CN108385534A - A kind of weight installation method that the rigid structure of bridge closes up - Google Patents
A kind of weight installation method that the rigid structure of bridge closes up Download PDFInfo
- Publication number
- CN108385534A CN108385534A CN201810282565.1A CN201810282565A CN108385534A CN 108385534 A CN108385534 A CN 108385534A CN 201810282565 A CN201810282565 A CN 201810282565A CN 108385534 A CN108385534 A CN 108385534A
- Authority
- CN
- China
- Prior art keywords
- bridge
- ballast
- rigid structure
- flat car
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses the weight installation methods that a kind of rigid structure of bridge closes up, which is characterized in that includes the following steps:First, in cradle construction process to after closing up fragment position, it is symmetrically installed ballast flat car temporary track and track car stop in two pier location top bridge floors, temporary track is fixed on the position of bridge floor longitudinal direction using foundation bolt, track car stop is fixedly mounted in ballast flat car temporary track end;Then, the bridge floor right over two bridge piers installs ballast flat car a and ballast flat car b, and draft gear is installed in ballast flat car temporary track tip position;It is segmented connection haulage cable through rigid structure construction hanging basket break-through, forms the weight of the closure segment construction of the rigid structure of bridge.The weight installation method that the rigid structure of bridge of the present invention closes up has the advantages of easy to operate, to be convenient for construction.
Description
Technical field
The present invention relates to the weight installation methods that a kind of rigid structure of bridge more particularly to a kind of rigid structure of bridge close up.
Background technology
The rigid structure closure segment of traditional bridge and abutment lapping construction operation, typically use heap earth bag, water tank or water packet into
Row closure segment and abutment lapping construction ballast conversion process;Its ballast method is more original, and the ballast point in work progress is more, makees
Industry is cumbersome and work efficiency is low.Secondly heap earth bag, water tank or the water packet used carries out closure segment and the conversion of abutment lapping construction ballast
The formation of operation is lack of standardization, it is difficult to meet the job requirements of site safety, civilized construction;This be mainly the rigid structure closure segment of bridge and
The ballast conversion process mode and construction technology that abutment lapping construction operation uses need to improve.
Invention content
In view of the above shortcomings of the prior art, the technical problem to be solved by the present invention is to:It is rigid how a kind of bridge is provided
The weight installation method that structure closes up.
In order to solve the above-mentioned technical problem, present invention employs the following technical solutions:
A kind of weight installation method that the rigid structure of bridge closes up, which is characterized in that include the following steps:First, it is applied in Hanging Basket
Work process is symmetrically installed ballast flat car temporary track 6 and railcar to after closing up fragment position, in two pier location top bridge floors
Shelves 7 are fixed temporary track 6 on the position of bridge floor longitudinal direction using foundation bolt, are fixed in 6 end of ballast flat car temporary track
Attachment rail car stop 7;Then, the bridge floor right over two bridge piers installs ballast flat car a and ballast flat car b, flat in ballast
6 tip position of wooden handcart temporary track installs draft gear 9;It is segmented connection haulage cable 10, shape through rigid 3 break-through of structure construction hanging basket
The weight constructed at the closure segment of the rigid structure of bridge.
Its main feature is that:Using symmetrical weight form, can after closure segment and the docking of abutment bond end fast debugging, into
It constructs after row configuration ballast.In concrete placings, the closure segment of ballast flat car a and the rigid structure of the above-mentioned bridges of ballast flat car b is constructed
Method uses symmetrical weight form, can be formed after mounting with easily functional device of walking;It may be implemented in concrete placings
When, configuration ballast vehicle can be moved as the increase of concrete placings amount is gradually rear steadily, realize the gradually conversion of ballast;It can ensure that rigid structure closes
The quick formation for holding together section and abutment bond end debugging docking process, can meet the job requirements of site safety, civilized construction;It is easy to
Reach the required construction technology mass effect under general condition.
Further feature is:It refers to the process of when concrete is gradually poured to end, and realization that the ballast, which is gradually converted,
The ballast weight of closure segment or abutment bond end is gradually decreased as the process of O.
Compared with the existing technology compared with the weight installation method that the rigid structure of bridge of the present invention closes up, which has advantage, is:
1, weight can be formed after mounting with easily functional device of walking;
2, rigid structure closure segment can be easily realized in concrete placings, and ballast flat car a and ballast flat car b are with concrete placings amount
Increase gradually steadily after move, realize the gradually conversion of ballast;
3, after can ensure that rigid structure closure segment and the debugging of abutment bond end, rigid structure closes up the quick formation of docking process, can meet existing
Field safety, the job requirements of civilized construction;Easily reach the required construction technology mass effect under general condition.
4, easy to operate, it is convenient to carry out.
Description of the drawings
Fig. 1 is the structural schematic diagram of the symmetrical rigid structure of bridge;
Fig. 2 is the schematic diagram for the weight installed using the present invention;
Fig. 3 is abutment lapping construction ballast position view;
Fig. 4 is abutment lapping construction ballast schematic diagram;
Fig. 5 is closure segment construction ballast position view;
Fig. 6 is closure segment construction ballast schematic diagram;
Fig. 7 is symmetrical weight removal position schematic diagram after closure segment construction;
Fig. 8 is the whole rigid frame bridge schematic diagram formed after closure segment is constructed.
In attached drawing label for:1-symmetrical just configuration formula, 2-abutments, 3-rigid structure construction hanging baskets, 4-rigid structure closure segments,
5-steel structure abutment bond ends, 6-ballast flat car temporary tracks, 7-track car bumpers, 8-ballast flat cars, 9-flat cars are led
Leading-in device, 10-haulage cables, the 11-whole rigid frame bridges formed.
Specific implementation mode
The weight installation method of the present invention is made into one with reference to a kind of section constructing method that closes up of the rigid structure of bridge
The detailed description of step.
A kind of technical solution for closing up section constructing method of the rigid structure of bridge includes the following steps:
(1)It prepares:According to production engineering specifications, symmetrical weight is carried out --- ballast flat car a's and ballast flat car b adds
Work prepares and the preparation of ballast flat car temporary track 6, track car stop 7, draft gear 9 and haulage cable 10;
(2)Installation(As technical scheme of the present invention):First, it constructs according to a kind of closure segment for the rigid structure of bridge accordingly invented
The symmetrical weight form of method, it is symmetrical in two pier location top bridge floors in cradle construction process to after closing up fragment position
Ballast flat car temporary track 6 and track car stop 7 are installed, temporary track 6 is fixed using foundation bolt bridge floor longitudinal direction position
On and attachment rail car stop 7;Installation combination ballast vehicle 8 contains a, b, and installs draft gear 9 at such as positions Fig. 2 both ends(It leads
Draw electric block);It is segmented connection haulage cable 10 through rigid 3 break-through of structure construction hanging basket(It is being held in ballast flat car temporary track 6
The pulley installed at head is set with haulage cable 10), form the walking weight of the closure segment construction of rigid structure;
(3)It in work progress, is provided according to arrangement and method for construction, first, the abutment overlap joint end construction of rigid structure is carried out, when ballast tablet
When vehicle a and ballast flat car b is drawn respectively to the abutment overlap joint end of rigid structure, then end can be overlapped to the abutment of rigid structure and applied
Work;Secondly, after the overlap joint end concrete placings molding of the abutment of construction, ballast flat car a and ballast flat car b are drawn respectively to rigid
When the closure segment end of structure, then it can construct to the closure segment of rigid structure;Finally, after the molding of the closure segment concrete placings of construction,
Ballast flat car a and ballast flat car b is drawn respectively to the bridge floor position right over two bridge piers, then can carry out construction hanging basket and complete
Whole construction operations of rigid structure are completed in the dismounting of portion's weight, form whole rigid frame bridge.
The section constructing method that closes up of the above-mentioned rigid structure of bridge uses symmetrical weight form, the ballast flat car 8 of a combination thereof
Contain(a、b)And ballast flat car temporary track 6, track car stop 7, draft gear 9 are formed with haulage cable 10, shape after assembly
At with easily functional device of walking.
The section constructing method that closes up of the above-mentioned rigid structure of bridge uses symmetrical weight form, can be overlapped in closure segment and abutment
After holding fast debugging docking, construct after carrying out configuration ballast.In concrete placings, configuration ballast vehicle can be with the increase of concrete placings amount
It is gradually rear steadily to move, realize the gradually conversion of ballast;It refers to when concrete is gradually poured to the mistake of end that the ballast, which is gradually converted,
Journey, and the ballast weight of realization closure segment or abutment bond end are gradually decreased as the process of O.
The brief description of the process for closing up section constructing method of the above-mentioned rigid structure of bridge is:(1)According to production engineering specifications, carry out
The processing preparation of symmetrical weight ballast flat car a and ballast flat car b →(2)Ballast flat car temporary track 6, railcar
The preparation of shelves 7, draft gear 9 and haulage cable 10 →(3)In cradle construction process to after closing up fragment position, with reference to symmetrical pressure
Weight device form →(4)Two pier location top bridge floors be symmetrically installed ballast flat car temporary track 6 and track car stop 7 →
(5)Using foundation bolt fix temporary track 6 on the position of bridge floor longitudinal direction and attachment rail car stop 7 →(6)Installation combination
Ballast flat car a and ballast flat car b →(7)Such as positions Fig. 2 both ends install draft gear 9 and traction electric block →(8)
Through rigid 3 break-through of structure construction hanging basket segmentation connection haulage cable 10 →(9)Form the walking ballast dress of the closure segment construction of rigid structure
Set →(10)Carry out the abutment overlap joint end construction of rigid structure, and the just closure segment construction operation of structure.
The section constructing method that closes up of the above-mentioned rigid structure of bridge uses symmetrical weight form, can be formed after mounting with row
Walk easily functional device;When may be implemented in concrete placings, configuration ballast vehicle can be moved as the increase of concrete placings amount is gradually rear steadily,
Realize the gradually conversion of ballast;The quick formation that can ensure that rigid structure closure segment and abutment bond end debugging docking process, can meet
The job requirements of site safety, civilized construction;Easily reach the required construction technology mass effect under general condition.
It the above is only the preferred embodiment of the present invention, need to point out it is that this skill is not being departed from for those skilled in the art
Under the premise of art scheme, several modifications and improvements can also be made, the technical solution of above-mentioned modification and improvement, which should equally be considered as, to be fallen
Enter the claimed range of the claims.
Claims (1)
1. a kind of weight installation method that the rigid structure of bridge closes up, which is characterized in that include the following steps:First, in Hanging Basket
Working procedure is symmetrically installed ballast flat car temporary track to after closing up fragment position, in two pier location top bridge floors(6)And rail
Road car stop(7), temporary track is fixed using foundation bolt(6)On the position of bridge floor longitudinal direction, in ballast flat car temporary track
(6)Track car stop is fixedly mounted in end(7);Then, the bridge floor installation ballast flat car a and ballast tablet right over two bridge piers
Vehicle b, in ballast flat car temporary track(6)Tip position installs draft gear(9);It is segmented and connects through rigid 3 break-through of structure construction hanging basket
Haulage cable 10 is connect, the weight of the closure segment construction of the rigid structure of bridge is formed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810282565.1A CN108385534B (en) | 2018-04-02 | 2018-04-02 | Installation method of weight device for folding rigid bridge frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810282565.1A CN108385534B (en) | 2018-04-02 | 2018-04-02 | Installation method of weight device for folding rigid bridge frame |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108385534A true CN108385534A (en) | 2018-08-10 |
CN108385534B CN108385534B (en) | 2020-04-14 |
Family
ID=63072954
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810282565.1A Active CN108385534B (en) | 2018-04-02 | 2018-04-02 | Installation method of weight device for folding rigid bridge frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108385534B (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4192120A (en) * | 1976-12-17 | 1980-03-11 | Entreprises de Travaux Publics et Prives J. Richard Societe Anonyme | Method of constructing reinforced concrete bridges |
CN105484158A (en) * | 2015-12-02 | 2016-04-13 | 中交路桥建设有限公司 | Asymmetrical casting construction method of side span of rigid frame bridge with extra high piers and long span length |
CN106948273A (en) * | 2017-05-10 | 2017-07-14 | 重庆交通大学 | Mountain area High-pier and long-span continuous frigid frame bridge T structures closure casting method |
-
2018
- 2018-04-02 CN CN201810282565.1A patent/CN108385534B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4192120A (en) * | 1976-12-17 | 1980-03-11 | Entreprises de Travaux Publics et Prives J. Richard Societe Anonyme | Method of constructing reinforced concrete bridges |
CN105484158A (en) * | 2015-12-02 | 2016-04-13 | 中交路桥建设有限公司 | Asymmetrical casting construction method of side span of rigid frame bridge with extra high piers and long span length |
CN106948273A (en) * | 2017-05-10 | 2017-07-14 | 重庆交通大学 | Mountain area High-pier and long-span continuous frigid frame bridge T structures closure casting method |
Non-Patent Citations (1)
Title |
---|
高健: "挂篮在大跨桥合拢中作为配重的施工工艺介绍", 《中国水运》 * |
Also Published As
Publication number | Publication date |
---|---|
CN108385534B (en) | 2020-04-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103032073B (en) | Urban subway mudstone stratum connected aisle and shield tunneling parallel construction method | |
CN104564102B (en) | A kind of tunnel lining concrete grouting device | |
CN109098099A (en) | Continuous truss flexible arch bridge rapid constructing method | |
CN108385535A (en) | A kind of rigid structure of bridge closes up section constructing method | |
CN205556009U (en) | Tunnel bow member operation car | |
CN105967078A (en) | Hoisting device used for hoisting prefabricated plate type ballast bed | |
CN204457800U (en) | Large Cross-section Tunnel in Subway Engineering two serves as a contrast the simple and easy chassis mould of arch wall separate type and builds construction equipment | |
CN114033398B (en) | Construction method for returning tunnel of low-gravity-center pulling method shield rear matched trolley | |
CN108487083A (en) | A kind of bridge rigid frame bridge platform overlapped construction method | |
CN201236319Y (en) | Apparatus for maintaining inclined molding edge joist dual-purpose bridge for road and railway | |
CN108487068A (en) | A kind of method for dismounting of the rigid structure weight of bridge | |
CN108385534A (en) | A kind of weight installation method that the rigid structure of bridge closes up | |
CN204267046U (en) | A kind of tunnel lining concrete grouting device | |
CN208815406U (en) | A kind of bridge rigid frame bridge platform overlapped weight | |
CN203855967U (en) | Drilling and filling trolley on slope gallery | |
CN201367556Y (en) | Hanging arch bridge inspection vehicle climbing by steel tube track | |
CN208917707U (en) | A kind of weight that the rigid structure of bridge closes up | |
CN108385536A (en) | A kind of ballast method that the rigid structure of bridge closes up | |
CN104060682B (en) | Associating dredging vehicle | |
CN205604089U (en) | Whole sideslip system of cast -in -situ box girder gate -type full framing | |
CN109162737A (en) | A kind of self-styled reinforcing steel bar-binding bench vehicle | |
CN104372746A (en) | Prefabricated post-tensioning-method simply-supported T-girder concrete injection formwork support and mounting process thereof of railway bridge | |
CN201801812U (en) | Multi-functional highway-railway overhead working truck for bridge inspection | |
CN209307801U (en) | A kind of railroad crossing mouth structure | |
CN205591932U (en) | Full -automatic highway, railway ditch cable duct lining cutting platform truck |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |