CN108360530A - Diaphram wall blank wall section construction technology at a kind of subway station transfer node - Google Patents
Diaphram wall blank wall section construction technology at a kind of subway station transfer node Download PDFInfo
- Publication number
- CN108360530A CN108360530A CN201810180721.3A CN201810180721A CN108360530A CN 108360530 A CN108360530 A CN 108360530A CN 201810180721 A CN201810180721 A CN 201810180721A CN 108360530 A CN108360530 A CN 108360530A
- Authority
- CN
- China
- Prior art keywords
- stage
- wall
- construction
- sections
- slot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/18—Bulkheads or similar walls made solely of concrete in situ
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810180721.3A CN108360530A (en) | 2018-03-05 | 2018-03-05 | Diaphram wall blank wall section construction technology at a kind of subway station transfer node |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810180721.3A CN108360530A (en) | 2018-03-05 | 2018-03-05 | Diaphram wall blank wall section construction technology at a kind of subway station transfer node |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108360530A true CN108360530A (en) | 2018-08-03 |
Family
ID=63003293
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810180721.3A Pending CN108360530A (en) | 2018-03-05 | 2018-03-05 | Diaphram wall blank wall section construction technology at a kind of subway station transfer node |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108360530A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109706950A (en) * | 2018-12-11 | 2019-05-03 | 北京建工土木工程有限公司 | The construction method of diaphram wall in a kind of tunnel |
CN112502132A (en) * | 2020-11-25 | 2021-03-16 | 中铁十四局集团第四工程有限公司 | Filling structure and filling method for hollow wall section of underground continuous wall |
CN114575332A (en) * | 2022-04-18 | 2022-06-03 | 北京住总集团有限责任公司 | Construction method of underground diaphragm wall at entrance and exit position |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060010372A (en) * | 2004-07-28 | 2006-02-02 | 김경희 | The wall panel construction method of having used a cast in place underground wall panel coupling device and this |
CN102061710A (en) * | 2010-10-29 | 2011-05-18 | 广东省基础工程公司 | Diaphragm wall joint and manufacturing method of diaphragm wall |
CN105970916A (en) * | 2016-06-30 | 2016-09-28 | 中铁十八局集团第五工程有限公司 | Construction method for plain concrete underground diaphragm wall of deep foundation pit |
CN107178078A (en) * | 2017-05-19 | 2017-09-19 | 中铁四局集团第二工程有限公司 | Change to the intercept form block wall construction method of section half in subway station |
-
2018
- 2018-03-05 CN CN201810180721.3A patent/CN108360530A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060010372A (en) * | 2004-07-28 | 2006-02-02 | 김경희 | The wall panel construction method of having used a cast in place underground wall panel coupling device and this |
CN102061710A (en) * | 2010-10-29 | 2011-05-18 | 广东省基础工程公司 | Diaphragm wall joint and manufacturing method of diaphragm wall |
CN105970916A (en) * | 2016-06-30 | 2016-09-28 | 中铁十八局集团第五工程有限公司 | Construction method for plain concrete underground diaphragm wall of deep foundation pit |
CN107178078A (en) * | 2017-05-19 | 2017-09-19 | 中铁四局集团第二工程有限公司 | Change to the intercept form block wall construction method of section half in subway station |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109706950A (en) * | 2018-12-11 | 2019-05-03 | 北京建工土木工程有限公司 | The construction method of diaphram wall in a kind of tunnel |
CN112502132A (en) * | 2020-11-25 | 2021-03-16 | 中铁十四局集团第四工程有限公司 | Filling structure and filling method for hollow wall section of underground continuous wall |
CN114575332A (en) * | 2022-04-18 | 2022-06-03 | 北京住总集团有限责任公司 | Construction method of underground diaphragm wall at entrance and exit position |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100591862C (en) | Pit construction method adopting prefabricated support | |
CN106013053B (en) | A kind of steel sheet pile construction method for supporting for being used to build underground garage open caisson | |
CN105804119A (en) | Underground corridor structure with dual-purpose pile foundations and construction method of underground corridor structure | |
CN108360530A (en) | Diaphram wall blank wall section construction technology at a kind of subway station transfer node | |
CN105672356B (en) | A kind of municipal pipeline group's Underground Construction method of spanning over subway tunnel | |
CN105239578B (en) | Water-rich sand layer deep foundation pit underwater construction method | |
CN109972623A (en) | A kind of construction method and device carrying out pipeline suspension using Bailey beam | |
CN104131566B (en) | A kind of basement is without the construction method of horizontal support foundation ditch | |
CN104184097B (en) | Non-migration suspension protection system and method for communication pipes and cables | |
CN108842820A (en) | A kind of subway station transfer node section foundation ditch construction method | |
CN102493487A (en) | Method for constructing foundation slab embedded with concrete supports | |
CN108149696A (en) | The composite supporting construction and construction method that a kind of gib soil nail wall is combined with permanent anti-float anchor rod | |
CN106884431A (en) | One kind building pit foundation construction safety supporting construction | |
CN105926642A (en) | Urban underground comprehensive pipe gallery foundation pit support and underground structure external mold integrated structure and construction method | |
CN108316314A (en) | A kind of inner supporting structure for solving to cheat biasing problem in depth foundation pit | |
CN102493488A (en) | Construction method for reverse beams and normal plates in foundation pit engineering | |
CN106906829A (en) | A kind of horizontal soil body reinforcement means of subway open-cut foundation ditch | |
CN207633225U (en) | The small spacing abutment constructing structure of neighbouring running railway line | |
CN106759383A (en) | A kind of reverse construction short section borehole wall pouring structure and construction method | |
CN205502070U (en) | A dual -purpose underground gallery structure | |
CN109797717A (en) | The construction method for having subway tunnel is worn on a kind of river | |
CN213980794U (en) | Shield construction working well that depth was arranged | |
CN215252932U (en) | Deep foundation pit PC steel pipe combination Larsen steel sheet pile double row pile supporting system | |
CN205475323U (en) | Municipal administration pipeline crowd stridees across underground structure in tunnel | |
CN210797573U (en) | Underground structure internal transportation system based on under-board sliding groove |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhang Xujie Inventor after: Hu Hongbiao Inventor after: Kong Jie Inventor after: Xu Xiaoyi Inventor after: Liu Xiao Inventor after: Zhang Jinlei Inventor after: Li Cheng Inventor before: Zhang Xujie Inventor before: Hu Hongbiao Inventor before: Kong Jie |
|
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhang Xujie Inventor after: Hu Hongbiao Inventor after: Liu Xiao Inventor after: Xu Xiaoyi Inventor after: Kong Jie Inventor after: Zhang Jinlei Inventor after: Li Cheng Inventor before: Zhang Xujie Inventor before: Hu Hongbiao Inventor before: Kong Jie Inventor before: Xu Xiaoyi Inventor before: Liu Xiao Inventor before: Zhang Jinlei Inventor before: Li Cheng |
|
CB03 | Change of inventor or designer information | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180803 |
|
RJ01 | Rejection of invention patent application after publication |