforcements that are parallel to each other, and is an anchor point with two next-door neighbours' little horizontal bar.
Under I-II class surrounding rock condition, steel band adopts beam shape arrangement to fix.
Under III-IV class surrounding rock condition, steel band adopts netted arrangement to fix.
Long 1.8~the 2.0m of anchor metal, diameter is 16~20mm.Long 1.6~the 1.8m of wood bolt, diameter is 36~38mm.
Adopt said method supporting mine fully-mechanized mining equipment to reclaim the tunnel, its advantage is clearly.
At first,, the full section usefull space in tunnel is increased, be very easy to tearing open of fully-mechanized mining equipment and move, avoided log hut to knock the generation of accident down owing to cancelled the support pin; In addition, under the situation that the supporting operation reduces, supporting district top board is difficult for inbreak takes place, and advantage has been created in the ventilation when removing for work plane.These all provide reliable assurance for the improvement of downhole safety working condition.
Saved a large amount of support materials owing to adopt anchor rod support method, both reduced support cost, reduce haul, Fu Peng when making driving again, blown out the canopy phenomenon that collapses, and do not exist and often safeguard top board and the prop drawing work of work back, also reduced and alternately held up farm labourer's word steelframe canopy operation, alleviated labor strength, improved safe condition and working environment, simultaneously also accelerate speed of application, improved production efficiency.
Because the investment of fully-mechanized mining equipment is very high, usage ratio of equipment then is directly connected to the total cost of coal production.Adopt this method supporting fully-mechanized mining equipment to remove the tunnel, the removal time of having reduced working face equipment effectively, accelerated removal speed, for the highly efficient and productive condition that provides is provided.
Owing to adopt supporting fully-mechanized mining equipment of the present invention to remove the tunnel, need not to make support to reduce the mining height exploitation, thereby improved the rate of recovery of coal resources.
In addition, the present invention also can make full use of the original transportation system of fully-mechanized mining working and produce coal, and has reduced taking of road heading machinery equipment; This method supporting effect is good, and technology is simple, and the operating personnel can reduce and work efficiency raising or the like advantage relatively, is easy to apply and have good economic and social benefit.
Fig. 1 is the schematic diagram of supporting method of the present invention.
Describe the present invention below in conjunction with accompanying drawing:
I have implemented this method supporting reclaimer tunnel at more than ten fully-mechanized mining working that belongs under II-IV class surrounding rock condition in the ore deposit.The concrete practice is: lay wire lath 2 when stopping adopting line 10m from work plane on hydraulic support 1 back timber.When support is pushed into when stopping adopting line 2.5m, support stops reach, entire working surface is carried out big gun piecemeal adopt and get ready the post supporting.Coal utilization transporter under adopting transports, and repairs out the lane space of recovery operation face equipment again.Top board lay wire lath and with support on the wire lath overlap joint with steel band 5 beam shapes arrange be pressed on online fixing with anchor metal 3, supporting plate 6.The long 1.8m of used anchor metal, array pitch 0.6~0.8m.Coal group still adopts steel band to push down wire lath, wood bolt 4 and is equipped with fixedly wall supporting of cement supporting plate 7 and voussoir.Array pitch is 0.8~1.0m between wood bolt, and the long 1.6m of wood bolt begins to be provided with from the downward 0.4m of top board.
Implement said method and shed shoring reclaimer tunnel relatively, effect is tangible.The useful area utilization rate that at first is the tunnel has improved 17%, knocks the pillar phenomenon when no longer occurring tearing moving device open down, has improved the dismounting hauling operation environment of working face equipment; Owing to utilize assembled bolt to realize the integration supporting, supporting effect is good, has cancelled the operation of alternately holding up farm labourer's word girder steel, has alleviated working strength of workers, removes the work efficiency height, and than moving a work plane and lack and use 20 days firmly tearing open, removal speed doubles many; After adopting supporting of the present invention, equipment is removed district's top board and is difficult for inbreak, the ventilation requirement when helping the work plane dismounting; Because support material consumption reduces, and has both saved the supporting expense, has reduced the transport of materials amount again, labour intensity is little.Its overall economic efficiency is that a work plane is saved more than 10 ten thousand yuan.In addition, technology of the present invention is simple, helps reclaiming to greatest extent coal resources, reduces the raw coal total production cost, is a kind of safe, economic, good method of being easy to promote.

Claims (9)

1, a kind of laneway support method that is used for recovery operation face support and equipment is characterized in that:
A, when stopping adopting line 10~15m, on set cap, lays the distance work plane wire lath;
B, when when stopping adopting line 2~3m, support stops reach, in the mode of drilling and blasting piecemeal coal is adopted down also and in time top board is carried out temporary lining;
C, produce coal piecemeal and successively top board, lateral wall are carried out combined bolt support from top to bottom.
2, supporting method as claimed in claim 1, it is characterized in that, to top board carry out combined bolt support be adopt with support on the wire lath tower succeed and continuously lay the metal roof net, and be equipped with steel band with anchor metal, rolling anchoring agent and metal supporting plate by fixedly supporting of nut.
3, supporting method as claimed in claim 1 is characterized in that, the supporting of lateral wall is fixed as one wire lath, steel band by wood bolt, cement supporting plate and voussoir.
As claim 2 or 3 described supporting method, it is characterized in that 4, array pitch is 0.6~1.0m between above-mentioned anchor pole.
As claim 2 or 3 described supporting method, it is characterized in that 5, above-mentioned steel band is to weld little horizontal bar according to the anchor pole spacing to form on two main reinforcements that are parallel to each other.
As claim 2 or 3 described supporting method, it is characterized in that 6, under I-II class surrounding rock condition, steel band adopts beam shape arrangement to fix.
As claim 2 or 3 described supporting method, it is characterized in that 7, under III-IV class surrounding rock condition, steel band adopts netted arrangement to fix.
8, supporting method as claimed in claim 2 is characterized in that, the long 1.8~2.0m of anchor metal, and diameter is 16~20mm.
9, supporting method as claimed in claim 3 is characterized in that, the long 1.6~1.8m of wood bolt, and diameter is 36~38mm.
CN 93108832 1993-07-24 1993-07-24 Gallery supporting method for recovering supports and equipment on working face Expired - Fee Related CN1026605C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 93108832 CN1026605C (en) 1993-07-24 1993-07-24 Gallery supporting method for recovering supports and equipment on working face

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 93108832 CN1026605C (en) 1993-07-24 1993-07-24 Gallery supporting method for recovering supports and equipment on working face

Publications (2)

Publication Number Publication Date
CN1083895A true CN1083895A (en) 1994-03-16
CN1026605C CN1026605C (en) 1994-11-16

Family

ID=4987335

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 93108832 Expired - Fee Related CN1026605C (en) 1993-07-24 1993-07-24 Gallery supporting method for recovering supports and equipment on working face

Country Status (1)

Country Link
CN (1) CN1026605C (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101975072A (en) * 2010-09-13 2011-02-16 山西晋城无烟煤矿业集团有限责任公司 Recovery method of common combined mining working face hydraulic support
CN102135005A (en) * 2011-03-11 2011-07-27 中国矿业大学 Method for supporting roof of roadway under coal pillar and gob transition section
CN102418527A (en) * 2011-12-28 2012-04-18 北京科技大学 Method for mining flat dipping ultrathin sedimentary type subterranean iron ore deposit
CN105134266A (en) * 2015-08-24 2015-12-09 天地科技股份有限公司 Support method for fully-mechanized coal mining face full-negative-pressure withdrawing channel
CN108316956A (en) * 2018-01-31 2018-07-24 大同煤矿集团有限责任公司 Fully-mechanized mining working stops adopting method for protecting support
CN109139076A (en) * 2018-08-24 2019-01-04 淮北矿业股份有限公司 A kind of mining tunnel face mechanization brush expands frame lane device
CN112412506A (en) * 2020-11-20 2021-02-26 中国矿业大学 Anti-scour method for head-on anchor cable support in coal roadway tunneling

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101975072A (en) * 2010-09-13 2011-02-16 山西晋城无烟煤矿业集团有限责任公司 Recovery method of common combined mining working face hydraulic support
CN101975072B (en) * 2010-09-13 2012-10-03 山西晋城无烟煤矿业集团有限责任公司 Recovery method of common combined mining working face hydraulic support
CN102135005A (en) * 2011-03-11 2011-07-27 中国矿业大学 Method for supporting roof of roadway under coal pillar and gob transition section
CN102135005B (en) * 2011-03-11 2012-07-25 中国矿业大学 Method for supporting roof of roadway under coal pillar and gob transition section
CN102418527A (en) * 2011-12-28 2012-04-18 北京科技大学 Method for mining flat dipping ultrathin sedimentary type subterranean iron ore deposit
CN102418527B (en) * 2011-12-28 2014-08-13 北京科技大学 Method for mining flat dipping ultrathin sedimentary type subterranean iron ore deposit
CN105134266A (en) * 2015-08-24 2015-12-09 天地科技股份有限公司 Support method for fully-mechanized coal mining face full-negative-pressure withdrawing channel
CN108316956A (en) * 2018-01-31 2018-07-24 大同煤矿集团有限责任公司 Fully-mechanized mining working stops adopting method for protecting support
CN108316956B (en) * 2018-01-31 2019-08-16 大同煤矿集团有限责任公司 Fully-mechanized mining working stops adopting method for protecting support
CN109139076A (en) * 2018-08-24 2019-01-04 淮北矿业股份有限公司 A kind of mining tunnel face mechanization brush expands frame lane device
CN112412506A (en) * 2020-11-20 2021-02-26 中国矿业大学 Anti-scour method for head-on anchor cable support in coal roadway tunneling

Also Published As

Publication number Publication date
CN1026605C (en) 1994-11-16

Similar Documents

Publication Publication Date Title
CN101349159B (en) Method of single channel railless plastic core-rubber-tire vehicle back withdrawing fully-mechanized mining working face
CN101514633B (en) Non-roadside supporting gob-side entry retaining process
CN100577986C (en) Goaf surrounding rock around gob-side supporting method under three soft geological condition
CN101775991B (en) Method for significant reduction of bracket support of gob-side roadway of fully-mechanized mining face
CN108979638B (en) Composite gob-side entry retaining method for wedge-shaped regenerated wall and single-leg shed beam of coal mining roadway
CN110529144A (en) A kind of hybrid advanced support method of light section stope drift active workings
CN100480398C (en) Self-hoisting construction method and furnace top crane for general overhaul of blast furnace
CN103867223A (en) Hydraulic supporting device of suspended top beams for roadways in shed
CN107165062A (en) A kind of method for removing Existing Railway Line gate-type pier capping beam protecting canopy frame
CN1026605C (en) Gallery supporting method for recovering supports and equipment on working face
CN115853514A (en) Reserved interval type ore pillar downward access filling mining method
CN210948737U (en) Efficient and rapid tunneling roadway support facility for inclined small-section half-coal-rock roadway with thin coal seam
CN1948714A (en) Method of construction supporting protection for mine under ground tunnel surrounding rock broken
CN1026606C (en) Gallery supporting method for underground free digging section in coal mine
CN110939464A (en) Gob-side entry retaining combined supporting method for adjacent working faces
CN113700489A (en) Coal mine bottom suction roadway rapid tunneling construction process
CN109751062A (en) One kind facing sky fender Floor Heave in Roadway control method
CN212670351U (en) Railway business line upper bridge demolishs protector
CN114087016A (en) Pre-control supporting method for isolating top column in caving-to-filling mining
CN204754950U (en) It puts force piece to combine to adopt to combine
CN1904313A (en) Concrete pole top protection mining method
CN206487486U (en) A kind of mining TBM safe temporary support device
CN202125305U (en) Hydraulic bracket for roadway support
CN218759195U (en) Windproof dust suppression net structure for belt conveyor line of train loading system
CN217558360U (en) Coal mine roof cutting self-entry roadway-side supporting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee