CN110127532A - Isolation switch lifting device - Google Patents
Isolation switch lifting device Download PDFInfo
- Publication number
- CN110127532A CN110127532A CN201910466512.XA CN201910466512A CN110127532A CN 110127532 A CN110127532 A CN 110127532A CN 201910466512 A CN201910466512 A CN 201910466512A CN 110127532 A CN110127532 A CN 110127532A
- Authority
- CN
- China
- Prior art keywords
- support rod
- slideway
- traction rope
- disconnecting switch
- hanging apparatus
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/02—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with non-adjustable and non-inclinable jibs mounted solely for slewing movements
- B66C23/027—Pivot axis separated from column axis
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/16—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with jibs supported by columns, e.g. towers having their lower end mounted for slewing movements
- B66C23/163—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with jibs supported by columns, e.g. towers having their lower end mounted for slewing movements where only part of the column rotates, i.e. at least the bottom part is fixed
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/88—Safety gear
- B66C23/90—Devices for indicating or limiting lifting moment
- B66C23/905—Devices for indicating or limiting lifting moment electrical
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B3/00—Apparatus specially adapted for the manufacture, assembly, or maintenance of boards or switchgear
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本发明提供了一种隔离开关吊装装置,属于电力维护设备技术领域,包括支撑杆、固定机构、搭接导向机构、吊装机构、牵引绳和动力机构,支撑杆用于延伸至承搭结构上方;固定机构与支撑杆下部连接,用于将支撑杆下部固定于工作面;搭接导向机构设于支撑杆上部,用于与承搭结构搭接;吊装机构用于与隔离开关的组件连接;牵引绳绕过搭接导向机构,且一端与吊装机构连接,用于牵引吊装机构运动;动力机构设在支撑杆上,且与牵引绳另一端连接,用于牵引牵引绳运动。本发明通过各部件的配合,能够完成隔离开关的吊装,同时占用的工作空间极小,具有足够大的安全距离,避免断电作业,有利于缩短施工工期,同时避免断电对用户造成不良影响。
The invention provides a hoisting device for an isolating switch, which belongs to the technical field of electric power maintenance equipment, and includes a support rod, a fixing mechanism, a lap guide mechanism, a hoisting mechanism, a traction rope and a power mechanism, and the support rod is used to extend above the supporting structure; The fixing mechanism is connected to the lower part of the support rod, which is used to fix the lower part of the support rod on the working surface; the lap guide mechanism is set on the upper part of the support rod, and is used to overlap with the supporting structure; the hoisting mechanism is used to connect with the components of the isolating switch; traction The rope bypasses the lap guide mechanism, and one end is connected with the hoisting mechanism for pulling the movement of the hoisting mechanism; the power mechanism is arranged on the support rod, and is connected with the other end of the traction rope for pulling the movement of the traction rope. The present invention can complete the hoisting of the isolating switch through the cooperation of various components, and at the same time occupies a very small working space, has a sufficiently large safety distance, avoids power-off operations, is beneficial to shorten the construction period, and avoids adverse effects caused by power-off to users .
Description
技术领域technical field
本发明属于电力维护设备技术领域,更具体地说,是涉及一种隔离开关吊装装置。The invention belongs to the technical field of electric power maintenance equipment, and more specifically relates to a hoisting device for an isolating switch.
背景技术Background technique
在目前220kV变电站的改、扩建工程施工中,隔离开关的安装或更换十分常见,且数量很多。In the current reconstruction and expansion project construction of 220kV substation, the installation or replacement of isolating switches is very common, and there are many of them.
隔离开关是一种主要用于“隔离电源、倒闸操作、用以连通和切断小电流电路”,无灭弧功能的开关器件。隔离开关在分位置时,触头间有符合规定要求的绝缘距离和明显的断开标志;在合位置时,能承载正常回路条件下的电流及在规定时间内异常条件(例如短路)下的电流的开关设备。一般用作高压隔离开关,即额定电压在1kV以上的隔离开关,它本身的工作原理及结构比较简单,但是由于使用量大,工作可靠性要求高,对变电所、电厂的设计、建立和安全运行的影响均较大。The isolating switch is a switching device that is mainly used to "isolate power supply, switch operation, connect and cut off small current circuits", and has no arc extinguishing function. When the isolating switch is in the off position, there is an insulation distance between the contacts that meets the specified requirements and an obvious disconnection mark; current switching device. Generally used as a high-voltage isolating switch, that is, an isolating switch with a rated voltage above 1kV. Its working principle and structure are relatively simple, but due to the large amount of use and high reliability requirements, it is very important for the design, establishment and maintenance of substations and power plants. The impact on safe operation is greater.
由于隔离开关的组件大多较重,常规的安装或更换方法是使用汽车吊起吊后进行移动和组装,但由于变电站中各种线路错综复杂,而且汽车吊等起吊装置的体型较大,吊臂较高且移动范围较大,吊装时往往会遇到吊臂与带电设备及主母线安全距离不足的情况,为了避免触电的危险,必须断电后才能进行吊装。但是停电方案的编制、申请和审批需要经过多个部门的协调研究,需要的时间比较长,通常会造成施工工期的拖延,影响工程的整体进度,同时断电施工还会对用户造成不良影响。Because most of the components of the isolating switch are heavy, the conventional installation or replacement method is to move and assemble after being hoisted by a car. And the movement range is relatively large. During hoisting, the safety distance between the boom and the live equipment and the main bus is often insufficient. In order to avoid the risk of electric shock, the hoisting must be carried out after the power is cut off. However, the preparation, application and approval of the power outage plan need to go through the coordinated research of multiple departments, which takes a long time, which usually causes delays in the construction period and affects the overall progress of the project. At the same time, the power outage construction will also cause adverse effects on users.
发明内容Contents of the invention
本发明的目的在于提供一种隔离开关吊装装置,以解决现有技术中存在的隔离开关吊装需要断电作业造成的工期拖延以及对用户造成不良影响的技术问题。The object of the present invention is to provide a hoisting device for a disconnector switch to solve the technical problems existing in the prior art that the hoisting of the disconnector switch requires power-off work, delaying the construction period and causing adverse effects on users.
为实现上述目的,本发明采用的技术方案是:提供一种隔离开关吊装装置,包括支撑杆、固定机构、搭接导向机构、吊装机构、牵引绳和动力机构,支撑杆用于延伸至承搭结构上方;固定机构与支撑杆下部连接,用于将支撑杆下部固定于工作面;搭接导向机构设于支撑杆上部,用于与承搭结构搭接;吊装机构用于与隔离开关的组件连接;牵引绳绕过搭接导向机构,且一端与吊装机构连接,用于牵引吊装机构运动;动力机构设在支撑杆上,且与牵引绳另一端连接,用于牵引牵引绳运动。In order to achieve the above object, the technical solution adopted by the present invention is to provide a hoisting device for a disconnector, including a support rod, a fixing mechanism, a lap guide mechanism, a hoisting mechanism, a traction rope and a power mechanism, and the support rod is used to extend to the Above the structure; the fixing mechanism is connected to the lower part of the support rod to fix the lower part of the support rod on the working surface; the lap guide mechanism is set on the upper part of the support rod to overlap with the overlapping structure; the hoisting mechanism is used for the assembly of the isolating switch Connection; the traction rope bypasses the lap joint guide mechanism, and one end is connected with the hoisting mechanism for pulling the movement of the hoisting mechanism; the power mechanism is arranged on the support rod, and is connected with the other end of the traction rope for pulling the movement of the traction rope.
进一步地,前述的隔离开关吊装装置中,支撑杆内部设有空腔,牵引绳中部穿设于支撑杆内;支撑杆下部用于牵引绳穿入的第一过线孔,支撑杆上部用于牵引绳穿出的第二过线孔;支撑杆设有第一过线孔和第二过线孔的部位均设有用于与牵引绳连接的第一滑轮。Further, in the aforementioned isolating switch hoisting device, a cavity is provided inside the support rod, and the middle part of the traction rope is passed through the support rod; the lower part of the support rod is used for the first wire hole for the traction rope to pass through, and the upper part of the support rod is used for The second wire passing hole through which the traction rope passes; the first pulley for connecting with the traction rope is provided at the parts where the support rod is provided with the first wire passing hole and the second wire passing hole.
进一步地,前述的隔离开关吊装装置中,支撑杆为伸缩式杆件结构。Further, in the aforementioned hoisting device for a disconnector switch, the support rod is a telescopic rod structure.
进一步地,前述的隔离开关吊装装置中,支撑杆包括外管、内管和销钉,外管与固定机构连接,内部中空;内管下端部用于滑动插接在外管内,且沿轴线方向设有若干销钉孔;销钉用于与销钉孔插接,且两端用于与外管上端抵接。Further, in the aforementioned isolating switch hoisting device, the support rod includes an outer tube, an inner tube and pins, the outer tube is connected to the fixing mechanism, and the inside is hollow; the lower end of the inner tube is used for sliding insertion into the outer tube, and there is a A plurality of pin holes; the pins are used for inserting into the pin holes, and the two ends are used for abutting against the upper end of the outer tube.
进一步地,前述的隔离开关吊装装置中,内管和外管均为圆管,销钉两端设有用于与销钉转动连接且用于与外管上端抵接的滚轮;内管上设有用于转动内管的转动手柄。Further, in the aforementioned isolating switch hoisting device, the inner tube and the outer tube are both round tubes, and the two ends of the pin are provided with rollers for rotating connection with the pin and for abutting against the upper end of the outer tube; Turning handle for the inner tube.
进一步地,前述的隔离开关吊装装置中,搭接导向机构包括搭接杆、第二滑轮和斜撑杆,搭接杆一端与支撑杆上部连接,用于与承搭结构搭接;第二滑轮设于搭接杆远离支撑杆的一端,用于与牵引绳连接;斜撑杆一端与支撑杆上端连接,另一端与搭接杆远离支撑杆的端部连接。Further, in the aforementioned isolating switch hoisting device, the overlapping guide mechanism includes an overlapping rod, a second pulley and a diagonal brace, and one end of the overlapping rod is connected to the upper part of the supporting rod for overlapping with the overlapping structure; the second pulley It is arranged at the end of the lap rod far away from the support rod, and is used for connecting with the traction rope; one end of the diagonal brace is connected with the upper end of the support rod, and the other end is connected with the end of the lap rod far away from the support rod.
进一步地,前述的隔离开关吊装装置中,固定机构包括第一滑道和第二滑道,第一滑道两端分别与支柱连接,且用于与支撑杆下部滑动连接;第二滑道两端分别与支柱连接,且用于与支撑杆中部滑动连接。Further, in the aforementioned isolating switch hoisting device, the fixing mechanism includes a first slideway and a second slideway. The ends are respectively connected with the pillars, and are used for sliding connection with the middle part of the support rod.
进一步地,前述的隔离开关吊装装置中,固定机构还包括第一滑动组件和第二滑动组件,第一滑动组件设于支撑杆下部,且与第一滑道滑动连接并用于将支撑杆紧固于第一滑道上;第二滑动组件设于支撑杆中部,且与第二滑道滑动连接并用于将支撑杆紧固于第二滑道上。Further, in the aforementioned disconnecting switch lifting device, the fixing mechanism further includes a first sliding assembly and a second sliding assembly, the first sliding assembly is arranged at the lower part of the support rod, and is slidably connected with the first slideway and is used to fasten the support rod On the first slideway; the second slide assembly is arranged in the middle of the support rod, and is slidably connected with the second slideway and is used for fastening the support rod on the second slideway.
进一步地,前述的隔离开关吊装装置中,第二滑动组件与支撑杆中部沿支撑杆轴线方向滑动连接。Furthermore, in the aforementioned hoisting device for a disconnector switch, the second sliding assembly is slidably connected to the middle part of the support rod along the axial direction of the support rod.
进一步地,前述的隔离开关吊装装置中,第一滑道和第二滑道平行设置,第一滑道和第二滑道均通过抱箍与支柱固定连接;第一滑动组件为设在支撑杆上且与第一滑道滑动连接的第一螺栓;第二滑动组件包括滑动设于支撑杆上的滑套体和与滑套体通过螺纹结构连接且与第二滑道滑动连接的第二螺栓。Further, in the aforementioned isolating switch hoisting device, the first slideway and the second slideway are arranged in parallel, and both the first slideway and the second slideway are fixedly connected to the pillar through the hoop; the first slide assembly is arranged on the support rod and the first bolt that is slidingly connected with the first slideway; the second slide assembly includes a sliding sleeve body that is slidably arranged on the support rod and a second bolt that is connected with the sliding sleeve body through a threaded structure and is slidingly connected with the second slideway .
进一步地,前述的隔离开关吊装装置中,隔离开关吊装装置还包括:开关触点和限位开关,开关触点设在牵引绳上;限位开关与动力机构连接,用于当开关触点触动限位开关后控制动力机构停止动力输出。Further, in the aforementioned isolating switch hoisting device, the isolating switch hoisting device also includes: a switch contact and a limit switch, the switch contact is arranged on the traction rope; the limit switch is connected with the power mechanism, and is used for After the limit switch, the power mechanism is controlled to stop the power output.
本发明提供的隔离开关吊装装置的有益效果在于:与现有技术相比,本发明通过支撑杆、固定机构、搭接导向机构、吊装机构、牵引绳和动力机构的配合,能够完成隔离开关的吊装,同时上部仅有支撑杆和搭接导向机构,没有传统的吊臂,占用的工作空间极小,能够与带电设备及主母线有足够大的安全距离,能够在变电站带电运行的情况下对隔离开关进行安装和更换,避免断电作业,有利于节省在停电方案的编制、申请和审批等环节浪费的时间,缩短施工工期,同时避免断电对用户造成不良影响。The beneficial effect of the hoisting device of the isolating switch provided by the present invention is that compared with the prior art, the present invention can complete the hoisting of the isolating switch through the cooperation of the support rod, the fixing mechanism, the lap guide mechanism, the hoisting mechanism, the traction rope and the power mechanism. Hoisting, at the same time, there are only support rods and lap guide mechanisms on the upper part, without traditional booms, which occupy a very small working space, and can have a large enough safety distance from live equipment and main busbars, and can operate under the condition of live substation. The installation and replacement of isolating switches can avoid power outage operations, which is conducive to saving time wasted in the preparation, application and approval of power outage plans, shortening the construction period, and avoiding the adverse effects of power outages on users.
附图说明Description of drawings
为了更清楚地说明本发明实施例中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following will briefly introduce the accompanying drawings that need to be used in the descriptions of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only of the present invention. For some embodiments, those of ordinary skill in the art can also obtain other drawings based on these drawings without paying creative efforts.
图1为本发明实施例提供的隔离开关吊装装置的结构示意图;Fig. 1 is a schematic structural view of a hoisting device for a disconnector provided by an embodiment of the present invention;
图2为本发明实施例提供的隔离开关吊装装置的搭接导向机构部位的示意图;Fig. 2 is a schematic diagram of the overlapping guiding mechanism of the isolating switch hoisting device provided by the embodiment of the present invention;
图3为图1中A处的放大结构剖视示意图。FIG. 3 is a schematic cross-sectional view of the enlarged structure at point A in FIG. 1 .
其中,图中各附图标记:Wherein, each reference sign in the figure:
10-支撑杆;10 - support rod;
11-第一过线孔;12-第二过线孔;13-外管;11-the first wire hole; 12-the second wire hole; 13-outer tube;
14-内管;15-销钉;16-滚轮;17-转动手柄;14-inner tube; 15-pin; 16-roller; 17-rotating handle;
20-固定机构;20 - fixing mechanism;
21-第一滑道;22-第二滑道;23-第一滑动组件;24-第二滑动组件;21-the first slideway; 22-the second slideway; 23-the first slide assembly; 24-the second slide assembly;
30-搭接导向机构;31-搭接杆;32-第二滑轮;33-斜撑杆;30-lap guide mechanism; 31-lap rod; 32-second pulley; 33-diagonal strut;
40-吊装机构;40-hoisting mechanism;
50-牵引绳;51-开关触点;50-traction rope; 51-switch contacts;
60-动力机构;60 - power mechanism;
70-限位开关;70-limit switch;
81-横担;82-支柱。81-cross arm; 82-pillar.
具体实施方式Detailed ways
为了使本发明所要解决的技术问题、技术方案及有益效果更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅用以解释本发明,并不用于限定本发明。In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
需要理解的是,术语“长度”、“宽度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。It is to be understood that the terms "length", "width", "top", "bottom", "front", "rear", "left", "right", "vertical", "horizontal", "top" , "bottom", "inner", "outer" and other indicated orientations or positional relationships are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying the referred device Or elements must have a certain orientation, be constructed and operate in a certain orientation, and thus should not be construed as limiting the invention.
此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。在本发明的描述中,“多个”的含义是两个或两个以上,除非另有明确具体的限定。In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be interpreted as indicating or implying relative importance or implicitly specifying the quantity of indicated technical features. Thus, a feature defined as "first" and "second" may explicitly or implicitly include one or more of these features. In the description of the present invention, "plurality" means two or more, unless otherwise specifically defined.
请一并参阅图1及图2,现对本发明提供的一种隔离开关吊装装置进行说明。所述隔离开关吊装装置,包括支撑杆10、固定机构20、搭接导向机构30、吊装机构40、牵引绳50和动力机构60,支撑杆10用于延伸至承搭结构上方;固定机构20与支撑杆10下部连接,用于将支撑杆10下部固定于工作面;搭接导向机构30设于支撑杆10上部,用于与承搭结构搭接;吊装机构40用于与隔离开关的组件连接;牵引绳50绕过搭接导向机构30,且一端与吊装机构40连接,用于牵引吊装机构40运动;动力机构60设在支撑杆10上,且与牵引绳50另一端连接,用于牵引牵引绳50运动。吊装机构40可以吊钩、吊环等用于与隔离开关的组件等起吊物连接的吊装件。Please refer to Fig. 1 and Fig. 2 together, and now a kind of isolating switch hoisting device provided by the present invention will be described. The isolating switch hoisting device includes a support rod 10, a fixing mechanism 20, an overlapping guide mechanism 30, a hoisting mechanism 40, a traction rope 50 and a power mechanism 60, and the supporting rod 10 is used to extend to the top of the supporting structure; the fixing mechanism 20 and The lower part of the support rod 10 is connected to fix the lower part of the support rod 10 on the working surface; the lap guide mechanism 30 is arranged on the upper part of the support rod 10 to overlap with the supporting structure; the hoisting mechanism 40 is used to connect with the components of the isolating switch The traction rope 50 bypasses the lap guide mechanism 30, and one end is connected with the hoisting mechanism 40 for traction hoisting mechanism 40 movement; the power mechanism 60 is located on the support rod 10, and is connected with the other end of the traction rope 50 for traction Traction rope 50 moves. The hoisting mechanism 40 can be a hoisting piece used for connecting with hoisting objects such as components of a disconnector, such as a hook and a hoisting ring.
隔离开关吊装的吊装主要是将隔离开关的组件起吊后,安装在设有支柱82的底座上,隔离开关上部一般都有横担81或输电线(用于连接隔离开关且不带电的)等承搭结构。因此在吊装隔离开关前,可以将固定机构20固定在底座上(即工作面),使支撑杆10向上延伸至横担81或输电线处,将搭接导向机构30搭在横担81或输电线上,并使牵引绳50和吊装机构40绕过搭接导向机构30后下垂。在吊装隔离开关时,将吊装机构40与隔离开关的组件连接后,驱动动力机构60牵引牵引绳50,进而将隔离开关的组件吊起至预定位置,进行安装。需要将隔离开关拆下时,进行相反操作即可。The hoisting of the isolating switch is mainly to lift the components of the isolating switch and install them on the base with the pillar 82. The upper part of the isolating switch generally has a cross arm 81 or a power line (used to connect the isolating switch and is not charged) and other bearings. build structure. Therefore, before hoisting the isolating switch, the fixing mechanism 20 can be fixed on the base (i.e., the working surface), so that the support rod 10 extends upward to the cross arm 81 or the power transmission line, and the lap guide mechanism 30 is placed on the cross arm 81 or the power transmission line. On the line, and make the traction rope 50 and the hoisting mechanism 40 sag after bypassing the overlapping guide mechanism 30. When hoisting the isolating switch, after the lifting mechanism 40 is connected with the components of the isolating switch, the power mechanism 60 is driven to pull the traction rope 50, and then the components of the isolating switch are hoisted to a predetermined position for installation. When it is necessary to remove the isolating switch, perform the opposite operation.
本发明提供的隔离开关吊装装置,与现有技术相比,通过支撑杆10、固定机构20、搭接导向机构30、吊装机构40、牵引绳50和动力机构60的配合,能够完成隔离开关的吊装,同时上部仅有支撑杆10和搭接导向机构30,没有传统的吊臂,占用的工作空间极小,能够与带电设备及主母线有足够大的安全距离,能够在变电站带电运行的情况下对隔离开关进行安装和更换,避免断电作业,有利于节省在停电方案的编制、申请和审批等环节浪费的时间,缩短施工工期,同时避免断电对用户造成不良影响。Compared with the prior art, the hoisting device for the isolating switch provided by the present invention can complete the hoisting of the isolating switch through the cooperation of the support rod 10, the fixing mechanism 20, the lap guide mechanism 30, the hoisting mechanism 40, the traction rope 50 and the power mechanism 60. Hoisting, at the same time, there are only support rods 10 and lap guide mechanism 30 on the upper part, without traditional booms, occupying a very small working space, and can have a large enough safety distance from live equipment and main busbars, and can be operated in substations with live electricity Install and replace the isolating switch to avoid power outage operations, which is conducive to saving the time wasted in the preparation, application and approval of power outage plans, shortening the construction period, and avoiding the adverse effects of power outages on users.
请一并参阅图1和图2,作为本发明提供的隔离开关吊装装置的一种具体实施方式,支撑杆10内部设有空腔,牵引绳50中部穿设于支撑杆10内;支撑杆10下部用于牵引绳50穿入的第一过线孔11,支撑杆10上部用于牵引绳50穿出的第二过线孔12;支撑杆10设有第一过线孔11和第二过线孔12的部位均设有用于与牵引绳50连接的第一滑轮。牵引绳50设于支撑杆10内部,有利于对牵引绳50进行防护,防止牵引绳50与其他部件或结构发生缠绕。Please refer to Fig. 1 and Fig. 2 together. As a specific embodiment of the isolating switch lifting device provided by the present invention, a cavity is provided inside the support rod 10, and the middle part of the traction rope 50 is passed through the support rod 10; the support rod 10 The lower part is used for the first wire hole 11 that the traction rope 50 passes through, and the upper part of the support rod 10 is used for the second wire hole 12 that the traction rope 50 passes through; the support rod 10 is provided with the first wire hole 11 and the second wire hole 12. The positions of the wire holes 12 are all provided with first pulleys for connecting with the traction rope 50 . The traction rope 50 is arranged inside the support rod 10, which is beneficial to protect the traction rope 50 and prevent the traction rope 50 from being entangled with other components or structures.
请参阅图3,作为本发明提供的隔离开关吊装装置的一种具体实施方式,支撑杆10为伸缩式杆件结构。可选地,支撑杆10包括外管13、内管14和销钉15,外管13与固定机构20连接,内部中空;内管14下端部用于滑动插接在外管13内,且沿轴线方向设有若干销钉孔;销钉15用于与销钉孔插接,且两端用于与外管13上端抵接。Please refer to FIG. 3 , as a specific embodiment of the hoisting device for a disconnector provided by the present invention, the support rod 10 is a telescopic rod structure. Optionally, the support rod 10 includes an outer tube 13, an inner tube 14 and a pin 15. The outer tube 13 is connected to the fixing mechanism 20 and is hollow inside; the lower end of the inner tube 14 is used for sliding insertion into the outer tube 13, and along the A number of pin holes are provided; the pin 15 is used for inserting into the pin holes, and the two ends are used for abutting against the upper end of the outer tube 13 .
在需要调节支撑杆10高度时,选择合适的销钉孔插入销钉15后,将销钉15抵在外管13上端即可,方便操作,同时能够起到稳定的、更好的承重效果,同时不会阻碍内部牵引绳50的运动。When it is necessary to adjust the height of the support rod 10, after selecting a suitable pin hole and inserting the pin 15, just put the pin 15 against the upper end of the outer tube 13, which is convenient for operation, and at the same time can achieve a stable and better load-bearing effect without hindering the Movement of the inner leash 50 .
可选地,内管14和外管13均为圆管,销钉15两端设有用于与销钉15转动连接且用于与外管13上端抵接的滚轮16;内管14上设有用于转动内管14的转动手柄17。这种结构能够在保证承重的同时,使内管14旋转,进而方便地调节搭接导向机构30的方向。Optionally, both the inner tube 14 and the outer tube 13 are round tubes, and the two ends of the pin 15 are provided with rollers 16 for rotational connection with the pin 15 and for abutting against the upper end of the outer tube 13; The turning handle 17 of the inner tube 14. This structure can rotate the inner tube 14 while ensuring load bearing, and then adjust the direction of the overlapping guide mechanism 30 conveniently.
请一并参阅图1和图2,作为本发明提供的隔离开关吊装装置的一种具体实施方式,搭接导向机构30包括搭接杆31、第二滑轮32和斜撑杆33,搭接杆31一端与支撑杆10上部连接,用于与承搭结构搭接;第二滑轮32设于搭接杆31远离支撑杆10的一端,用于与牵引绳50连接;斜撑杆33一端与支撑杆10上端连接,另一端与搭接杆31远离支撑杆10的端部连接。Please refer to Fig. 1 and Fig. 2 together, as a specific embodiment of the isolating switch lifting device provided by the present invention, the overlapping guide mechanism 30 includes an overlapping rod 31, a second pulley 32 and a diagonal brace 33, and the overlapping rod 31 one end is connected with support rod 10 tops, is used for lapping with bearing structure; The upper end of the rod 10 is connected, and the other end is connected with the end of the lap rod 31 away from the support rod 10 .
搭接导向机构30一方面用于与横担81或输电线搭接,和固定机构20一同提供起吊的支撑力;另一方面以可以起到导向作用,即将吊装机构40限定至与支撑杆10有一定距离的位置,防止起吊时吊装机构40和支撑杆10产生碰撞摩擦;另外,也用于判定整个装置的位置,防止整个装置与带电设备及主母线安全距离过小。在隔离开关上部一般没有横担81或输电线等搭接结构时,搭接导向机构30可以悬空设置,仅起到导向的作用。The overlapping guide mechanism 30 is used to overlap with the cross arm 81 or the transmission line on the one hand, and provides the supporting force for lifting together with the fixing mechanism 20; There is a certain distance to prevent collision and friction between the hoisting mechanism 40 and the support rod 10 during lifting; in addition, it is also used to determine the position of the entire device to prevent the safety distance between the entire device and the live equipment and the main bus from being too small. When there is generally no overlapping structure such as a cross arm 81 or a transmission line on the top of the disconnector, the overlapping guide mechanism 30 can be suspended in the air and only play a guiding role.
请参阅图1,作为本发明提供的隔离开关吊装装置的一种具体实施方式,固定机构20包括第一滑道21和第二滑道22,第一滑道21两端分别与支柱82连接,且用于与支撑杆10下部滑动连接;第二滑道22两端分别与支柱82连接,且用于与支撑杆10中部滑动连接。第一滑道21和第二滑道22用于在稳固地传递受力的同时,方便调节支撑杆10的位置和方向。Please refer to Fig. 1, as a specific embodiment of the isolating switch lifting device provided by the present invention, the fixing mechanism 20 includes a first slideway 21 and a second slideway 22, and the two ends of the first slideway 21 are respectively connected to the pillars 82, And it is used for sliding connection with the lower part of the support rod 10 ; The first slideway 21 and the second slideway 22 are used to facilitate the adjustment of the position and direction of the support rod 10 while stably transmitting the force.
可选地,固定机构20还包括第一滑动组件23和第二滑动组件24,第一滑动组件23设于支撑杆10下部,且与第一滑道21滑动连接并用于将支撑杆10紧固于第一滑道21上;第二滑动组件24设于支撑杆10中部,且与第二滑道22滑动连接并用于将支撑杆10紧固于第二滑道22上。Optionally, the fixing mechanism 20 further includes a first sliding assembly 23 and a second sliding assembly 24, the first sliding assembly 23 is arranged at the lower part of the support rod 10, and is slidably connected with the first slideway 21 and is used to fasten the support rod 10 On the first slideway 21 ; the second slide assembly 24 is arranged in the middle of the support rod 10 , and is slidably connected with the second slideway 22 and used for fastening the support rod 10 on the second slideway 22 .
可选地,第二滑动组件24与支撑杆10中部沿支撑杆10轴线方向滑动连接,以方便调节支撑杆10的方向。Optionally, the second sliding assembly 24 is slidably connected to the middle of the support rod 10 along the axis direction of the support rod 10 to facilitate adjustment of the direction of the support rod 10 .
可选地,第一滑道21和第二滑道22平行设置,第一滑道21和第二滑道22均通过抱箍与支柱82固定连接;第一滑动组件23为设在支撑杆10上且与第一滑道21滑动连接的第一螺栓;第二滑动组件24包括滑动设于支撑杆10上的滑套体和与滑套体通过螺纹结构连接且与第二滑道22滑动连接的第二螺栓。Optionally, the first slideway 21 and the second slideway 22 are arranged in parallel, and both the first slideway 21 and the second slideway 22 are fixedly connected to the pillar 82 through a hoop; the first slide assembly 23 is arranged on the support rod 10 and the first bolt that is slidingly connected with the first slideway 21; the second slide assembly 24 includes a sliding sleeve body that is slidably arranged on the support rod 10 and is connected with the sliding sleeve body through a threaded structure and is slidingly connected with the second slideway 22 the second bolt.
请参阅图2,作为本发明提供的隔离开关吊装装置的一种具体实施方式,隔离开关吊装装置还包括:开关触点51和限位开关70,开关触点51设在牵引绳50上;限位开关70与动力机构60连接,用于当开关触点51触动限位开关70后控制动力机构60停止动力输出。动力机构60可以是电葫芦。限位开关70可以是与动力机构60电连接的电子开关,也可以是与动力机构60的开关通过机械传动结构连接的机械式开关。Please refer to Fig. 2, as a specific embodiment of the isolating switch hoisting device provided by the present invention, the isolating switch hoisting device also includes: a switch contact 51 and a limit switch 70, the switch contact 51 is arranged on the traction rope 50; The position switch 70 is connected with the power mechanism 60 and is used for controlling the power mechanism 60 to stop power output when the switch contact 51 touches the limit switch 70 . The power mechanism 60 may be an electric hoist. The limit switch 70 may be an electronic switch electrically connected to the power mechanism 60, or a mechanical switch connected to the switch of the power mechanism 60 through a mechanical transmission structure.
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present invention should be included in the protection of the present invention. within range.
Claims (11)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910466512.XA CN110127532A (en) | 2019-05-31 | 2019-05-31 | Isolation switch lifting device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910466512.XA CN110127532A (en) | 2019-05-31 | 2019-05-31 | Isolation switch lifting device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN110127532A true CN110127532A (en) | 2019-08-16 |
Family
ID=67583251
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910466512.XA Pending CN110127532A (en) | 2019-05-31 | 2019-05-31 | Isolation switch lifting device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110127532A (en) |
Citations (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN203558749U (en) * | 2013-11-29 | 2014-04-23 | 浙江迦南科技股份有限公司 | Wet type mixing granulator stirring paddle lifting mechanism |
| CN104150373A (en) * | 2014-08-06 | 2014-11-19 | 山东丰汇设备技术有限公司 | Movable mast crane |
| CN105129627A (en) * | 2015-07-23 | 2015-12-09 | 国家电网公司 | Folding type suspension arm device supported by electric pole |
| CN205222518U (en) * | 2015-10-26 | 2016-05-11 | 国家电网公司 | Outdoor equipment hoisting accessory |
| CN205294663U (en) * | 2015-12-03 | 2016-06-08 | 广东电网有限责任公司江门供电局 | Hoisting device for isolation switch |
| CN106115498A (en) * | 2016-08-08 | 2016-11-16 | 国家电网公司 | A kind of adhesion type pole |
| CN205855853U (en) * | 2016-08-02 | 2017-01-04 | 西安科技大学 | A kind of underground mine use track hoisting machine |
| CN205953369U (en) * | 2016-08-08 | 2017-02-15 | 国家电网公司 | Adhere to formula and embrace pole |
| CN107010551A (en) * | 2017-04-25 | 2017-08-04 | 中冶建工集团有限公司 | A kind of restricted clearance construction method for hanging |
| CN108383015A (en) * | 2018-03-15 | 2018-08-10 | 广厦建设集团有限责任公司 | A kind of Super High creeping formwork auxiliary hoisting device |
| CN109081256A (en) * | 2018-09-25 | 2018-12-25 | 国网辽宁省电力有限公司锦州供电公司 | Disconnecting switch Special lifting device |
| CN208413695U (en) * | 2018-06-12 | 2019-01-22 | 许昌富华玻璃有限公司 | A kind of tempered glass carrying boom hoisting |
| CN210286539U (en) * | 2019-05-31 | 2020-04-10 | 河北省送变电有限公司 | Disconnecting switch hoisting device |
-
2019
- 2019-05-31 CN CN201910466512.XA patent/CN110127532A/en active Pending
Patent Citations (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN203558749U (en) * | 2013-11-29 | 2014-04-23 | 浙江迦南科技股份有限公司 | Wet type mixing granulator stirring paddle lifting mechanism |
| CN104150373A (en) * | 2014-08-06 | 2014-11-19 | 山东丰汇设备技术有限公司 | Movable mast crane |
| CN105129627A (en) * | 2015-07-23 | 2015-12-09 | 国家电网公司 | Folding type suspension arm device supported by electric pole |
| CN205222518U (en) * | 2015-10-26 | 2016-05-11 | 国家电网公司 | Outdoor equipment hoisting accessory |
| CN205294663U (en) * | 2015-12-03 | 2016-06-08 | 广东电网有限责任公司江门供电局 | Hoisting device for isolation switch |
| CN205855853U (en) * | 2016-08-02 | 2017-01-04 | 西安科技大学 | A kind of underground mine use track hoisting machine |
| CN106115498A (en) * | 2016-08-08 | 2016-11-16 | 国家电网公司 | A kind of adhesion type pole |
| CN205953369U (en) * | 2016-08-08 | 2017-02-15 | 国家电网公司 | Adhere to formula and embrace pole |
| CN107010551A (en) * | 2017-04-25 | 2017-08-04 | 中冶建工集团有限公司 | A kind of restricted clearance construction method for hanging |
| CN108383015A (en) * | 2018-03-15 | 2018-08-10 | 广厦建设集团有限责任公司 | A kind of Super High creeping formwork auxiliary hoisting device |
| CN208413695U (en) * | 2018-06-12 | 2019-01-22 | 许昌富华玻璃有限公司 | A kind of tempered glass carrying boom hoisting |
| CN109081256A (en) * | 2018-09-25 | 2018-12-25 | 国网辽宁省电力有限公司锦州供电公司 | Disconnecting switch Special lifting device |
| CN210286539U (en) * | 2019-05-31 | 2020-04-10 | 河北省送变电有限公司 | Disconnecting switch hoisting device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204778471U (en) | Single armed formula on -load tap -changer core hoisting accessory | |
| CN103086278A (en) | Sliding type gantry crane and application thereof | |
| CN202967920U (en) | Hanging overhaul device of load switch of transformer | |
| CN211004299U (en) | Hoisting device for high-voltage isolating switch in complex environment | |
| CN102674162A (en) | Special lifting device for pneumatic mechanism of circuit breaker | |
| CN210607690U (en) | Hook-holding automatic fastening grounding wire clamp | |
| CN113697689B (en) | Pole setting lifting device of transformer substation high altitude equipment | |
| CN210286539U (en) | Disconnecting switch hoisting device | |
| CN103035368B (en) | A kind of 10kV transformer yoke | |
| CN205687433U (en) | A kind of on-load tap changers of transformers boom hoisting | |
| CN205061410U (en) | Ring column crane is prevented askew drawing and is hung safety device to one side | |
| CN103601140A (en) | Insulation crane capable of carrying person for aloft work | |
| CN219226657U (en) | Quick and safe unlocking device for power connection wire clamp | |
| CN202025638U (en) | Suspension frame for on-load voltage regulation switch of transformer | |
| CN115832735B (en) | A quick and safe unlocking device and unlocking method for wiring clamp | |
| CN201252354Y (en) | On-load tapping changing switch suspension bracket | |
| CN112645210A (en) | Bypass flexible cable hoisting accessory | |
| CN206051406U (en) | The disconnecting switch hoisting apparatus of tiltable section | |
| CN212085657U (en) | Vehicle-mounted power transmission line emergency mobile tower | |
| CN203707624U (en) | Auxiliary installation device | |
| CN110880716B (en) | High-voltage switch cabinet cable access device and construction method | |
| CN102570325B (en) | A kind of light hoisting device for converting station | |
| CN208791052U (en) | A kind of power transformer load tap changer maintenance lifting device | |
| CN205527504U (en) | Isolator gallows | |
| CN218100879U (en) | Overhead for transformer installation |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |