CN108386162A - A kind of formation testing gas operation raffinate does not land automatic recovery device - Google Patents

A kind of formation testing gas operation raffinate does not land automatic recovery device Download PDF

Info

Publication number
CN108386162A
CN108386162A CN201810379709.5A CN201810379709A CN108386162A CN 108386162 A CN108386162 A CN 108386162A CN 201810379709 A CN201810379709 A CN 201810379709A CN 108386162 A CN108386162 A CN 108386162A
Authority
CN
China
Prior art keywords
tank body
distribution box
cover board
fixedly connected
dredge pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810379709.5A
Other languages
Chinese (zh)
Inventor
钱军利
马小东
段晓军
柳双平
任海江
陈建林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd filed Critical Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN201810379709.5A priority Critical patent/CN108386162A/en
Publication of CN108386162A publication Critical patent/CN108386162A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/005Waste disposal systems
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F23/00Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm
    • G01F23/30Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm by floats

Abstract

The invention discloses a kind of formation testing gas operation raffinates not to land automatic recovery device, including at least hydrops pond, hydrops pond is by tank body, cover board, dredge pump and distribution box composition, wherein tank body is open top, bottom blocks and up big and down small rectangular pyramid, the open top end face of tank body is removably connected with cover board, the closure bottom surface of tank body is embedded in ground, tank body blocks bottom surface and is fixedly connected with dredge pump and the interior steel pipe for being connected to line component, wherein dredge pump and the interior steel pipe for being connected to line component are extended to through cover board above cover board, it is opened up there are two inlet positioned at ground above section on tank wall, two inlet centre positions offer watch window, tank body, which is located on a side wall of ground above section, is also removably connected with distribution box.The present invention reduces pollution of the formation testing gas scene raffinate sewage greasy filth to environment, realizes clean manufacturing and environmental requirement, and live overall process is closed, and sump oil, oily wastewater etc. is avoided to generate fire explosion.

Description

A kind of formation testing gas operation raffinate does not land automatic recovery device
Technical field
The present invention relates to petroleum exploration and development field of environment protection, especially a kind of formation testing gas operation raffinate, which does not land, to be automated back Receiving apparatus, for the discharge of formation testing gas construction site raffinate greasy filth, recycling integrated apparatus.
Background technology
The liquid collection mode that oil field at home uses at present is mainly collected using hole canal guiding for the mode of most original, The modes such as liquid collection bath, cement of mating formation hole canal, laying geomembrane implement liquid and do not land measure, thus generate a large amount of oil-containings soil The dangerous wastes such as work film, greasy filth, liquid, which is easy to leak into soil, causes environmental hazard, right with the implementation of Law on Environmental Protection Formation testing gas work site environments protect work, and more stringent requirements are proposed, and scene does not allow storage crude oil raffinate of digging pit, greasy filth danger Useless necessary recycling disposal, causes production cost further to be promoted.
In petroleum exploration and development leads engineering field, as horizontal well increases, construction liquid measure is big, and drain liquid measure is returned in well Greatly, construction later stage scene fluid reservoir raffinate greasy filth is more, recovery processing easy to leak and pollution environment.The implementation of " Law on Environmental Protection ", Draining back into receipts to construction site trade effluent, waste water greasy filth, more stringent requirements are proposed, and formation testing gas well field fills interior raffinate oil at present Mud is mainly collected using hole canal guiding, is laid with due to the use of geomembrane, construction period is longer, and it is easy to appear geomembrane leakages Environment is polluted, and scene digs hydrops pond and impervious material leakage often occurs, is unable to meet the requirement of environmental protection.It is recycled using slush pump Raffinate needs 2 people or more to operate, and on-site cable is more, and security risk is big.
Invention content
The purpose of the present invention is to overcome the above shortcomings and to provide a kind of formation testing gas operation raffinates not to land automation recycling dress Set, for raffinate in the tank of formation testing gas scene, the closed cleaning of greasy filth, hydrops, recycling technology.It is no longer dug using scene after the device Canal collects raffinate, is collected using fixation means, further decreases greasy filth dirt and generates total amount, reduce labor intensity, reuses, It is energy-saving, promote cleanly production work, it is intended to reduce environment caused by the waste water greasy filth recycling discharge process of construction site Pollution.Formation testing gas construction site residual liquid discharge and automatic recovery device can protrude two maximum functions:Closed pollution-free cleaning Raffinate and drain greasy filth is returned in fluid reservoir, reduces construction cost, solves scene recycling sewage, it is preceding the problems such as greasy filth leakage pollution Scape is wide.Function realizes that steps are as follows:
All liquid storages of onsite application are filled 6 cun of hoses of water outlet to connect, hydrops retracting device is typically placed in by liquid storage tank field 3-5 meters, it is placed below ground 0.2-0.4 meters, connector is vertical with pipeline of connecting, and series connection one end is connected to hydrops recycling dress It sets, raffinate greasy filth enters hydrops retracting device, and Floating Ball Liquid Level device control assembly is dived under water after liquid level reaches hydrops pond certain altitude Pump startup, raffinate greasy filth start to recycle, and when hydrops pit level is down to bottom, immersible pump is stopped, and complete recycling raffinate work Make.
The technical solution adopted by the present invention to solve the technical problems is:A kind of formation testing gas operation raffinate does not land automation Retracting device, it includes at least hydrops pond, it is characterised in that:Hydrops pond is made of tank body, cover board, dredge pump and distribution box, institute The top side detachable for stating tank body is connected with cover board, along the thickness direction of tank body be fixedly connected on its bottom surface inner wall dredge pump, It is socketed with the pipeline steel tube and ball float level controller assembly of line component, is wherein fixedly connected with outlet tube at the top of dredge pump, Outlet tube forms outlet connector through cover board above tank body, and a side wall upper part of tank body is further opened with two inlets, into Liquid mouth is removably connected with liquid inlet joint, and the side-wall outer side of tank body is also removably connected with distribution box.
The tank body is that open top is big, and bottom blocks small rectangular pyramid, and tank body is along its thickness direction from blocking bottom surface The embedded ground of above/-/offers watch window, top frame, bottom frame and the connection of tank body between described two liquid inlet joints The perpendicular support of top frame and bottom frame quadrangle forms integral structure skeleton, four sides of tank structure skeleton and bottom surface by square tubes soldering It is close to structural framework by steel plate to be welded, lifting made of useful round steel is fixedly installed in the quadrangle of tank structure skeleton Ring.
Four sides centre position of the tank body is also fixedly connected with layback muscle, the envelope of tank body along the thickness direction of tank body Stifled bottom surface is both provided with several layback muscle along the length and width direction of tank body, and the tank wall upper edge tank that inlet is opposite Body thickness direction is equipped with liquid level gauge.
The tank body is welded with two intubations close to a side-wall outer side of pipeline steel tube, and two intubations are removably connected with Distribution box support, the top of distribution box support are fixedly connected with distribution box, the spacing of two of which intubation and distribution box support Spacing matches and the aperture that is intubated is not less than the aperture of distribution box support, and it is total to be additionally provided with distribution box below the distribution box At distribution box assembly is fixedly connected on distribution box support, and distribution box assembly is connected with distribution box, the equal electric signal of dredge pump.
Urgent termination of pumping switch and manual operation switch are provided on the distribution box assembly.
The size of the cover board 10 and the open end of tank body match, and cover board is equal along the length and width direction of cover board It is fixedly installed the galvanized steel plain sheet of several layback muscle, cover board is made of bulk steel grating and fritter steel plate two parts, wherein greatly Block steel grating has opened several manhole grid and has been to be detachably connected with tank body, fritter steel plate offer small one and large one circular hole and It is to be fixedly connected with tank body, wherein the aperture of big hole is not less than the aperture of dredge pump outlet tube, and the aperture of small sircle hole is not less than Inside it is connected to the aperture of line component steel pipe.
Liquid outlet is fixedly connected with outlet tube at the top of the dredge pump, and outlet tube is also fixed on closer tank wall, Outlet tube is extended to through cover board above cover board, and the outlet tube above cover board is fixedly connected with three-way pipe formation two and goes out liquid Mouthful, each liquid outlet is both provided with valve and is fixedly connected with outlet connector, and one of outlet connector is pagoda silk.
The dredge pump bottom is provided with inlet, and inlet is fixedly connected with pagoda silk, the inlet of dredge pump and goes out Liquid oral pore diameter is identical and hose is fixedly connected between inlet and liquid outlet.
The ball float level controller assembly is made of floating ball lever meter, liquid level meter, liquid level meter position limiting pile, wherein floating ball liquid Position meter is movably connected in dredge pump on the inside of tank body and on the side wall parallel with distribution box support, and liquid level meter position limiting pile is along tank body Thickness direction is fixedly connected on tank body and blocks on bottom surface, and the inner wall of liquid level meter and tank body is contacted and vertically slided with liquid level meter position limiting pile Dynamic connection.
The floating ball lever meter is made of motion bar and floating ball inductor, effect of the floating ball inductor in motion bar and liquid It can be moved up and down along the thickness direction of tank body down, the floating ball lever meter, liquid level meter and dredge pump, the equal electric signal of distribution box connect It connects.
The present invention have it is simple in structure, it is easy to use, it is at low cost the advantages that, secondly realize fluid reservoir between totally-enclosed unicom, Exposure duration of the worker in risk environment is reduced, reduces the labour of worker, while the liquids recovery that stratum is returned out utilizes. The present invention realizes that closed clearing and retrieving work, no pollution are securely and reliably, easy to operate in oil/gas well construction site.Therefore this hair Bright advantageous effect is:
1, pollution of the formation testing gas scene raffinate sewage greasy filth to environment is reduced, realizes clean manufacturing and environmental requirement.
2, live overall process is closed, and sump oil, oily wastewater etc. is avoided to generate fire explosion.
3, reduce each well antiseepage, anti-pollution goods and materials cost input.
4, worker's labor intensity is low, after being installed in place, is automatically performed raffinate recovery operation, it is only necessary to which 1 people completes tube body gate Operation.
5, there is simple in structure, easy to use, low cost.
6, it is convenient for metering sewage quantity.
Description of the drawings
To describe the technical solutions in the embodiments of the present invention more clearly, say that needs make in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for For those of ordinary skill in the art, without creative efforts, other are can also be obtained according to these attached drawings Attached drawing, wherein:
Fig. 1 is the front view of the present invention;
Fig. 2 is the right view of the present invention;
Fig. 3 is the vertical view of the present invention.
In figure:1, dredge pump;2, liquid level meter position limiting pile;3, layback muscle;4, hydrops pond;5, liquid inlet joint;6, outlet connector; 7, distribution box support;8, liquid level meter;9, floating ball lever meter;10, cover board;11, distribution box;12, liquid level gauge;13, pipeline steel tube; 14, ball float level controller assembly;15, hoisting ring.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiment is only a part of the embodiment of the present invention, instead of all the embodiments.Base Embodiment in the present invention, those of ordinary skill in the art obtained without creative efforts it is all its His embodiment, shall fall within the protection scope of the present invention.
Embodiment 1
A kind of formation testing gas operation raffinate does not land automatic recovery device, it includes at least hydrops pond 4, it is characterised in that:Hydrops Pond 4 is made of tank body, cover board 10, dredge pump 1 and distribution box 11, and the top side detachable of the tank body is connected with cover board 10, along tank The pipeline steel tube 13 and floating ball that the thickness direction of body is fixedly connected with dredge pump 1 on its bottom surface inner wall, is socketed with line component Fluid level controller assembly 14, wherein 1 top of dredge pump are fixedly connected with outlet tube, and outlet tube is rectangular on tank body through cover board 10 At outlet connector 6, a side wall upper part of tank body is further opened with two inlets, and inlet is removably connected with liquid inlet joint 5, the side-wall outer side of tank body is also removably connected with distribution box 11.
The present invention is that formation testing gas operation raffinate does not land automatic recovery device, 6 cun of hose strings of water outlet between fluid reservoir Join seal joining, hydrops retracting device is typically placed in by liquid storage tank field 3-5 meters, is placed below ground 0.2-0.4 meters, feed liquor Connector 5 is vertical with pipeline of connecting, and series connection one end is connected to hydrops retracting device, and the raffinate greasy filth cleaned out passes through sealed tube It is emitted into hydrops device from inlet, hydrops device rises according to 14 liquid level of ball float level controller assembly starts dredge pump 1 soon Speed collects raffinate greasy filth, and when liquid level drops to liquid level meter limit bottom in hydrops pond, dredge pump 1 is automatically stopped work, realizes Totally-enclosed clearing and retrieving works;Liquid level rise and fall realize that automatic start-stop, operating personnel need to only observe monitoring.Apparatus of the present invention are real Existing overall process is pollution-free, ne-leakage, reaches industrial wastewater discharge recycling environmental requirement, and entire removal process it is pollution-free, without peace Full hidden danger, can reduce hand labor intensity, and less impervious material realizes that apparatus of the present invention of the method have and is readily transported, is green The characteristics of colour circle is protected is the hydrops retracting device of a sustainable cycle.
Embodiment 2
As shown in Figure 1 and Figure 2, it is improved on the basis of embodiment 1, and the tank body is that open top is big, and bottom blocks small Rectangular pyramid, tank body along its thickness direction from block bottom surface more than 2/3-4/5 be embedded in ground, described two liquid inlet joints 5 it Between offer watch window, the top frame of tank body, bottom frame and connect the perpendicular support of top frame and bottom frame quadrangle and formed by square tubes soldering Integral structure skeleton, four sides of tank structure skeleton and bottom surface are close to structural framework by steel plate and are welded, tank body knot Hoisting ring 15 made of useful round steel is fixedly installed in the quadrangle of structure skeleton.
Four sides centre position of the tank body is also fixedly connected with layback muscle 3 along the thickness direction of tank body, tank body It blocks bottom surface and is both provided with several layback muscle 3 along the length and width direction of tank body, and on the opposite tank wall of inlet Liquid level gauge 12 is installed along tank body thickness direction.Hydrops tank is reinforced in the setting of several layback muscle.
The tank body is welded with two intubations close to a side-wall outer side of pipeline steel tube 13, and two intubations are detachably connected There are distribution box support 7, the top of distribution box support 7 to be fixedly connected with distribution box 11, the spacing and distribution box of two of which intubation The spacing of holder 7 matches and the aperture that is intubated is not less than the aperture of distribution box support 7, and 11 lower section of the distribution box is additionally provided with Distribution box assembly, distribution box assembly are fixedly connected on distribution box support 7, distribution box assembly and distribution box 11, dredge pump 1 electricity Signal connects.
Urgent termination of pumping switch and manual operation switch are provided on the distribution box assembly.
The tank body in hydrops pond 4 is rectangular pyramid, high by 1500.It is formed with 5-10mm steel plate butt weldings, inside is welded with 40*4 square tubes Synthetism frame, quadrangle lifting, hoisting ring 20 round steel of φ, proof strength.Inside setting Simple crawling ladder, cat ladder φ 20-30 round steel It makes, one jiao is sludge pump inlet opening, and centre bore is manufactured according to sludge pump pump head;The top frame of tank body, bottom frame erect support and tank body It is welded into a whole, top plate is made of two pieces of zinc-plated steel gratings, and the end of fritter steel grating is one piece of fixed plate, 1 He of dredge pump The steel pipe for being inside connected to line component is located at through cover board 10 10 above cover board.The tank body side wall opposite with inlet is installed above to be had Liquid level gauge 12, distribution box support are movable, are inserted into when use and are located in the intubation of tank body side two, terrain clearance about 0.5- 1m, it is easy to operation.
Distribution box assembly 7 designs urgent termination of pumping switch and manual operation switch, convenient for emergent.
Embodiment 3
As shown in Figure 1, Figure 2 and Figure 3, it is improved on the basis of embodiment 1, the size of the cover board 10 and the opening of tank body End face matches, and cover board 10 is the galvanized steel that several layback muscle 3 are fixedly installed along the length and width direction of cover board 10 Plate, cover board 10 are made of bulk steel grating and fritter steel plate two parts, and wherein bulk steel grating has opened several manhole grid And with tank body be to be detachably connected, fritter steel plate offers small one and large one circular hole and is to be fixedly connected with tank body, wherein big hole Aperture be not less than the aperture of 1 outlet tube of dredge pump, the aperture of small sircle hole is not less than the interior aperture for being connected to line component steel pipe.
1 top liquid outlet of the dredge pump is fixedly connected with outlet tube, and outlet tube is also fixed on closer tank wall, Outlet tube extends to 10 top of cover board through cover board 10, and the outlet tube above cover board 10 is fixedly connected with three-way pipe and forms two A liquid outlet, each liquid outlet are both provided with valve and are fixedly connected with outlet connector 6, and one of outlet connector 6 is pagoda Silk.
1 bottom of the dredge pump is provided with inlet, and inlet is fixedly connected with pagoda silk, the inlet of dredge pump 1 and Liquid outlet aperture is identical and hose is fixedly connected between inlet and liquid outlet.In tank body, the bottom of the pipeline water inlet is pagoda silk, The same pump outlet of size, intermediate one section of hose(Internal diameter about φ 50-100)Connection, with stainless steel pipe collar clamping.Outlet pipeline Divide two-way, controlled by valve, one end outlet is pagoda silk, connects hose(Internal diameter about φ 30-55), it is soft that the other end can connect 2 cun of fire-fightings Pipe.Tank interior also sets up floating ball lever meter 9, belt controling signal output, and signal is into explosion-proof electrical distribution box.
Embodiment 4
As shown in Figure 1, it is improved on the basis of embodiment 1, the ball float level controller assembly 14 is by floating ball lever meter 9, liquid level meter 8, liquid level meter position limiting pile 2 form, wherein floating ball lever meter 9 be movably connected in dredge pump 1 on the inside of the tank body and and On the parallel side wall of distribution box support 7, liquid level meter position limiting pile 2 is fixedly connected on tank body along tank body thickness direction and blocks on bottom surface, Liquid level meter 8 is contacted with the inner wall of tank body and is connected with 2 vertical sliding motion of liquid level meter position limiting pile.
The floating ball lever meter 9 is made of motion bar and floating ball inductor, work of the floating ball inductor in motion bar and liquid It can be moved up and down along the thickness direction of tank body with lower, the floating ball lever meter 9, liquid level meter 8 and dredge pump 1, distribution box 11 electricity Signal connects.
All liquid storages of onsite application are filled 6 cun of hoses of water outlet to connect, hydrops retracting device is typically placed in fluid reservoir 3-5 meters by area, it is placed below ground 0.2-0.4 meters, connector is vertical with pipeline of connecting, and series connection one end is connected to hydrops and is returned Receiving apparatus, raffinate greasy filth enter hydrops retracting device, and Floating Ball Liquid Level device controls assembly after liquid level reaches hydrops pond certain altitude Diving pump startup, raffinate greasy filth start to recycle, and when hydrops pit level is down to bottom, immersible pump is stopped, and it is residual to complete recycling Liquid works.
In the present invention, raffinate greasy filth enters hydrops pond by liquid inlet joint 5, and liquid level, which rises, pushes ball float level controller total At, it is upper to rise to liquid level meter position limiting pile 2, and dredge pump 1 starts automatically starts to work, and raffinate greasy filth is recycled by outlet connector 6, When liquid level drops to 2 bottom of liquid level meter position limiting pile in hydrops pond, dredge pump 1 is automatically stopped work, and distribution box assembly 7 designs tightly Emergency stop switch pump and manual operation switch, convenient for emergent, liquid level rise and fall realize that automatic start-stop, operating personnel only need to observe Monitoring.The present invention reduces pollution of the formation testing gas scene raffinate sewage greasy filth to environment, realizes clean manufacturing and environmental requirement, scene Overall process is closed, and sump oil, oily wastewater etc. is avoided to generate fire explosion, reduce each well antiseepage, anti-pollution goods and materials at This input, worker's labor intensity is low, after being installed in place, is automatically performed raffinate recovery operation, it is only necessary to which 1 people completes tube body gate behaviour Make, there is simple in structure, easy to use, low cost, convenient for metering sewage quantity.
Desirable embodiment according to the present invention described above is enlightenment, through the above description, relevant staff Various changes and amendments can be carried out without departing from the scope of the technological thought of the present invention' completely.The technology of the present invention Property range is not limited to the contents of the specification, it is necessary to determine its technical scope according to right.
In addition, the technical solution between each embodiment can be combined with each other, but must be with ordinary skill Personnel can be implemented as basis, will be understood that this technical side when the combination of technical solution appearance is conflicting or cannot achieve The combination of case is not present, also not the present invention claims protection domain within.

Claims (10)

1. a kind of formation testing gas operation raffinate does not land automatic recovery device, it includes at least hydrops pond(4), it is characterised in that: Hydrops pond(4)By tank body, cover board(10), dredge pump(1)And distribution box(11)Composition, the top side detachable of the tank body are connected with Cover board(10), the thickness direction along tank body is fixedly connected with dredge pump on its bottom surface inner wall(1), be socketed with the pipe of line component Line steel pipe(13)With ball float level controller assembly(14), wherein dredge pump(1)Top is fixedly connected with outlet tube, and outlet tube passes through Wear cover board(10)Outlet connector is formed above tank body(6), a side wall upper part of tank body is further opened with two inlets, feed liquor Mouth is removably connected with liquid inlet joint(5), the side-wall outer side of tank body is also removably connected with distribution box(11).
2. a kind of formation testing gas operation raffinate according to claim 1 does not land automatic recovery device, it is characterised in that:Institute It is that open top is big to state tank body, and bottom blocks small rectangular pyramid, 2/3- of the tank body along its thickness direction more than closure bottom surface 4/5 insertion ground, described two liquid inlet joints(5)Between offer watch window, top frame, bottom frame and the connection top frame of tank body Perpendicular support with bottom frame quadrangle forms integral structure skeleton by square tubes soldering, four sides and bottom surface of tank structure skeleton by Steel plate is close to structural framework and is welded, and hoisting ring made of useful round steel is fixedly installed in the quadrangle of tank structure skeleton (15).
3. a kind of formation testing gas operation raffinate according to claim 1 or 2 does not land automatic recovery device, feature exists In:Four sides centre position of the tank body is also fixedly connected with layback muscle along the thickness direction of tank body(3), the closure of tank body Bottom surface is both provided with several layback muscle along the length and width direction of tank body(3), and tank wall upper edge that inlet is opposite Tank body thickness direction is equipped with liquid level gauge(12).
4. a kind of formation testing gas operation raffinate according to claim 1 does not land automatic recovery device, it is characterised in that:Institute Tank body is stated close to pipeline steel tube(13)A side-wall outer side be welded with two intubations, two intubations are removably connected with distribution box Holder(7), distribution box support(7)Top be fixedly connected with distribution box(11), the spacing and distribution box branch of two of which intubation Frame(7)Spacing match and the aperture that is intubated is not less than distribution box support(7)Aperture, the distribution box(11)Lower section is also set It is equipped with distribution box assembly, distribution box assembly is fixedly connected on distribution box support(7)On, distribution box assembly and distribution box(11), row Dirt pump(1)Equal electric signal connection.
5. a kind of formation testing gas operation raffinate according to claim 4 does not land automatic recovery device, it is characterised in that:Institute Urgent termination of pumping switch and manual operation switch are provided on the distribution box assembly stated.
6. a kind of formation testing gas operation raffinate according to claim 1 does not land automatic recovery device, it is characterised in that:Institute State cover board(10)Size and the open end of tank body match, cover board(10)It is along cover board(10)Length and width direction it is equal It is fixedly installed several layback muscle(3)Galvanized steel plain sheet, cover board(10)It is made of bulk steel grating and fritter steel plate two parts, Wherein bulk steel grating has opened several manhole grid and has been to be detachably connected with tank body, and fritter steel plate offers small one and large one Circular hole and be to be fixedly connected with tank body, the wherein aperture of big hole are not less than dredge pump(1)The aperture of outlet tube, the hole of small sircle hole Diameter is not less than the interior aperture for being connected to line component steel pipe.
7. a kind of formation testing gas operation raffinate according to claim 1 does not land automatic recovery device, it is characterised in that:Institute State dredge pump(1)Top liquid outlet is fixedly connected with outlet tube, and outlet tube is also fixed on closer tank wall, and outlet tube passes through Wear cover board(10)Extend to cover board(10)Top is located at cover board(10)The outlet tube of top is fixedly connected with three-way pipe and forms two Liquid outlet, each liquid outlet are both provided with valve and are fixedly connected with outlet connector(6), one of outlet connector(6)For treasured Tower silk.
8. a kind of formation testing gas operation raffinate according to claim 7 does not land automatic recovery device, it is characterised in that:Institute State dredge pump(1)Bottom is provided with inlet, and inlet is fixedly connected with pagoda silk, dredge pump(1)Inlet and liquid outlet Aperture is identical and hose is fixedly connected between inlet and liquid outlet.
9. a kind of formation testing gas operation raffinate according to claim 1 does not land automatic recovery device, it is characterised in that:Institute State ball float level controller assembly(14)By floating ball lever meter(9), liquid level meter(8), liquid level meter position limiting pile(2)Composition, wherein floating Ball liquid level gauge(9)It is movably connected in dredge pump(1)Close to tank body inside and and distribution box support(7)On parallel side wall, liquid level Device position limiting pile(2)Tank body is fixedly connected on along tank body thickness direction to block on bottom surface, liquid level meter(8)With the contact of the inner wall of tank body and With liquid level meter position limiting pile(2)Vertical sliding motion connects.
10. a kind of formation testing gas operation raffinate according to claim 9 does not land automatic recovery device, it is characterised in that: The floating ball lever meter(9)It is made of motion bar and floating ball inductor, floating ball inductor can under the action of motion bar and liquid Thickness direction along tank body moves up and down, the floating ball lever meter(9), liquid level meter(8)And dredge pump(1), distribution box(11) Electric signal connects.
CN201810379709.5A 2018-04-25 2018-04-25 A kind of formation testing gas operation raffinate does not land automatic recovery device Pending CN108386162A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810379709.5A CN108386162A (en) 2018-04-25 2018-04-25 A kind of formation testing gas operation raffinate does not land automatic recovery device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810379709.5A CN108386162A (en) 2018-04-25 2018-04-25 A kind of formation testing gas operation raffinate does not land automatic recovery device

Publications (1)

Publication Number Publication Date
CN108386162A true CN108386162A (en) 2018-08-10

Family

ID=63065537

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810379709.5A Pending CN108386162A (en) 2018-04-25 2018-04-25 A kind of formation testing gas operation raffinate does not land automatic recovery device

Country Status (1)

Country Link
CN (1) CN108386162A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109538929A (en) * 2018-12-10 2019-03-29 中国航发四川燃气涡轮研究院 A kind of automatic draining device for small-sized gas source
CN114671157A (en) * 2022-02-22 2022-06-28 海洋石油工程股份有限公司 Liquid collecting device capable of automatically draining water during hose recovery

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203066933U (en) * 2013-01-28 2013-07-17 大庆科丰石油技术开发有限公司 Multifunctional self-control type oily sewage recovery and reinjection environmental protection device
CN204307456U (en) * 2014-11-14 2015-05-06 中国石油天然气股份有限公司 A kind of condensed liquid hermetic recovery device
CN204457642U (en) * 2015-03-06 2015-07-08 王强 Automation waste-oil waste-water recovery equipment
CN208220736U (en) * 2018-04-25 2018-12-11 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 A kind of formation testing gas operation raffinate does not land automatic recovery device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203066933U (en) * 2013-01-28 2013-07-17 大庆科丰石油技术开发有限公司 Multifunctional self-control type oily sewage recovery and reinjection environmental protection device
CN204307456U (en) * 2014-11-14 2015-05-06 中国石油天然气股份有限公司 A kind of condensed liquid hermetic recovery device
CN204457642U (en) * 2015-03-06 2015-07-08 王强 Automation waste-oil waste-water recovery equipment
CN208220736U (en) * 2018-04-25 2018-12-11 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 A kind of formation testing gas operation raffinate does not land automatic recovery device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109538929A (en) * 2018-12-10 2019-03-29 中国航发四川燃气涡轮研究院 A kind of automatic draining device for small-sized gas source
CN114671157A (en) * 2022-02-22 2022-06-28 海洋石油工程股份有限公司 Liquid collecting device capable of automatically draining water during hose recovery

Similar Documents

Publication Publication Date Title
CN211421194U (en) Green ecological self-drainage anti-floating device for sloping field building
CN102418347B (en) Drainage construction method for blind drain and sump wells in deep foundation pit
CN106734178A (en) Comprehensive restoration system and method for polluted site
CN108386162A (en) A kind of formation testing gas operation raffinate does not land automatic recovery device
CN106644596A (en) In-situ monitoring and sampling device for percolating water in farmland soil
CN208220736U (en) A kind of formation testing gas operation raffinate does not land automatic recovery device
CN106368239A (en) Water stop structure arranged at position of expansion joint of urban underground comprehensive pipe rack and construction method of water stop structure
CN206705741U (en) Workover treatment well head oil-water recovering device
CN109577337A (en) The construction method of deep foundation ditch of flowing line
CN104193131A (en) Polypropylene harmless septic tank
CN114855822A (en) Construction method for deep foundation pit of rain sewage pipeline on highway
CN204899978U (en) Shaft excavation to interface water layer drainage system
CN106869301B (en) Old residential quarters septic tank cleaning method
CN201679081U (en) Slope leachate guiding and draining well
CN209179065U (en) A kind of steel construction production waste inspection shaft
CN106592635A (en) Integrated inspection shaft and installation method thereof
JP3664166B2 (en) Steel wall manufacturing method
CN216007010U (en) Sand gravel section leading pipe well precipitation construction structure
CN210621605U (en) A prevent stifled cistern for hydraulic engineering
CN219973434U (en) Lifting inspection well
CN110397097A (en) A kind of garbage leachate and Groundwater Comprehensive pump-drainage well
CN110560467B (en) Harmless treatment method for waste and old pipelines
CN218970034U (en) Side slope protection drainage mechanism with flow dividing structure
CN210288564U (en) Dredging device for hydraulic engineering
CN220203959U (en) Tunnel waterproof and drainage structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20201029

Address after: 100007 Dongcheng District, Dongzhimen, China, North Street, No. 9 Oil Mansion, No.

Applicant after: CHINA NATIONAL PETROLEUM Corp.

Applicant after: CNPC Chuanqing Drilling Engineering Co.,Ltd.

Address before: 710018 Changqing building, 1203 Changqing Changqing Garden area, Shaanxi, Xi'an Province

Applicant before: CHANGQING DOWNHOLE TECHNOLOGY OPERATION COMPANY OF CNPC CHUANQING DRILLING ENGINEERING Co.,Ltd.

TA01 Transfer of patent application right