CN108386608A - Pipe with small pipe diameter plastic drain-pipe push pipe equipment and plastic drain-pipe pipe jacking construction method - Google Patents
Pipe with small pipe diameter plastic drain-pipe push pipe equipment and plastic drain-pipe pipe jacking construction method Download PDFInfo
- Publication number
- CN108386608A CN108386608A CN201810411693.1A CN201810411693A CN108386608A CN 108386608 A CN108386608 A CN 108386608A CN 201810411693 A CN201810411693 A CN 201810411693A CN 108386608 A CN108386608 A CN 108386608A
- Authority
- CN
- China
- Prior art keywords
- pipe
- mud
- casing
- push
- plastic drain
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/028—Laying or reclaiming pipes on land, e.g. above the ground in the ground
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/06—Accessories therefor, e.g. anchors
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The present invention relates to a kind of pipe with small pipe diameter plastic drain-pipe jacking construction equipment and plastic drain-pipe pipe jacking construction methods.Jacking construction equipment is mainly made of push-bench, push-bench console, conduit, head, casing, pulp feeding system, dreg removing system.Pipe jacking construction method is to go out mud and water balance tubing displacement pipe jacking construction method before one kind is laggard, is divided into the jacking of laser guide conduit, the jacking of mud and water balance casing, tubing three steps of displacement.Push-bench is equipped with jacking direction system for automatically correcting, and head cuts native jacking using slurry-water balance type system, head front end connecting conduit, rear end connecting sleeve, head along the track that conduit drills out, and casing is headed into the track of head in soil.After casing penetrates through between active well and received well, it will be in plastic drain-pipe threading, casing is extracted using substitute mode, plastic drain-pipe stays in soil, then to slip casting on the outside of plastic drain-pipe, grouting layer is full of between pipeline outer wall and the soil body, solves the problems, such as that plastic drain-pipe is difficult to jacking construction.
Description
Technical field
The present invention relates to a kind of pipe with small pipe diameter plastic drain-pipe jacking construction equipment and plastic drain-pipe pipe jacking construction methods, belong to
In drainage system field, more particularly to the non-excavating construction equipment and construction method of pipe with small pipe diameter drainage pipeline.
Background technology
Municipal drainage is divided into rainwater and sewage, and run-off system is divided into two kinds of separate system and combined system, and most cities are all
Separate system, i.e. rainwater, sewage is taken to discharge respectively.Open cut is usually used in the drainage pipeline at urban construction initial stage, rain sewage diversion
Trench backfill is built road by construction again after pipeline laying.There are many more city, urban construction initial stage due to fund etc. because
Element uses drainage system system, i.e. rain sewage interflow to be directly discharged into river.With urban development, environmental protection consciousness it is strong
Change, sewage need to can just be discharged into river after sewage treatment plant's processing is up to standard, these combined sewerage pipelines need to carry out rain dirt point
Stream transformation, original collecting fitting caliber is larger, is reserved for storm sewer, creates sewage and retains pipeline, will be discharged into collecting fitting originally
Sewage retained from source, then sewage treatment plant is discharged by trunk sewer.Drainage pipeline is transformed in completed region of the city, needs brokenly
Except road, groove is backfilled after being laid with pipeline, restores road surface, project cost is high, influences the road traffic in city.Jacking construction is row
The common construction method of waterpipe is not required to large area and breaks road, it is only necessary in the position of inspection shaft, upper pipe working well and received well are set,
It is smaller to ground traffic impact.
State of the art drainage pipeline jacking construction mainly has earth pressure balance method and mud and water balance method, earth pressure balance method master
It applies in big-diameter pipeline, people can enter pipe operations area and be unearthed.Pipeline less than or equal to 1500mm is mainly flat using muddy water
Weighing apparatus method, in push pipe pipeline front end, the head rotating of installation cuts soil, makes soil pressure by the mud being pressed between head front end and the soil body
The soil of dynamic balance, the jack pushing tow pipeline of active well, head cutting is discharged with mud, and pipeline is pushed up section by section to received well.Muddy water
Balancing method pipe jacking construction technique is ripe, and construction precision is high, but minimum pipe can only jacking diameter 800mm pipeline.
The secondary branch pipe webmaster diameter majority of wastewater interception pipe is 300~600mm, and quantity is most in cutting dirty pipe network, because caliber compared with
It is small to use Sludge-liquid balance method in pipe-jacking construction.The prior art also has a kind of secondary push bench process, can be arranged with 300~600mm of jacking
Waterpipe.Its method is the guide rod of a piece diameter 100mm of first jacking, and guide rod rear end passes through a cone connection installation diameter 200
The unearthed pipe of~250mm, the pipe that is unearthed are pushed up to received well section by section, and spiral of being unearthed is packed into the pipe that is unearthed, and be unearthed pipe rear end fitting machine
Head, head cut soil and are sent forward to received well by spiral of being unearthed.Reinforced concrete pipiline is installed, use is very heavy behind head
Pipeline is pushed up section by section to received well on top.Push pipe head is to transmit top power by pipeline, when encountering complicated geology, it sometimes appear that being machine
Head does not push up received well, and the pipe wall fracture phenomena of rear end haves no alternative but excavate taking-up head in Handpiece Location;Leading portion resistance mistake
Greatly, pushing tow may also result in pipeline protuberance;Unearthed spiral often occur can not be sent out by earth accumulation, cause head load super
It carries.
The prior art also has the practice into pipe with small pipe diameter drainpipe using the mud water balance push bench crown, but caliber is smaller, especially
It is effective most 300mm, 400mm pipelines of sewage, drum diameter also very little, deviation correcting device can not be arranged in head, only
It can be according to the prior push pipe gradient of setting without correction jacking, it is easy to deviation occur beyond the phenomenon that requiring.Mud water balance push bench
Fixation mud flow inlet and scum pipe, it is complicated with the rotating blade muddy water storehouse connection structure of head, in the head of narrow space
It is inside difficult to realize, also limits the use of pipe with small pipe diameter mud water balance push bench.
Drainage pipeline push pipe is all to use armored concrete tubing, and have higher intensity requirement to tubing at present, has been protected
Demonstrate,prove the transmission that power is pushed up in pipeline jack-in process.High-density polyethylene plastics drainage pipe, since inner wall smooth frictional resistance is small, interface
It the advantages that tight non-leakage, corrosion resistance and good, is widely used in drainage pipeline project.Especially caliber 600mm is below
Pipe with small pipe diameter is used widely in sewage conduct.Plastic drain-pipe is embedded in underground, and the ring stiffness of itself can meet top
The requirement of load, but plastic drain-pipe cannot be satisfied the requirement of powerful top power as push pipe tubing, constrain plastic drain pipe
The application in dirty harnessing project is cut in the transformation of old city drainage pipeline, sewage.If the plastic draining of top power can be transmitted by making
Pipe, it is necessary to which the wall thickness for increasing tubing increases the material such as steel of longitudinal stress, to meet the transmission of top power, considerably increases
The cost of tubing, therefore, plastic drain-pipe push pipe are difficult to apply in Practical Project.
Invention content
The purpose of the present invention is:A kind of pipe with small pipe diameter plastic drain-pipe jacking construction equipment and construction method are provided, it is special to use
In the plastic drainage pipeline jacking construction of 300~700mm of caliber.Jacking construction equipment mainly by push-bench, push-bench console,
Conduit, head, casing, pulp feeding system, dreg removing system composition.Push-bench is equipped with jacking direction system for automatically correcting, and head uses
Hydraulic motor drives, head front end connecting conduit, rear end connecting sleeve, after head uses slurry-water balance type system, mud to use
Into the mode preceding gone out;Head cuts native jacking along the track that conduit drills out, and casing is headed into the track of head in soil.Casing is working
After being penetrated through between well and received well, by plastic drain-pipe threading, casing is extracted using substitute mode, plastic drain-pipe stays
In soil, then to slip casting on the outside of plastic drain-pipe, grouting layer is full of between pipeline outer wall and the soil body.Advantageous effect is:Using
For hydraulic motor as power, small driving force is big, without electrical equipment in head, is conducive to safety;Mud goes out using before laggard
Mode reduces the space occupied in driving storehouse and casing, is axially connect using coaxial with muddy water storehouse into grout outlet so that fixed
Mud tube and the mud storehouse connection structure of rotation greatly simplify, and are conducive to the realization of pipe with small pipe diameter pipe jacking equipment;It is set using plastic tube
The mode of casing replacing, plastic drain-pipe, which heads into casing only, needs the top power of very little, and the ring stiffness of plastic drain-pipe can after casing extraction
To undertake conduit upper and surrounding soil pressure load, the defect that plastic drain-pipe may not apply to jacking construction is overcome.
The present invention is realized by following technology:Pipe with small pipe diameter plastic drain-pipe jacking construction equipment, mainly by push-bench
1, push-bench console 2, conduit 3, head 4, casing 5, pulp feeding system 6, dreg removing system 7 form.The push-bench 1 is equipped with top
Into direction system for automatically correcting, conduit 3 constructs for hollow circular-tube, and push-bench 1 passes through 3 front end light target pair of conduit using laser guide
Jacking direction automatically controls.The head 4 is slurry-water balance type, mainly by piggyback pod 41, hydraulic motor 42, cutterhead 43, mud
Entrance 44, the composition of slurry outlet 45 are starched, piggyback pod 41 is cylindrical shape, with push pipe direction of advance, is pacified in 41 front end center of piggyback pod
Hydraulic motor 42 is filled, the fuel feed pump 8 and oil return pipe 9 of hydraulic motor 42 are connect with the high-pressure oil pump of push-bench console 2, hydraulic oil
The power driven as hydraulic motor 42.The drive shaft 46 of hydraulic motor 42 is hollow-core construction, the circular hole for perforation that there are one centers,
It is the channel of slurry transportation, the rear end of drive shaft 46 is connect with mud entrance 44 using rotational slide, and the front end of drive shaft 46 connects
Cutterhead 43 is connect, mud entrance 44 is fixed on 42 shell of hydraulic motor, and drive shaft 46 rotates and mud entrance 44 does not turn, and rotation is slided
Dynamic junction is equipped with sealing ring, and mud can be transported to cutterhead 43 from mud entrance 44 by drive shaft 46.The outer diameter of cutterhead 43
Consistent with 41 outer diameter of piggyback pod, rear end is connect with the drive shaft 46 of hydraulic motor 42, and 43 front end top surface of cutterhead tapers slightly, cutterhead
The hollow mud storehouse 47 of 43 Inner Constitutions, the position of respective drive 46 is equipped with mud guiding plate 48 in mud storehouse 47, and mud passes through
The centre bore of drive shaft 46 enters mud storehouse 47 from the surrounding of mud guiding plate 48, and mud is avoided directly to be arranged from the centre bore of drive shaft 46
To slurry outlet 45.Slurry outlet 45 is arranged in the front end of cutterhead 43, and 45 front end of slurry outlet is equipped with rotary joint 49, and rotation connects
The centre bore of first 49 front end connecting conduit 3, conduit 3 is mud passing away, and when cutterhead 43 rotates, slurry outlet 45 revolves therewith
Turn, rotary joint 49 and conduit 3 do not turn, and the front end top surface of cutterhead 43, which is equipped with, cuts native knife 50 and into cinder hole 51,41 rear end of piggyback pod
It is connect using tapered thread with casing 5.
The casing 5 is outer diameter steel pipe identical with 41 outer diameter of piggyback pod, often saves 1.0~2.0m of length, casing 5
Using being threadedly coupled between the piggyback pod 41 of front end and the section of casing 5 and section, screw thread is tapered thread, the internal diameter ratio of casing 5
Big 20~the 50mm of plastic draining pipe outside diameter of jacking.
The pulp feeding system 6 and dreg removing system 7 constitute the slurry-water balance type system and the unearthed system of push pipe of head 4, adopt
With the mode gone out before laggard.Pulp feeding system 6 includes mud pit 10, slush pump 11, flow inlet 12, the flow inlet 12 in piggyback pod 41
It is connect with mud entrance 44, dreg removing system 7 includes conduit 3, pressure-regulating valve 13, slag bucket 14, scum pipe 15, deslagging pump 16, sinks
Slag bath 17.The mud of mud pit 10 injects hydraulic motor 42 using slush pump 11 by flow inlet 12, mud entrance 44, from hydraulic pressure
The centre bore of the drive shaft 46 of motor 42 enters the mud storehouse 47 of cutterhead 43, and mud storehouse is uniformly filled under the action of mud guiding plate 48
47, mud pressure comes balancing earth pressure power and groundwater pressure, and the soil that 43 rotary cutting soil knife 50 of cutterhead is cut is by into cinder hole
51 enter mud storehouse 47, are mixed with mud and drain into slag bucket 14 by slurry outlet 45, conduit 3, pressure-regulating valve 13, and pressure is adjusted
Valve 13 is used to adjust the mud and water balance pressure in mud storehouse 47, and the mud containing silt impurity uses 16 row of deslagging pump by scum pipe 15
It is precipitated to detritus tank 17, the body refuse precipitation containing aggregate chips, upper layer mud is reused.
The fuel feed pump 8 and oil return pipe 9 10~20m of length mono- sections, the both sides of interface are each provided with valve.Described
Flow inlet 12 10~20m of length mono- sections, the both sides of interface are each provided with valve.Fuel feed pump 8 need to be laid down per jacking casing joint 5
With oil return pipe 9 and flow inlet 12, it is packed into new casing joint 5, the effect of valve is to dismantle fuel feed pump 8 and oil return pipe 9 and for slurry
When pipe 12, the valve at down interface both ends reduces the loss of medium.
A kind of pipe with small pipe diameter plastic drain-pipe pipe jacking construction method of the present invention is to go out mud and water balance tubing before one kind is laggard to set
Pipe jacking construction method is changed, the jacking of laser guide conduit, the jacking of mud and water balance casing, tubing three steps of displacement are divided into.
One, steps are as follows for laser guide jacking conduit:
1)Active well 21 and received well 22 are excavated in the well location of design, push-bench 1 is installed in active well 21, push-bench 1 is loaded onto
One section conduit 3, adjusts plan-position, elevation and the gradient of push-bench 1, makes the center of conduit 3 and the pipe center of design, the gradient
Unanimously, the circuit and high-pressure oil pipe of connecting jacking pipe machine 1 and push-bench console 2;
2)Start push-bench 1, conduit 3 according to the tube hub and the gradient of design to 22 direction jacking of received well, the direction of conduit 3 by
The laser-guided systems of push-bench 1, by 3 leading portion light target position offset direction automatic deviation correction of conduit, a section conduit 3 heads into soil
Afterwards, a section is refilled, until conduit 3 is pushed up to received well 22.
Two, steps are as follows for the jacking of mud and water balance casing:
1)Head 4 is installed in the end of 21 inner catheter 3 of active well, fuel feed pump 8 and oil return are connected on the hydraulic motor 42 of head 4
Pipe 9, flow inlet 12 are connected on the mud entrance 44 of hydraulic motor 42, and one end that the piggyback pod 41 of head 4 is connect with casing 5 is interior
External screw thread one end of casing 5 is connect by screw thread with the tail portion of piggyback pod 41, and fuel feed pump 8, oil return pipe 9 and flow inlet 12 are from casing 5
It inside penetrates, casing 5 is screwed using dedicated plank;
2)21 side of active well install pulp feeding system 6, prepare mud injection mud pit 10, connect slush pump 11 with
Pipeline between mud pit 10 and flow inlet 12, the flow inlet 12 drawn with hydraulic motor 42 in active well 21 are connect, and are had more than needed
Pipeline fold and be placed in active well 21;Dreg removing system 7, the end peace of 22 inner catheter 3 of received well are installed in 22 side of received well
Pressure-regulating valve 13 is filled, places slag bucket 14 in received well 22, scum pipe 15 is connect with deslagging pump 16, detritus tank 17;
3)Fuel feed pump 8 that hydraulic motor 42 connects, oil return pipe 9 are connect with 2 high-pressure oil pipe of push-bench console, pipeline more than needed
It folds and is placed in active well 21;
4)Installation top iron, opens the slush pump 11 of pulp feeding system 6 between casing 5 and push-bench 1, and mud enters muddy water storehouse 47, leads to
It crosses the outflow of conduit 3 and drains into slag bucket 14, when mud is discharged, start hydraulic motor 42 and push-bench 1, adjusting pressure-regulating valve 13 makes
Certain pressure, the front end of cutterhead 43 is maintained to form mud and water balance, the driving synchronous with head 4 of push-bench 1, push-bench in muddy water storehouse 47
1 jack all ejects, and has pushed up a stroke, retracts jack, increases top iron and continues jacking, after 5 jacking of casing joint, closes
The valve of fuel feed pump 8, oil return pipe 9 and flow inlet 12 is closed, connector is removed, new clothes casing joint 5 is inserted in fuel feed pump 8,9 and of oil return pipe
Flow inlet 12 installs fuel feed pump 8, oil return pipe 9 and flow inlet 12, the external screw thread of new tubing 5 and spiral shell in preceding casing joint 5 again
Line docking is tightened;The conduit 3 of ejection is unloaded in the side of received well 22, installs pressure-regulating valve 13, opens fuel feed pump 8, oil return
12 interface valve of pipe 9 and flow inlet opens the slush pump 11 of pulp feeding system 6, starts hydraulic motor 42 and push-bench 1, continues one
The jacking of casing 5 is saved, until whole casings 5 head into soil;
5)The head 4 for heading into received well 22 is removed, fuel feed pump 8, oil return pipe 9 and pulp feeding system 6, dreg removing system 7 are removed.
Three, tubing displacement step is as follows:
1)The installation of plastic drain-pipe 24 is carried out in active well 21 and is headed into, and the plastic drain-pipe 24 of merogenesis is connected section by section,
Plastic pipe uses socket hot-melting interface, the inner edge of bellmouth that heating wire is housed, and the socket of plastic drain-pipe 24 is inserted into bellmouth,
The outer rim of bellmouth uses clamp in one week, is powered to bellmouth heating wire, fixture exert force, socket and bellmouth at heating wire
Plastic molting together with socket and the plastic molting of bellmouth, form the thermal welding of good seal under the strength effect of fixture
Mouthful, ensure the seal of interface;
2)Plastic drain-pipe 24 often connects a section, and in the installation Grouting Pipe of the outer wall of plastic drain-pipe 24, the one side of Grouting Pipe is certainly
With adhesive sticker, plum blossom-shaped is equipped with injected hole in Grouting Pipe, and Grouting Pipe is carried along the elongated arrangement 4~8 in 24 periphery of plastic drain-pipe
Adhesive sticker is pasted onto on one side on 24 outer wall of plastic drain-pipe, and the plastic drain-pipe 24 for installing Grouting Pipe heads into the section of casing 5 one, then
Next section plastic drain-pipe 24 is connected, the section of plastic drain-pipe 24 1 one, which saves land, to be connected, and is headed into together together with the Grouting Pipe in outside
In casing 5, when heading into plastic drain-pipe 24 into casing 5, a cable wire 25 is brought into plastic drain-pipe 24, until all
Plastic drain-pipe 24 heads into casing 5, and cable wire 25 is in plastic drain-pipe 24;
3)In the side of active well 21, cable wire 25 is fixed on 24 tube head of plastic drain-pipe, is set on the well rear wall of received well 22
Anchor pile 26 is set, 22 one end cable wire 25 of received well is anchored on anchor pile 26 and is tensioned, 22 side Grouting Pipe connection of received well
Good grouting pump;
4)In 21 side of active well, pull head 23 is installed on casing 5, is drawn casing 5 from soil using the jack backhaul of push-bench 1
Go out, plastic drain-pipe 24 is locked by cable wire 25, will not be moved with casing 5, and casing 5 is pulled out by displacement section by section;
5)While casing 5 is replaced, the Grouting Pipe slip casting to 24 outside of plastic drain-pipe, slip casting is carried out in 22 side of received well,
5% cement, after casing 5 pulls out, the seam between 27 filled plastics drainpipe 24 of grouting layer and the soil body are added in the mud of slip casting
Gap prevents from coming to nothing between the soil body on the outside of pipeline caused by jack-in process, causes land subsidence or pipe sedimentation.
Using the push pipe equipment jacking plastic draining pipe construction of the present invention, using with jacking direction system for automatically correcting
Push-bench first pushes up conduit, then cuts native jacking along the track of conduit using mud water balance push bench head, and mud is pumped into from active well, mud
Slurry with cut under native slag mix after to preceding, arranged to received well by conduit, be that go out mud and water balance before a kind of mud is laggard secondary
Push bench process.Back-end of machine head connects steel casing, and it is steel casing to head into the soil body and transmit top power, and casing jacking is completed, then will be special
With Grouting Pipe plastic drain-pipe push-in casing in, with plastic drain-pipe replace steel casing, steel casing is a week
Turn the equipment reused.The internal diameter of casing is bigger than the outer diameter of plastic drain-pipe, between there are gaps, plastic drain-pipe only to need
The frictional resistance between casing is overcome to head into, top power is relatively small.To the seam on the outside of plastic drain-pipe while casing is replaced
Gap slip casting, grouting layer are full of between plastic tube and the soil body, and plastic pipe need to only meet the ring stiffness of buried depth.
Description of the drawings
Fig. 1 is conduit vertical section of the present invention;
Fig. 2 is head vertical section;
Fig. 3 is cutterhead front end face figure;
Fig. 4 casings vertical section;
Fig. 5 laser guide conduit jacking schematic diagrames;
Fig. 6 mud and water balance casing jacking schematic diagrames;
Fig. 7 tubing replaces schematic diagram.
In figure:1- push-bench, 2- push-bench consoles, 3- conduits, 4- heads, 5- casings, 6- pulp feeding systems, 7- deslagginves system
System, 8- fuel feed pumps, 9- oil return pipes, 10- mud pits, 11- slush pumps, 12- flow inlets, 13- pressure-regulating valves, 14- slag buckets, 15-
Scum pipe, 16- deslagging pumps, 17- detritus tanks, 21- active wells, 22- received wells, 23- pull heads, 24- plastic drain-pipes, 25- cable wires,
26- anchor piles, 27- grouting layers, 31- centre bores, 32- conduit external screw threads, 33- conduit internal threads, 41- piggyback pods, 42- hydraulic pressure horses
It reaches, 43- cutterheads, 44- mud entrances, 45- slurry outlets, 46- drive shafts, 47- mud storehouse, 48- mud guiding plates, 49- rotary joints,
50- cuts native knife, and 51- is into cinder hole, 52- sleeve external threads, 53- casing internal threads.
Specific implementation mode
The push pipe equipment of the present invention, is to go out the secondary push bench process plastic drain-pipe special machine of mud and water balance before a kind of mud is laggard
Tool.Mainly it is made of push-bench 1, push-bench console 2, conduit 3, head 4, casing 5, pulp feeding system 6, dreg removing system 7.Push pipe
Machine 1 is equipped with jacking direction system for automatically correcting, and conduit 3 constructs for hollow circular-tube, and conduit 3 uses steel, is 80~100mm of diameter
Hollow circular beam, center there are one penetrate through centre bore 31,31 diameter phi=40 of centre bore~60mm, conduit 3 one save length 1.0
~2.0m, internode are connected using tapered thread, and one end of conduit 3 is conduit external screw thread 32, and the other end is conduit internal thread 33, spiral shell
The taper of line is 10~20:1, tapered thread has docking convenient, and self-tightening sealing is good, and 3 profilograph of conduit is shown in Fig. 1.Push pipe
Machine 1 automatically controls jacking direction by 3 front end light target of conduit using laser guide.Head 4 is slurry-water balance type, and head 4 is vertical
Section is shown in Fig. 2.It is mainly made of piggyback pod 41, hydraulic motor 42, cutterhead 43, mud entrance 44, slurry outlet 45, piggyback pod 41
For cylindrical shape, using steel.With push pipe direction of advance, hydraulic motor 42, hydraulic motor 42 are installed in 41 front end center of piggyback pod
Using gear type low speed hydraulic motor, axial-piston hydraulic motor, the main feature body of low speed hydraulic motor can also be used
Product is small, and output torque is big, can direct output torque without retarder.The fuel feed pump 8 and oil return pipe 9 and push pipe of hydraulic motor 42
The high-pressure oil pump of machine console 2 connects, the power that hydraulic oil drives as hydraulic motor 42.
The drive shaft 46 of hydraulic motor 42 is the output shaft of rotary power, the jacking force of front end cutterhead 43 is undertaken, in liquid
46 both ends of drive shaft of pressure motor 42 are equipped with thrust roller bearing, for bearing axial load.Drive shaft 46 is hollow-core construction,
There are one the circular holes penetrated through at center, are the channels of slurry transportation, drive shaft 46 is connect using rotational slide with mud entrance 44, driven
The other end of moving axis 46 connects cutterhead 43, and mud entrance 44 is fixed on 42 shell of hydraulic motor, and drive shaft 46 rotates and mud
Entrance 44 does not turn, and rotational slide junction is equipped with sealing ring, and mud can be transported to knife from mud entrance 44 by drive shaft 46
Disk 43.The outer diameter of cutterhead 43 is consistent with 41 outer diameter of piggyback pod, and rear end is connect with the drive shaft 46 of hydraulic motor 42,43 front end of cutterhead
Top surface tapers slightly, the hollow mud storehouse 47 of 43 Inner Constitution of cutterhead, and the position of respective drive 46 is equipped in mud storehouse 47
Mud guiding plate 48, mud enter mud storehouse 47 from the surrounding of mud guiding plate 48 by the circular hole at 46 center of drive shaft, avoid mud from drive
The circular hole of moving axis 46 is immediately discharged to slurry outlet 45.Slurry outlet 45 is arranged in the front end of cutterhead 43, and 45 front end of slurry outlet is set
There are rotary joint 49, junction to be equipped with sealing ring, the centre bore 31 of the front end connecting conduit 3 of rotary joint 49, conduit 3 is mud
Passing away, when cutterhead 43 rotates, slurry outlet 45 rotates with, and rotary joint 49 and conduit 3 do not turn.It pushes up the front end of cutterhead 43
Face is equipped with and cuts native knife 50 and into cinder hole 51, cut native knife 50 and be evenly arranged on the front end face of cutterhead 43 into 51 circumferential direction of cinder hole.It cuts
Native knife 50 is made of steel alloy, is welded on the front end face of cutterhead 43, not into the width rectangular opening of cinder hole 51 or diameter circular hole
Should be greater than the 2/3 of the centre bore 31 of conduit 3, with ensure cutting rock ballast will not obstruction conduit 3 centre bore 31.43 front end of cutterhead
Face figure is shown in Fig. 3.
41 rear end of piggyback pod is connect with casing 5, and casing 5 is outer diameter steel pipe identical with 41 outer diameter of piggyback pod, is often saved
1.0~2.0m of length, using being threadedly coupled between casing 5 and the piggyback pod 41 of front end and the section of casing 5 and section, screw thread is taper
The internal diameter D of screw thread, casing 5 is bigger 20~50mm than the plastic draining pipe outside diameter of jacking.One end of casing 5 is sleeve external thread 52,
The other end is casing internal thread 53, and the taper of screw thread is 10~20:1, it is convenient for abutting joint the characteristics of tapered thread.Casing 5
It is rolled using steel plate, 10~20mm of steel plate thickness, steel use carbon structural steels, inner and outer welding to be welded using V-butt, casing 5
Vertical profile meets personally Fig. 4.
The slurry-water balance type system and the unearthed system of push pipe, use of pulp feeding system 6 and the composition head 4 of dreg removing system 7 are laggard
Before the mode that goes out, compared with the mud and water balance mud system of the prior art, mud using mode is gone out before laggard, reduce driving storehouse and
The space occupied in casing is axially connect with muddy water storehouse using coaxial so that the mud of fixed mud tube and rotation into grout outlet
Pulp bin connection structure greatly simplifies, and is conducive to the realization of pipe with small pipe diameter pipe jacking equipment.Pulp feeding system 6 includes mud pit 10, slush pump
11, flow inlet 12, flow inlet 12 is connect with mud entrance 44 in piggyback pod 41, and dreg removing system 7 includes conduit 3, pressure adjusting
Valve 13, slag bucket 14, scum pipe 15, deslagging pump 16, detritus tank 17.The mud of stock tank 10 using slush pump 11 by flow inlet 12,
Mud entrance 44 injects hydraulic motor 42, and the mud storehouse of cutterhead 43 is entered from the circular hole at 46 center of drive shaft of hydraulic motor 42
47, mud storehouse 47 is uniformly filled under the action of mud guiding plate 48, mud pressure comes balancing earth pressure power and groundwater pressure, cutterhead 43
The soil that rotary cutting soil knife 50 is cut into cinder hole 51 by entering mud storehouse 47, and the proportion of mud is larger, and rock ballast is suspended in mud
In slurry, is mixed with mud and slag bucket 14 is drained by slurry outlet 45, conduit 3, pressure-regulating valve 13, pressure-regulating valve 13 is for adjusting
Save the mud and water balance pressure in mud storehouse 47.Mud containing silt impurity drains into detritus tank 17 by scum pipe 15 using deslagging pump 16
Precipitation, the body refuse precipitation containing aggregate chips, upper layer mud are reused.
Fuel feed pump 8 and oil return pipe 9 10~20m of length mono- sections, using braided steel wire rubber high-pressure oil pipe or steel wire winding rubber
The both sides of glue high-pressure oil pipe, interface are each provided with valve.The mud tube of the heavy caliber mud water balance push bench of the prior art, one
As using diameter 100mm or so steel pipe, connector connected using clip cushion rubber, and length is consistent with a section push pipe tubing, and one saves and manages
It after road top is complete, when a new length of tubing is installed, needs to lay down flow inlet and scum pipe, increases a section flow inlet and sludge pipe, then
Connector is connected, needs that four connectors are installed.The present invention is using mode is gone out before laggard, and only there are one flow inlets 12 in pipeline.By
Smaller in the cutterhead 43 of pipe with small pipe diameter push pipe, mud storehouse 47 is also smaller, and required stock volume is also less, and the present invention uses the high pressure of DN50
Hose is flexible convenient for connection installation as flow inlet, can be used fiber reinforced nylon hose, steel wire reinforcement polyurethane flexible pipe,
Steel wire reinforcement nylon hose etc..Flow inlet 12 10~20m of length mono- sections, only there are one mouths for dismounting, and the both sides of interface are respectively arranged
There is valve.Fuel feed pump 8 and oil return pipe 9 and flow inlet 12 need to be laid down per jacking casing joint 5, is packed into new casing joint 5, valve
Effect be dismounting fuel feed pump 8 and oil return pipe 9 and when flow inlet 12, the valve at down interface both ends reduces the loss of medium.For
Oil pipe and oil return pipe 9 and flow inlet are arranged to the sections of 10~20m mono-, when just having started jacking and having extended pipeline, grow pipeline more than needed
It folds and is placed in active well, do not have to frequently increase tube coupling.
A kind of pipe with small pipe diameter plastic drain-pipe pipe jacking construction method of the present invention is to go out mud and water balance tubing before one kind is laggard to set
Pipe jacking construction method is changed, the jacking of laser guide conduit, the jacking of mud and water balance casing, tubing three steps of displacement are divided into.
One, steps are as follows for laser guide jacking conduit, sees Fig. 5:
1)It should be arranged using supporting appropriate according to geological condition in the well location excavation active well 21 and received well 22 of design, excavation
It applies, the negative direction in push pipe direction will make firm backrest in active well 21, if level of ground water is higher than the bottom surface of active well 21,
Should also there be good drainage measure in active well 21.Push-bench 1 is installed in active well 21, push-bench 1 loads onto a section conduit 3,
Plan-position, elevation and the gradient for adjusting push-bench 1, it is to protect to make the center of conduit 3 and consistent this of the pipe center of design, the gradient
Card is according to the key for designing push pipe.The circuit and high-pressure oil pipe of connecting jacking pipe machine 1 and push-bench console 2, carry out jacking construction
Preparation;
2)Start push-bench 1, conduit 3 according to the tube hub and the gradient of design to 22 direction jacking of received well, the direction of conduit 3 by
The laser-guided systems of push-bench 1, by 3 leading portion light target position offset direction automatic deviation correction of conduit, a section conduit 3 heads into soil
Afterwards, a section is refilled, until conduit 3 is pushed up to received well 22.
Two, steps are as follows for the jacking of mud and water balance casing, sees Fig. 6:
1)Head 4 is installed in the end of 21 inner catheter 3 of active well, fuel feed pump 8 and oil return are connected on the hydraulic motor 42 of head 4
Pipe 9, flow inlet 12 are connected on the mud entrance 44 of hydraulic motor 42, and one end that the piggyback pod 41 of head 4 is connect with casing 5 is interior
External screw thread one end of casing 5 is connect by screw thread with the tail portion of piggyback pod 41, and fuel feed pump 8, oil return pipe 9 and flow inlet 12 are from casing 5
It inside penetrates, casing 5 is screwed using dedicated plank;
2)21 side of active well install pulp feeding system 6, prepare mud injection mud pit 10, connect slush pump 11 with
Pipeline between mud pit 10 and flow inlet 12, the flow inlet 12 drawn with hydraulic motor 42 in active well 21 are connect, and are had more than needed
Pipeline fold and be placed in active well 21;Dreg removing system 7, the end peace of 22 inner catheter 3 of received well are installed in 22 side of received well
Pressure-regulating valve 13 is filled, places slag bucket 14 in received well 22, scum pipe 15 is connect with deslagging pump 16, detritus tank 17;
3)Fuel feed pump 8 that hydraulic motor 42 connects, oil return pipe 9 are connect with 2 high-pressure oil pipe of push-bench console, pipeline more than needed
It folds and is placed in active well 21;
4)Installation top iron, opens the slush pump 11 of pulp feeding system 6 between casing 5 and push-bench 1, and mud enters muddy water storehouse 47, leads to
It crosses the outflow of conduit 3 and drains into slag bucket 14, when mud is discharged, start hydraulic motor 42 and push-bench 1, adjusting pressure-regulating valve 13 makes
Certain pressure, the front end of cutterhead 43 is maintained to form mud and water balance, the driving synchronous with head 4 of push-bench 1, push-bench in muddy water storehouse 47
1 jack all ejects, and has pushed up a stroke, retracts jack, increases top iron and continues jacking, after 5 jacking of casing joint, closes
The valve of fuel feed pump 8, oil return pipe 9 and flow inlet 12 is closed, connector is removed, new clothes casing joint 5 is inserted in fuel feed pump 8,9 and of oil return pipe
Flow inlet 12 installs fuel feed pump 8, oil return pipe 9 and flow inlet 12, the external screw thread of new tubing 5 and spiral shell in preceding casing joint 5 again
Line docking is tightened;The conduit 3 of ejection is unloaded in the side of received well 22, installs pressure-regulating valve 13, opens fuel feed pump 8, oil return
12 interface valve of pipe 9 and flow inlet opens the slush pump 11 of pulp feeding system 6, starts hydraulic motor 42 and push-bench 1, continues one
The jacking of casing 5 is saved, until whole casings 5 head into soil;
5)The head 4 for heading into received well 22 is removed, fuel feed pump 8, oil return pipe 9 and pulp feeding system 6, dreg removing system 7 are removed.
Three, tubing displacement step is as follows, sees Fig. 7:
1)The installation of plastic drain-pipe 24 is carried out in active well 21 and is headed into, and the plastic drain-pipe 24 of merogenesis is connected section by section,
Plastic pipe uses socket hot-melting interface, the inner edge of bellmouth that heating wire is housed, and the socket of plastic drain-pipe 24 is inserted into bellmouth,
The outer rim of bellmouth uses clamp in one week, is powered to bellmouth heating wire, fixture exert force, socket and bellmouth at heating wire
Plastic molting together with socket and the plastic molting of bellmouth, form the thermal welding of good seal under the strength effect of fixture
Mouthful, ensure the seal of interface;
2)Plastic drain-pipe 24 often connects a section, and in the installation Grouting Pipe of the outer wall of plastic drain-pipe 24, the one side of Grouting Pipe is certainly
With adhesive sticker, plum blossom-shaped is equipped with injected hole in Grouting Pipe, and Grouting Pipe is carried along the elongated arrangement 4~8 in 24 periphery of plastic drain-pipe
Adhesive sticker is pasted onto on one side on 24 outer wall of plastic drain-pipe, and the plastic drain-pipe 24 for installing Grouting Pipe heads into the section of casing 5 one, then
Next section plastic drain-pipe 24 is connected, the section of plastic drain-pipe 24 1 one, which saves land, to be connected, and is headed into together together with the Grouting Pipe in outside
In casing 5, when heading into plastic drain-pipe 24 into casing 5, a cable wire 25 is brought into plastic drain-pipe 24, until all
Plastic drain-pipe 24 heads into casing 5, and cable wire 25 is in plastic drain-pipe 24;
3)In the side of active well 21, cable wire 25 is fixed on 24 tube head of plastic drain-pipe, is set on the well rear wall of received well 22
Anchor pile 26 is set, 22 one end cable wire 25 of received well is anchored on anchor pile 26 and is tensioned, 22 side Grouting Pipe connection of received well
Good grouting pump;
4)In 21 side of active well, pull head 23 is installed on casing 5, is drawn casing 5 from soil using the jack backhaul of push-bench 1
Go out, plastic drain-pipe 24 is locked by cable wire 25, will not be moved with casing 5, and casing 5 is pulled out by displacement section by section;
5)While casing 5 is replaced, the Grouting Pipe slip casting to 24 outside of plastic drain-pipe, slip casting is carried out in 22 side of received well,
5% cement, after casing 5 pulls out, the seam between 27 filled plastics drainpipe 24 of grouting layer and the soil body are added in the mud of slip casting
Gap prevents from coming to nothing between the soil body on the outside of pipeline caused by jack-in process, causes land subsidence or pipe sedimentation.
So far pipe with small pipe diameter plastic drain-pipe push pipe process is completed, and installation check well is conventionally built in follow-up work by laying bricks or stones,
Backfilling working well and received well.
The push pipe equipment jacking plastic draining pipe construction of the present invention, using the push pipe with jacking direction system for automatically correcting
Machine first pushes up conduit, then cuts native jacking along the track of conduit using mud water balance push bench head, and mud is pumped into from active well, mud with
The lower native slag of cutting mix after to preceding, arranged to received well by conduit, be to go out the secondary push pipe of mud and water balance before a kind of mud is laggard
Method.Back-end of machine head connects steel casing, and it is steel casing to head into the soil body and transmit top power, and casing jacking is completed, then by special band
Have in the plastic drain-pipe push-in casing of Grouting Pipe, replaces steel casing with plastic drain-pipe, steel casing is a turnover weight
The equipment used again.The internal diameter of casing is bigger than the outer diameter of plastic drain-pipe, between there are gap, plastic drain-pipe only needs to overcome
Frictional resistance between casing heads into, and top power is relatively small.When displacement, in the side of active well, the end of plastic drain-pipe,
It is fixed on tube head using cable wire, cable wire is worn out of plastic drain-pipe to received well, and cable wire is anchored on the well rear wall of received well
And it is tensioned.In active well side, pull head is installed on casing, is pulled out from soil casing using jack, plastic drain-pipe is by steel
Suo Suoding will not be moved with casing, and casing is drawn out section by section.It is noted to the gap on the outside of plastic drain-pipe while casing is replaced
Slurry, grouting layer are full of between plastic tube and the soil body, prevent from coming to nothing between the soil body on the outside of pipeline caused by jack-in process, cause ground
Face sinks or pipe sedimentation.
The present patent application file and the described construction of attached drawing are only one embodiment, change construction anyway, as long as
It is the mud water balance push bench head for going out mode before mud is laggard, the pipe with small pipe diameter push pipe push pipe method replaced using casing, all at this
The protection domain of application.
Claims (8)
1. a kind of pipe with small pipe diameter plastic drain-pipe jacking construction equipment, mainly by push-bench(1), push-bench console(2), conduit
(3), head(4), casing(5), pulp feeding system(6), dreg removing system(7)Composition, it is characterized in that:The push-bench(1)It is equipped with
Jacking direction system for automatically correcting, conduit(3)It is constructed for hollow circular-tube, push-bench(1)Conduit is passed through using laser guide(3)Before
End light target automatically controls jacking direction;The head(4)For slurry-water balance type, mainly by piggyback pod(41), hydraulic motor
(42), cutterhead(43), mud entrance(44), slurry outlet(45)Composition, piggyback pod(41)For cylindrical shape, with push pipe advance side
To in piggyback pod(41)Front end center installs hydraulic motor(42), hydraulic motor(42)Fuel feed pump(8)And oil return pipe(9)With
Push-bench console(2)High-pressure oil pump connection, hydraulic oil is as hydraulic motor(42)The power of driving;Hydraulic motor(42)'s
Drive shaft(46)For hollow-core construction, center is the channel of slurry transportation, drive shaft there are one the circular hole penetrated through(46)Rear end with
Mud entrance(44)It is connected using rotational slide, drive shaft(46)Front end connect cutterhead(43), mud entrance(44)It is fixed on
Hydraulic motor(42)On shell, drive shaft(46)It rotates and mud entrance(44)Not turning, rotational slide junction is equipped with sealing ring,
Mud can be from mud entrance(44)Pass through drive shaft(46)It is transported to cutterhead(43);Cutterhead(43)Outer diameter and piggyback pod(41)
Outer diameter is consistent, rear end and hydraulic motor(42)Drive shaft(46)Connection, cutterhead(43)Front end top surface tapers slightly, cutterhead(43)
The hollow muddy water storehouse of Inner Constitution(47), muddy water storehouse(47)Interior respective drive(46)Position mud guiding plate is installed(48), mud
Slurry passes through drive shaft(46)Centre bore from mud guiding plate(48)Surrounding enter muddy water storehouse(47), avoid mud from drive shaft(46)
Centre bore be immediately discharged to slurry outlet(45), slurry outlet(45)It is arranged in cutterhead(43)Front end, slurry outlet(45)Before
End is equipped with rotary joint(49), rotary joint(49)Front end connecting conduit(3), conduit(3)Centre bore be that mud discharge is logical
Road, cutterhead(43)When rotation, slurry outlet(45)It rotates with, rotary joint(49)And conduit(3)Do not turn, cutterhead(43)Before
End top surface, which is equipped with, cuts native knife(50)With into cinder hole(51), piggyback pod(41)Rear end and casing(5)It is connected using tapered thread.
2. pipe with small pipe diameter plastic drain-pipe jacking construction equipment according to claim 1, it is characterized in that:The casing(5)
For outer diameter and piggyback pod(41)The identical steel pipe of outer diameter often saves 1.0~2.0m of length, casing(5)With the piggyback pod of front end
(41)And casing(5)Using being threadedly coupled between section and section, screw thread is tapered thread, casing(5)Internal diameter than jacking modeling
Big 20~the 50mm of material draining pipe outside diameter.
3. pipe with small pipe diameter plastic drain-pipe jacking construction equipment according to claim 1, it is characterized in that:The pulp feeding system
(6)And dreg removing system(7)Constitute head(4)Slurry-water balance type system and push pipe be unearthed system, by the way of being gone out before laggard;
Pulp feeding system(6)Including mud pit(10), slush pump(11), flow inlet(12), in piggyback pod(41)Interior flow inlet(12)With mud
Starch entrance(44)Connection, dreg removing system(7)Including conduit(3), pressure-regulating valve(13), slag bucket(14), scum pipe(15), deslagging
Pump(16), detritus tank(17);Stock tank(10)Mud use slush pump(11)Pass through flow inlet(12), mud entrance(44)Injection
Hydraulic motor(42), from hydraulic motor(42)Drive shaft(46)Centre bore enter cutterhead(43)Muddy water storehouse(47), leading
Mud plate(48)Under the action of be uniformly filled in muddy water storehouse(47), mud pressure comes balancing earth pressure power and groundwater pressure, cutterhead(43)
Rotary cutting soil knife(50)The soil cut is by into cinder hole(51)Into muddy water storehouse(47), mixed with mud and pass through slurry outlet
(45), conduit(3), pressure-regulating valve(13)Drain into slag bucket(14), pressure-regulating valve(13)For adjusting muddy water storehouse(47)Mud
Water balance pressure, the mud containing silt impurity pass through scum pipe(15)Using deslagging pump(16)Drain into detritus tank(17)Precipitation.
4. pipe with small pipe diameter plastic drain-pipe jacking construction equipment according to claim 1, it is characterized in that:The fuel feed pump
(8)And oil return pipe(9)10~20m of length mono- is saved, and the both sides of interface are each provided with valve.
5. pipe with small pipe diameter plastic drain-pipe jacking construction equipment according to claim 3, it is characterized in that:The flow inlet
(12)10~20m of length mono- is saved, and the both sides of interface are each provided with valve.
6. a kind of pipe with small pipe diameter plastic drain-pipe pipe jacking construction method, it is characterized in that:It is to go out mud and water balance tubing before one kind is laggard to set
Pipe jacking construction method is changed, the jacking of laser guide conduit, the jacking of mud and water balance casing, tubing three steps of displacement are divided into;Laser is led
To jacking conduit, steps are as follows:
1)Active well is excavated in the well location of design(21)And received well(22), in active well(21)Interior installation push-bench(1), push pipe
Machine(1)Load onto a section conduit(3), adjust push-bench(1)Plan-position, elevation and the gradient, make conduit(3)Center and design
Pipe center, the gradient it is consistent, connecting jacking pipe machine(1)With push-bench console(2)Circuit and high-pressure oil pipe;
2)Start push-bench(1), conduit(3)According to the tube hub and the gradient of design to received well(22)Direction jacking, conduit(3)
Direction by push-bench(1)Laser-guided systems, pass through conduit(3)Leading portion light target position offset direction automatic deviation correction, a section
Conduit(3)After heading into soil, a section is refilled, until conduit(3)It pushes up to received well(22).
7. pipe with small pipe diameter plastic drain-pipe pipe jacking construction method according to claim 6, it is characterized in that:Mud and water balance covers tube top
Into steps are as follows:
1)In active well(21)Inner catheter(3)End install head(4), in head(4)Hydraulic motor(42)On connect confession
Oil pipe(8)And oil return pipe(9), flow inlet(12)It is connected on hydraulic motor(42)Mud entrance(44)On, head(4)Piggyback pod
(41)With casing(5)One end of connection is internal thread, by casing(5)External screw thread one end and piggyback pod(41)Tail portion connection,
Fuel feed pump(8), oil return pipe(9)And flow inlet(12)From casing(5)It inside penetrates, casing is screwed using dedicated plank(5);
2)In active well(21)Side is installed by pulp feeding system(6), prepare mud injection mud pit(10), connect slush pump
(11)And mud pit(10)Between pipeline and flow inlet(12), in active well(21)Interior and hydraulic motor(42)The confession of extraction
Slurry pipe(12)Connection, pipeline more than needed, which is folded, is placed in active well(21)It is interior;In received well(22)Side is installed by dreg removing system(7),
Received well(22)Inner catheter(3)End install pressure-regulating valve(13), in received well(22)Place slag bucket(14), scum pipe
(15)With deslagging pump(16), detritus tank(17)Connection;
3)By hydraulic motor(42)The fuel feed pump of connection(8), oil return pipe(9)With push-bench console(2)High-pressure oil pipe connects, rich
Remaining pipeline, which is folded, is placed in active well(21)It is interior;
4)Casing(5)With push-bench(1)Between installation top iron, open pulp feeding system(6)Slush pump(11), mud enters muddy water
Storehouse(47), pass through conduit(3)Outflow drains into slag bucket(14), when mud is discharged, start hydraulic motor(42)And push-bench(1),
Adjust pressure-regulating valve(13)Make muddy water storehouse(47)Interior maintenance certain pressure, cutterhead(43)Front end formed mud and water balance, push pipe
Machine(1)And head(4)Synchronous driving, push-bench(1)Jack all eject, push up one stroke, has retracted jack, increase
It pushes up iron and continues jacking, casing joint(5)After jacking, fuel feed pump is closed(8), oil return pipe(9)And flow inlet(12)Valve, remove
Connector, new clothes casing joint(5)It is inserted in fuel feed pump(8), oil return pipe(9)And flow inlet(12), fuel feed pump is installed again(8), return
Oil pipe(9)And flow inlet(12), new tubing(5)External screw thread and preceding casing joint(5)Internal thread docking is tightened;Received well
(22)Side unload the conduit of ejection(3), install pressure-regulating valve(13), open fuel feed pump(8), oil return pipe(9)And confession
Slurry pipe(12)Interface valve opens pulp feeding system(6)Slush pump(11), start hydraulic motor(42)And push-bench(1), continue
Casing joint(5)Jacking, until whole casings(5)It heads into soil;
5)Dismounting heads into received well(22)Head(4), remove fuel feed pump(8), oil return pipe(9)And pulp feeding system(6), deslagging system
System(7).
8. pipe with small pipe diameter plastic drain-pipe pipe jacking construction method according to claim 6, it is characterized in that:Tubing displacement step is such as
Under:
1)In active well(21)Interior carry out plastic drain-pipe(24)Installation and head into, by the plastic drain-pipe of merogenesis(24)Section by section
Connection, plastic pipe use socket hot-melting interface, the inner edge of bellmouth that heating wire, plastic drain-pipe are housed(24)Socket insertion hold
In mouthful, clamp is used in the outer rim one week of bellmouth, is powered to bellmouth heating wire, fixture exert force is slotting at heating wire
Mouthful and the plastic molting of bellmouth together with socket and the plastic molting of bellmouth, form good seal under the strength effect of fixture
Hot melt interface, ensure the seal of interface;
2)Plastic drain-pipe(24)One section of often connection, in plastic drain-pipe(24)Outer wall installation Grouting Pipe, the one of Grouting Pipe
Face carries adhesive sticker, and plum blossom-shaped is equipped with injected hole in Grouting Pipe, and Grouting Pipe is along plastic drain-pipe(24)Periphery is elongated to arrange 4~8
Road is pasted onto plastic drain-pipe on one side with adhesive sticker(24)On outer wall, the plastic drain-pipe of Grouting Pipe is installed(24)It heads into
Casing(5)One section, reconnects next section plastic drain-pipe(24), plastic drain-pipe(24)One section one, which saves land, to be connected, together with outer
The Grouting Pipe of side heads into casing together(5)It is interior, to casing(5)Inside head into plastic drain-pipe(24)When, in plastic drain-pipe
(24)Inside bring a cable wire into(25), until whole plastic drain-pipes(24)Head into casing(5)It is interior, cable wire(25)Through plastic row
Water pipe(24)It is interior;
3)In active well(21)Side, by cable wire(25)It is fixed on plastic drain-pipe(24)On tube head, received well(22)Well
Anchor pile is set on rear wall(26), by received well(22)One end cable wire(25)It is anchored at anchor pile(26)It goes up and is tensioned, received well
(22)Side Grouting Pipe connects grouting pump;
4)In active well(21)Side, casing(5)Upper installation pull head(23), using push-bench(1)Jack backhaul by casing
(5)It is pulled out from soil, plastic drain-pipe(24)By cable wire(25)Locking, will not be with casing(5)It is mobile, casing(5)It is set section by section
Change pull-out;
5)Casing(5)While displacement, to plastic drain-pipe(24)The Grouting Pipe slip casting in outside, slip casting is in received well(22)Side
It carries out, 5% cement, casing is added in the mud of slip casting(5)After pull-out, grouting layer(27)Filled plastics drainpipe(24)With soil
Gap between body prevents from coming to nothing between the soil body on the outside of pipeline caused by jack-in process, causes land subsidence or pipeline heavy
Drop.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810411693.1A CN108386608B (en) | 2018-05-02 | 2018-05-02 | Small-pipe-diameter plastic drain pipe jacking machine tool and plastic drain pipe jacking construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810411693.1A CN108386608B (en) | 2018-05-02 | 2018-05-02 | Small-pipe-diameter plastic drain pipe jacking machine tool and plastic drain pipe jacking construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108386608A true CN108386608A (en) | 2018-08-10 |
CN108386608B CN108386608B (en) | 2023-06-16 |
Family
ID=63066162
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810411693.1A Active CN108386608B (en) | 2018-05-02 | 2018-05-02 | Small-pipe-diameter plastic drain pipe jacking machine tool and plastic drain pipe jacking construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108386608B (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109141716A (en) * | 2018-08-16 | 2019-01-04 | 中铁二十局集团第工程有限公司 | A kind of pipe gallery big cross section rectangular top pipe construction pipe-soil contact pressure test method |
CN110106961A (en) * | 2019-06-06 | 2019-08-09 | 广东隆建工程有限公司 | Drainage management construction method |
CN110513534A (en) * | 2019-08-23 | 2019-11-29 | 广东凯厦建设工程有限公司 | Municipal wastewater pipeline non-excavating construction method |
CN110715111A (en) * | 2019-10-08 | 2020-01-21 | 中国一冶集团有限公司 | Pipe jacking and casing pipe construction method |
CN111335898A (en) * | 2020-02-24 | 2020-06-26 | 中铁工程装备集团有限公司 | Trenchless pipeline updating construction system and construction method |
CN112065425A (en) * | 2020-09-17 | 2020-12-11 | 临沂市政集团有限公司 | Slurry balance type pipe jacking equipment and construction process thereof on sand and stone superposed layer |
CN112267892A (en) * | 2020-08-28 | 2021-01-26 | 春涛国际建筑有限公司 | Secondary pipe jacking construction operation method and system |
CN112922630A (en) * | 2021-02-05 | 2021-06-08 | 广州市第一市政工程有限公司 | Pipe jacking construction structure for reinforcing convective sand layer and construction process thereof |
CN112922625A (en) * | 2021-02-07 | 2021-06-08 | 南京工业大学 | Large-scale high-pressure water jet automatic deviation rectifying pipe jacking device and construction method |
CN113266386A (en) * | 2021-02-03 | 2021-08-17 | 中国水利水电第八工程局有限公司 | Rotary excavating device and rotary excavating method |
CN113685187A (en) * | 2021-08-16 | 2021-11-23 | 北京市市政一建设工程有限责任公司 | Small-clear-distance multi-hole underground excavation tunnel construction process |
CN114060050A (en) * | 2021-11-19 | 2022-02-18 | 中铁工程装备集团有限公司 | Pipeline in-situ breaking and updating construction method |
CN114412494A (en) * | 2022-01-27 | 2022-04-29 | 浙江宝鲲机械科技有限公司 | Cutter head structure for pipe jacking machine for penetrating through foundation containing high-toughness structure |
CN114754194A (en) * | 2022-03-26 | 2022-07-15 | 北京金河水务建设集团有限公司 | Storage tank top pipe installation device and construction method thereof |
Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1046794A (en) * | 1989-04-28 | 1990-11-07 | 株式会社伊萨基开发工机 | Intermediate conduit jacking construction device |
JP2001349182A (en) * | 2000-06-09 | 2001-12-21 | Kurimoto Ltd | Pipe supporting device for sleeve pipe jacking method |
JP2002276284A (en) * | 2001-03-14 | 2002-09-25 | Kurimoto Ltd | Sleeve jacking method and pipe joint structure used for it |
CN1391053A (en) * | 2002-07-25 | 2003-01-15 | 上海隧道工程股份有限公司 | Earth pressure balancing technology for laying rectangular top pipe |
CN2593002Y (en) * | 2002-12-12 | 2003-12-17 | 上海市机械施工公司 | Front-mounted cutter head cutting mud-water casting and staving apparatus |
JP2006057443A (en) * | 2004-07-21 | 2006-03-02 | Kurimoto Ltd | Method of construction of propelling sheath pipe |
CN201283359Y (en) * | 2008-10-30 | 2009-08-05 | 武汉钢铁(集团)公司 | Concave push head structure of tube push bench |
CN101749024A (en) * | 2008-12-22 | 2010-06-23 | 上海广联建设发展有限公司 | Pipe-pulling construction method of underground buried box culvert |
CN101922297A (en) * | 2010-08-23 | 2010-12-22 | 上海广联建设发展有限公司 | Synchronous towing, pushing and tunneling device of underground box culvert or pipeline construction |
CN102032393A (en) * | 2010-11-10 | 2011-04-27 | 博大建设有限公司 | Small-bore long distance curved pipe jacking method |
CN202834382U (en) * | 2012-07-02 | 2013-03-27 | 中国石油化工股份有限公司 | Pipe pushing headpiece used for condition of sludge clay |
CN103046637A (en) * | 2012-12-21 | 2013-04-17 | 广州市市政集团有限公司 | Pipe-jacking construction method utilizing pipeline augering |
CN203770834U (en) * | 2014-04-18 | 2014-08-13 | 山东龙泉管道工程股份有限公司 | Intermediate relaying jacking pipe for prestressed concrete cylinder pipe for use in jacking construction method |
CN106988751A (en) * | 2017-04-07 | 2017-07-28 | 杜少平 | Pipe with small pipe diameter drainage pipeline push pipe equipment and pipe jacking construction method |
CN107060796A (en) * | 2017-01-16 | 2017-08-18 | 浙江宝田环境建设有限公司 | One kind uses Slurry Balanced Pipe Jacking Construction technique |
CN107339111A (en) * | 2017-06-30 | 2017-11-10 | 中城投集团第六工程局有限公司 | The floating construction method of installation of more PE pipes in large-scale push pipe |
CN107795749A (en) * | 2017-12-13 | 2018-03-13 | 北京住总集团有限责任公司 | A kind of precast spliced pipe fitting jacking system and its construction method |
CN208364940U (en) * | 2018-05-02 | 2019-01-11 | 广东中科华冉智网科技有限公司 | Small diameter tube plastic drain-pipe jacking construction equipment |
-
2018
- 2018-05-02 CN CN201810411693.1A patent/CN108386608B/en active Active
Patent Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1046794A (en) * | 1989-04-28 | 1990-11-07 | 株式会社伊萨基开发工机 | Intermediate conduit jacking construction device |
JP2001349182A (en) * | 2000-06-09 | 2001-12-21 | Kurimoto Ltd | Pipe supporting device for sleeve pipe jacking method |
JP2002276284A (en) * | 2001-03-14 | 2002-09-25 | Kurimoto Ltd | Sleeve jacking method and pipe joint structure used for it |
CN1391053A (en) * | 2002-07-25 | 2003-01-15 | 上海隧道工程股份有限公司 | Earth pressure balancing technology for laying rectangular top pipe |
CN2593002Y (en) * | 2002-12-12 | 2003-12-17 | 上海市机械施工公司 | Front-mounted cutter head cutting mud-water casting and staving apparatus |
JP2006057443A (en) * | 2004-07-21 | 2006-03-02 | Kurimoto Ltd | Method of construction of propelling sheath pipe |
CN201283359Y (en) * | 2008-10-30 | 2009-08-05 | 武汉钢铁(集团)公司 | Concave push head structure of tube push bench |
CN101749024A (en) * | 2008-12-22 | 2010-06-23 | 上海广联建设发展有限公司 | Pipe-pulling construction method of underground buried box culvert |
CN101922297A (en) * | 2010-08-23 | 2010-12-22 | 上海广联建设发展有限公司 | Synchronous towing, pushing and tunneling device of underground box culvert or pipeline construction |
CN102032393A (en) * | 2010-11-10 | 2011-04-27 | 博大建设有限公司 | Small-bore long distance curved pipe jacking method |
CN202834382U (en) * | 2012-07-02 | 2013-03-27 | 中国石油化工股份有限公司 | Pipe pushing headpiece used for condition of sludge clay |
CN103046637A (en) * | 2012-12-21 | 2013-04-17 | 广州市市政集团有限公司 | Pipe-jacking construction method utilizing pipeline augering |
CN203770834U (en) * | 2014-04-18 | 2014-08-13 | 山东龙泉管道工程股份有限公司 | Intermediate relaying jacking pipe for prestressed concrete cylinder pipe for use in jacking construction method |
CN107060796A (en) * | 2017-01-16 | 2017-08-18 | 浙江宝田环境建设有限公司 | One kind uses Slurry Balanced Pipe Jacking Construction technique |
CN106988751A (en) * | 2017-04-07 | 2017-07-28 | 杜少平 | Pipe with small pipe diameter drainage pipeline push pipe equipment and pipe jacking construction method |
CN107339111A (en) * | 2017-06-30 | 2017-11-10 | 中城投集团第六工程局有限公司 | The floating construction method of installation of more PE pipes in large-scale push pipe |
CN107795749A (en) * | 2017-12-13 | 2018-03-13 | 北京住总集团有限责任公司 | A kind of precast spliced pipe fitting jacking system and its construction method |
CN208364940U (en) * | 2018-05-02 | 2019-01-11 | 广东中科华冉智网科技有限公司 | Small diameter tube plastic drain-pipe jacking construction equipment |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109141716A (en) * | 2018-08-16 | 2019-01-04 | 中铁二十局集团第工程有限公司 | A kind of pipe gallery big cross section rectangular top pipe construction pipe-soil contact pressure test method |
CN110106961A (en) * | 2019-06-06 | 2019-08-09 | 广东隆建工程有限公司 | Drainage management construction method |
CN110513534A (en) * | 2019-08-23 | 2019-11-29 | 广东凯厦建设工程有限公司 | Municipal wastewater pipeline non-excavating construction method |
CN110715111B (en) * | 2019-10-08 | 2021-11-26 | 中国一冶集团有限公司 | Pipe jacking and casing pipe construction method |
CN110715111A (en) * | 2019-10-08 | 2020-01-21 | 中国一冶集团有限公司 | Pipe jacking and casing pipe construction method |
CN111335898A (en) * | 2020-02-24 | 2020-06-26 | 中铁工程装备集团有限公司 | Trenchless pipeline updating construction system and construction method |
CN111335898B (en) * | 2020-02-24 | 2021-09-10 | 中铁工程装备集团有限公司 | Trenchless pipeline updating construction system and construction method |
CN112267892A (en) * | 2020-08-28 | 2021-01-26 | 春涛国际建筑有限公司 | Secondary pipe jacking construction operation method and system |
CN112065425A (en) * | 2020-09-17 | 2020-12-11 | 临沂市政集团有限公司 | Slurry balance type pipe jacking equipment and construction process thereof on sand and stone superposed layer |
CN113266386A (en) * | 2021-02-03 | 2021-08-17 | 中国水利水电第八工程局有限公司 | Rotary excavating device and rotary excavating method |
CN112922630A (en) * | 2021-02-05 | 2021-06-08 | 广州市第一市政工程有限公司 | Pipe jacking construction structure for reinforcing convective sand layer and construction process thereof |
CN112922630B (en) * | 2021-02-05 | 2023-10-13 | 广州市第一市政工程有限公司 | Pipe jacking construction structure for reinforcing convection sand layer and construction process thereof |
CN112922625A (en) * | 2021-02-07 | 2021-06-08 | 南京工业大学 | Large-scale high-pressure water jet automatic deviation rectifying pipe jacking device and construction method |
CN112922625B (en) * | 2021-02-07 | 2022-04-15 | 南京工业大学 | Large-scale high-pressure water jet automatic deviation rectifying pipe jacking device and construction method |
CN113685187A (en) * | 2021-08-16 | 2021-11-23 | 北京市市政一建设工程有限责任公司 | Small-clear-distance multi-hole underground excavation tunnel construction process |
CN113685187B (en) * | 2021-08-16 | 2023-12-01 | 北京市市政一建设工程有限责任公司 | Construction process of small-clear-distance multi-hole undercut tunnel |
CN114060050A (en) * | 2021-11-19 | 2022-02-18 | 中铁工程装备集团有限公司 | Pipeline in-situ breaking and updating construction method |
CN114412494A (en) * | 2022-01-27 | 2022-04-29 | 浙江宝鲲机械科技有限公司 | Cutter head structure for pipe jacking machine for penetrating through foundation containing high-toughness structure |
CN114754194A (en) * | 2022-03-26 | 2022-07-15 | 北京金河水务建设集团有限公司 | Storage tank top pipe installation device and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN108386608B (en) | 2023-06-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108386608A (en) | Pipe with small pipe diameter plastic drain-pipe push pipe equipment and plastic drain-pipe pipe jacking construction method | |
CN101761083B (en) | Underground continuous wall obstacle clearing construction method for traversing ultra-thick obstacle | |
US4507019A (en) | Method and apparatus for replacing buried pipe | |
AU712736B2 (en) | Method and apparatus for removal of utility line and replacement with polyolefin pipe | |
CN106988751A (en) | Pipe with small pipe diameter drainage pipeline push pipe equipment and pipe jacking construction method | |
CN111794764B (en) | Jacking and pulling construction method | |
CN112664221B (en) | Pipe jacking construction method for complex geological layer | |
CN104846810A (en) | Self-circulating posterior grouting bored pile construction method | |
CN208364940U (en) | Small diameter tube plastic drain-pipe jacking construction equipment | |
CN110778323A (en) | Construction method for pulling and passing buried pipeline | |
CN105257908A (en) | Jacking-pushing drilling construction device and method of underground pipeline | |
CN206625841U (en) | Pipe with small pipe diameter drainage pipeline push pipe equipment | |
CN111140243A (en) | Slurry balance shield machine and pipe-jacking tunneling construction method applying same | |
O’Dwyer et al. | Blackpool south strategy project: analysis of pipe jacking records | |
CN210034627U (en) | Muddy water and soil pressure balance type hydraulic pipe jacking machine | |
CN208918541U (en) | A kind of device for abolishing cutterhead mud cake | |
KR101867598B1 (en) | ahead reaming method of drilling method | |
KR101867599B1 (en) | reaming device for drilling and reaming process | |
CN208364988U (en) | Plastic drain-pipe for small diameter tube jacking construction | |
US7993078B2 (en) | Method and apparatus for installing an underground pipe | |
CN102677724B (en) | Mechanical steel sleeve installation device and mechanical steel sleeve installation method | |
CN113153321A (en) | Muck improvement system for shield construction and construction method thereof | |
CN111101957A (en) | Electric power channel structure crossing subway line | |
KR20060101734A (en) | Method for constructing non-excavation directivity pipe | |
GB2167156A (en) | Replacing buried pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200428 Address after: 523071 No.A, floor 2, building a, Shizhu garden, Yuanmei East Road, Xincheng, Nancheng street, Dongguan City, Guangdong Province Applicant after: Dongguan branch of China Ruilin Engineering Technology Co.,Ltd. Address before: 523799 in Dalang Town, Dongguan, Guangdong Province, Dalang Town, rhino Poe village, No. 61, No. 61, No. two Applicant before: GUANGDONG ZHONGKE HUARAN INTELLIGENT NETWORK TECHNOLOGY Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |