CN108343187A - A kind of ceiling construction process based on plasterboard - Google Patents
A kind of ceiling construction process based on plasterboard Download PDFInfo
- Publication number
- CN108343187A CN108343187A CN201810085036.2A CN201810085036A CN108343187A CN 108343187 A CN108343187 A CN 108343187A CN 201810085036 A CN201810085036 A CN 201810085036A CN 108343187 A CN108343187 A CN 108343187A
- Authority
- CN
- China
- Prior art keywords
- plasterboard
- ceiling
- fixed
- keel
- lightgage steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/04—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Finishing Walls (AREA)
Abstract
The present invention relates to building fields, and in particular to ceiling construction process.A kind of ceiling construction process based on plasterboard, includes the following steps:Step 1 draws plaster tablet suspended ceiling figure;Step 2, decomposing gypsum plate furred ceiling figure;Step 3 cuts plasterboard;Step 4, plasterboard sizing;Step 5, installation of ceiling.The present invention passes through this construction technology, pass sequentially through draw plaster tablet suspended ceiling figure, decomposing gypsum plate furred ceiling figure, cut plasterboard, plasterboard sizing, installation of ceiling and etc. operation difficulty when reducing ceiling construction, reduce the somatic damage to staff, improves construction efficiency and construction effect.
Description
Technical field
The present invention relates to building fields, and in particular, to ceiling construction process.
Background technology
During the decoration of existing building, it is the step during relatively conventional decoration using plaster tablet suspended ceiling, passes
The construction technology of system be successively by bullet ceiling horizontal line, installation main joist, installation secondary joist, brush antirust paint and fireproof coating,
Install plasterboard, facing cleaning and etc. composition, however in traditional work progress, staff need to directly exist by staircase
Ceiling, roof construction, staff need to come back, bend over for a long time when construction, will produce on body to staff
Damage and reduce construction efficiency and construction effect.
Invention content
The object of the present invention is to provide a kind of ceiling construction process based on plasterboard, to solve above-mentioned at least one skill
Art problem.
In order to achieve the above object, the present invention uses following technical proposals:
A kind of ceiling construction process based on plasterboard, which is characterized in that include the following steps:
Step 1 draws plaster tablet suspended ceiling figure, according to construction site structure determination plaster tablet suspended ceiling pattern, draws plaster tablet suspended ceiling
Drawing;
Step 2, decomposing gypsum plate furred ceiling figure are broken down at least one according to the structure drawn in plaster tablet suspended ceiling figure
Plate;
Step 3 cuts plasterboard, and plasterboard is cut according to the plate that plaster tablet suspended ceiling figure decomposes;
Step 4, plasterboard sizing, the plasterboard after cutting is screwed to lightgage steel joist;
Lightgage steel joist equipped with plasterboard is transported to construction site and is installed by step 5, installation of ceiling.
In the step 5, the structure drawn for plaster tablet suspended ceiling figure is non-when being rectangle, and installs at the construction field (site)
When, absolute altitude is first fixed, keelson is fixed on wall, will then push up on keel installation to ceiling, and be set on the keelson
There is card slot, the lightgage steel joist for being equipped with plasterboard is caught in using the card slot in the keelson, then lightgage steel joist is fixed
Onto the top keel, plasterboard riser is fixed on lightgage steel joist using screw, to be fixed on the gypsum on lightgage steel joist
Plasterboard tablet is finally screwed by plate as plasterboard tablet with keelson.
In the step 5, when being rectangle for the structure that plaster tablet suspended ceiling figure is drawn, when installing at the construction field (site),
Absolute altitude is first fixed, plasterboard riser is fixed on wall using screw;
Keelson is fixed on wall, will then be pushed up on keel installation to ceiling, on the keelson, the top keel
Equipped with card slot, then the lightgage steel joist for being equipped with plasterboard is caught in using the card slot in the keelson, then will be equipped with
The lightgage steel joist of plasterboard is snapped onto using card slot in the top keel, using the plasterboard that is fixed on lightgage steel joist as flat
Plate, the tablet are fixed on by bayonet lock on the riser.
In the step 4, plasterboard is placed on operation console, the lightgage steel joist includes false keel, corner joist, lamp
False keel and corner joist or light trough are attached with keel using component by slot keel, followed by screw by the stone
Cream plate is fixed on the false keel equipped with corner joist or light trough keel.When the gypsum plate thickness is 0.95cm, phase
Spacing between adjacent two false keels is 30cm.When the gypsum plate thickness is 1.2cm, the spacing between adjacent two false keels
For 40cm.
The component is using component made of galvanized sheet.
In the step 4, the screw use plasterboard full dog point socket set, the plasterboard full dog point socket set include a nut,
One screw rod, one end of the screw rod are fixed on the middle part of the nut, and the other end of the screw rod is in coniform;
The screw rod is equipped with external screw thread, and the external screw thread is positioned close to one end to the institute of the screw rod of the nut side
It states at 2/3rds length of screw rod, the externally threaded width is not less than 0.2cm.
The nut is equipped with a hole for injecting glue, the hollow cavity that the hole for injecting glue connection one is arranged in the screw rod, far from institute
The one end for stating the screw rod at nut is equipped with a gum outlet, and the gum outlet is connected to the hollow cavity.
The present invention is passed sequentially through by this construction technology and is drawn plaster tablet suspended ceiling figure, decomposing gypsum plate furred ceiling figure, cuts stone
Cream plate, plasterboard sizing, installation of ceiling and etc. operation difficulty when reducing ceiling construction, reduce the body to staff
Bulk damage improves construction efficiency and construction effect.
Description of the drawings
Fig. 1 is the part-structure schematic diagram of the present invention.
Specific implementation mode
The specific implementation mode of the present invention is further described below in conjunction with attached drawing.
As shown in Figure 1, a kind of ceiling construction process based on plasterboard, includes the following steps:Step 1 draws plasterboard
Furred ceiling figure according to construction site structure determination plaster tablet suspended ceiling pattern, draws plaster tablet suspended ceiling drawing;Step 2, decomposing gypsum
Plate furred ceiling figure is broken down at least one plate according to the structure drawn in plaster tablet suspended ceiling figure;Step 3 cuts gypsum
Plate cuts plasterboard according to the plate that plaster tablet suspended ceiling figure decomposes;Step 4, plasterboard sizing, the plasterboard after cutting is led to
Screw is crossed to be fixed on lightgage steel joist;Step 5, installation of ceiling transport the lightgage steel joist equipped with plasterboard to construction site simultaneously
It is installed.The present invention is passed sequentially through by this construction technology and is drawn plaster tablet suspended ceiling figure, decomposing gypsum plate furred ceiling figure, cut
Plasterboard, plasterboard sizing, installation of ceiling and etc. operation difficulty when reducing ceiling construction, reduce to staff's
Somatic damage improves construction efficiency and construction effect.
In step 5, the structure drawn for plaster tablet suspended ceiling figure is non-when being rectangle, when installing at the construction field (site), first
Absolute altitude is fixed, keelson 4 is fixed on wall, will then be pushed up on keel installation to ceiling, keelson is equipped with card slot, will
The lightgage steel joist for being equipped with plasterboard is caught in using card slot in keelson, then lightgage steel joist is fixed on the top keel, profit
Plasterboard riser is fixed on lightgage steel joist with screw, using the plasterboard that is fixed on lightgage steel joist as plasterboard tablet,
Finally plasterboard tablet is screwed with keelson.For irregular furred ceiling shape, tablet installation is first carried out, then install
The plasterboard riser of side wall is installed, i.e., first carries out level-one furred ceiling and carry out two level furred ceiling again, this scheme construction efficiency is higher.
It is first fixed when installing at the construction field (site) when being rectangle for the structure that plaster tablet suspended ceiling figure is drawn in step 5
Plasterboard riser is fixed on wall by lower absolute altitude using screw;Keelson 4 is fixed on wall, it then will top keel peace
It is filled on ceiling, is equipped with card slot on keelson, top keel, the lightgage steel joist for being equipped with plasterboard is then utilized into card slot card
Enter in keelson, then the lightgage steel joist for being equipped with plasterboard is snapped onto using card slot in the keel of top, to be fixed on lightgage steel joist
On plasterboard as tablet, tablet is fixed on by bayonet lock on riser.For more regular furred ceiling shape, for example rectangular
The furred ceilings such as shape, square, triangle, diamond shape first carry out plasterboard riser installation, and plasterboard riser is not fixed extremely when mounted,
It allows it to there is certain shaking, convenient for subsequently carrying out tablet installation again, after tablet is installed, recycles bayonet lock to be completely fixed, this scheme
Construction efficiency is higher.
In step 4, plasterboard 1 is placed on operation console, lightgage steel joist includes false keel 2, corner joist 3, light trough dragon
False keel and corner joist or light trough are attached with keel using component by bone, are fixed to plasterboard followed by screw
On false keel equipped with corner joist or light trough keel.When gypsum plate thickness is 0.95cm, between adjacent two false keels
Spacing is 30cm.When gypsum plate thickness is 1.2cm, the spacing between adjacent two false keels is 40cm.Convenient for ensureing enough
Convenience when secured intensity and installation, improves installation effectiveness.Plasterboard is placed on operation console, by false keel and corner joist
Or light trough is attached with keel with component, is screwed on plasterboard, the false keel of wherein side stays half, corner dragon
Bone or light trough stay 5cm to extend out with keel, in order to fix the second block gypsum plate.Other side plasterboard stays 10cm in order to solid
Fixed previous block gypsum plate.
Component is using component made of galvanized sheet.Ensure bonding strength, antirust.
In step 4, it includes a nut, a screw rod, screw rod that screw, which uses plasterboard full dog point socket set, plasterboard full dog point socket set,
One end be fixed on the middle part of nut, the other end of screw rod is in coniform;Screw rod is equipped with external screw thread, and external screw thread is positioned close to
At one end of the screw rod of nut side to 2/3rds length of screw rod, externally threaded width is not less than 0.2cm.Due to plasterboard
Characteristic frangible, easy to crack, the screw of this structure can play the preferable bonding strength of plasterboard, improve when being screwed into plasterboard
Practicability.Nut is equipped with a hole for injecting glue, and hole for injecting glue is connected to a hollow cavity being arranged in screw rod, and one of the screw rod at separate nut
End is equipped with a gum outlet, and gum outlet is connected to hollow cavity.After screw is screwed into plasterboard, bonded adhesives is injected, keel is connected, carries
Bonding strength is risen.
Although present disclosure is discussed in detail by above preferred embodiment, but it should be appreciated that above-mentioned
Description is not considered as limitation of the present invention.After those skilled in the art have read the above, for the present invention's
A variety of modifications and substitutions all will be apparent.Therefore, protection scope of the present invention should be limited to the appended claims.
Claims (9)
1. a kind of ceiling construction process based on plasterboard, which is characterized in that include the following steps:
Step 1 draws plaster tablet suspended ceiling figure, according to construction site structure determination plaster tablet suspended ceiling pattern, draws plaster tablet suspended ceiling
Drawing;
Step 2, decomposing gypsum plate furred ceiling figure are broken down at least one according to the structure drawn in plaster tablet suspended ceiling figure
Plate;
Step 3 cuts plasterboard, and plasterboard is cut according to the plate that plaster tablet suspended ceiling figure decomposes;
Step 4, plasterboard sizing, the plasterboard after cutting is screwed to lightgage steel joist;
Lightgage steel joist equipped with plasterboard is transported to construction site and is installed by step 5, installation of ceiling.
2. a kind of ceiling construction process based on plasterboard as described in claim 1, which is characterized in that in the step 5,
The structure drawn for plaster tablet suspended ceiling figure is non-when being rectangle, and when installing at the construction field (site), absolute altitude is first fixed, by keelson
Fixed on wall, will then push up on keel installation to ceiling, the keelson is equipped with card slot, will be equipped with plasterboard
Lightgage steel joist is caught in using the card slot in the keelson, then lightgage steel joist is fixed on the top keel, utilizes screw
Plasterboard riser is fixed on lightgage steel joist, the plasterboard to be fixed on lightgage steel joist finally will as plasterboard tablet
Plasterboard tablet is screwed with keelson.
3. a kind of ceiling construction process based on plasterboard as described in claim 1, which is characterized in that in the step 5,
When being rectangle for the structure that plaster tablet suspended ceiling figure is drawn, when installing at the construction field (site), absolute altitude is first fixed, it will using screw
Plasterboard riser is fixed on wall;
Keelson is fixed on wall, will then be pushed up on keel installation to ceiling, on the keelson, the top keel
Equipped with card slot, then the lightgage steel joist for being equipped with plasterboard is caught in using the card slot in the keelson, then will be equipped with
The lightgage steel joist of plasterboard is snapped onto using card slot in the top keel, using the plasterboard that is fixed on lightgage steel joist as flat
Plate, the tablet are fixed on by bayonet lock on the riser.
4. a kind of ceiling construction process based on plasterboard as described in claim 1, which is characterized in that in the step 4,
Plasterboard is placed on operation console, the lightgage steel joist includes false keel, corner joist, light trough keel, by false keel and is turned
Wall angle or light trough are attached with keel using component, are fixed to the plasterboard followed by screw and are equipped with corner joist
Or on the false keel of light trough keel.
5. a kind of ceiling construction process based on plasterboard as claimed in claim 4, which is characterized in that the gypsum plate thickness
For 0.95cm when, the spacing between adjacent two false keels is 30cm.
6. a kind of ceiling construction process based on plasterboard as claimed in claim 4, which is characterized in that the gypsum plate thickness
For 1.2cm when, the spacing between adjacent two false keels is 40cm.
7. a kind of ceiling construction process based on plasterboard as claimed in claim 4, which is characterized in that the component is using plating
Component made of zine plate.
8. a kind of ceiling construction process based on plasterboard as described in claim 1, which is characterized in that in the step 4,
It includes a nut, a screw rod, one end of the screw rod that the screw, which uses plasterboard full dog point socket set, the plasterboard full dog point socket set,
It is fixed on the middle part of the nut, the other end of the screw rod is in coniform;
The screw rod is equipped with external screw thread, and the external screw thread is positioned close to one end to the institute of the screw rod of the nut side
It states at 2/3rds length of screw rod, the externally threaded width is not less than 0.2cm.
9. a kind of ceiling construction process based on plasterboard as claimed in claim 8, which is characterized in that the nut is equipped with one
Hole for injecting glue, the hollow cavity that the hole for injecting glue connection one is arranged in the screw rod, one far from the screw rod at the nut
End is equipped with a gum outlet, and the gum outlet is connected to the hollow cavity.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810085036.2A CN108343187A (en) | 2018-01-29 | 2018-01-29 | A kind of ceiling construction process based on plasterboard |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810085036.2A CN108343187A (en) | 2018-01-29 | 2018-01-29 | A kind of ceiling construction process based on plasterboard |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108343187A true CN108343187A (en) | 2018-07-31 |
Family
ID=62961638
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810085036.2A Pending CN108343187A (en) | 2018-01-29 | 2018-01-29 | A kind of ceiling construction process based on plasterboard |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108343187A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103821373A (en) * | 2014-02-28 | 2014-05-28 | 四川雅豪房地产开发有限公司 | Ceiling hanging construction technology of light steel keel gypsum boards |
CN204456575U (en) * | 2015-01-28 | 2015-07-08 | 寻杰 | Split module plaster tablet suspended ceiling |
CN206545311U (en) * | 2017-01-22 | 2017-10-10 | 青岛集好建筑科技有限公司 | A kind of clamping connection facade adjustment structure and ceiling device |
CN206554358U (en) * | 2017-03-10 | 2017-10-13 | 青岛有住信息技术有限公司 | Top surface sheet material hoisting structure |
CN107587643A (en) * | 2017-09-12 | 2018-01-16 | 浙江未来加电子商务有限公司 | The ceiling structure of quick grafting assembling |
-
2018
- 2018-01-29 CN CN201810085036.2A patent/CN108343187A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103821373A (en) * | 2014-02-28 | 2014-05-28 | 四川雅豪房地产开发有限公司 | Ceiling hanging construction technology of light steel keel gypsum boards |
CN204456575U (en) * | 2015-01-28 | 2015-07-08 | 寻杰 | Split module plaster tablet suspended ceiling |
CN206545311U (en) * | 2017-01-22 | 2017-10-10 | 青岛集好建筑科技有限公司 | A kind of clamping connection facade adjustment structure and ceiling device |
CN206554358U (en) * | 2017-03-10 | 2017-10-13 | 青岛有住信息技术有限公司 | Top surface sheet material hoisting structure |
CN107587643A (en) * | 2017-09-12 | 2018-01-16 | 浙江未来加电子商务有限公司 | The ceiling structure of quick grafting assembling |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103510631B (en) | A kind of indoor sound insulation constructing structure and construction method thereof | |
CN106168067A (en) | A kind of construction method of light steel keel partition | |
CN107035095A (en) | A kind of metope integration installation structure | |
CN210177784U (en) | Assembled adjustable large-block-plate suspended ceiling | |
CN101476361A (en) | Inner partition plate system and its construction method | |
CN106567476B (en) | The construction method of pre- crack resistence partition wall | |
CN109914661A (en) | Dry-hang stone curtain wall construction method | |
CN106401024B (en) | The partition wall of pre- crack resistence | |
CN108343187A (en) | A kind of ceiling construction process based on plasterboard | |
CN103321448A (en) | Construction process for reinforcing wall of building | |
CN207003900U (en) | A kind of novel wall surface cladding panel structure | |
CN207405853U (en) | Kitchen and toilet ceiling structure | |
CN206189711U (en) | Prevent plasterboard suspended ceiling that ftractures | |
CN202227559U (en) | Edging device for plasterboard furred ceiling | |
CN112726931A (en) | Green construction method of light steel keel gypsum plasterboard | |
CN208415599U (en) | A kind of sound-absorbing slab-wall structure | |
CN109610717A (en) | A kind of installation method of W font furred ceiling keelson | |
CN212224366U (en) | Special-shaped keel ceiling lamp groove | |
CN205876045U (en) | Indoorly prevent that fire door fixed knot constructs | |
CN102296827A (en) | Mounting method of light-weight partition wall board | |
CN202577581U (en) | Precast floor-free self-support modular unit | |
CN206397069U (en) | A kind of Fast Installation structure of two grades of furred ceiling corners lines | |
CN109750784B (en) | Lamp slot ceiling right angle module for preventing lamp slot right angle cracking and construction method | |
CN211114334U (en) | Blue or green brick furred ceiling basic unit structure | |
CN208219924U (en) | Mounting structure for the non-load bearing wall that light-duty shingle nail flexibly assembles |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180731 |
|
RJ01 | Rejection of invention patent application after publication |