Prior art keywords
stage
wall
construction
sections
slot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810180721.3A
Other languages
Chinese (zh)
Inventor
张绪杰
胡宏飚
孔锴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BCEG Civil Engineering Co Ltd
Original Assignee
BCEG Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BCEG Civil Engineering Co Ltd filed Critical BCEG Civil Engineering Co Ltd
Priority to CN201810180721.3A priority Critical patent/CN108360530A/en
Publication of CN108360530A publication Critical patent/CN108360530A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses diaphram wall blank wall section construction technologies at a kind of subway station transfer node, include multiple phase slot sections and multiple the second stage of slot sections with first stage construction, the method excavated using interval skip when construction, the slot section concreting of one phase is to ground, B sections of steel reinforcement cages are hung by steel reinforcement cage hanging steel bar in the second stage of slot section, and concrete is poured into a mould to the elevation location at standard paragraphs foundation pit bottom, upper part is at empty slot, rubble earthen backfill empty slot part is used after concrete initial set, by the second stage of slot section wall is uniformly crushed to standard paragraphs foundation pit bottom when later stage earth excavation.Concrete perfusion is to ground when phase slot section construction of the invention, it can play a supporting role to the grooving cavity of the second stage of slot section, reduce soil at both sides to deform into cavity, the second stage of upper ends slot section Di Qiang empty slot part backfills gravelly soil to ground, also visual field condition is adjusted flexibly the breadth of a phase slot section and the second stage of slot section simultaneously, reduce duration and cost, improves construction efficiency.

Description

Diaphram wall blank wall section construction technology at a kind of subway station transfer node
Technical field
The invention belongs to the realm of building construction, and in particular to diaphram wall blank wall section at a kind of subway station transfer node Construction technology.
Background technology
Country's metro station construction is most of at present or uses cut and cover method, and foundation pit enclosure structure is mainly diaphram wall Support pattern.As subway station circuit increases, it is more and more that station circuit changes to crossover node.Station transfer node section is general With station standard paragraphs foundation pit with foundation pit synchronous construction considers by their entirety in depth bounds, base in first construction reference section depth bounds Hole, then pit under transfer node section of constructing.The elongated setting of ground-connecting-wall building enclosure at transfer node, in Excavation Process with It digs with transfer node standard paragraphs bottom plate above section ground-connecting-wall is cut, pit ground-connecting-wall, which is used as, only under reservation transfer node section goes along with sb. to guard him Structure, construction in later period station agent structure.The common diaphram wall upper end blank wall construction in subway station at present includes following step Suddenly:1)Wall is led in construction;2)Ground-connecting-wall grooving;3)Lift steel reinforcement cage and locking notch pipe;4)Conduit, borehole cleaning, concrete perfusion are installed extremely Ground;5)Locking notch pipe is gradually extracted, that is, completes the ground wall construction of a groove segment;6)According to certain sequence construction remaining slot section even Wall, construction method is the same as step 1)To 5);7)By blank wall section wall is uniformly crushed to standard paragraphs foundation pit bottom when later stage earth excavation Place.This construction technology not only waste of resource but also had influenced the duration, increases construction cost, reduces construction efficiency.
Invention content
To solve the above problems, the object of the present invention is to provide diaphram wall blank walls at a kind of subway station transfer node Section construction technology, improves construction efficiency, reduces cost, the ground wall that can reduce by more than half picks chisel amount.
System is informed to realize above-mentioned technical purpose and the technique effect, the present invention passes through following technology by sample treatment plant Scheme is realized:
Diaphram wall blank wall section construction technology at a kind of subway station transfer node, includes the following steps:
1)Wall is led in construction, for carrying engineering machinery and bank protection;
2)Ground-connecting-wall grooving is carried out using chute forming machine, mud off is used when grooving, includes multiple phase slot sections with first stage construction The method excavated using interval skip with multiple the second stage of slot sections, when construction, an adjacent phase slot section two-by-two pass through spaced apart, phase It is the second stage of slot section in the adjacent spacing that a phase slot section separates two-by-two;
3)It constructs a phase slot section, lifts A sections of steel reinforcement cages and locking notch pipe;
4)Conduit, borehole cleaning are installed, A sections of steel reinforcement cage both sides set H profile steel conduct and first open width, concreting to ground;
5)Locking notch pipe is gradually extracted, that is, completes the ground wall construction of a phase slot section, for completed A sections wall wall;
6)The construction of remaining all phase slot sections is carried out, construction method is the same as step 1)To 5);
7)The construction for carrying out the second stage of slot section, by step 1)With 2)Afterwards, chute forming machine is oriented to grooving along H profile steel, in the second stage of slot section B sections of steel reinforcement cages are hung by steel reinforcement cage hanging steel bar, and pour into a mould concrete to the elevation location at standard paragraphs foundation pit bottom, upper part is not poured It builds, forms empty slot, rubble earthen backfill empty slot part, the as completed wall wall of the ground B sections of are used after concrete initial set;
8)The construction of remaining all the second stage of slot sections is carried out, construction method is the same as step 7);
9)By the second stage of slot section wall is uniformly crushed to standard paragraphs foundation pit bottom when later stage earth excavation.
Further, the width of the phase slot section is the width that chute forming machine grab bucket one is grabbed, the width of the second phase slot section The width grabbed for chute forming machine grab bucket two to three.
Further, after the adjacent phase slot section concrete intensity described two-by-two reaches 70%, the second phase in its spacing Slot section can construct.
Further, the height of the A sections of steel reinforcement cage is more than the height of the B sections of steel reinforcement cage.
Further, the locking notch pipe is two groups, is divided into positioned at the both sides of the A sections of reinforcing bar.
The beneficial effects of the invention are as follows:
Concrete perfusion can play a supporting role to the grooving cavity of the second stage of slot section to ground when phase slot section construction of the invention, Reduce soil at both sides to deform into cavity, while condition can be provided for the mud off grooving of the second stage of slot section;
The second phase upper ends slot section Di Qiang empty slot part of the invention backfills gravelly soil to ground, while the width of a phase slot section and the second stage of slot section Wide also visual field condition is adjusted flexibly, and the width of a phase slot section is suitably reduced, the second stage of slot section width suitably increases, and can reduce Filling concrete amount, at the same can also reduce later stage broken the second stage of slot section blank wall section when it is a greater part of pick chisel amount, reduce the duration and Cost improves construction efficiency.
Above description is only the general introduction of technical solution of the present invention, in order to better understand the technical means of the present invention, And can be implemented in accordance with the contents of the specification, below with presently preferred embodiments of the present invention and after coordinating attached drawing to be described in detail such as. The specific implementation mode of the present invention is shown in detail by following embodiment and its attached drawing.
Description of the drawings
Fig. 1 is the construction floor map of the present invention;
Fig. 2 is the sequence of construction schematic diagram of the present invention;
Fig. 3 is the work progress figure of the phase slot section of the present invention;
Fig. 4 is the work progress figure of the second stage of slot section of the present invention;
Fig. 5 is that schematic diagram is completed in the construction of the present invention.
Figure label explanation:
1, locking notch pipe;2, A sections of steel reinforcement cages;3, B sections of steel reinforcement cages;4, H profile steel;5, steel reinforcement cage hanging steel bar;6, the completed ground A sections of wall wall Body;7, the completed ground B sections of wall wall, 8, gravelly soil.
Specific implementation mode
It is below with reference to the accompanying drawings and in conjunction with the embodiments, next that the present invention will be described in detail.
Shown in Fig. 1, Fig. 2, diaphram wall blank wall section construction technology at a kind of subway station transfer node, including such as Lower step:
1)Wall is led in construction, for carrying engineering machinery and bank protection;
2)Ground-connecting-wall grooving is carried out using chute forming machine, mud off is used when grooving, includes multiple phase slot sections with first stage construction The method excavated using interval skip with multiple the second stage of slot sections, when construction, an adjacent phase slot section two-by-two pass through spaced apart, phase It is the second stage of slot section in the adjacent spacing that a phase slot section separates two-by-two;
3)Shown in Figure 3, a phase slot section of constructing lifts A sections of steel reinforcement cages 2 and locking notch pipe 1;
4)Conduit, borehole cleaning are installed, A sections of 2 both sides of steel reinforcement cage set the conduct of H profile steel 4 and first open width, concreting to ground;
5)Locking notch pipe 1 is gradually extracted, that is, completes the ground wall construction of a phase slot section, for completed A sections wall wall 6;
6)The construction of remaining all phase slot sections is carried out, construction method is the same as step 1)To 5), wherein A1, A2, A3, A4 slot Duan Weiyi phase slot sections;
7)It is shown in Figure 4, the construction of the second stage of slot section is carried out, by step 1)With 2)Afterwards, chute forming machine is oriented to grooving along H profile steel 4, B sections of steel reinforcement cages 3 are hung by steel reinforcement cage hanging steel bar 5 in the second stage of slot section, and pour into a mould concrete to the absolute altitude position at standard paragraphs foundation pit bottom It sets, upper part does not pour, and forms empty slot, and empty slot part, as completed B are backfilled with gravelly soil 8 after concrete initial set Section ground wall wall 7;
8)The construction of remaining all the second stage of slot sections is carried out, construction method is the same as step 7), wherein B1, B2, B3 slot section are the second phase Slot section;
9)Shown in Figure 5, by the second stage of slot section wall is uniformly crushed to standard paragraphs foundation pit bottom when later stage earth excavation.
Further, the width of the phase slot section is the width that chute forming machine grab bucket one is grabbed, the width of the second phase slot section The width grabbed for chute forming machine grab bucket two to three.
Further, after the adjacent phase slot section concrete intensity described two-by-two reaches 70%, the second phase in its spacing Slot section can construct.
Further, the height of the A sections of steel reinforcement cage 2 is more than the height of the B sections of steel reinforcement cage 3.
Further, the locking notch pipe 1 is two groups, is divided into positioned at the both sides of the A sections of reinforcing bar 2.
The foregoing is merely the preferred embodiments of invention, are not intended to restrict the invention, for the technology of this field For personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, any made by repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (5)

1. diaphram wall blank wall section construction technology at a kind of subway station transfer node, which is characterized in that include the following steps:
1)Wall is led in construction, for carrying engineering machinery and bank protection;
2)Ground-connecting-wall grooving is carried out using chute forming machine, mud off is used when grooving, includes multiple phase slot sections with first stage construction The method excavated using interval skip with multiple the second stage of slot sections, when construction, an adjacent phase slot section two-by-two pass through spaced apart, phase It is the second stage of slot section in the adjacent spacing that a phase slot section separates two-by-two;
3)It constructs a phase slot section, lifts A sections of steel reinforcement cages(2)And locking notch pipe(1);
4)Conduit, borehole cleaning, A sections of steel reinforcement cages are installed(2)Both sides set H profile steel(4)As first opening width, concreting to ground;
5)Gradually extract locking notch pipe(1), that is, the ground wall construction of a phase slot section is completed, for completed A sections wall wall(6);
6)The construction of remaining all phase slot sections is carried out, construction method is the same as step 1)To 5);
7)The construction for carrying out the second stage of slot section, by step 1)With 2)Afterwards, chute forming machine is along H profile steel(4)It is oriented to grooving, in the second stage of slot section Inside pass through steel reinforcement cage hanging steel bar(5)Hang B sections of steel reinforcement cages(3), and concrete is poured into a mould to the elevation location at standard paragraphs foundation pit bottom, upper end Part does not pour, and forms empty slot, gravelly soil is used after concrete initial set(8)Empty slot part is backfilled, the as completed wall of the ground B sections of Wall(7);
8)The construction of remaining all the second stage of slot sections is carried out, construction method is the same as step 7);
9)By the second stage of slot section wall is uniformly crushed to standard paragraphs foundation pit bottom when later stage earth excavation.
2. diaphram wall blank wall section construction technology, feature exist at subway station transfer node according to claim 1 In:The width of the one phase slot section is the width that chute forming machine grab bucket one is grabbed, and the width of the second phase slot section is chute forming machine grab bucket two The width grabbed to three.
3. diaphram wall blank wall section construction technology, feature exist at subway station transfer node according to claim 1 In:After the adjacent phase slot section concrete intensity described two-by-two reaches 70%, the second stage of slot section in its spacing can construct.
4. diaphram wall blank wall section construction technology, feature exist at subway station transfer node according to claim 1 In:The A sections of steel reinforcement cage(2)Height be more than the B sections of steel reinforcement cage(3)Height.
5. diaphram wall blank wall section construction technology, feature exist at subway station transfer node according to claim 1 In:The locking notch pipe(1)It is two groups, is divided into positioned at the A sections of steel reinforcement cage(2)Both sides.
CN201810180721.3A 2018-03-05 2018-03-05 Diaphram wall blank wall section construction technology at a kind of subway station transfer node Pending CN108360530A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810180721.3A CN108360530A (en) 2018-03-05 2018-03-05 Diaphram wall blank wall section construction technology at a kind of subway station transfer node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810180721.3A CN108360530A (en) 2018-03-05 2018-03-05 Diaphram wall blank wall section construction technology at a kind of subway station transfer node

Publications (1)

Publication Number Publication Date
CN108360530A true CN108360530A (en) 2018-08-03

Family

ID=63003293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810180721.3A Pending CN108360530A (en) 2018-03-05 2018-03-05 Diaphram wall blank wall section construction technology at a kind of subway station transfer node

Country Status (1)

Country Link
CN (1) CN108360530A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109706950A (en) * 2018-12-11 2019-05-03 北京建工土木工程有限公司 The construction method of diaphram wall in a kind of tunnel
CN112502132A (en) * 2020-11-25 2021-03-16 中铁十四局集团第四工程有限公司 Filling structure and filling method for hollow wall section of underground continuous wall
CN114575332A (en) * 2022-04-18 2022-06-03 北京住总集团有限责任公司 Construction method of underground diaphragm wall at entrance and exit position

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060010372A (en) * 2004-07-28 2006-02-02 김경희 The wall panel construction method of having used a cast in place underground wall panel coupling device and this
CN102061710A (en) * 2010-10-29 2011-05-18 广东省基础工程公司 Diaphragm wall joint and manufacturing method of diaphragm wall
CN105970916A (en) * 2016-06-30 2016-09-28 中铁十八局集团第五工程有限公司 Construction method for plain concrete underground diaphragm wall of deep foundation pit
CN107178078A (en) * 2017-05-19 2017-09-19 中铁四局集团第二工程有限公司 Change to the intercept form block wall construction method of section half in subway station

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060010372A (en) * 2004-07-28 2006-02-02 김경희 The wall panel construction method of having used a cast in place underground wall panel coupling device and this
CN102061710A (en) * 2010-10-29 2011-05-18 广东省基础工程公司 Diaphragm wall joint and manufacturing method of diaphragm wall
CN105970916A (en) * 2016-06-30 2016-09-28 中铁十八局集团第五工程有限公司 Construction method for plain concrete underground diaphragm wall of deep foundation pit
CN107178078A (en) * 2017-05-19 2017-09-19 中铁四局集团第二工程有限公司 Change to the intercept form block wall construction method of section half in subway station

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109706950A (en) * 2018-12-11 2019-05-03 北京建工土木工程有限公司 The construction method of diaphram wall in a kind of tunnel
CN112502132A (en) * 2020-11-25 2021-03-16 中铁十四局集团第四工程有限公司 Filling structure and filling method for hollow wall section of underground continuous wall
CN114575332A (en) * 2022-04-18 2022-06-03 北京住总集团有限责任公司 Construction method of underground diaphragm wall at entrance and exit position

Similar Documents

Publication Publication Date Title
CN100591862C (en) Pit construction method adopting prefabricated support
CN106013053B (en) A kind of steel sheet pile construction method for supporting for being used to build underground garage open caisson
CN105804119A (en) Underground corridor structure with dual-purpose pile foundations and construction method of underground corridor structure
CN108360530A (en) Diaphram wall blank wall section construction technology at a kind of subway station transfer node
CN105672356B (en) A kind of municipal pipeline group's Underground Construction method of spanning over subway tunnel
CN105239578B (en) Water-rich sand layer deep foundation pit underwater construction method
CN109972623A (en) A kind of construction method and device carrying out pipeline suspension using Bailey beam
CN104131566B (en) A kind of basement is without the construction method of horizontal support foundation ditch
CN104184097B (en) Non-migration suspension protection system and method for communication pipes and cables
CN108842820A (en) A kind of subway station transfer node section foundation ditch construction method
CN102493487A (en) Method for constructing foundation slab embedded with concrete supports
CN108149696A (en) The composite supporting construction and construction method that a kind of gib soil nail wall is combined with permanent anti-float anchor rod
CN106884431A (en) One kind building pit foundation construction safety supporting construction
CN105926642A (en) Urban underground comprehensive pipe gallery foundation pit support and underground structure external mold integrated structure and construction method
CN108316314A (en) A kind of inner supporting structure for solving to cheat biasing problem in depth foundation pit
CN102493488A (en) Construction method for reverse beams and normal plates in foundation pit engineering
CN106906829A (en) A kind of horizontal soil body reinforcement means of subway open-cut foundation ditch
CN207633225U (en) The small spacing abutment constructing structure of neighbouring running railway line
CN106759383A (en) A kind of reverse construction short section borehole wall pouring structure and construction method
CN205502070U (en) A dual -purpose underground gallery structure
CN109797717A (en) The construction method for having subway tunnel is worn on a kind of river
CN213980794U (en) Shield construction working well that depth was arranged
CN215252932U (en) Deep foundation pit PC steel pipe combination Larsen steel sheet pile double row pile supporting system
CN205475323U (en) Municipal administration pipeline crowd stridees across underground structure in tunnel
CN210797573U (en) Underground structure internal transportation system based on under-board sliding groove

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhang Xujie

Inventor after: Hu Hongbiao

Inventor after: Kong Jie

Inventor after: Xu Xiaoyi

Inventor after: Liu Xiao

Inventor after: Zhang Jinlei

Inventor after: Li Cheng

Inventor before: Zhang Xujie

Inventor before: Hu Hongbiao

Inventor before: Kong Jie

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhang Xujie

Inventor after: Hu Hongbiao

Inventor after: Liu Xiao

Inventor after: Xu Xiaoyi

Inventor after: Kong Jie

Inventor after: Zhang Jinlei

Inventor after: Li Cheng

Inventor before: Zhang Xujie

Inventor before: Hu Hongbiao

Inventor before: Kong Jie

Inventor before: Xu Xiaoyi

Inventor before: Liu Xiao

Inventor before: Zhang Jinlei

Inventor before: Li Cheng

CB03 Change of inventor or designer information
RJ01 Rejection of invention patent application after publication

Application publication date: 20180803

RJ01 Rejection of invention patent application after publication