CN108388978A - A kind of intelligence asset management statistical method and device - Google Patents

A kind of intelligence asset management statistical method and device Download PDF

Info

Publication number
CN108388978A
CN108388978A CN201810099434.XA CN201810099434A CN108388978A CN 108388978 A CN108388978 A CN 108388978A CN 201810099434 A CN201810099434 A CN 201810099434A CN 108388978 A CN108388978 A CN 108388978A
Authority
CN
China
Prior art keywords
data
project
enterprise
assets
asset management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810099434.XA
Other languages
Chinese (zh)
Inventor
谢春旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810099434.XA priority Critical patent/CN108388978A/en
Publication of CN108388978A publication Critical patent/CN108388978A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/23Updating
    • G06F16/2365Ensuring data consistency and integrity
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2455Query execution
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/95Retrieval from the web
    • G06F16/951Indexing; Web crawling techniques
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06398Performance of employee with respect to a job function

Abstract

The invention discloses a kind of intelligent asset management statistical methods, include the following steps:Receiving step:Enterprise assets data are received, the enterprise assets data include Enterprise Project data, and the Enterprise Project data include project yield, project personnel and the project cycle;Assessment calculates step:The contribution of project personnel is assessed according to project yield and the project cycle, to obtain the current human capital data of respective item personnel;First data update step:Enterprise assets report is updated according to obtained current human capital data.The present invention also provides a kind of electronic equipment and computer readable storage medium.The intelligent asset management statistical method of the present invention is by assessing to achieve the purpose that the work capacity evaluation to company clerk the contribution of projects personnel in Enterprise Project, to carry out storage management as human capital data so that each company being capable of the comprehensive asset data progress control to our company.

Description

A kind of intelligence asset management statistical method and device
Technical field
The present invention relates to a kind of asset management technical field more particularly to a kind of intelligent asset management statistical method and dresses It sets.
Background technology
Currently, personal or enterprise of general company is that can improve its performance of handling official business, therefore need to buy such as stationery, computer dress It sets, the office accommodations such as printer, printer.In addition, the incorporated business such as high-tech industry, conventional industries be also required to research and development, It produces and manufactures it and sell the productions such as the special device of product, such as semiconductor board, product test board and technique fixture Equipment.
These office accommodations and appurtenance tool are the assets of incorporated business, and asset management is appropriate whether can also influence Incorporated business's cost.For ease of the management in assets, most of incorporated business, which sets up, exclusive administrative department, the exclusive pipe Manage the tracking and maintenance of the keyholed back plate, appurtenance equipment function situation of department liable office accommodation behaviour in service.
However, the shortcomings that legacy asset way to manage is to fail to integrate asset management information, thus assets can not be allowed Administrative staff grasp the use flow direction and service condition of the office accommodation or appurtenance equipment immediately;Furthermore legacy asset management Mode can not also allow asset management personnel to grasp the office accommodation in a certain its use of specific employee and appurtenance equipment really What kind of;In addition, while increasing the office accommodation or appurtenance number of devices, the also integration of relative reduction asset management information Property, thus easily improve difficulty of the asset management personnel in tracking and maintenance, therefore, make asset management personnel in management rather It is time-consuming and laborious without efficiency.
And there is no the management to human capital for present Corporate Asset Management, since manpower was managed in business administration Certain bigger ratio is also taken up in journey, so to how to remove evaluation human capital and be also belonged to the management of human capital The one side of Corporate Asset Management;So exploitation is a kind of becoming this to the system that enterprise assets multi-faceted data is managed Field technology personnel technical problem urgently to be resolved hurrily.
Invention content
For overcome the deficiencies in the prior art, one of the objects of the present invention is to provide a kind of intelligent asset managements to count Method can solve the technical issues of enterprise assets are checked.
The second object of the present invention is to provide a kind of electronic equipment, can solve the technical issues of enterprise assets are checked.
The third object of the present invention is to provide a kind of computer readable storage medium, can solve what enterprise assets were checked Technical problem.
The fourth object of the present invention is to provide a kind of intelligent asset management statistic device, and it is clear to solve enterprise assets The technical issues of point.
An object of the present invention adopts the following technical scheme that realization:
A kind of intelligence asset management statistical method, includes the following steps:
Receiving step:Enterprise assets data are received, the enterprise assets data include Enterprise Project data, the enterprise Mesh number is according to including project yield, project personnel and the project cycle;
Assessment calculates step:The contribution of project personnel is assessed according to project yield and the project cycle, to obtain The current human capital data of respective item personnel;
First data update step:Enterprise assets report is updated according to obtained current human capital data.
Further, the assessment calculates step and specifically includes following sub-step:
Receive each node time information, project progress message and the corresponding project personal information in the project cycle;
The complete period related data of Enterprise Project is analyzed, to obtain the contribution rate of corresponding project personnel;
According to contribution rate to obtain the current human capital data of respective item personnel, the human capital data include Office worker's ability value.
Further, the enterprise assets data further include fixed assets data, and the fixed assets data set for terminal Standby, desk, chair and office space.
Further, further comprising the steps of after receiving step:
Database obtaining step:Relevant asset data is crawled on network simultaneously by crawler technology according to fixed assets data Structure comparison asset database;
Assets calculate step:Fixed assets data are corrected according to indices in comparison asset database.
Further, further comprising the steps of after receiving step:
Monitor step:Each terminal device for being connected to server is monitored in real time;
Judgment step:Judge whether each terminal device has altered according to monitored data, if it is, change data are passed It transports at database;
Second data update step:Enterprise assets report is updated according to change data.
Further, the monitoring is to monitor the instruction that each terminal is sended and received in real time.
Further, further include query steps after the first data update step:Reception Query Information, and according to Query Information transfers the data information in enterprise assets report.
The second object of the present invention adopts the following technical scheme that realization:
A kind of electronic equipment, including memory, processor and storage can be run on a memory and on a processor Computer program, the processor realize the intelligence as described in any one of one of the object of the invention when executing described program Asset management statistical method.
The third object of the present invention adopts the following technical scheme that realization:
A kind of computer readable storage medium, is stored thereon with computer program, it is characterised in that:The computer program The intelligent asset management statistical method as described in any one of one of the object of the invention is realized when being executed by processor.
The fourth object of the present invention adopts the following technical scheme that realization:
A kind of intelligence asset management statistic device, comprises the following modules:
Receiving module:For receiving enterprise assets data, the enterprise assets data include Enterprise Project data, the enterprise Industry project data includes project yield, project personnel and the project cycle;
Assess computing module:For being assessed the contribution of project personnel according to project yield and the project cycle, with Obtain the current human capital data of respective item personnel;
First data update module:For being carried out more to enterprise assets report according to obtained current human capital data Newly.
Compared with prior art, the beneficial effects of the present invention are:
The intelligent asset management statistical method of the present invention is by commenting the contribution of projects personnel in Enterprise Project Estimate to achieve the purpose that the work capacity evaluation to company clerk, to carry out storage management as human capital data, Enable each company comprehensive and control is carried out to the asset data of our company.
Description of the drawings
Fig. 1 is the flow chart of the intelligent asset management statistical method of embodiment one;
Fig. 2 is the structure chart of the intelligent asset management statistic device of embodiment two.
Specific implementation mode
In the following, in conjunction with attached drawing and specific implementation mode, the present invention is described further, it should be noted that not Under the premise of conflicting, new implementation can be formed between various embodiments described below or between each technical characteristic in any combination Example.
Embodiment one:
As shown in Figure 1, present embodiments providing a kind of intelligent asset management statistical method, include the following steps:
S1:Enterprise assets data are received, the enterprise assets data include Enterprise Project data, the Enterprise Project data Including project yield, project personnel and the project cycle;This step is the basic steps of data acquisition, goes to carry out to enterprise assets The essential information for being also required to obtain enterprise when checking can not be to the data of enterprise if the not master data of enterprise It is checked;
It is more the management of fixed assets and the management of fund to be more often managed at present to enterprise assets, but It is more and more, human cost is also the great spending item of some enterprises, so the management to human capital comes enterprise It says it is an important project, more often, Human Resource Department and the profession portion of enterprise is to rely on for the evaluation of manpower Door will also have certain subjectivity in this way in conjunction with evaluating employee;And the method for the present invention is by one Corresponding personnel play the role of to evaluate its ability in project, and data have traceability, and work as and acquire ratio Compared with the complete period of completion data when, be also easier to the whole career development to the employee and positioning make subject to more True evaluation;And place employee in correct position, then it is that the maximum of enterprise assets embodies.
S2:The contribution of project personnel is assessed according to project yield and the project cycle, to obtain respective item people The current human capital data of member;The step S2 specifically includes following sub-step:
Receive each node time information, project progress message and the corresponding project personal information in the project cycle;It is looking forward to In the progression of industry project, some PROJECT TIMEs are long, and the energy of consuming is also bigger, but some projects are then short time consumptions It is short;So the quantity that can not complete project is as the standard of Capacity Evaluation.Since the effect of the project of enterprise is all for enterprise Industry creates profit, so in this process according to create in the unit interval profit number evaluate the ability of project personnel more For it is objective, do not depend on the participation of people in the test and appraisal of whole process, but rely on the objective data got, thus obtained from As a result also more objective, is more favorable to the development of enterprise.
The complete period related data of Enterprise Project is analyzed, to obtain the contribution rate of corresponding project personnel;In this reality The contribution margin using project personnel to project in example is applied, this contribution more refers to the responsibility undertaken in this process And complete task amount;Contribution margin evaluation is carried out according to the different parameter of different divisions of responsibility.
According to contribution rate to obtain the current human capital data of respective item personnel, the human capital data include Office worker's ability value.Different contribution proportions can be set according to different ranks, due to a project manager and a project office worker The thing done is different, so should not be placed in same appraisement system when evaluation, what a project manager was done The task contribution rate that task is done relative to project office worker should higher, so also there is higher contribution when evaluation Rate;If in this process, project office worker undertakes the content of the responsibility of project manager, then to it also according to project manager's It contributes to calculate, the excitation employee that bigger is capable of in such setting works hard.
S3:Enterprise assets report is updated according to obtained current human capital data.Here enterprise assets Report includes the clearance of fixed assets and the clearance of human capital.
S4:Query Information is received, and the data information in enterprise assets report is transferred according to Query Information.This step is main It is in order to obtain the specific asset information of enterprise, when needing to transfer the assets information of that part, it is only necessary to which input is looked into The content of inquiry can take out corresponding content.
Other than human resource data, the enterprise assets data further include fixed assets data, the amount of fixed assets According to for terminal device, desk, chair and office space;For different fixed assets data, there is also have for newer mode It is different.
It is further comprising the steps of after step S1:
Database obtaining step:Relevant asset data is crawled on network simultaneously by crawler technology according to fixed assets data Structure comparison asset database;These fixed assets data more refer to the value of of the fixed assets itself, and such as one chair The price of son is 100, and the price of an office is 1,000,000 equal such data;For house property, change in this way Bigger data especially needed such modes is cleared;
Assets calculate step:Fixed assets data are corrected according to indices in comparison asset database.This part is main If being directed to fixed assets to carry out the modified of data, such as the office space in fixed assets, due to office space meeting As price and subway etc. are because of usually corresponding adjustment, so be also required to according to Current ambient when carrying out information update The land price of environment adjusts the data of fixed assets, so that and company manager becomes apparent from knows during enterprise operation, The variation of entire company total assets.In addition to real estate, also some office appliances will produce certain depreciation in this process Rate, so the real value of the fixed assets can be calculated and then obtained according to current allowance for depreciation when evaluation.
It is directed to for computer these electronic equipments, the management of assets and clearance are carried out by other modes, in step The terminal device assets in the fixed assets of enterprise can also be managed by following step after rapid S1:
Monitor step:Each terminal device for being connected to server is monitored in real time;The monitoring is to monitor each terminal in real time The instruction sended and received.It is this monitor mainly for the fixtures such as computer, due to each enterprise can be designed into The problems such as duty and leaving office or upgrading of company's integral device, computer equipment also can there are certain data in this process Change, this step essentially consist in the state for obtaining each terminal device.
Judgment step:Judge whether each terminal device has altered according to monitored data, if it is, change data are passed It transports at database;When having monitored terminal device change, then this partial data can be transmitted at database, in case The current data of part;The operating condition for knowing computer equipment more convenient in this way.
Second data update step:Enterprise assets report is updated according to change data.
Embodiment two
Embodiment two discloses a kind of electronic equipment, which includes processor, memory and program, wherein locating One or more can be used in reason device and memory, and program is stored in memory, and is configured to be executed by processor, When processor executes the program, the intelligent asset management statistical method of embodiment one is realized.The electronic equipment can be mobile phone, The a series of electronic equipment of computer, tablet computer etc..
Embodiment three
Embodiment three discloses a kind of readable computer storage media, which is somebody's turn to do for storing program When program is executed by processor, the intelligent asset management statistical method of embodiment one is realized.
Certainly, a kind of storage medium including computer executable instructions that the embodiment of the present invention is provided, computer The method operation that executable instruction is not limited to the described above, can also be performed in the method that any embodiment of the present invention is provided Relevant operation.
By the description above with respect to embodiment, it is apparent to those skilled in the art that, the present invention It can be realized by software and required common hardware, naturally it is also possible to which by hardware realization, but the former is more in many cases Good embodiment.Based on this understanding, technical scheme of the present invention substantially in other words contributes to the prior art Part can be expressed in the form of software products, which can be stored in computer readable storage medium In, such as the floppy disk of computer, read-only memory (Read-Only Memory, ROM), random access memory (Random Access Memory, RAM), flash memory (FLASH), hard disk or CD etc., including some instructions use so that an electronic equipment (can be personal computer, server or the network equipment etc.) executes the method described in each embodiment of the present invention.
It is worth noting that, in the above-mentioned embodiment for notifying device based on content update, included each unit and mould Block is only divided according to function logic, but is not limited to above-mentioned division, as long as corresponding function can be realized i.e. It can;In addition, the specific name of each functional unit is also only to facilitate mutually distinguish, the protection model being not intended to restrict the invention It encloses.
Example IV:
As shown in Fig. 2, present embodiments providing a kind of intelligent asset management statistic device, comprise the following modules:
Receiving module:For receiving enterprise assets data, the enterprise assets data include Enterprise Project data, the enterprise Industry project data includes project yield, project personnel and the project cycle;
Assess computing module:For being assessed the contribution of project personnel according to project yield and the project cycle, with Obtain the current human capital data of respective item personnel;
First data update module:For being carried out more to enterprise assets report according to obtained current human capital data Newly.
The above embodiment is only the preferred embodiment of the present invention, and the scope of protection of the present invention is not limited thereto, The variation and replacement for any unsubstantiality that those skilled in the art is done on the basis of the present invention belong to institute of the present invention Claimed range.

Claims (10)

1. a kind of intelligence asset management statistical method, which is characterized in that include the following steps:
Receiving step:Enterprise assets data are received, the enterprise assets data include Enterprise Project data, the Enterprise Project number According to including project yield, project personnel and the project cycle;
Assessment calculates step:The contribution of project personnel is assessed according to project yield and the project cycle, it is corresponding to obtain The current human capital data of project personnel;
First data update step:Enterprise assets report is updated according to obtained current human capital data.
2. intelligence asset management statistical method as described in claim 1, which is characterized in that it is specific that the assessment calculates step Including following sub-step:
Receive each node time information, project progress message and the corresponding project personal information in the project cycle;
The complete period related data of Enterprise Project is analyzed, to obtain the contribution rate of corresponding project personnel;
According to contribution rate to obtain the current human capital data of respective item personnel, the human capital data include office worker Ability value.
3. the intelligent asset management statistical method as described in claims 1 or 2, which is characterized in that the enterprise assets number According to further including fixed assets data, the fixed assets data are terminal device, desk, chair and office space.
4. intelligence asset management statistical method as claimed in claim 3, which is characterized in that further include after receiving step Following steps:
Database obtaining step:Relevant asset data on network is crawled by crawler technology according to fixed assets data and is built Compare asset database;
Assets calculate step:Fixed assets data are corrected according to indices in comparison asset database.
5. intelligence asset management statistical method as claimed in claim 3, which is characterized in that further include after receiving step Following steps:
Monitor step:Each terminal device for being connected to server is monitored in real time;
Judgment step:Judge whether each terminal device has altered according to monitored data, if it is, data transmission will be changed extremely At database;
Second data update step:Enterprise assets report is updated according to change data.
6. intelligence asset management statistical method as claimed in claim 5, which is characterized in that the monitoring is to monitor in real time The instruction that each terminal is sended and received.
7. intelligence asset management statistical method as described in claim 1, which is characterized in that walked in first data update Further include query steps after rapid:Query Information is received, and the data information in enterprise assets report is transferred according to Query Information.
8. a kind of electronic equipment, including memory, processor and storage are on a memory and the meter that can run on a processor Calculation machine program, which is characterized in that the processor realizes the intelligence described in any one of claim 1-7 when executing described program Asset management statistical method can be changed.
9. a kind of computer readable storage medium, is stored thereon with computer program, it is characterised in that:The computer program quilt The intelligent asset management statistical method as described in claim 1-7 any one is realized when processor executes.
10. a kind of intelligence asset management statistic device, which is characterized in that comprise the following modules:
Receiving module:For receiving enterprise assets data, the enterprise assets data include Enterprise Project data, the enterprise Mesh number is according to including project yield, project personnel and the project cycle;
Assess computing module:For being assessed the contribution of project personnel according to project yield and the project cycle, to obtain The current human capital data of respective item personnel;
First data update module:For being updated to enterprise assets report according to obtained current human capital data.
CN201810099434.XA 2018-02-01 2018-02-01 A kind of intelligence asset management statistical method and device Pending CN108388978A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810099434.XA CN108388978A (en) 2018-02-01 2018-02-01 A kind of intelligence asset management statistical method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810099434.XA CN108388978A (en) 2018-02-01 2018-02-01 A kind of intelligence asset management statistical method and device

Publications (1)

Publication Number Publication Date
CN108388978A true CN108388978A (en) 2018-08-10

Family

ID=63074732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810099434.XA Pending CN108388978A (en) 2018-02-01 2018-02-01 A kind of intelligence asset management statistical method and device

Country Status (1)

Country Link
CN (1) CN108388978A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113780981A (en) * 2021-08-16 2021-12-10 北京神矢数据科技有限公司 Asset management method for technical full life cycle

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1629854A (en) * 2003-12-19 2005-06-22 鸿富锦精密工业(深圳)有限公司 Assets management system and method
CN104102959A (en) * 2013-04-07 2014-10-15 淄博职业学院 Enterprise resource management system and device
CN107341588A (en) * 2017-06-06 2017-11-10 安徽赛福贝特信息技术有限公司 A kind of resource operation management system and its method
CN107358358A (en) * 2017-07-12 2017-11-17 北京中金浩资产评估有限责任公司 A kind of assets assessment market method based on computer technology
CN107527163A (en) * 2017-09-30 2017-12-29 新奥(中国)燃气投资有限公司 A kind of project implementation method and device
CN107545378A (en) * 2017-10-11 2018-01-05 阿凡提信息科技(湖南)股份有限公司 A kind of appraisal procedure of technological value, device, equipment and readable storage medium storing program for executing

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1629854A (en) * 2003-12-19 2005-06-22 鸿富锦精密工业(深圳)有限公司 Assets management system and method
CN104102959A (en) * 2013-04-07 2014-10-15 淄博职业学院 Enterprise resource management system and device
CN107341588A (en) * 2017-06-06 2017-11-10 安徽赛福贝特信息技术有限公司 A kind of resource operation management system and its method
CN107358358A (en) * 2017-07-12 2017-11-17 北京中金浩资产评估有限责任公司 A kind of assets assessment market method based on computer technology
CN107527163A (en) * 2017-09-30 2017-12-29 新奥(中国)燃气投资有限公司 A kind of project implementation method and device
CN107545378A (en) * 2017-10-11 2018-01-05 阿凡提信息科技(湖南)股份有限公司 A kind of appraisal procedure of technological value, device, equipment and readable storage medium storing program for executing

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
叶常发: ""基于无形资产的企业核心竞争力评价研究"", 《万方中国学位论文全文数据库》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113780981A (en) * 2021-08-16 2021-12-10 北京神矢数据科技有限公司 Asset management method for technical full life cycle

Similar Documents

Publication Publication Date Title
Ivanov et al. The Ripple effect in supply chains: trade-off ‘efficiency-flexibility-resilience’in disruption management
Navon et al. An automated model for materials management and control
US7443282B2 (en) System and a method, including software and hardware, for providing real-time and synchronization views of supply chain information
Suprabhas et al. Integration of BIM and utility sensor data for facilities management
US9069352B2 (en) Automated fault analysis and response system
Padhi et al. A simulation-based methodology to analyse production line disruptions
US20130103794A1 (en) System and method for monitoring tooling activities
Ong et al. Integrated earned value Gantt chart (EV-Gantt) tool for project portfolio planning and monitoring optimization
CN104392297A (en) Method and system for realizing non-business process irregularity detection in large data environment
Rojek et al. Hybrid artificial intelligence system in constraint based scheduling of integrated manufacturing ERP systems
Wijaya et al. Downtime analysis of a scaling machine
CN116303385A (en) Data auditing method and device, electronic equipment and storage medium
Kafiabad et al. Robust collaborative maintenance logistics network design and planning
CN108388978A (en) A kind of intelligence asset management statistical method and device
CN105654385A (en) Technical risk evaluation method and system of venture investment project
CN102012902A (en) Website visitor value estimation system and method
US20070239776A1 (en) Bonded material monitoring system and method
Tseng et al. A model for an integrated manufacturing system implementation in China: a case study
Pai et al. Effective implementation for introducing ISO/TS 16949 in semiconductor manufacturing industries
Burduk Stability analysis of the production system using simulation models
Krebs et al. Evaluation of interconnected production sites taking into account multidimensional uncertainties
Piechowski et al. Use of KPI Indicators to Optimize Production Process Performance–Case Study
CN201732392U (en) Material and equipment corresponding relationship information processing device applicable to electric power system
Jian-Ping Li et al. Simulation based reliability assessment of services in the context of functional products
US10317980B2 (en) Grouping power sources and power loads to groups that share similar properties

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180810