CN108372279A CN201810328871.4A CN201810328871A CN108372279A CN 108372279 A CN108372279 A CN 108372279A CN 201810328871 A CN201810328871 A CN 201810328871A CN 108372279 A CN108372279 A CN 108372279A
Authority
CN
China
Prior art keywords
slag
tundish
bloom
surplus
continuous casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810328871.4A
Other languages
Chinese (zh)
Other versions
CN108372279B (en
Inventor
郑淑国
王冲
刘志远
朱苗勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeastern University China
Original Assignee
Northeastern University China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeastern University China filed Critical Northeastern University China
Priority to CN201810328871.4A priority Critical patent/CN108372279B/en
Publication of CN108372279A publication Critical patent/CN108372279A/en
Application granted granted Critical
Publication of CN108372279B publication Critical patent/CN108372279B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/10Supplying or treating molten metal
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/16Controlling or regulating processes or operations
    • B22D11/18Controlling or regulating processes or operations for pouring
    • B22D11/181Controlling or regulating processes or operations for pouring responsive to molten metal level or slag level

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Continuous Casting (AREA)

Abstract

A kind of continuous casting process tundish pours the measurement method of surplus, belongs to continuous casting process area;Method is:1) it after continuous casting one pours time, measures when pouring basket liquid level depth is 200~350mm and stops basket pouring;2) by tundish natural cooling;3) tundish is transferred to cinder field after cooling;4) slag of solidification is all poured out and is stood in cinder field;5) cooled down to slag artificial recharge in tundish by the way of water cooling, then natural cooling;6) by the slag crushing after water cooling, and after carrying out comprehensive artificial recharge cooling to bloom, blocky slag, then natural cooling;7) after moisture air-dries, the bloom broken off in slag is all sucked out, the quality of bloom is that tundish pours surplus;The method of the present invention can fast and effeciently by a series of operation of systems to tundish pour surplus carry out precise, and it is at low cost, easy to operate, measurement result is accurate.

Description

A kind of continuous casting process tundish pours the measurement method of surplus
Technical field
The invention belongs to the measurements that continuous casting process area more particularly to a kind of continuous casting process tundish pour surplus Method.
Background technology
Tundish is the device that molten steel transition is used between ladle and crystallizer, and tundish bears the steel of Con casting ladle inflow The effects that plaing a part of to form a connecting link after water, playing decompression, current stabilization, remove slag, shunt.Tundish is not only one in producing Container, and have become an important ring for clean steel production.No matter the direct motion for continuous casting operation, or for ensure molten steel matter Amount suits the requirements, and the effect of tundish all be can not ignore.
In continuous casting, the slag of basket pouring process control be always perplex economic clean steel production problem it One.After continuous casting process pours time the last one ladle to one stops cast, molten steel liquid level is gradually reduced in tundish, under Drop process easy tos produce slag, and harm mainly has:It generates field trash and deteriorates steel quality, be easy to cause nozzle blocking;It is intermediate Cinder inclusion can enter in crystallizer, not only reduce cleanliness, and easily induce bleed-out.Generally steel is stayed to grasp using tundish at present Make to inhibit tundish slag, though meeting quality requirement in this way, can cause in tundish more than a large amount of molten steel pour, to reduce steel Water recovery rate.Therefore, how to take what new process reduced tundish to greatest extent under the premise of avoiding slag to pour surplus, be Realize basket pouring processing efficient, economic control slag key.Research and development control slag new process very the key link It obtains the accurate of tundish and pours surplus, the slag control effect of new process could be evaluated in this way.Therefore, tundish pours remaining The accurate of amount measures the key for becoming control slag effect assessment.
Tundish pours surplus there are no clear, system measurement method at present, limits and controls the new work of slag to tundish The evaluation of skill effect, the present invention propose a kind of method that quantitative measurment tundish pours surplus, systematically solve quantitative measurment The technical barrier for pouring surplus of tundish, and it is at low cost, easy to operate, measurement result is accurate, to high-quality continuous casting process It reduces tundish and pours surplus, and then it is significant to improve molten steel recovery rate.
Invention content
In view of the deficiencies of the prior art, the present invention proposes that a kind of continuous casting process tundish pours the measurement method of surplus, A kind of method for quantitative measuring of steel in slag steel, can fast and effeciently by a series of operation of systems to tundish pour surplus into Row precise, and it is at low cost, easy to operate, measurement result is accurate.Currently, to tundish pour surplus there is no it is clear, system Measurement method, the method for the present invention solve this technical problem.
A kind of continuous casting process tundish pours the measurement method of surplus, specifically comprises the following steps:
Step 1, after continuous casting one pours the secondary stopping cast to the last one ladle, measuring pouring basket liquid level depth is Stop basket pouring when 200~350mm;
Step 2, tundish car is opened to the side of continuous casting platform and carries out natural cooling;
Step 3, tundish is sling to rail travel vehicle by the driving in steel mill after cooling, then will by rail travel vehicle Tundish transports to cinder field;
Step 4, the slag of solidification is all poured out into 20~45m in cinder field2Reserved area, stand 20~40min;
Step 5, cooled down to slag artificial recharge in tundish by the way of water cooling, then 40~60min of natural cooling;Its In, the bore of water pipe is 25~40mm of Φ, 8.0~12.0m of flow3/h;
Step 6, by the slag after water cooling, it is broken into bloom and the blocky slag of the length of side≤250mm, and to bloom, blocky slag After carrying out comprehensive artificial recharge cooling, then 1.5~3.0h of natural cooling;Wherein, the bore of water pipe is 25~40mm of Φ, stream Measure 5.0~10.0m3/h;
Step 7, after the moisture in bloom, blocky slag air-dries, the bloom broken off in slag is all inhaled with lifting magnet Go out, the quality of bloom is that tundish pours surplus.
A kind of above-mentioned continuous casting process tundish pours the measurement method of surplus, wherein:
In the step 1, continuous casting one, which pours last secondary packet, to complete cast according to normal cast flow.
In the step 1, with tape measure pouring basket liquid level depth;Wherein, scale for special heat-resisting material makes and At the graduated scale of band, size:Long L is 20~50mm, wide W is 10~30mm, high H is 1500~2000mm.
In the step 1, when measuring level in tundish, scale should measure vertical high perpendicular to tundish bottom Degree.
In the step 1, steel grade, heat (batch) number and the time in tundish are recorded.
In the step 2, it is specified that the side of continuous casting platform refers to that tundish car reaches on the track of teeming stage Cooling position.
In the step 2, the time of natural cooling is 3.0~5.0h.
In the step 3, tundish should slowly transport to ensure safety during being transferred to cinder field.
In the step 4,180 degree is overturn after slinging tundish by package turning mechanism, the slag of solidification is all poured out In cinder field.
In the step 5, comprehensive artificial recharge should equably water in all directions when cooling down, lasting watering cooling.
In the step 5, the time that artificial recharge cools down when cooling down is 2.0~4.0h.
In the step 6, using quartering hammer carefully by slag crushing at bulk.
In the step 6, comprehensive artificial recharge should equably water in all directions when cooling down, lasting watering cooling.
In the step 6, the time that artificial recharge cools down when cooling down is 2.0~3.0h.
In the step 6, block-like slag should be small as possible to ensure without bloom in slag when being crushed, and will be adsorbed on bloom Blocky slag is washed out with water, and then continues to cool down to bloom and blocky slag, starts to weigh again later until bloom is completely cooling.
In the step 7, should carefully it be collected when collecting bloom with lifting magnet, size block is intended to collect complete.
In the step 7, the quality method for weighing bloom is:(1) with lifting magnet by the bloom broken off in slag all After suction, it is put into loading machine, it is to be weighed before loading machine is opened to on-ground weigher;(2) on-ground weigher is corrected and is reset, fill the loading of bloom Machine weighs on on-ground weigher and is denoted as A1, is re-weighed after bloom is outwelled and is denoted as A2, the difference of the two is the quality of bloom, i.e., This collection tundish pours surplus.
In the step 7, with on-ground weigher weigh record when, record registration stablize after actual value.
Description of the drawings
The quantitative measurment tundish of Fig. 1 embodiment of the present invention 1~3 pours the flow chart of surplus.
The apparatus structure schematic diagram of the tundish water filling cooling of Fig. 2 embodiment of the present invention 1~3;In figure, 1, filling pipe; 2, control switch;3, pressure gauge;4, flowmeter.
The apparatus structure schematic diagram of molten steel depth in the tape measure tundish of Fig. 3 embodiment of the present invention 1~3.In figure, 5, Scale;6, tundish;7, slag blanket;8, molten steel.
The scale schematic diagram of Fig. 4 embodiment of the present invention 1~3;In figure, H represents the height of scale, and the unit of scale is mm.
The scale vertical view of Fig. 5 embodiment of the present invention 1~3;In figure, L represents the length of scale, and W represents the width of scale, The unit of scale is mm.
Specific implementation mode
In following embodiment, with on-ground weigher weigh record when, record registration stablize after actual value.Examples 1 to 3 The flow chart that quantitative measurment tundish pours surplus is as shown in Figure 1;The apparatus structure of the tundish water filling cooling of Examples 1 to 3 shows It is intended to as shown in Figure 2;The apparatus structure schematic diagram of molten steel depth is as shown in Figure 3 in the tape measure tundish of Examples 1 to 3; The scale schematic diagram of Examples 1 to 3 is as shown in Figure 4;The scale vertical view of Examples 1 to 3 is as shown in Figure 5.
Embodiment 1
A kind of continuous casting process tundish pours the measurement method of surplus, specifically comprises the following steps:
Step 1, it is deep with tape measure pouring basket liquid level after continuous casting one pours the secondary stopping cast to the last one ladle Stop basket pouring when degree is to 200mm, wherein the capacity of tundish is 30t;Wherein, scale size:Long L is 20mm, width W It is 1500mm for 10mm, high H;
Step 2, tundish car is opened to the side of continuous casting platform and carries out natural cooling 3.0h;
Step 3, tundish is sling to rail travel vehicle by the driving in steel mill after cooling, then will by rail travel vehicle Tundish carefully slowly transports to cinder field;
Step 4,180 degree is overturn after slinging tundish using package turning mechanism, and the slag of solidification is all poured out in cinder field Interior 20m2Reserved area, stand 20min;
Step 5, cooled down to molten steel artificial recharge in tundish by the way of water cooling, then natural cooling 40min;Wherein, The bore of water pipe is Φ 25mm, flow 8.0m3/h;The time that artificial recharge cools down when cooling down is 2.0h;Comprehensive artificial note Water should equably water in all directions when cooling down, lasting watering cooling;
Step 6, by the slag after water cooling, quartering hammer is carefully by slag crushing at the blocky slag of the length of side≤250mm, and to steel After block, blocky slag carry out comprehensive artificial recharge cooling, then natural cooling 1.5h;Wherein, the bore of water pipe is Φ 25mm, stream Measure 5.0m3/h;The time that artificial recharge cools down when cooling down is 2.0h;Block-like slag should be small as possible when broken, and will be adsorbed on Blocky slag on bloom is washed out with water, and then continues to cool down to bloom;
Step 7, after the moisture in bloom, blocky slag air-dries, with lifting magnet by the bloom broken off in slag and block After bloom in shape slag is all sucked out, it is put into loading machine, it is to be weighed before loading machine is opened to on-ground weigher, on-ground weigher is corrected and is reset, is contained There is the loading machine of bloom to weigh on on-ground weigher and be denoted as 18.25t, is re-weighed after bloom is outwelled and is denoted as 16.40t, the two Difference is the quality 1.85t of bloom, i.e. the surplus of pouring of tundish is 1.85t.
If do not used the continuous casting process tundish of the present embodiment to pour the measurement method of surplus, scene is estimated tundish and is poured Surplus empirical value is 2.30t, and it is 1.85t that the tundish of measurement method, which pours surplus, through this embodiment, it is seen that the method for the present invention is more It is accurate for science.
Embodiment 2
A kind of continuous casting process tundish pours the measurement method of surplus, specifically comprises the following steps:
Step 1, it is deep with tape measure pouring basket liquid level after continuous casting one pours the secondary stopping cast to the last one ladle Stop basket pouring when degree is to 250mm, wherein the capacity of tundish is 35t;Wherein, scale size:Long L is 35mm, width W It is 1800mm for 20mm, high H;
Step 2, tundish car is opened to the side of continuous casting platform and carries out natural cooling 4.0h;
Step 3, tundish is sling to rail travel vehicle by the driving in steel mill after cooling, then will by rail travel vehicle Tundish carefully slowly transports to cinder field;
Step 4,180 degree is overturn after slinging tundish using package turning mechanism, and the slag of solidification is all poured out in cinder field Interior 30m2Reserved area, stand 30min;
Step 5, cooled down to molten steel artificial recharge in tundish by the way of water cooling, then natural cooling 50min;Wherein, The bore of water pipe is Φ 35mm, flow 10.0m3/h;The time that artificial recharge cools down when cooling down is 3.0h;Comprehensive artificial note Water should equably water in all directions when cooling down, lasting watering cooling;
Step 6, by the slag after water cooling, quartering hammer is carefully by slag crushing at the blocky slag of the length of side≤250mm, and to steel After block, blocky slag carry out comprehensive artificial recharge cooling, then natural cooling 2.5h;Wherein, the bore of water pipe is Φ 35mm, stream Measure 7.0m3/h;The time that artificial recharge cools down when cooling down is 2.5h;Block-like slag should be small as possible when broken, and will be adsorbed on Blocky slag on bloom is washed out with water, and then continues to cool down to bloom;
Step 7, after the moisture in bloom, blocky slag air-dries, with lifting magnet by the bloom broken off in slag and block After bloom in shape slag is all sucked out, it is put into loading machine, it is to be weighed before loading machine is opened to on-ground weigher, on-ground weigher is corrected and is reset, is contained There is the loading machine of bloom to weigh on on-ground weigher and be denoted as 19.32t, is re-weighed after bloom is outwelled and is denoted as 16.60t, the two Difference is the quality 2.72t of bloom, i.e. the surplus of pouring of tundish is 2.72t.
If do not used the continuous casting process tundish of the present embodiment to pour the measurement method of surplus, scene is estimated tundish and is poured Surplus empirical value is 3.20t, and it is 2.72t that the tundish of measurement method, which pours surplus, through this embodiment, it is seen that the method for the present invention is more It is accurate for science.
Embodiment 3
A kind of continuous casting process tundish pours the measurement method of surplus, specifically comprises the following steps:
Step 1, it is deep with tape measure pouring basket liquid level after continuous casting one pours the secondary stopping cast to the last one ladle Stop basket pouring when degree is to 350mm, wherein the capacity of tundish is 40t;Wherein, scale size:Long L is 50mm, width W It is 2000mm for 30mm, high H;
Step 2, tundish car is opened to the side of continuous casting platform and carries out natural cooling 5.0h;
Step 3, tundish is sling to rail travel vehicle by the driving in steel mill after cooling, then will by rail travel vehicle Tundish carefully slowly transports to cinder field;
Step 4,180 degree is overturn after slinging tundish using package turning mechanism, and the slag of solidification is all poured out in cinder field Interior 45m2Reserved area, stand 40min;
Step 5, cooled down to molten steel artificial recharge in tundish by the way of water cooling, then natural cooling 60min;Wherein, The bore of water pipe is Φ 40mm, flow 12.0m3/h;The time that artificial recharge cools down when cooling down is 4.0h;Comprehensive artificial note Water should equably water in all directions when cooling down, lasting watering cooling;
Step 6, by the slag after water cooling, quartering hammer is carefully by slag crushing at the blocky slag of the length of side≤250mm, and to steel After block, blocky slag carry out comprehensive artificial recharge cooling, then natural cooling 3.0h;Wherein, the bore of water pipe is Φ 40mm, stream Measure 10.0m3/h;The time that artificial recharge cools down when cooling down is 3.0h;Block-like slag should be small as possible when broken, and will be adsorbed on Blocky slag on bloom is washed out with water, and then continues to cool down to bloom;
Step 7, after the moisture in bloom, blocky slag air-dries, with lifting magnet by the bloom broken off in slag and block After bloom in shape slag is all sucked out, it is put into loading machine, it is to be weighed before loading machine is opened to on-ground weigher, on-ground weigher is corrected and is reset, is contained There is the loading machine of bloom to weigh on on-ground weigher and be denoted as 20.74t, is re-weighed after bloom is outwelled and is denoted as 16.10t, the two Difference is the quality 4.64t of bloom, i.e. the surplus of pouring of tundish is 4.64t.
If do not used the continuous casting process tundish of the present embodiment to pour the measurement method of surplus, scene is estimated tundish and is poured Surplus empirical value is 5.00t, and it is 4.64t that the tundish of measurement method, which pours surplus, through this embodiment, it is seen that the method for the present invention is more It is accurate for science.
It should be noted last that the above examples are only used to illustrate the technical scheme of the present invention and are not limiting.Although ginseng It is described the invention in detail according to embodiment, it will be apparent to an ordinarily skilled person in the art that the technical side of the present invention Case is modified or replaced equivalently, and without departure from the spirit and scope of technical solution of the present invention, should all be covered in the present invention Right in.

Claims (9)

1. a kind of continuous casting process tundish pours the measurement method of surplus, which is characterized in that specifically comprise the following steps:
Step 1, continuous casting one pours time stop cast to the last one ladle after, measure pouring basket liquid level depth be 200~ Stop basket pouring when 350mm;
Step 2, tundish car is opened to the side of continuous casting platform and carries out natural cooling;
Step 3, tundish is sling to rail travel vehicle by the driving in steel mill after cooling, then will be intermediate by rail travel vehicle Packet transports to cinder field;
Step 4, the slag of solidification is all poured out into 20~45m in cinder field2Reserved area, stand 20~40min;
Step 5, cooled down to slag artificial recharge in tundish by the way of water cooling, then 40~60min of natural cooling;Wherein, The bore of water pipe is 25~40mm of Φ, 8.0~12.0m of flow3/h;
Step 6, by the slag after water cooling, it is broken into bloom and the blocky slag of the length of side≤250mm, and carry out to bloom, blocky slag After comprehensive artificial recharge cooling, then 1.5~3.0h of natural cooling;Wherein, the bore of water pipe is 25~40mm of Φ, flow 5.0~10.0m3/h;
Step 7, after the moisture in bloom, blocky slag air-dries, the bloom broken off in slag is all sucked out with lifting magnet, steel The quality of block is that tundish pours surplus.
2. continuous casting process tundish according to claim 1 pours the measurement method of surplus, which is characterized in that the step In rapid 1, with tape measure pouring basket liquid level depth;Wherein, scale is that the band that special heat-resisting material is made is graduated Scale, size:Long L is 20~50mm, wide W is 10~30mm, high H is 1500~2000mm.
3. continuous casting process tundish according to claim 1 pours the measurement method of surplus, which is characterized in that the step In rapid 2, the time of natural cooling is 3.0~5.0h.
4. continuous casting process tundish according to claim 1 pours the measurement method of surplus, which is characterized in that the step In rapid 4, after overturning 180 degree after slinging tundish by package turning mechanism, the slag of solidification is all poured out in cinder field.
5. continuous casting process tundish according to claim 1 pours the measurement method of surplus, which is characterized in that the step In rapid 5, the time that artificial recharge cools down when cooling down is 2.0~4.0h.
6. continuous casting process tundish according to claim 1 pours the measurement method of surplus, which is characterized in that the step In rapid 6, using quartering hammer carefully by slag crushing at bulk.
7. continuous casting process tundish according to claim 1 pours the measurement method of surplus, which is characterized in that the step In rapid 6, the time that artificial recharge cools down when cooling down is 2.0~3.0h.
8. continuous casting process tundish according to claim 1 pours the measurement method of surplus, which is characterized in that the step In rapid 6, block-like slag should be small as possible to ensure without bloom in slag when being crushed, and will be adsorbed on bloom blocky slag and be rushed with water Fall, and then bloom and blocky slag are continued to cool down, starts to weigh again later until bloom is completely cooling.
9. continuous casting process tundish according to claim 1 pours the measurement method of surplus, which is characterized in that the step In rapid 7, the quality method for weighing bloom is:(1) after the bloom broken off in slag being all sucked out with lifting magnet, it is put into loading It is to be weighed before loading machine is opened to on-ground weigher in machine;(2) on-ground weigher is corrected and is reset, the loading machine for filling bloom is weighed on on-ground weigher And it is denoted as A1, it is re-weighed after bloom is outwelled and is denoted as A2, the difference of the two is the quality of bloom, i.e., this collects tundish Pour surplus.
CN201810328871.4A 2018-04-13 2018-04-13 Method for measuring pouring allowance of tundish in continuous casting pouring process Active CN108372279B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810328871.4A CN108372279B (en) 2018-04-13 2018-04-13 Method for measuring pouring allowance of tundish in continuous casting pouring process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810328871.4A CN108372279B (en) 2018-04-13 2018-04-13 Method for measuring pouring allowance of tundish in continuous casting pouring process

Publications (2)

Publication Number Publication Date
CN108372279A true CN108372279A (en) 2018-08-07
CN108372279B CN108372279B (en) 2020-01-07

Family

ID=63032268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810328871.4A Active CN108372279B (en) 2018-04-13 2018-04-13 Method for measuring pouring allowance of tundish in continuous casting pouring process

Country Status (1)

Country Link
CN (1) CN108372279B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113523217A (en) * 2020-04-21 2021-10-22 上海梅山钢铁股份有限公司 Method for calibrating continuous casting ladle scale and tundish scale
CN114769543A (en) * 2022-04-19 2022-07-22 重庆钢铁股份有限公司 Method for observing liquid level height of tundish

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55117548A (en) * 1979-03-05 1980-09-09 Nippon Kokan Kk <Nkk> Preventing method for molten slag effluence
EP0115258A1 (en) * 1982-12-06 1984-08-08 Studsvik Energiteknik AB Method and apparatus for measuring the remaining amount of metal melt at the bottom of a container
JPS619966A (en) * 1984-06-27 1986-01-17 Kawasaki Steel Corp Estimating method of amount of molten steel remaining in ladle
JPS63252656A (en) * 1987-04-10 1988-10-19 Sumitomo Metal Ind Ltd Method for completing casting in continuous casting equipment
JPH079096A (en) * 1993-06-23 1995-01-13 Nippon Steel Corp Method for pouring molten metal at the end stage of ladle
JPH08224659A (en) * 1995-02-22 1996-09-03 Nippon Steel Corp Method for separating molten metal and slag
JPH1058120A (en) * 1996-06-14 1998-03-03 Hitachi Metals Ltd Method for automatically pouring molten metal and casting system
JPH10211559A (en) * 1997-01-28 1998-08-11 Nippon Steel Corp Method for continuously casting different kinds of steels and continuous caster suitable to continuous casting of different kinds of steels
JP2009072800A (en) * 2007-09-19 2009-04-09 Jfe Steel Kk Method for treating seam part slab in continuous casting of different steels
JP2010230564A (en) * 2009-03-27 2010-10-14 Nippon Steel Corp Method, device and program for estimation of heat flux on container inner surface
CN102019414A (en) * 2009-09-15 2011-04-20 鞍钢股份有限公司 Control method of steel cast ending
JP2013536087A (en) * 2010-08-30 2013-09-19 ヒュンダイ スチール カンパニー Method for predicting contamination range of molten steel when changing ladle
CN106041011A (en) * 2016-08-12 2016-10-26 湖南千盟物联信息技术有限公司 Implementation method of continuous casting intermediate ladle remaining steel model
CN206898332U (en) * 2017-06-26 2018-01-19 北京首钢股份有限公司 A kind of device for the remaining measurement of slab tundish casting

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55117548A (en) * 1979-03-05 1980-09-09 Nippon Kokan Kk <Nkk> Preventing method for molten slag effluence
EP0115258A1 (en) * 1982-12-06 1984-08-08 Studsvik Energiteknik AB Method and apparatus for measuring the remaining amount of metal melt at the bottom of a container
JPS619966A (en) * 1984-06-27 1986-01-17 Kawasaki Steel Corp Estimating method of amount of molten steel remaining in ladle
JPS63252656A (en) * 1987-04-10 1988-10-19 Sumitomo Metal Ind Ltd Method for completing casting in continuous casting equipment
JPH079096A (en) * 1993-06-23 1995-01-13 Nippon Steel Corp Method for pouring molten metal at the end stage of ladle
JPH08224659A (en) * 1995-02-22 1996-09-03 Nippon Steel Corp Method for separating molten metal and slag
JPH1058120A (en) * 1996-06-14 1998-03-03 Hitachi Metals Ltd Method for automatically pouring molten metal and casting system
JPH10211559A (en) * 1997-01-28 1998-08-11 Nippon Steel Corp Method for continuously casting different kinds of steels and continuous caster suitable to continuous casting of different kinds of steels
JP2009072800A (en) * 2007-09-19 2009-04-09 Jfe Steel Kk Method for treating seam part slab in continuous casting of different steels
JP2010230564A (en) * 2009-03-27 2010-10-14 Nippon Steel Corp Method, device and program for estimation of heat flux on container inner surface
CN102019414A (en) * 2009-09-15 2011-04-20 鞍钢股份有限公司 Control method of steel cast ending
JP2013536087A (en) * 2010-08-30 2013-09-19 ヒュンダイ スチール カンパニー Method for predicting contamination range of molten steel when changing ladle
CN106041011A (en) * 2016-08-12 2016-10-26 湖南千盟物联信息技术有限公司 Implementation method of continuous casting intermediate ladle remaining steel model
CN206898332U (en) * 2017-06-26 2018-01-19 北京首钢股份有限公司 A kind of device for the remaining measurement of slab tundish casting

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113523217A (en) * 2020-04-21 2021-10-22 上海梅山钢铁股份有限公司 Method for calibrating continuous casting ladle scale and tundish scale
CN113523217B (en) * 2020-04-21 2022-09-06 上海梅山钢铁股份有限公司 Method for calibrating continuous casting ladle scale and tundish scale
CN114769543A (en) * 2022-04-19 2022-07-22 重庆钢铁股份有限公司 Method for observing liquid level height of tundish

Also Published As

Publication number Publication date
CN108372279B (en) 2020-01-07

Similar Documents

Publication Publication Date Title
JP6472899B2 (en) Method of managing casting mold data and molten metal state data in casting equipment and casting equipment
CN108372279A (en) A kind of continuous casting process tundish pours the measurement method of surplus
CN105215310A (en) A kind of method that big cross section Properties of Heavy Rail Steel strand center porosity controls
CN102717039A (en) Automatic plate blank continuous casting machine tundish pouring method and automatic pouring system
CN206966634U (en) A kind of improved ladle upper nozzle brick cup
CN104936726B (en) Test specimen acquisition method, test specimen data managing method and test specimen model
CN109153071A (en) The information display system of Casting Equipment
CN106077494A (en) A kind of pouring procedure casting VHP main beating cap
CN1631579A (en) Visible casting method
CN107552752A (en) Large section Properties of Heavy Rail Steel green shell steady quality control method
CN106202809B (en) A kind of Optimization Prediction method for simulating cast iron sand casting casting cycle
CN107812907A (en) Large section Properties of Heavy Rail Steel green shell method of quality control
CN203484651U (en) Continuous casting steel liquid ladle low in vortex and high in molten steel yield
TW201840377A (en) System for detecting causes of abnormalities in plurality of devices constituting casting equipment
CN108515156A (en) A kind of continuous casting process is big to wrap the measurement method for pouring surplus
CN112387946A (en) Device and method for continuous casting of small square billets
CN107824756A (en) Steel control method more than a kind of slab caster tundish based on continuous temperature measurement
CN203900408U (en) Diversion disc
CN201931063U (en) Device for measuring immersed depth of slab continuous casting nozzle and thickness of casting powder melt cinder
CN109084874A (en) A kind of molten iron quantitative loading system and molten iron quantitative loading method
CN106424575A (en) Pouring system with slag collecting grooves
CN204035492U (en) A kind of checkout gear of ladle roughing slag
CN108555274A (en) Hot Metal in Beam Blank tundish quick change method
CN204621063U (en) A kind of steel ingot quiet pouring platform
CN107737899A (en) Large section Properties of Heavy Rail Steel continuous casting producing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant