CN108343187A - A kind of ceiling construction process based on plasterboard - Google Patents

A kind of ceiling construction process based on plasterboard Download PDF

Info

Publication number
CN108343187A
CN108343187A CN201810085036.2A CN201810085036A CN108343187A CN 108343187 A CN108343187 A CN 108343187A CN 201810085036 A CN201810085036 A CN 201810085036A CN 108343187 A CN108343187 A CN 108343187A
Authority
CN
China
Prior art keywords
plasterboard
ceiling
fixed
keel
lightgage steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810085036.2A
Other languages
Chinese (zh)
Inventor
罗遂康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810085036.2A priority Critical patent/CN108343187A/en
Publication of CN108343187A publication Critical patent/CN108343187A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/04Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The present invention relates to building fields, and in particular to ceiling construction process.A kind of ceiling construction process based on plasterboard, includes the following steps:Step 1 draws plaster tablet suspended ceiling figure;Step 2, decomposing gypsum plate furred ceiling figure;Step 3 cuts plasterboard;Step 4, plasterboard sizing;Step 5, installation of ceiling.The present invention passes through this construction technology, pass sequentially through draw plaster tablet suspended ceiling figure, decomposing gypsum plate furred ceiling figure, cut plasterboard, plasterboard sizing, installation of ceiling and etc. operation difficulty when reducing ceiling construction, reduce the somatic damage to staff, improves construction efficiency and construction effect.

Description

A kind of ceiling construction process based on plasterboard
Technical field
The present invention relates to building fields, and in particular, to ceiling construction process.
Background technology
During the decoration of existing building, it is the step during relatively conventional decoration using plaster tablet suspended ceiling, passes The construction technology of system be successively by bullet ceiling horizontal line, installation main joist, installation secondary joist, brush antirust paint and fireproof coating, Install plasterboard, facing cleaning and etc. composition, however in traditional work progress, staff need to directly exist by staircase Ceiling, roof construction, staff need to come back, bend over for a long time when construction, will produce on body to staff Damage and reduce construction efficiency and construction effect.
Invention content
The object of the present invention is to provide a kind of ceiling construction process based on plasterboard, to solve above-mentioned at least one skill Art problem.
In order to achieve the above object, the present invention uses following technical proposals:
A kind of ceiling construction process based on plasterboard, which is characterized in that include the following steps:
Step 1 draws plaster tablet suspended ceiling figure, according to construction site structure determination plaster tablet suspended ceiling pattern, draws plaster tablet suspended ceiling Drawing;
Step 2, decomposing gypsum plate furred ceiling figure are broken down at least one according to the structure drawn in plaster tablet suspended ceiling figure Plate;
Step 3 cuts plasterboard, and plasterboard is cut according to the plate that plaster tablet suspended ceiling figure decomposes;
Step 4, plasterboard sizing, the plasterboard after cutting is screwed to lightgage steel joist;
Lightgage steel joist equipped with plasterboard is transported to construction site and is installed by step 5, installation of ceiling.
In the step 5, the structure drawn for plaster tablet suspended ceiling figure is non-when being rectangle, and installs at the construction field (site) When, absolute altitude is first fixed, keelson is fixed on wall, will then push up on keel installation to ceiling, and be set on the keelson There is card slot, the lightgage steel joist for being equipped with plasterboard is caught in using the card slot in the keelson, then lightgage steel joist is fixed Onto the top keel, plasterboard riser is fixed on lightgage steel joist using screw, to be fixed on the gypsum on lightgage steel joist Plasterboard tablet is finally screwed by plate as plasterboard tablet with keelson.
In the step 5, when being rectangle for the structure that plaster tablet suspended ceiling figure is drawn, when installing at the construction field (site), Absolute altitude is first fixed, plasterboard riser is fixed on wall using screw;
Keelson is fixed on wall, will then be pushed up on keel installation to ceiling, on the keelson, the top keel Equipped with card slot, then the lightgage steel joist for being equipped with plasterboard is caught in using the card slot in the keelson, then will be equipped with The lightgage steel joist of plasterboard is snapped onto using card slot in the top keel, using the plasterboard that is fixed on lightgage steel joist as flat Plate, the tablet are fixed on by bayonet lock on the riser.
In the step 4, plasterboard is placed on operation console, the lightgage steel joist includes false keel, corner joist, lamp False keel and corner joist or light trough are attached with keel using component by slot keel, followed by screw by the stone Cream plate is fixed on the false keel equipped with corner joist or light trough keel.When the gypsum plate thickness is 0.95cm, phase Spacing between adjacent two false keels is 30cm.When the gypsum plate thickness is 1.2cm, the spacing between adjacent two false keels For 40cm.
The component is using component made of galvanized sheet.
In the step 4, the screw use plasterboard full dog point socket set, the plasterboard full dog point socket set include a nut, One screw rod, one end of the screw rod are fixed on the middle part of the nut, and the other end of the screw rod is in coniform;
The screw rod is equipped with external screw thread, and the external screw thread is positioned close to one end to the institute of the screw rod of the nut side It states at 2/3rds length of screw rod, the externally threaded width is not less than 0.2cm.
The nut is equipped with a hole for injecting glue, the hollow cavity that the hole for injecting glue connection one is arranged in the screw rod, far from institute The one end for stating the screw rod at nut is equipped with a gum outlet, and the gum outlet is connected to the hollow cavity.
The present invention is passed sequentially through by this construction technology and is drawn plaster tablet suspended ceiling figure, decomposing gypsum plate furred ceiling figure, cuts stone Cream plate, plasterboard sizing, installation of ceiling and etc. operation difficulty when reducing ceiling construction, reduce the body to staff Bulk damage improves construction efficiency and construction effect.
Description of the drawings
Fig. 1 is the part-structure schematic diagram of the present invention.
Specific implementation mode
The specific implementation mode of the present invention is further described below in conjunction with attached drawing.
As shown in Figure 1, a kind of ceiling construction process based on plasterboard, includes the following steps:Step 1 draws plasterboard Furred ceiling figure according to construction site structure determination plaster tablet suspended ceiling pattern, draws plaster tablet suspended ceiling drawing;Step 2, decomposing gypsum Plate furred ceiling figure is broken down at least one plate according to the structure drawn in plaster tablet suspended ceiling figure;Step 3 cuts gypsum Plate cuts plasterboard according to the plate that plaster tablet suspended ceiling figure decomposes;Step 4, plasterboard sizing, the plasterboard after cutting is led to Screw is crossed to be fixed on lightgage steel joist;Step 5, installation of ceiling transport the lightgage steel joist equipped with plasterboard to construction site simultaneously It is installed.The present invention is passed sequentially through by this construction technology and is drawn plaster tablet suspended ceiling figure, decomposing gypsum plate furred ceiling figure, cut Plasterboard, plasterboard sizing, installation of ceiling and etc. operation difficulty when reducing ceiling construction, reduce to staff's Somatic damage improves construction efficiency and construction effect.
In step 5, the structure drawn for plaster tablet suspended ceiling figure is non-when being rectangle, when installing at the construction field (site), first Absolute altitude is fixed, keelson 4 is fixed on wall, will then be pushed up on keel installation to ceiling, keelson is equipped with card slot, will The lightgage steel joist for being equipped with plasterboard is caught in using card slot in keelson, then lightgage steel joist is fixed on the top keel, profit Plasterboard riser is fixed on lightgage steel joist with screw, using the plasterboard that is fixed on lightgage steel joist as plasterboard tablet, Finally plasterboard tablet is screwed with keelson.For irregular furred ceiling shape, tablet installation is first carried out, then install The plasterboard riser of side wall is installed, i.e., first carries out level-one furred ceiling and carry out two level furred ceiling again, this scheme construction efficiency is higher.
It is first fixed when installing at the construction field (site) when being rectangle for the structure that plaster tablet suspended ceiling figure is drawn in step 5 Plasterboard riser is fixed on wall by lower absolute altitude using screw;Keelson 4 is fixed on wall, it then will top keel peace It is filled on ceiling, is equipped with card slot on keelson, top keel, the lightgage steel joist for being equipped with plasterboard is then utilized into card slot card Enter in keelson, then the lightgage steel joist for being equipped with plasterboard is snapped onto using card slot in the keel of top, to be fixed on lightgage steel joist On plasterboard as tablet, tablet is fixed on by bayonet lock on riser.For more regular furred ceiling shape, for example rectangular The furred ceilings such as shape, square, triangle, diamond shape first carry out plasterboard riser installation, and plasterboard riser is not fixed extremely when mounted, It allows it to there is certain shaking, convenient for subsequently carrying out tablet installation again, after tablet is installed, recycles bayonet lock to be completely fixed, this scheme Construction efficiency is higher.
In step 4, plasterboard 1 is placed on operation console, lightgage steel joist includes false keel 2, corner joist 3, light trough dragon False keel and corner joist or light trough are attached with keel using component by bone, are fixed to plasterboard followed by screw On false keel equipped with corner joist or light trough keel.When gypsum plate thickness is 0.95cm, between adjacent two false keels Spacing is 30cm.When gypsum plate thickness is 1.2cm, the spacing between adjacent two false keels is 40cm.Convenient for ensureing enough Convenience when secured intensity and installation, improves installation effectiveness.Plasterboard is placed on operation console, by false keel and corner joist Or light trough is attached with keel with component, is screwed on plasterboard, the false keel of wherein side stays half, corner dragon Bone or light trough stay 5cm to extend out with keel, in order to fix the second block gypsum plate.Other side plasterboard stays 10cm in order to solid Fixed previous block gypsum plate.
Component is using component made of galvanized sheet.Ensure bonding strength, antirust.
In step 4, it includes a nut, a screw rod, screw rod that screw, which uses plasterboard full dog point socket set, plasterboard full dog point socket set, One end be fixed on the middle part of nut, the other end of screw rod is in coniform;Screw rod is equipped with external screw thread, and external screw thread is positioned close to At one end of the screw rod of nut side to 2/3rds length of screw rod, externally threaded width is not less than 0.2cm.Due to plasterboard Characteristic frangible, easy to crack, the screw of this structure can play the preferable bonding strength of plasterboard, improve when being screwed into plasterboard Practicability.Nut is equipped with a hole for injecting glue, and hole for injecting glue is connected to a hollow cavity being arranged in screw rod, and one of the screw rod at separate nut End is equipped with a gum outlet, and gum outlet is connected to hollow cavity.After screw is screwed into plasterboard, bonded adhesives is injected, keel is connected, carries Bonding strength is risen.
Although present disclosure is discussed in detail by above preferred embodiment, but it should be appreciated that above-mentioned Description is not considered as limitation of the present invention.After those skilled in the art have read the above, for the present invention's A variety of modifications and substitutions all will be apparent.Therefore, protection scope of the present invention should be limited to the appended claims.

Claims (9)

1. a kind of ceiling construction process based on plasterboard, which is characterized in that include the following steps:
Step 1 draws plaster tablet suspended ceiling figure, according to construction site structure determination plaster tablet suspended ceiling pattern, draws plaster tablet suspended ceiling Drawing;
Step 2, decomposing gypsum plate furred ceiling figure are broken down at least one according to the structure drawn in plaster tablet suspended ceiling figure Plate;
Step 3 cuts plasterboard, and plasterboard is cut according to the plate that plaster tablet suspended ceiling figure decomposes;
Step 4, plasterboard sizing, the plasterboard after cutting is screwed to lightgage steel joist;
Lightgage steel joist equipped with plasterboard is transported to construction site and is installed by step 5, installation of ceiling.
2. a kind of ceiling construction process based on plasterboard as described in claim 1, which is characterized in that in the step 5, The structure drawn for plaster tablet suspended ceiling figure is non-when being rectangle, and when installing at the construction field (site), absolute altitude is first fixed, by keelson Fixed on wall, will then push up on keel installation to ceiling, the keelson is equipped with card slot, will be equipped with plasterboard Lightgage steel joist is caught in using the card slot in the keelson, then lightgage steel joist is fixed on the top keel, utilizes screw Plasterboard riser is fixed on lightgage steel joist, the plasterboard to be fixed on lightgage steel joist finally will as plasterboard tablet Plasterboard tablet is screwed with keelson.
3. a kind of ceiling construction process based on plasterboard as described in claim 1, which is characterized in that in the step 5, When being rectangle for the structure that plaster tablet suspended ceiling figure is drawn, when installing at the construction field (site), absolute altitude is first fixed, it will using screw Plasterboard riser is fixed on wall;
Keelson is fixed on wall, will then be pushed up on keel installation to ceiling, on the keelson, the top keel Equipped with card slot, then the lightgage steel joist for being equipped with plasterboard is caught in using the card slot in the keelson, then will be equipped with The lightgage steel joist of plasterboard is snapped onto using card slot in the top keel, using the plasterboard that is fixed on lightgage steel joist as flat Plate, the tablet are fixed on by bayonet lock on the riser.
4. a kind of ceiling construction process based on plasterboard as described in claim 1, which is characterized in that in the step 4, Plasterboard is placed on operation console, the lightgage steel joist includes false keel, corner joist, light trough keel, by false keel and is turned Wall angle or light trough are attached with keel using component, are fixed to the plasterboard followed by screw and are equipped with corner joist Or on the false keel of light trough keel.
5. a kind of ceiling construction process based on plasterboard as claimed in claim 4, which is characterized in that the gypsum plate thickness For 0.95cm when, the spacing between adjacent two false keels is 30cm.
6. a kind of ceiling construction process based on plasterboard as claimed in claim 4, which is characterized in that the gypsum plate thickness For 1.2cm when, the spacing between adjacent two false keels is 40cm.
7. a kind of ceiling construction process based on plasterboard as claimed in claim 4, which is characterized in that the component is using plating Component made of zine plate.
8. a kind of ceiling construction process based on plasterboard as described in claim 1, which is characterized in that in the step 4, It includes a nut, a screw rod, one end of the screw rod that the screw, which uses plasterboard full dog point socket set, the plasterboard full dog point socket set, It is fixed on the middle part of the nut, the other end of the screw rod is in coniform;
The screw rod is equipped with external screw thread, and the external screw thread is positioned close to one end to the institute of the screw rod of the nut side It states at 2/3rds length of screw rod, the externally threaded width is not less than 0.2cm.
9. a kind of ceiling construction process based on plasterboard as claimed in claim 8, which is characterized in that the nut is equipped with one Hole for injecting glue, the hollow cavity that the hole for injecting glue connection one is arranged in the screw rod, one far from the screw rod at the nut End is equipped with a gum outlet, and the gum outlet is connected to the hollow cavity.
CN201810085036.2A 2018-01-29 2018-01-29 A kind of ceiling construction process based on plasterboard Pending CN108343187A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810085036.2A CN108343187A (en) 2018-01-29 2018-01-29 A kind of ceiling construction process based on plasterboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810085036.2A CN108343187A (en) 2018-01-29 2018-01-29 A kind of ceiling construction process based on plasterboard

Publications (1)

Publication Number Publication Date
CN108343187A true CN108343187A (en) 2018-07-31

Family

ID=62961638

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810085036.2A Pending CN108343187A (en) 2018-01-29 2018-01-29 A kind of ceiling construction process based on plasterboard

Country Status (1)

Country Link
CN (1) CN108343187A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821373A (en) * 2014-02-28 2014-05-28 四川雅豪房地产开发有限公司 Ceiling hanging construction technology of light steel keel gypsum boards
CN204456575U (en) * 2015-01-28 2015-07-08 寻杰 Split module plaster tablet suspended ceiling
CN206545311U (en) * 2017-01-22 2017-10-10 青岛集好建筑科技有限公司 A kind of clamping connection facade adjustment structure and ceiling device
CN206554358U (en) * 2017-03-10 2017-10-13 青岛有住信息技术有限公司 Top surface sheet material hoisting structure
CN107587643A (en) * 2017-09-12 2018-01-16 浙江未来加电子商务有限公司 The ceiling structure of quick grafting assembling

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821373A (en) * 2014-02-28 2014-05-28 四川雅豪房地产开发有限公司 Ceiling hanging construction technology of light steel keel gypsum boards
CN204456575U (en) * 2015-01-28 2015-07-08 寻杰 Split module plaster tablet suspended ceiling
CN206545311U (en) * 2017-01-22 2017-10-10 青岛集好建筑科技有限公司 A kind of clamping connection facade adjustment structure and ceiling device
CN206554358U (en) * 2017-03-10 2017-10-13 青岛有住信息技术有限公司 Top surface sheet material hoisting structure
CN107587643A (en) * 2017-09-12 2018-01-16 浙江未来加电子商务有限公司 The ceiling structure of quick grafting assembling

Similar Documents

Publication Publication Date Title
CN103510631B (en) A kind of indoor sound insulation constructing structure and construction method thereof
CN106168067A (en) A kind of construction method of light steel keel partition
CN107035095A (en) A kind of metope integration installation structure
CN210177784U (en) Assembled adjustable large-block-plate suspended ceiling
CN101476361A (en) Inner partition plate system and its construction method
CN106567476B (en) The construction method of pre- crack resistence partition wall
CN109914661A (en) Dry-hang stone curtain wall construction method
CN106401024B (en) The partition wall of pre- crack resistence
CN108343187A (en) A kind of ceiling construction process based on plasterboard
CN103321448A (en) Construction process for reinforcing wall of building
CN207003900U (en) A kind of novel wall surface cladding panel structure
CN207405853U (en) Kitchen and toilet ceiling structure
CN206189711U (en) Prevent plasterboard suspended ceiling that ftractures
CN202227559U (en) Edging device for plasterboard furred ceiling
CN112726931A (en) Green construction method of light steel keel gypsum plasterboard
CN208415599U (en) A kind of sound-absorbing slab-wall structure
CN109610717A (en) A kind of installation method of W font furred ceiling keelson
CN212224366U (en) Special-shaped keel ceiling lamp groove
CN205876045U (en) Indoorly prevent that fire door fixed knot constructs
CN102296827A (en) Mounting method of light-weight partition wall board
CN202577581U (en) Precast floor-free self-support modular unit
CN206397069U (en) A kind of Fast Installation structure of two grades of furred ceiling corners lines
CN109750784B (en) Lamp slot ceiling right angle module for preventing lamp slot right angle cracking and construction method
CN211114334U (en) Blue or green brick furred ceiling basic unit structure
CN208219924U (en) Mounting structure for the non-load bearing wall that light-duty shingle nail flexibly assembles

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180731

RJ01 Rejection of invention patent application after publication