CN108383015A - A kind of Super High creeping formwork auxiliary hoisting device - Google Patents

A kind of Super High creeping formwork auxiliary hoisting device Download PDF

Info

Publication number
CN108383015A
CN108383015A CN201810215207.9A CN201810215207A CN108383015A CN 108383015 A CN108383015 A CN 108383015A CN 201810215207 A CN201810215207 A CN 201810215207A CN 108383015 A CN108383015 A CN 108383015A
Authority
CN
China
Prior art keywords
frame
suspension hook
rope
super high
guide rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810215207.9A
Other languages
Chinese (zh)
Other versions
CN108383015B (en
Inventor
李智慧
夏建俊
尹友成
占勇利
季海勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGSHA CONSTRUCTION GROUP CO Ltd
Original Assignee
GUANGSHA CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGSHA CONSTRUCTION GROUP CO Ltd filed Critical GUANGSHA CONSTRUCTION GROUP CO Ltd
Priority to CN201810215207.9A priority Critical patent/CN108383015B/en
Publication of CN108383015A publication Critical patent/CN108383015A/en
Application granted granted Critical
Publication of CN108383015B publication Critical patent/CN108383015B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • B66C1/14Slings with hooks

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of Super High creeping formwork auxiliary hoisting devices, including pedestal, upending frame there are one being fixedly mounted on the pedestal, the top of upending frame is equipped with traction rope by a first crossbeam, one end of the traction rope is lifted with suspension hook, the other end of traction rope passes through first crossbeam, it is connect with the first hoist on pedestal, the one end of first crossbeam far from upending frame is equipped with second cross beam, second cross beam is vertical with first crossbeam, the top of the suspension hook is equipped with stabilising arrangement, the stabilising arrangement includes stablizing to restrict, one end of the stable rope is connected to the top of suspension hook, the other end is connected with movable pulley, the guide rail being obliquely installed there are one being set on the upending frame, the movable pulley is rolled along guide rail, and the side of guide rail and movable pulley cooperation is rough surface.The present invention can assist the quickly and easily lifting of material in Super High Core Walls Structure, ensure the stability that fragmentary component is lifted on Super High creeping formwork.

Description

A kind of Super High creeping formwork auxiliary hoisting device
Technical field
The present invention relates to hoisting technology, more particularly to a kind of Super High creeping formwork auxiliary hoisting device.
Background technology
Creeping formwork is made of jumping formwork, climbing frame and climbing equipment, is generally used for shear wall system, cylinder system, bridge pier The construction technology of equal tall and slender structures.During the construction and installation of high-rise building, usually all also need to building block, reinforcing bar, auxiliary The fragmentary component lifting such as assistant engineer's tool is in place.Therefore auxiliary hoisting device inside climbing form system need to be set, and ensure that the present apparatus is transported Row is reliable steady.
Invention content
Technical problem to be solved by the invention is to provide a kind of Super High creeping formwork auxiliary hoisting device, auxiliary lifting dresses The quickly and easily lifting of material in Super High Core Walls Structure can be assisted by setting, and ensure to lift fragmentary component on Super High creeping formwork Stability.
To achieve the above object, the present invention provides technical solution below:A kind of Super High creeping formwork auxiliary hoisting device, packet Pedestal is included, is fixedly mounted on the pedestal there are one upending frame, the top of upending frame is equipped with traction rope by a first crossbeam, One end of the traction rope is lifted with suspension hook, and the other end of traction rope passes through first crossbeam, with the first elevator on pedestal Machine connects, and the one end of first crossbeam far from upending frame is equipped with second cross beam, and second cross beam is vertical with first crossbeam, the suspension hook Top is equipped with stabilising arrangement, and the stabilising arrangement includes stablizing to restrict, and one end of the stable rope is connected to the top of suspension hook, another End is connected with movable pulley, is set on the upending frame there are one the guide rail being obliquely installed, the movable pulley is led along guide rail rolling Rail and the side of movable pulley cooperation are rough surface, and one end of the guide rail is fixed on upending frame, and the other end is fixed on the second cross The end of beam.
Preferably, suspension hook include rectangular frame and be separately mounted to first suspension hook at rectangular frame both ends and Second suspension hook, first suspension hook and the second suspension hook are respectively equipped with a pair, and the first suspension hook and the second suspension hook connect respectively It is connected on the both ends of frame.
Preferably, 4 corners at the top of frame are respectively fixed with a lifting lug, and 4 lifting lugs are respectively fixed with A piece head-rope, the other end of the head-rope are fixed with traction rope, and the length of 4 head-ropes is consistent, and head-rope with The tie point of traction rope is located at the top of frame center.
Preferably, guide rail is equipped with a pair, and one end of two guide rails is separately fixed on upending frame, and the other end is separately fixed at The both ends end of second cross beam, two guide rails are slidably connected a movable pulley respectively, and the stable rope is equipped with two, Wherein one one end for stablizing rope is connected to one end of frame, and the other end is connected on the movable pulley on the guide rail of corresponding side;Separately One one end for stablizing rope is connected to the other end of frame, and the other end is connected on the movable pulley on another guide rail.
Preferably, the both ends at the top of frame are fixedly mounted respectively there are one second hoist, two stablize rope positioned at End on suspension hook is connect with two second hoist respectively.
Preferably, upending frame is steel structure well cabinet frame.
Preferably, the bottom of upending frame, which is equipped with, reinforces diagonal brace, and described one end for reinforcing diagonal brace is welded with upending frame, the other end It is welded on pedestal.
Using above-mentioned technical proposal, at the top of suspension hook, rope is stablized in installation to the present invention, when suspension hook lifts fragmentary component, surely Surely the one end restricted is stabilized by suspension hook, and the movable pulley of the other end can be moved along guide rail, due to guide rail and the one of movable pulley cooperation Side is rough surface, thus when guide rail and movable pulley cooperation, the effect of tensioning can be played to stablizing rope, so that suspension hook is in height When spending relatively low, stablize rope and one pulling force towards upending frame direction generated to suspension hook, to avoid suspension hook carry fragmentary component to Outer swing so that lifting has more stability, improves safety coefficient when construction.
Description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is the structural schematic diagram of pedestal of the present invention;
Fig. 3 is the structural schematic diagram of the suspension hook of the present invention.
Specific implementation mode
Below in conjunction with the accompanying drawings, by the description of the embodiment, the present invention will be further described:
As shown in Fig. 1 ~ 3, a kind of Super High creeping formwork auxiliary hoisting device of the present invention, including pedestal 1 is installed on pedestal 1 One upending frame 2, upending frame 2 are steel structure well cabinet frame, and the bottom of upending frame 2, which is equipped with, reinforces diagonal brace 8, reinforce one end of diagonal brace 8 with Upending frame 2 welds, and the other end is welded on pedestal 1, and the top of upending frame 2 is equipped with traction rope 4 by a first crossbeam 3, leads One end of messenger 4 is lifted with suspension hook 5, and the other end of traction rope 4 passes through first crossbeam 3, with the first hoist on pedestal 1 6 connections.
The one end of first crossbeam 3 far from upending frame 2 is equipped with second cross beam 9, and second cross beam 9 is vertical with first crossbeam 3, suspension hook 5 top is equipped with stabilising arrangement 7, and stabilising arrangement 7 includes stablizing rope 701, and the one end for stablizing rope 701 is connected to the top of suspension hook 5, The other end is connected with movable pulley 702, is set on upending frame 2 there are one the guide rail 703 being obliquely installed, movable pulley 702 is rolled along guide rail 703 It is dynamic, and the side that guide rail 703 coordinates with movable pulley 702 is rough surface, and one end of guide rail 703 is fixed on upending frame 2, another End is fixed on the end of second cross beam 9.
The suspension hook 5 of the present invention includes rectangular frame 501 and is separately mounted to the first of 501 both ends of rectangular frame Suspension hook 502 and the second suspension hook 503, the first suspension hook 502 and the second suspension hook 503 are respectively equipped with a pair, and the first suspension hook 502 And second suspension hook 503 be connected to the both ends of frame 501.4 corners at the top of frame 501 are respectively fixed with one 504,4 lifting lugs 504 of lifting lug are respectively fixed with a head-rope 505, and the other end of head-rope 505 is fixed with traction rope 4, and 4 The length of a head-rope 505 is consistent, and the tie point of head-rope 505 and traction rope 4 is located at the top at 501 center of frame.
The guide rail 703 of the present invention is equipped with a pair, and one end of two guide rails 703 is separately fixed on upending frame 2, the other end point It is not fixed on the both ends end of second cross beam 9, two guide rails 703 sling the whole distribution triangular in shape of 2, second cross beam 9 with rising, and make It is more stable to obtain structure.Two guide rails 703 are slidably connected a movable pulley 702 respectively, and stablize rope 701 and be equipped with two, wherein One one end for stablizing rope 701 is connected to one end of frame 501, and the other end is connected to the movable pulley on the guide rail 703 of corresponding side On 702;Another one end for stablizing rope 701 is connected to the other end of frame 501, and the other end is connected on another guide rail 703 Movable pulley 702 on, the both ends at the top of frame 501 are fixedly mounted respectively there are one second hoist 506, and two are stablized rope 701 connect with two second hoist 506 respectively in the end on suspension hook 5.Stablize stablizing for rope 701 by two to make With the phenomenon that frame 501 of suspension hook 5 can be avoided to rotate so that lifting is more stable.
Under normal conditions, a sliding rail 10 is fixedly mounted on creeping formwork, after sliding rail 10 arranges, by the lifting of the present invention Device is installed on sliding rail 10, after the completion of the fragmentary component at one lifts, so that pedestal 1 is slided along sliding rail 10, is slided into Behind position, then in place by the lifting of fragmentary component, the process that the hanging apparatus for removing the present invention again to remove from assembles again, specifically , sliding rail 10 is in I-shaped, and pedestal 1 includes Mobile base 101, and the bottom of Mobile base 101 is equipped with and 10 matched T-slot of sliding rail 102, the monosymmetric of the top of T-slot 102 is equipped with a pair of of idler wheel 103, and the width of the horizontal component of T-slot 102 More than the thickness at the top of sliding rail 10 so that sliding rail 10 with T-slot 102 after matching, and there are gap 104, this realities between the two It applies in example, the width in gap 104 is 10mm.Mounting groove 105 there are one being opened up at the center at the top of T-slot 102, mounting groove Hydraulic cylinder 106 is installed, and the telescopic rod 107 of hydraulic cylinder 106 is towards T-slot 102, the end of telescopic rod 107 in 105 It is fixed with compact heap 108.Mounting groove 105 uses three sections of stepped groove, and close to one section of section of T-slot 102 in rectangular Shape, interlude and cylinder close to one section of section of 1 top surface of pedestal, mounting groove 105 is close to one section of T-slot 102 Width is more than the width of 105 another sections of mounting groove, one section of width and compact heap 108 of the mounting groove 105 close to T-slot 102 Width is adapted, and mounting groove 105 two sections far from T-slot 102 is for installing stretching for hydraulic cylinder 106 and hydraulic cylinder 106 Contracting bar 107.
The present invention ensures the stability of hanging apparatus lifting, is equipped on pedestal 1 to further increase safety coefficient Balancing stand 11, balancing stand 11 are mounted on side of the upending frame 2 far from suspension hook 5, and balancing stand 11 tilts installation, the top of balancing stand 11 It is connected by link 12 with the middle part of upending frame 2, and installs clump weight 13 on balancing stand 11.
At the top of suspension hook, rope 701 is stablized in installation to the present invention, when suspension hook 5 lifts fragmentary component, stablizes one end of rope 701 Suspension hook 5 is stabilized, and the movable pulley 702 of the other end can be moved along guide rail 703, be coordinated with movable pulley 702 due to guide rail 703 Side is rough surface, thus when guide rail 703 and the cooperation of movable pulley 702, the effect of tensioning can be played to stablizing rope 701, to So that stablizing the 701 pairs of suspension hooks 5 of restricting generates a pulling force towards 2 direction of upending frame, to avoid suspension hook 5 carry fragmentary component to Outer swing so that the lifting of fragmentary component has more stability, improves safety coefficient when construction.
What has been described above is only a preferred embodiment of the present invention, it is noted that for those of ordinary skill in the art For, without departing from the concept of the premise of the invention, various modifications and improvements can be made, these belong to the present invention Protection domain.

Claims (7)

1. a kind of Super High creeping formwork auxiliary hoisting device, including pedestal(1), the pedestal(1)There are one liftings for upper fixed installation Frame(2), upending frame(2)Top pass through a first crossbeam(3)Equipped with traction rope(4), the traction rope(4)One end lifting There is suspension hook(5), traction rope(4)The other end pass through first crossbeam(3), and positioned at pedestal(1)On first hoist(6)Even It connects, it is characterised in that:First crossbeam(3)Far from upending frame(2)One end be equipped with second cross beam(9), second cross beam(9)With first Crossbeam(3)Vertically, the suspension hook(5)Top be equipped with stabilising arrangement(7), the stabilising arrangement(7)It restricts including stablizing(701), The stable rope(701)One end be connected to suspension hook(5)Top, the other end is connected with movable pulley(702), the upending frame (2)On set that there are one the guide rails that are obliquely installed(703), the movable pulley(702)Along guide rail(703)It rolls, and guide rail(703) With movable pulley(702)The side of cooperation is rough surface, the guide rail(703)One end be fixed on upending frame(2)On, the other end is solid It is scheduled on second cross beam(9)End.
2. Super High creeping formwork auxiliary hoisting device according to claim 1, it is characterised in that:The suspension hook(5)Including length Rectangular frame(501)And it is separately mounted to rectangular frame(501)First suspension hook at both ends(502)And second suspension hook (503), first suspension hook(502)And second suspension hook(503)It is respectively equipped with a pair, and the first suspension hook(502)And the Two suspension hooks(503)It is connected to frame(501)Both ends.
3. Super High creeping formwork auxiliary hoisting device according to claim 2, it is characterised in that:The frame(501)Top 4 corners in portion are respectively fixed with a lifting lug(504), 4 lifting lugs(504)It is respectively fixed with a head-rope (505), the head-rope(505)The other end and traction rope(4)It is fixed, 4 head-ropes(505)Length it is consistent, and Head-rope(505)With traction rope(4)Tie point be located at frame(501)The top at center.
4. Super High creeping formwork auxiliary hoisting device according to claim 3, it is characterised in that:The guide rail(703)It is equipped with A pair, two guide rails(703)One end be separately fixed at upending frame(2)On, the other end is separately fixed at second cross beam(9)Two Hold end, two guide rails(703)Be slidably connected a movable pulley respectively(702), and the stable rope(701)Equipped with two Item, wherein one is stablized rope(701)One end be connected to frame(501)One end, the other end is connected to the guide rail of corresponding side (703)On movable pulley(702)On;Another is stablized rope(701)One end be connected to frame(501)The other end, the other end It is connected to another guide rail(703)On movable pulley(702)On.
5. Super High creeping formwork auxiliary hoisting device according to claim 4, it is characterised in that:The frame(501)Top The both ends in portion are fixedly mounted respectively there are one second hoist(506), two are stablized rope(701)Positioned at suspension hook(5)On end Portion respectively with two second hoist(506)Connection.
6. according to claim 1 ~ 5 any one of them Super High creeping formwork auxiliary hoisting device, it is characterised in that:The upending frame (2)For steel structure well cabinet frame.
7. Super High creeping formwork auxiliary hoisting device according to claim 6, it is characterised in that:The upending frame(2)Bottom Portion, which is equipped with, reinforces diagonal brace(8), the reinforcement diagonal brace(8)One end and upending frame(2)Welding, the other end are welded on pedestal(1)On.
CN201810215207.9A 2018-03-15 2018-03-15 Hoisting device is assisted to super high-rise creeping formwork Active CN108383015B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810215207.9A CN108383015B (en) 2018-03-15 2018-03-15 Hoisting device is assisted to super high-rise creeping formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810215207.9A CN108383015B (en) 2018-03-15 2018-03-15 Hoisting device is assisted to super high-rise creeping formwork

Publications (2)

Publication Number Publication Date
CN108383015A true CN108383015A (en) 2018-08-10
CN108383015B CN108383015B (en) 2020-01-24

Family

ID=63067811

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810215207.9A Active CN108383015B (en) 2018-03-15 2018-03-15 Hoisting device is assisted to super high-rise creeping formwork

Country Status (1)

Country Link
CN (1) CN108383015B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110127532A (en) * 2019-05-31 2019-08-16 河北省送变电有限公司 Disconnecting switch hanging apparatus
CN111017718A (en) * 2020-01-03 2020-04-17 赵茜 Hoisting device is assisted to super high-rise creeping formwork
CN113668393A (en) * 2021-08-16 2021-11-19 中交路桥建设有限公司 Method for quickly installing cable tower steel bar hook bar
CN116354260A (en) * 2023-05-11 2023-06-30 霍州煤电集团吕梁山煤电有限公司方山店坪煤矿 Rope stable type guiding device for winch

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1099658A1 (en) * 1999-11-09 2001-05-16 Atecs Mannesmann AG Load guiding in a mobile harbour crane
CN105692448A (en) * 2016-04-12 2016-06-22 南通润邦重机有限公司 Angle-adjustable crane goods stabilizing system
CN106081904A (en) * 2016-06-06 2016-11-09 武汉理工大学 Jib-type crane container spreader stabilizer
CN106865415A (en) * 2017-03-30 2017-06-20 中国矿业大学 It is a kind of to restrain large-scale general lifting stabilising arrangement and method that weight swings and rotates

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1099658A1 (en) * 1999-11-09 2001-05-16 Atecs Mannesmann AG Load guiding in a mobile harbour crane
CN105692448A (en) * 2016-04-12 2016-06-22 南通润邦重机有限公司 Angle-adjustable crane goods stabilizing system
CN106081904A (en) * 2016-06-06 2016-11-09 武汉理工大学 Jib-type crane container spreader stabilizer
CN106865415A (en) * 2017-03-30 2017-06-20 中国矿业大学 It is a kind of to restrain large-scale general lifting stabilising arrangement and method that weight swings and rotates

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110127532A (en) * 2019-05-31 2019-08-16 河北省送变电有限公司 Disconnecting switch hanging apparatus
CN111017718A (en) * 2020-01-03 2020-04-17 赵茜 Hoisting device is assisted to super high-rise creeping formwork
CN113668393A (en) * 2021-08-16 2021-11-19 中交路桥建设有限公司 Method for quickly installing cable tower steel bar hook bar
CN116354260A (en) * 2023-05-11 2023-06-30 霍州煤电集团吕梁山煤电有限公司方山店坪煤矿 Rope stable type guiding device for winch
CN116354260B (en) * 2023-05-11 2023-07-28 霍州煤电集团吕梁山煤电有限公司方山店坪煤矿 Rope stable type guiding device for winch

Also Published As

Publication number Publication date
CN108383015B (en) 2020-01-24

Similar Documents

Publication Publication Date Title
CN108383015A (en) A kind of Super High creeping formwork auxiliary hoisting device
CN105256728B (en) A kind of cantilever erection method of the Chinese human relations formula steel truss girder of cable-stayed bridge
CN107119921B (en) A kind of skyscraper Bailey beam Demolition Construction method
CN208995928U (en) A kind of multi-functional erection crane suitable for composite beam construction
CN104989111B (en) Steel construction high level construction method for hanging
CN106144929A (en) Group hoist device and construction method
CN206955494U (en) A kind of hoisting frame for being used for nose girder supporting leg under 900 tons of nose-girder bridging machines
CN106012861B (en) The construction method of the mounting and positioning device of Wavelike steel webplate and the Wavelike steel webplate
CN102926330B (en) Installation method of hanging basket suitable for bridge construction
CN207293909U (en) A kind of precast beam reinforced bar skeleton hanging apparatus
CN107893377B (en) The on-site consolidation method of Cable-stayed Bridges loop wheel machine bottom basket system
CN207862788U (en) It is a kind of to be connected to the outstanding stretch-draw jack hanging apparatus filled on Hanging Basket
CN106219413B (en) A kind of cold rolling mill AGC hydraulic cylinders hanging method and hanging apparatus
CN210195198U (en) Elevartor shaft moving platform
CN210658016U (en) Trolley for movably dismounting bridge guardrail template
CN107673202A (en) A kind of track crane installation method
CN105060124B (en) Intra-frame portal crane system and hoisting use method thereof
CN210286440U (en) A transport hoist for hoisting bridge girder erection machine
CN203419665U (en) Support beam device for hoisting heavy equipment
CN208309400U (en) A kind of collapsible suspension apparatus
CN112777484A (en) Hoisting method of goods shelf
CN206033090U (en) Group hoist device
CN205555868U (en) A overhead hoist that is used for precasting yard roof beam, board side form
CN204959505U (en) Single line roof beam security platform
CN218541450U (en) A draw bridge formula operation platform that is used for interior creeping formwork of core section of thick bamboo to hang material

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant