CN202530367U - Deepwater complex geology foundation construction system - Google Patents

Deepwater complex geology foundation construction system Download PDF

Info

Publication number
CN202530367U
CN202530367U CN 201220094296 CN201220094296U CN202530367U CN 202530367 U CN202530367 U CN 202530367U CN 201220094296 CN201220094296 CN 201220094296 CN 201220094296 U CN201220094296 U CN 201220094296U CN 202530367 U CN202530367 U CN 202530367U
Authority
CN
China
Prior art keywords
platform
steel pipe
foundation construction
deep water
shellfish thunder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220094296
Other languages
Chinese (zh)
Inventor
丁立明
徐冬青
杨金有
施德旭
徐高山
庞前凤
袁越
江龙
肖春春
薛志明
韩春放
刘积明
韩三幸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway 22nd Bureau Group Co Ltd
China Railway 22nd Bureau Group Co Ltd
Original Assignee
First Engineering Co Ltd of China Railway 22nd Bureau Group Co Ltd
China Railway 22nd Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of China Railway 22nd Bureau Group Co Ltd, China Railway 22nd Bureau Group Co Ltd filed Critical First Engineering Co Ltd of China Railway 22nd Bureau Group Co Ltd
Priority to CN 201220094296 priority Critical patent/CN202530367U/en
Application granted granted Critical
Publication of CN202530367U publication Critical patent/CN202530367U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a deepwater complex geology foundation construction system which is characterized by comprising a bailey beam trestle bridge, a drilling platform and platform steel pipe piles, wherein horizontal diagonal bracings of the steel pipe piles are welded among the platform steel pipe piles to form a whole; pile top distribution beams are welded on the platform steel pipe piles; the bailey beam trestle bridge is fixed on the top faces of the pile top distribution beams; and a platform face plate is paved on the bailey beam trestle bridge to form the drilling platform. The bailey beam trestle bridge comprises a bailey beam and an upper cross beam, which are connected with each other by bailey pieces, the upper cross beam is fixed and horizontally distributed on the bailey beam, and the platform face plate is placed on the upper cross beam. The deepwater complex geology foundation construction system can effectively solve the difficult problems of high drilling accident rate and unstability in foundation excavation caused by construction in a deepwater complex geology area and can guarantee the quality of a pile foundation and a bearing platform, and the cost is saved.

Description

Deep water complicated geological foundation construction system
Technical field
The utility model relates to a kind of deep water complicated geological foundation construction system.
Background technology
For the foundation construction in the grand bridge main stem, be usually located at the main stem profundal zone, penetrating ground is complicated; On-site actual situations shows that its construction works amount is big, structure construction is complicated, technical difficulty is high, long construction period; The main span depth of water, complicated geological condition, bridge span is big, and foundation construction in the water, firm structure continuous beam etc. is the emphasis and the difficult point engineering of this type engineering.
The utility model content
The utility model technical problem to be solved provides a kind of deep water complicated geological foundation construction system, has effectively solved the high and unsettled difficult problem of foundation excavation of the boring accident rate of bringing in the construction of deep water complicated geological zone.
The utility model technical problem to be solved realizes through following technical scheme:
A kind of deep water complicated geological foundation construction system is characterized in that: comprise shellfish thunder beam trestle, drilling platform and platform steel pipe pile; The horizontal bridging of welded steel pipe pile forms integral body between the said platform steel pipe pile, welding stake top distribution beam on the platform steel pipe pile, and stake top distribution beam end face is shellfish thunder beam trestle fixedly, lays the flat upper surface plate on the shellfish thunder beam trestle and forms drilling platform.
Said shellfish thunder beam trestle comprises Bei Leiliang and the top rail that shellfish thunder sheet connects into; The top rail that the last fixed lateral of Bei Leiliang is distributed, placement platform panel on the top rail.
Adopt C shaped steel plate and channel-section steel integral solder to fix between said top rail and shellfish thunder sheet.
The said drilling platform periphery that borders on the river is established high 1.2m guard rail.
The column of said guard rail adopt angle steel and with the top rail welding of shellfish thunder beam trestle.
Be provided with fixedly steel pipe between the column of said guard rail.
Taper pile is squeezed in the downstream of said drilling platform, and arranges the steel pipe pile welding with one of drilling platform downstream.
The advantage of the utility model is:
The solution that the utility model is imitated the high and unsettled difficult problem of bringing in the construction of deep water complicated geological zone of foundation excavation of boring accident rate, guaranteed the quality of pile foundation and cushion cap, practiced thrift cost.Adopting Bei Leiliang to take trestle, drilling platform is used in combination vibrating hammer again and sets long steel casing, selects high-power pump suction type clean-out machine for use, adopts construction technologies such as special leak stopping K-PAM mud off, steel sheet-pile cofferdam; Pile foundation and the basic construction of cushion cap under the deep water complicated geological have been accomplished in the influence that overcomes the deep water complex geological condition of success.
Description of drawings
Fig. 1 is the utility model overall schematic
Among the figure: 1-platform steel pipe pile, 2-stake top distribution beam, 3-taper pile, 4-Bei Leiliang, 5-top rail, 6-platform panel, 7-guard rail, the horizontal bridging of 8-steel pipe pile
The specific embodiment
Shown in Figure 1, a kind of deep water complicated geological foundation construction system is characterized in that: comprise shellfish thunder beam trestle, drilling platform and platform steel pipe pile 1; The horizontal bridging 8 of welded steel pipe pile forms integral body between the said platform steel pipe pile 1, in case platform steel pipe pile 1 is tilted or fatigue failure by water impact, and is connected with the steel casing, guarantees the anti-twisting property of drilling platform.Welding stake top distribution beam 2 on the platform steel pipe pile 1, stake top distribution beam 2 end faces are shellfish thunder beam trestle fixedly, lays flat upper surface plate 6 on the shellfish thunder beam trestle and forms drilling platform.
Said shellfish thunder beam trestle comprises the shellfish thunder beam 4 and top rail 5 that shellfish thunder sheet connects into; The top rail 5 that fixed lateral is distributed on the shellfish thunder beam 4, placement platform panel 6 on the top rail 5.
Adopt C shaped steel plate and channel-section steel integral solder to fix between said top rail 5 and shellfish thunder sheet.
The said drilling platform periphery that borders on the river is established high 1.2m guard rail 7; The column of said guard rail 7 adopt angle steel and with top rail 5 welding of shellfish thunder beam trestle; Be provided with fixedly steel pipe between the column of said guard rail 7; To guarantee safety of construction.
Taper pile 3 is squeezed in the downstream of said drilling platform, and arranges the steel pipe pile welding with one of drilling platform downstream, with opposing water flow impact pressure flood period.

Claims (7)

1. a deep water complicated geological foundation construction system is characterized in that: comprise shellfish thunder beam trestle, drilling platform and platform steel pipe pile; The horizontal bridging of welded steel pipe pile forms integral body between the said platform steel pipe pile, welding stake top distribution beam on the platform steel pipe pile, and stake top distribution beam end face is shellfish thunder beam trestle fixedly, lays the flat upper surface plate on the shellfish thunder beam trestle and forms drilling platform.
2. deep water complicated geological foundation construction as claimed in claim 1 system, it is characterized in that: said shellfish thunder beam trestle comprises Bei Leiliang and the top rail that shellfish thunder sheet connects into; The top rail that the last fixed lateral of Bei Leiliang is distributed, placement platform panel on the top rail.
3. deep water complicated geological foundation construction as claimed in claim 2 system is characterized in that: adopt C shaped steel plate and channel-section steel integral solder to fix between said top rail and shellfish thunder sheet.
4. deep water complicated geological foundation construction as claimed in claim 1 system is characterized in that: the said drilling platform periphery that borders on the river is established high 1.2m guard rail.
5. deep water complicated geological foundation construction as claimed in claim 4 system is characterized in that: the column of said guard rail adopt angle steel and with the top rail welding of shellfish thunder beam trestle.
6. deep water complicated geological foundation construction as claimed in claim 1 system is characterized in that: be provided with fixedly steel pipe between the column of said guard rail.
7. deep water complicated geological foundation construction as claimed in claim 1 system, it is characterized in that: taper pile is squeezed in the downstream of said drilling platform, and with row's steel pipe pile welding in drilling platform downstream.
CN 201220094296 2012-03-14 2012-03-14 Deepwater complex geology foundation construction system Expired - Fee Related CN202530367U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220094296 CN202530367U (en) 2012-03-14 2012-03-14 Deepwater complex geology foundation construction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220094296 CN202530367U (en) 2012-03-14 2012-03-14 Deepwater complex geology foundation construction system

Publications (1)

Publication Number Publication Date
CN202530367U true CN202530367U (en) 2012-11-14

Family

ID=47131561

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220094296 Expired - Fee Related CN202530367U (en) 2012-03-14 2012-03-14 Deepwater complex geology foundation construction system

Country Status (1)

Country Link
CN (1) CN202530367U (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103422445A (en) * 2013-09-04 2013-12-04 中建六局土木工程有限公司 Constructing method of high temporary bridge crossing river in extremely cold area
CN104404861A (en) * 2014-11-05 2015-03-11 中交第二航务工程局有限公司 Steel trestle provided with steel anchor pile and construction method of steel trestle
CN104420418A (en) * 2013-09-02 2015-03-18 国家电网公司 Construction method of tower pile foundation engineering trestle
CN104929044A (en) * 2014-04-04 2015-09-23 重庆建工桥梁工程有限责任公司 Construction method for offshore steel trestle
CN105464403A (en) * 2015-12-16 2016-04-06 华煜建设集团有限公司 Simple connecting bridge
CN106978777A (en) * 2017-05-22 2017-07-25 中铁第五勘察设计院集团有限公司 A kind of make-shift bridge device
CN107401118A (en) * 2016-07-22 2017-11-28 中国科学院武汉岩土力学研究所 A kind of suspension bridge pier-stage type prestressing force anchorage
CN108179695A (en) * 2017-11-24 2018-06-19 湖北华舟重工应急装备股份有限公司 A kind of modular assembly formula is met an urgent need bridge and its erection method
CN108342984A (en) * 2018-01-15 2018-07-31 中铁大桥局集团有限公司 A kind of beach soft foundation trestle and its installation sedimentation method
CN110872807A (en) * 2018-09-04 2020-03-10 宏润建设集团股份有限公司 A kind of construction method of steel stool bridge and steel stool bridge
CN111236242A (en) * 2020-03-17 2020-06-05 中交隧道工程局有限公司 Antitorque foundation ditch of bailey beam excavates platform under water
CN113250166A (en) * 2021-05-26 2021-08-13 张成瑞 Construction method and platform for building bored concrete pile drilling platform on top surface of steel plate pile foundation
CN114934433A (en) * 2022-06-22 2022-08-23 中铁十九局集团有限公司 Stirrup pile foundation steel trestle structure for assisting bridge construction and construction process thereof

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104420418B (en) * 2013-09-02 2017-01-04 国家电网公司 Tower pile foundation engineering trestle construction method
CN104420418A (en) * 2013-09-02 2015-03-18 国家电网公司 Construction method of tower pile foundation engineering trestle
CN103422445A (en) * 2013-09-04 2013-12-04 中建六局土木工程有限公司 Constructing method of high temporary bridge crossing river in extremely cold area
CN104929044A (en) * 2014-04-04 2015-09-23 重庆建工桥梁工程有限责任公司 Construction method for offshore steel trestle
CN104404861A (en) * 2014-11-05 2015-03-11 中交第二航务工程局有限公司 Steel trestle provided with steel anchor pile and construction method of steel trestle
CN105464403B (en) * 2015-12-16 2018-02-16 华煜建设集团有限公司 A kind of simple connection bridge
CN105464403A (en) * 2015-12-16 2016-04-06 华煜建设集团有限公司 Simple connecting bridge
CN107401118A (en) * 2016-07-22 2017-11-28 中国科学院武汉岩土力学研究所 A kind of suspension bridge pier-stage type prestressing force anchorage
CN106978777A (en) * 2017-05-22 2017-07-25 中铁第五勘察设计院集团有限公司 A kind of make-shift bridge device
CN108179695A (en) * 2017-11-24 2018-06-19 湖北华舟重工应急装备股份有限公司 A kind of modular assembly formula is met an urgent need bridge and its erection method
CN108342984A (en) * 2018-01-15 2018-07-31 中铁大桥局集团有限公司 A kind of beach soft foundation trestle and its installation sedimentation method
CN108342984B (en) * 2018-01-15 2020-08-04 中铁大桥局集团有限公司 A trestle bridge with weak foundation of tidal flat and its installation and settlement method
CN110872807A (en) * 2018-09-04 2020-03-10 宏润建设集团股份有限公司 A kind of construction method of steel stool bridge and steel stool bridge
CN111236242A (en) * 2020-03-17 2020-06-05 中交隧道工程局有限公司 Antitorque foundation ditch of bailey beam excavates platform under water
CN111236242B (en) * 2020-03-17 2021-10-26 中交隧道工程局有限公司 Antitorque foundation ditch of bailey beam excavates platform under water
CN113250166A (en) * 2021-05-26 2021-08-13 张成瑞 Construction method and platform for building bored concrete pile drilling platform on top surface of steel plate pile foundation
CN114934433A (en) * 2022-06-22 2022-08-23 中铁十九局集团有限公司 Stirrup pile foundation steel trestle structure for assisting bridge construction and construction process thereof

Similar Documents

Publication Publication Date Title
CN202530367U (en) Deepwater complex geology foundation construction system
CN101666081B (en) Abrupt slope bare rock drilling platform and technology in huge reservoir
CN1837512B (en) Combined cofferdam of steel slab pile and steel pipe pile an method for manufacturing the same
CN203145038U (en) lattice column type tower crane foundation
CN204510230U (en) Rich groundwater and the bad deep pit digging supporting and protection structure of geology
CN104805854B (en) A kind of Deep Water Ultra-long steel sheet pile cofferdam construction method under tide environment
CN201132960Y (en) Composite batardeau of steel light structure
CN203034464U (en) Truss type foundation pit supporting structure
CN102677592B (en) Method for erecting deepwater steel trestle and platform on exposed bedrock in shallow sea
CN103526722A (en) Debris flow gabion prevention and control structural body and design method thereof
CN104389315A (en) Consolidation grouting drilled pile wall and construction method thereof
CN104695380A (en) Revetment structure composed of plastic steel plate piles and concrete
CN201502056U (en) Bare rock drilling platform for steep slope of deep reservoir area
CN111851523A (en) Settlement deviation prevention method for foundation pit construction
CN202830936U (en) Supporting structure of foundation pit
CN204492660U (en) Rectangular percussion drill bit for diaphragm wall construction
CN202705883U (en) Deepwater steel trestle and platform built on shallow sea bare bedrock
CN203361116U (en) Drilling construction platform
CN205975551U (en) A construction platform for construction of aquatic steel sheet pile
CN205046537U (en) Naked rock platform of deep water
CN215715333U (en) Pre-buried device of flow plasticity geology bottom plate construction
CN202247830U (en) Novel underwater steel platform
CN205742125U (en) A kind of work platform for boring
CN203066026U (en) Novel revetment composite structure
CN201883449U (en) Sea wall structure of compound pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121114

Termination date: 20210314