CN108342984A - A kind of beach soft foundation trestle and its installation sedimentation method - Google Patents

A kind of beach soft foundation trestle and its installation sedimentation method Download PDF

Info

Publication number
CN108342984A
CN108342984A CN201810036364.3A CN201810036364A CN108342984A CN 108342984 A CN108342984 A CN 108342984A CN 201810036364 A CN201810036364 A CN 201810036364A CN 108342984 A CN108342984 A CN 108342984A
Authority
CN
China
Prior art keywords
steel pipe
pipe pile
bridge
trestle
tidal flat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810036364.3A
Other languages
Chinese (zh)
Other versions
CN108342984B (en
Inventor
贾卫中
李响
张成军
王海彬
宋先聪
段匡世
姜鹏
赵志伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
China Railway Group Ltd CREC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
China Railway Group Ltd CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC, China Railway Group Ltd CREC filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN201810036364.3A priority Critical patent/CN108342984B/en
Publication of CN108342984A publication Critical patent/CN108342984A/en
Application granted granted Critical
Publication of CN108342984B publication Critical patent/CN108342984B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/20—Placing by pressure or pulling power

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Foundations (AREA)
  • Piles And Underground Anchors (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of beach soft foundation trestle and its installation sedimentation methods, it is related to field of bridge construction, the device includes the more steel-pipe piles being inserted in ground, the steel-pipe pile top surface is disposed with distribution beam, Bailey beam and floorings from lower to upper, the steel-pipe pile is equipped with back-pressure bearing support in the both sides of direction across bridge, and the back-pressure bearing support is equipped with the jack that top surface is held in the distribution beam bottom surface.The present invention can realize the settlement treatment to steel-pipe pile.

Description

一种滩涂软弱地基栈桥及其安装沉降方法A tidal flat weak foundation trestle bridge and its installation and settlement method

技术领域technical field

本发明涉及桥梁施工领域,具体涉及一种滩涂软弱地基栈桥和一种滩涂软弱地基栈桥的安装沉降方法。The invention relates to the field of bridge construction, in particular to a tidal flat weak foundation trestle and a method for installing and settling the tidal flat weak foundation trestle.

背景技术Background technique

在大型桥梁工程施工中,经常需要搭建临时栈桥,同时栈桥搭建完成后,需对栈桥的钢管桩进行沉降处理。在滩涂软弱地基栈桥的施工中,受滩涂软弱地形的影响,对此地基下的栈桥钢管桩的沉降通常使用打桩机重新插打钢管桩,以及对钢管桩进行混凝土浇筑以增大钢管桩的承载力,虽能够有效防止钢管桩的沉降,但会导致栈桥建造成本增加,且后期栈桥的拆除不易。In the construction of large-scale bridge projects, it is often necessary to build temporary trestles. At the same time, after the trestles are built, the steel pipe piles of the trestles need to be settled. In the construction of the trestle bridge with weak tidal flat foundation, due to the influence of the soft tidal flat terrain, the settlement of the trestle steel pipe pile under the foundation is usually re-inserted with a pile driver, and concrete is poured on the steel pipe pile to increase the steel pipe pile settlement. Although the bearing capacity of the pipe piles can effectively prevent the settlement of the steel pipe piles, it will increase the construction cost of the trestle bridge, and it will be difficult to dismantle the trestle bridge later.

发明内容Contents of the invention

针对现有技术中存在的缺陷,本发明的目的在于提供一种滩涂软弱地基栈桥,能够实现对钢管桩的沉降处理。In view of the defects existing in the prior art, the object of the present invention is to provide a tidal flat weak foundation trestle, which can realize the settlement treatment of steel pipe piles.

为达到以上目的,本发明采取的技术方案是:包括多根插设于地基中的钢管桩,所述钢管桩顶面由下往上依次设置有分配梁、贝雷梁和桥面板,所述钢管桩在横桥向的两侧设有反压支承架,所述反压支承架上设有顶面抵持于所述分配梁下底面的千斤顶。In order to achieve the above object, the technical solution adopted by the present invention is: comprising a plurality of steel pipe piles inserted in the foundation, and the top surface of the steel pipe piles is provided with distribution beams, Bailey beams and bridge decks sequentially from bottom to top, so The steel pipe piles are provided with anti-pressure supporting frames on both sides in the direction of the transverse bridge, and the anti-pressure supporting frames are provided with a jack whose top surface is against the bottom surface of the distribution beam.

在上述技术方案的基础上,每根钢管桩上均设有2个反压支承架,且2个反压支承架沿所述钢管桩的轴向中心线对称设置。On the basis of the above technical solution, each steel pipe pile is provided with two back pressure support frames, and the two back pressure support frames are arranged symmetrically along the axial center line of the steel pipe pile.

在上述技术方案的基础上,所述反压支承架包括横杆和斜杆,所述斜杆的一端连接所述横杆远离钢管桩的一端,另一端连接钢管桩,所述千斤顶位于所述横杆上。On the basis of the above technical solution, the anti-pressure support frame includes a cross bar and an oblique bar, one end of the oblique bar is connected to the end of the cross bar away from the steel pipe pile, and the other end is connected to the steel pipe pile, and the jack is located at on the crossbar.

在上述技术方案的基础上,所述桥面板的两侧设有栏杆。On the basis of the above technical solution, railings are provided on both sides of the bridge deck.

在上述技术方案的基础上,所述钢管桩的顶面设有钢管桩桩帽。On the basis of the above technical solution, the top surface of the steel pipe pile is provided with a steel pipe pile cap.

本发明还提供一种滩涂软弱地基栈桥的安装沉降方法,包括:The present invention also provides a method for installation and settlement of trestle bridges with weak foundations in tidal flats, including:

放样定位钢管桩;Lofting and positioning of steel pipe piles;

插打钢管桩,并在钢管桩上安装分配梁、贝雷梁和桥面板,钢管桩侧面安装反压支承架和千斤顶;Insert and drive steel pipe piles, and install distribution beams, Bailey beams and bridge decks on the steel pipe piles, and install anti-pressure support frames and jacks on the sides of the steel pipe piles;

在桥面板上放置荷载进行压重使钢管桩下沉至预设深度,同时千斤顶顶升分配梁使桥面板上升至预设高度;Place the load on the bridge deck for weighting to sink the steel pipe piles to the preset depth, and at the same time jack up the distribution beam to raise the bridge deck to the preset height;

在钢管桩顶面和分配梁之间放置垫板。A backing plate is placed between the top face of the steel pipe pile and the distribution beam.

在上述技术方案的基础上,在桥面板上依次增加荷载重量对桥面板进行分级压重,且压重总量为1.25倍的桥面板车道荷载。On the basis of the above-mentioned technical scheme, the load weight is sequentially increased on the bridge deck to perform graded ballasting on the bridge deck, and the total ballast weight is 1.25 times the bridge deck lane load.

在上述技术方案的基础上,所述钢管桩的顶面设有钢管桩桩帽,所述垫板放置于所述钢管桩桩帽上。On the basis of the above technical solution, a steel pipe pile cap is provided on the top surface of the steel pipe pile, and the backing plate is placed on the steel pipe pile cap.

在上述技术方案的基础上,所述反压支承架焊接于所述钢管桩侧面上。On the basis of the above technical solution, the back pressure support frame is welded on the side of the steel pipe pile.

与现有技术相比,本发明的优点在于:在桥面板上放置荷载的方式对栈桥压重,使钢管桩下沉至稳定位置,实现对钢管桩的沉降处理,且千斤顶顶升分配梁,有效保证沉降后的钢管桩的承载力达到设计要求,且保证桥面板位于设计高度,整个沉降处理过程操作简单、安全,加快了施工进度,且后期栈桥也较容易拆除以重复使用,节约施工成本,满足绿色施工要求。Compared with the prior art, the present invention has the advantages of: placing loads on the bridge deck to pressurize the trestle bridge so that the steel pipe piles can sink to a stable position, realizing the settlement treatment of the steel pipe piles, and the jack can lift and distribute Beams can effectively ensure that the bearing capacity of steel pipe piles after settlement meets the design requirements, and ensure that the bridge deck is at the design height. The entire settlement process is simple and safe to operate, which speeds up the construction progress, and the trestle bridge is also easier to dismantle for reuse in the later stage. Save construction costs and meet green construction requirements.

附图说明Description of drawings

图1为本发明一种滩涂软弱地基栈桥的结构示意图;Fig. 1 is the structural representation of a trestle bridge with weak ground in tidal flats of the present invention;

图2为钢管桩上安装分配梁、贝雷梁和桥面板的示意图;Figure 2 is a schematic diagram of installing distribution beams, Bailey beams and bridge decks on steel pipe piles;

图3为钢管桩侧面安装反压支承架和千斤顶的示意图;Fig. 3 is a schematic diagram of installing a back pressure support frame and a jack on the side of a steel pipe pile;

图4为在桥面板上放置荷载进行压重的示意图。Figure 4 is a schematic diagram of placing loads on the bridge deck for ballasting.

图中:1-钢管桩,2-分配梁,3-贝雷梁,4-桥面板,5-反压支承架,6-千斤顶,7-横杆,8-斜杆,9-栏杆,10-钢管桩桩帽,11-荷载。In the figure: 1-steel pipe pile, 2-distribution beam, 3-Bayley beam, 4-bridge deck, 5-back pressure support frame, 6-jack, 7-horizontal bar, 8-slanting bar, 9-railing, 10-steel pipe pile cap, 11-load.

具体实施方式Detailed ways

以下结合附图对本发明作进一步详细说明。The present invention will be described in further detail below in conjunction with the accompanying drawings.

参见图1所示,本发明提供一种滩涂软弱地基栈桥,安装于滩涂软弱地基上,滩涂软弱地基土质较软,具体的,滩涂软弱地基栈桥包括多根插设于地基中的钢管桩1,钢管桩1顶面由下往上依次设置有分配梁2、贝雷梁3和桥面板4,钢管桩1在横桥向的两侧设有反压支承架5,反压支承架5上布设有顶面抵持于分配梁2下底面的千斤顶6,千斤顶6用于顶升所述分配梁2以在钢管桩1顶面和分配梁2之间放置垫板。Referring to Fig. 1, the present invention provides a tidal flat weak foundation trestle, which is installed on the tidal flat weak foundation, and the tidal flat soft foundation soil is relatively soft. Specifically, the tidal flat weak foundation trestle includes a plurality of steel pipe piles 1 inserted in the foundation, The top surface of steel pipe pile 1 is provided with distribution beam 2, Bailey beam 3 and bridge deck 4 in sequence from bottom to top. A jack 6 whose top surface bears against the bottom surface of the distribution beam 2 is arranged on the upper surface, and the jack 6 is used to lift the distribution beam 2 to place a backing plate between the top surface of the steel pipe pile 1 and the distribution beam 2 .

每根钢管桩1上均设有2个反压支承架5,且2个反压支承架5沿钢管桩1的轴向中心线对称设置。反压支承架5包括横杆7和斜杆8,斜杆8的一端连接横杆7远离钢管桩1的一端,另一端连接钢管桩1,千斤顶6位于横杆7上,斜杆8、横杆7和钢管桩1三者形成一稳定直角三角形结构,以便于对千斤顶6进行更好的支撑。桥面板4的两侧设有栏杆9,且钢管桩1的顶面设有钢管桩桩帽10。Each steel pipe pile 1 is provided with two back pressure support frames 5 , and the two back pressure support frames 5 are arranged symmetrically along the axial center line of the steel pipe pile 1 . The back pressure support frame 5 includes a cross bar 7 and an oblique bar 8. One end of the oblique bar 8 is connected to one end of the cross bar 7 away from the steel pipe pile 1, and the other end is connected to the steel pipe pile 1. The jack 6 is located on the cross bar 7, and the oblique bar 8 , the cross bar 7 and the steel pipe pile 1 form a stable right-angled triangle structure, so as to better support the jack 6 . Both sides of the bridge deck 4 are provided with railings 9 , and the top surface of the steel pipe pile 1 is provided with a steel pipe pile cap 10 .

本发明的一种滩涂软弱地基栈桥,整体结构简单,安装拆卸方便,且可重复使用,提高栈桥建造速度的同时且可有效降低栈桥的建造成本。The tidal flat weak foundation trestle of the present invention has a simple overall structure, is convenient to install and disassemble, and is reusable, improves the construction speed of the trestle and can effectively reduce the construction cost of the trestle.

本发明还提供一种用于对上述栈桥进行安装沉降的滩涂软弱地基栈桥的安装沉降方法,包括:The present invention also provides a method for installation and settlement of the tidal flat weak foundation trestle for installation and settlement of the above-mentioned trestle, including:

S1:放样定位钢管桩1;S1: stakeout and position steel pipe pile 1;

S2:插打钢管桩1,即在钢管桩1设计位置进行钢管桩1的插打,并在钢管桩1上安装分配梁2、贝雷梁3和桥面板4,参见图2所示,钢管桩1侧面安装反压支承架5和千斤顶6,参见图3所示。S2: Insert steel pipe pile 1, that is, insert and drive steel pipe pile 1 at the design position of steel pipe pile 1, and install distribution beam 2, Bailey beam 3 and bridge deck 4 on steel pipe pile 1, see Figure 2 As shown, the steel pipe pile 1 is equipped with a back pressure support frame 5 and a jack 6 on the side, as shown in FIG. 3 .

S3:参见图4所示,在桥面板4上放置荷载11进行压重使钢管桩1下沉至预设深度,同时千斤顶6顶升分配梁2使桥面板4上升至预设高度,保证桥面高度。本发明采用先安装栈桥部件的方式,在荷载11时,钢管桩1下沉,桥面板4的高度也会下降,因此使用千斤顶6顶升桥面板4,使桥面板4的高度与设计高度持平,此时分配梁2和钢管桩1间便会出现一定距离的间隔。荷载11压重和千斤顶6对分配梁2的顶升同步进行。S3: As shown in Figure 4, the load 11 is placed on the bridge deck 4 to carry out ballasting so that the steel pipe pile 1 sinks to a preset depth, and at the same time, the jack 6 lifts the distribution beam 2 to raise the bridge deck 4 to a preset height, ensuring Deck height. The present invention adopts the method of first installing trestle components. When the load is 11, the steel pipe pile 1 sinks, and the height of the bridge deck 4 will also drop. Therefore, jacks 6 are used to lift the bridge deck 4, so that the height of the bridge deck 4 is equal to the design height. At this time, there will be a certain distance between the distribution beam 2 and the steel pipe pile 1. The lifting of the distribution beam 2 by the load 11 and the weight of the jack 6 are carried out synchronously.

S4:在钢管桩1顶面和分配梁2之间放置垫板,从而使分配梁2架于钢管桩1上,或者对钢管桩1进行接高使钢管桩1支撑分配梁2。S4: Place a backing plate between the top surface of the steel pipe pile 1 and the distribution beam 2, so that the distribution beam 2 is mounted on the steel pipe pile 1, or connect the steel pipe pile 1 so that the steel pipe pile 1 supports the distribution beam 2 .

在桥面板4上依次增加荷载11重量对桥面板4进行分级压重,即采用逐渐增加荷载11重量的方式对桥面板4进行压重,分别为10%、30%、50%、70%和100%,且压重总量为1.25倍的桥面板4车道荷载11。On the bridge deck 4, increase the weight of the load 11 in turn to carry out the classification and weighting of the bridge deck 4, that is, adopt the mode of gradually increasing the weight of the load 11 to carry out the weighting of the bridge deck 4, respectively 10%, 30%, 50%, 70% and 100%, and the total ballast weight is 1.25 times the load of the bridge deck 4 lanes11.

钢管桩1的顶面设有钢管桩桩帽10,垫板放置于钢管桩桩帽10上。反压支承架5焊接于钢管桩1侧面上。A steel pipe pile cap 10 is provided on the top surface of the steel pipe pile 1 , and a backing plate is placed on the steel pipe pile cap 10 . The back pressure supporting frame 5 is welded on the side of the steel pipe pile 1 .

本发明的滩涂软弱地基栈桥的安装沉降方法,在钢管桩1的侧面设置反压支承架5,并在反压支承架5上安装千斤顶6,在桥面板4上放置荷载11的方式对栈桥压重,使钢管桩1下沉至稳定位置,实现对钢管桩1的沉降处理,且千斤顶6顶升分配梁2,有效保证沉降后的钢管桩1的承载力达到设计要求,且保证桥面板4位于设计高度,整个沉降处理过程操作简单、安全,加快了施工进度,且后期栈桥也较容易拆除以重复使用,节约施工成本,满足绿色施工要求。The installation and settlement method of tidal flat weak ground trestle bridge of the present invention, back pressure supporting frame 5 is set on the side of steel pipe pile 1, and jack 6 is installed on the back pressure supporting frame 5, and the mode of placing load 11 on bridge deck 4 is opposite to trestle bridge The steel pipe pile 1 sinks to a stable position to realize the settlement treatment of the steel pipe pile 1, and the distribution beam 2 is lifted by the jack 6 to effectively ensure that the bearing capacity of the steel pipe pile 1 after settlement meets the design requirements, and Ensure that the bridge deck 4 is at the design height, the whole settlement process is easy and safe to operate, and the construction progress is accelerated, and the later trestle is also easier to dismantle for reuse, saving construction costs and meeting the requirements of green construction.

本发明不局限于上述实施方式,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也视为本发明的保护范围之内。本说明书中未作详细描述的内容属于本领域专业技术人员公知的现有技术。The present invention is not limited to the above-mentioned embodiments. For those of ordinary skill in the art, without departing from the principle of the present invention, some improvements and modifications can also be made, and these improvements and modifications are also considered protection of the present invention. within range. The content not described in detail in this specification belongs to the prior art known to those skilled in the art.

Claims (9)

1.一种滩涂软弱地基栈桥,安装于滩涂软弱地基上,其特征在于:包括多根插设于地基中的钢管桩(1),所述钢管桩(1)顶面由下往上依次设置有分配梁(2)、贝雷梁(3)和桥面板(4),所述钢管桩(1)在横桥向的两侧设有反压支承架(5),所述反压支承架(5)上设有顶面抵持于所述分配梁(2)下底面的千斤顶(6)。1. A tidal flat weak foundation trestle, installed on the tidal flat weak foundation, is characterized in that: it comprises a plurality of steel pipe piles (1) inserted in the foundation, and the top surface of the steel pipe piles (1) is sequentially arranged from bottom to top Distributing beams (2), Bailey beams (3) and bridge decks (4) are provided, and the steel pipe piles (1) are provided with back pressure supporting frames (5) on both sides in the transverse bridge direction, and the back pressure The support frame (5) is provided with a jack (6) whose top surface is against the bottom surface of the distribution beam (2). 2.如权利要求1所述的一种滩涂软弱地基栈桥,其特征在于:每根钢管桩(1)上均设有2个反压支承架(5),且2个反压支承架(5)沿所述钢管桩(1)的轴向中心线对称设置。2. A tidal flat weak foundation trestle bridge as claimed in claim 1 is characterized in that: each steel pipe pile (1) is provided with 2 back pressure support frames (5), and 2 back pressure support frames ( 5) symmetrically arranged along the axial center line of the steel pipe pile (1). 3.如权利要求1所述的一种滩涂软弱地基栈桥,其特征在于:所述反压支承架(5)包括横杆(7)和斜杆(8),所述斜杆(8)的一端连接所述横杆(7)远离钢管桩(1)的一端,另一端连接钢管桩(1),所述千斤顶(6)位于所述横杆(7)上。3. A tidal flat weak foundation trestle bridge as claimed in claim 1, characterized in that: the counter pressure support frame (5) comprises a cross bar (7) and a slanting bar (8), and the slanting bar (8) One end is connected to the end of the cross bar (7) away from the steel pipe pile (1), the other end is connected to the steel pipe pile (1), and the jack (6) is located on the cross bar (7). 4.如权利要求1所述的一种滩涂软弱地基栈桥,其特征在于:所述桥面板(4)的两侧设有栏杆(9)。4. The tidal flat weak foundation trestle bridge according to claim 1, characterized in that: railings (9) are provided on both sides of the bridge deck (4). 5.如权利要求1所述的一种滩涂软弱地基栈桥,其特征在于:所述钢管桩(1)的顶面设有钢管桩桩帽(10)。5. A tidal flat weak foundation trestle bridge according to claim 1, characterized in that: the top surface of the steel pipe pile (1) is provided with a steel pipe pile cap (10). 6.一种滩涂软弱地基栈桥的安装沉降方法,其特征在于,包括:6. A method for installation and settlement of trestle bridges with weak foundations in tidal flats, characterized in that it comprises: 放样定位钢管桩(1);Lofting and positioning steel pipe piles (1); 插打钢管桩(1),并在钢管桩(1)上安装分配梁(2)、贝雷梁(3)和桥面板(4),钢管桩(1)侧面安装反压支承架(5)和千斤顶(6);Insert and drive steel pipe piles (1), and install distribution beams (2), Bailey beams (3) and bridge decks (4) on steel pipe piles (1), and install back pressure support frames on the side of steel pipe piles (1) (5) and jack (6); 在桥面板(4)上放置荷载(11)进行压重使钢管桩(1)下沉至预设深度,同时千斤顶(6)顶升分配梁(2)使桥面板(4)上升至预设高度;Place the load (11) on the bridge deck (4) to make the steel pipe pile (1) sink to the preset depth, and at the same time, the jack (6) lifts the distribution beam (2) to raise the bridge deck (4) to the preset depth. set height; 在钢管桩(1)顶面和分配梁(2)之间放置垫板。A backing plate is placed between the top surface of the steel pipe pile (1) and the distribution beam (2). 7.如权利要求6所述的一种滩涂软弱地基栈桥的安装沉降方法,其特征在于:在桥面板(4)上依次增加荷载(11)重量对桥面板(4)进行分级压重,且压重总量为1.25倍的桥面板(4)车道荷载(11)。7. the installation settlement method of a kind of tidal flat weak ground trestle bridge as claimed in claim 6, is characterized in that: on bridge deck (4), increase load (11) weight successively to bridge deck (4) carry out classification ballast, and The total amount of ballast is 1.25 times the bridge deck (4) lane load (11). 8.如权利要求6所述的一种滩涂软弱地基栈桥的安装沉降方法,其特征在于:所述钢管桩(1)的顶面设有钢管桩桩帽(10),所述垫板放置于所述钢管桩桩帽(10)上。8. The installation and settlement method of a tidal flat weak foundation trestle bridge as claimed in claim 6, characterized in that: the top surface of the steel pipe pile (1) is provided with a steel pipe pile cap (10), and the backing plate Place it on the pile cap (10) of the steel pipe pile. 9.如权利要求6所述的一种滩涂软弱地基栈桥的安装沉降方法,其特征在于:所述反压支承架(5)焊接于所述钢管桩(1)侧面上。9. The method for installation and settlement of trestle bridges with weak foundations in tidal flats according to claim 6, characterized in that: the counter-pressure support frame (5) is welded to the side of the steel pipe pile (1).
CN201810036364.3A 2018-01-15 2018-01-15 Soft foundation trestle for mudflat and installation and sedimentation method thereof Active CN108342984B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810036364.3A CN108342984B (en) 2018-01-15 2018-01-15 Soft foundation trestle for mudflat and installation and sedimentation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810036364.3A CN108342984B (en) 2018-01-15 2018-01-15 Soft foundation trestle for mudflat and installation and sedimentation method thereof

Publications (2)

Publication Number Publication Date
CN108342984A true CN108342984A (en) 2018-07-31
CN108342984B CN108342984B (en) 2020-08-04

Family

ID=62960678

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810036364.3A Active CN108342984B (en) 2018-01-15 2018-01-15 Soft foundation trestle for mudflat and installation and sedimentation method thereof

Country Status (1)

Country Link
CN (1) CN108342984B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114319077A (en) * 2022-01-05 2022-04-12 腾达建设集团股份有限公司 Pile slab bridge supporting structure and supporting method
CN114960458A (en) * 2022-07-04 2022-08-30 中铁四局集团第二工程有限公司 Temporary support for bridge superstructure construction
CN117051705A (en) * 2023-08-07 2023-11-14 保利长大工程有限公司 Trestle construction method for water area

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101050824B1 (en) * 2011-01-31 2011-07-20 혜림엔지니어링(주) Expansion bridge construction method using oscillator for bridge expansion
CN202401398U (en) * 2011-12-13 2012-08-29 中铁十八局集团第三工程有限公司 Construction steel pipe bailey beam support in soft foundation
CN202530367U (en) * 2012-03-14 2012-11-14 中铁二十二局集团第一工程有限公司 Deepwater complex geology foundation construction system
CN104294749A (en) * 2014-08-13 2015-01-21 中国石油天然气集团公司 Method for installing cylinder foundation trestle structure
CN104372743A (en) * 2014-10-31 2015-02-25 中铁四局集团第二工程有限公司 Rapid construction method for trestle
CN105544375A (en) * 2016-01-18 2016-05-04 中国铁建大桥工程局集团有限公司 Trestle anchoring structure and erecting construction method
CN106284089A (en) * 2016-08-31 2017-01-04 中铁大桥局集团有限公司 A kind of steel trestle rapid constructing method
CN107142926A (en) * 2017-06-12 2017-09-08 广西路建工程集团有限公司 The supratectal steel trestle steel-pipe pile antiscour construction method of shallow water riverbed thickness erratic boulder
CN206706762U (en) * 2017-05-12 2017-12-05 中国港湾工程有限责任公司 Shellfish thunder steel trestle pile foundation construction positioning guiding rack
CN206722852U (en) * 2017-05-05 2017-12-08 中铁十二局集团有限公司 A kind of mobile inverted arch trestle of growing up for carrying inverted arch template

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101050824B1 (en) * 2011-01-31 2011-07-20 혜림엔지니어링(주) Expansion bridge construction method using oscillator for bridge expansion
CN202401398U (en) * 2011-12-13 2012-08-29 中铁十八局集团第三工程有限公司 Construction steel pipe bailey beam support in soft foundation
CN202530367U (en) * 2012-03-14 2012-11-14 中铁二十二局集团第一工程有限公司 Deepwater complex geology foundation construction system
CN104294749A (en) * 2014-08-13 2015-01-21 中国石油天然气集团公司 Method for installing cylinder foundation trestle structure
CN104372743A (en) * 2014-10-31 2015-02-25 中铁四局集团第二工程有限公司 Rapid construction method for trestle
CN105544375A (en) * 2016-01-18 2016-05-04 中国铁建大桥工程局集团有限公司 Trestle anchoring structure and erecting construction method
CN106284089A (en) * 2016-08-31 2017-01-04 中铁大桥局集团有限公司 A kind of steel trestle rapid constructing method
CN206722852U (en) * 2017-05-05 2017-12-08 中铁十二局集团有限公司 A kind of mobile inverted arch trestle of growing up for carrying inverted arch template
CN206706762U (en) * 2017-05-12 2017-12-05 中国港湾工程有限责任公司 Shellfish thunder steel trestle pile foundation construction positioning guiding rack
CN107142926A (en) * 2017-06-12 2017-09-08 广西路建工程集团有限公司 The supratectal steel trestle steel-pipe pile antiscour construction method of shallow water riverbed thickness erratic boulder

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114319077A (en) * 2022-01-05 2022-04-12 腾达建设集团股份有限公司 Pile slab bridge supporting structure and supporting method
CN114960458A (en) * 2022-07-04 2022-08-30 中铁四局集团第二工程有限公司 Temporary support for bridge superstructure construction
CN117051705A (en) * 2023-08-07 2023-11-14 保利长大工程有限公司 Trestle construction method for water area

Also Published As

Publication number Publication date
CN108342984B (en) 2020-08-04

Similar Documents

Publication Publication Date Title
CN104963301B (en) The dilatory translation downward putting device and method removed for pier top beam section and bridge pier
CN102864795B (en) Light steel factory post foundation suitable for sedimentation of filled-in ground and construction method
CN102031756A (en) Support assembly and construction method of cast-in-place box girder
CN205775848U (en) Skew web plate box beam Hanging Basket prepressing device
CN105714683A (en) Installation and dismantling method of high bent cast-in-situ aqueduct suspension type bailey frames
CN106368127A (en) Whole support landing device and method for box girder support
CN112854008A (en) Prefabricated bridge pier and beam integrated bridge girder erection machine and construction method thereof
CN108330837A (en) Set up the construction method of girder steel
CN108342984B (en) Soft foundation trestle for mudflat and installation and sedimentation method thereof
CN111395192A (en) Support for upper-layer member construction by using lower steel box girder bearing and construction method
CN208009277U (en) A kind of short sliding installation system of land-based area large-tonnage steel box beam
CN205604080U (en) Building construction platform
CN214939311U (en) Integrated bridge erection machine for prefabricated bridge piers and beams
CN210597037U (en) Pre-compaction structure of super high beam support
CN217104777U (en) Interim landing stage demolishs device
CN218619992U (en) Jacking device is changed in maintenance of bank bridge gate leg
CN202627492U (en) Single-surface side wall slide mold
CN110512474A (en) A railway track overhead reinforcement structure and method
CN110883920A (en) Prefabricated T roof beam self-propelled hydraulic pressure template device and template system
CN212000656U (en) Construction device for river-crossing special-shaped steel bridge
CN206408527U (en) A kind of box beam bracket integrally falls rack device
CN204920244U (en) Supporting structure of large -span steel construction segmentation hoist and mount
CN211772879U (en) A steel box girder hoisting limit jacking construction structure
CN204715219U (en) Distribution beam hanging apparatus
CN203546623U (en) Cast-in-cantilever construction 0# block concrete supporting system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant