CN108341323A
CN108341323A CN201810158728.5A CN201810158728A CN108341323A CN 108341323 A CN108341323 A CN 108341323A CN 201810158728 A CN201810158728 A CN 201810158728A CN 108341323 A CN108341323 A CN 108341323A
Authority
CN
China
Prior art keywords
mobile jib
pedal
handle
crane
people
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810158728.5A
Other languages
Chinese (zh)
Other versions
CN108341323B (en
Inventor
郑永如
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zaozhuang Xuecheng Hongxiang Transportation Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810158728.5A priority Critical patent/CN108341323B/en
Publication of CN108341323A publication Critical patent/CN108341323A/en
Application granted granted Critical
Publication of CN108341323B publication Critical patent/CN108341323B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Current six layers and building below are all without elevator, and it is inconvenient to live, and it is difficult to vacate the position for installing elevator to install elevator additional.The all multi-schemes for installing elevator additional in pedestrian stairway, usually because complicated, performance difficulty.The structure of the present invention is comparatively simple, and the present invention installs collapsible pedal and handle on the mobile jib for be equivalent to story height, and mobile jib moves under the traction of roof crane in stair gap, and people can step on pedal and hold handle upstairs and go downstairs.Two cranes are separately fixed on the wall of roof both sides, and two fixed pulleys are mounted on the position that roof is equivalent to stair gap both ends, and two crane lines are downward by fixed pulley respectively, and two cable ends tie up to the top of mobile jib simultaneously.In this way, controlling the operating of two cranes respectively, mobile jib just can obliquely move upward or downward along pedestrian stairway.

Description

Pedestrian stairway installs suspension type elevator additional
Technical field
The present invention relates to pedestrian stairways to install elevator additional.
Background technology
Current six layers and building below, all without elevator, it is inconvenient to live, and it is difficult to vacate installation elevator to install elevator additional Position
The all multi-schemes for installing elevator additional in pedestrian stairway, usually because complicated, performance difficulty.
Invention content
The present invention structure it is comparatively simple, the present invention installed on the mobile jib for be equivalent to story height collapsible pedal and Handle, mobile jib move under the traction of roof crane in stair gap, and people can step on pedal and hold handle upstairs and go downstairs.
Two cranes are separately fixed on the wall of roof both sides, and two fixed pulleys are equivalent to stair gap two mounted on roof The position at end.Two crane lines are downward by fixed pulley respectively, and two cable ends tie up to the top of mobile jib simultaneously, divide in this way Not Kong Zhi two cranes operating, mobile jib just can obliquely move upward or downward along pedestrian stairway.Such as allow two cranes It operates simultaneously, mobile jib 7 just can also be above and below 24 cathetus of stair gap.
The lower part of stairway handrail, install two parallel band irons identical with stair gradient, and remove this two it is flat Local railing section between iron forms a parallel gap identical with stair gradient, allows pedal-rod in this gap Operation.But the railing at balustrade both ends not only needs to keep complete, it is also necessary to reinforce, to keep the firm of balustrade.Separately Then to expand close to the gap at the railing of both ends outside, so that pedal can be dug herein.
Description of the drawings:
Attached drawing is schematic diagram.
Attached drawing 1 is that mobile jib is in the on-board and off-board position in ground floor or floor levels.
Attached drawing 2 is in respectively for mobile jib just to be risen the first step, rises to intermediate, these three positions of rising arrival turnover platform Conjunction figure.
Attached drawing 3 is the side view of attached drawing 1, it expresses the thin portion of pedal and handle.
Attached drawing 4 is the vertical view of attached drawing 3.
Specific implementation mode:
Mobile jib 7 is suspended on by the hawser 4 of two cranes in stair gap 24, and the length of mobile jib 7 is slightly longer than story height, in master The pedal 14 that can be dug and be laid flat and handle 8 are hinged on bar 7.
Two cranes are separately fixed on corridor both sides wall 5, and main crane 1 is on floor one side, and secondary crane 2 is in turnover platform one Side, two fixed pulleys 3 are mounted on the position that 24 both ends 21 of stair gap are equivalent on Roofing slab, and two crane lines 4 pass through respectively Cross fixed pulley 3 downwards, two 4 ends of hawser tie up to the top of mobile jib 7 simultaneously, control the operating of two cranes respectively in this way, main Bar 7 just can obliquely move upward or downward along pedestrian stairway.It such as allows and two cranes while operating, mobile jib 7 just can also Above and below 24 cathetus of stair gap.
Pedal 14 is hinged by the pedal shaft 23 of 7 lower part of pedal-rod 19 and main sunpender, on pedal shaft 23 equipped with torsional spring 22 with Pedal 7 is set to be dug automatically when people leaves, pedal shaft 23 and 7 junction of mobile jib are also welded with buting iron 20, buting iron when pedal 7 is laid flat 20, which can block pedal-rod 19, makes pedal 14 be maintained at horizontal position and is subjected to the weight of human body.
The handle axle 17 at 7 middle part of handle 8 and mobile jib is hinged, and handle 8 is trisquare shape, makes all to be convenient for holding when stair activity.
Pedal 14 and handle 8 are all around each one, and are respectively in the front and back position of mobile jib 7.Such position makes up and down Stair are all very convenient.
Digging and being laid flat for pedal-rod 19 and handle 8 is linkage, and control handle 8 can be used for being laid flat pedal 14, step on Also handle 8 can be driven to dig together when plate 7 is dug automatically, their side is all welded with ear and climbs 16 thus, and pedal-rod ear is climbed and handle Hand ear is hinged with connecting rod 18 between climbing, and the height that ear climbs 16 makes connecting rod 18 and its hinge joint deviate from pedal-rod 19 and handle 8 Spindle central line, also avoid through connecting rod 18 come movement dead when handle 8 and pedal-rod 19 being made to link.Make this hinge For contact in shaft horizontal line each 45 degree of angle swinging up and down, this is most steerable swing angle.
Pedal-rod 19 is all installed in the place and handle 8 contacted with parallel band iron 10 in the place contacted with balustrade 6 There is idler wheel 15, so that the reduction friction that operates steadily.
Two parallel band irons 10 identical with stair gradient are installed, and remove this two band irons in the lower part of stairway handrail 9 Between local railing section, formed a parallel gap 11 identical with stair gradient, allow pedal-rod 19 in this gap Middle operation.But the railing 12 at 6 both ends of balustrade not only still needs to keep complete, it is also necessary to reinforce, to keep balustrade 6 It is firm.In addition it to be then extended to slightly larger than pedal 14 close to the gap 13 at both ends railing 12, so that pedal 14 can turn over herein It rises.
Illustrate the use process of the present invention below:
First say building:
People and mobile jib 7 are in bottom or certain floor, will first be pressed under handle 8, and handle 8 is driven by connecting rod 18 and translates into water under pedal 14 Flat, people can stand upper pedal 14, open the button switch startup power supply at handle 8, main crane 1 first moves, and rotates forward, and draws on mobile jib 7 It stops after rising a lattice step, is moved after secondary crane 2, rotated forward, its 4 oblique pulling mobile jib 7 of hawser tilts uplink, 19 He of pedal-rod Idler wheel 15 on handle 8 is rolled along balustrade 6 and band iron guide rail 10 respectively, and mobile jib 7 and people is guided to tilt uplink along stair Equal with turnover platform to pedal 14, parking, people takes a step to turnover platform, and pedal 14 is dug automatically under the action of torsional spring 22, Handle 8 is driven also to dig simultaneously, people and mobile jib 7 are in turnover platform, continue upstairs, to press the handle 8 of another side, repeat above-mentioned Step is only changed to move after secondary crane 2 first moves main crane 1, until reaching next level, continues to repeat the above steps until arriving Up to purpose floor.
Besides downstairs:
Mobile jib 7 is in certain floor, will first be pressed under handle 8, and handle 8 is driven by connecting rod 18 and translates into level, people under pedal 14 Pedal 14 on standing opens the button switch startup power supply at handle 8, and main crane 1 first moves, and inverts, its hawser 4 is oblique to put mobile jib 7 tilt downlink, and the idler wheel 15 on pedal-rod 19 and handle 8 is rolled along balustrade 6 and band iron guide rail 10 respectively, guides mobile jib 7 Downlink is tilted along stair with people, secondary crane slightly petty action during this, reversion, it is a bit of that its hawser 4 puts mobile jib 7, makes Mobile jib 7 can just come downwards to pedal 14 with turnover platform it is equal, parking, people take a step to turnover platform, pedal 14 is in torsional spring 22 It is dug under effect, while handle 8 being driven also to dig, people and mobile jib 7 are in turnover platform, continue to go downstairs, and press the handle of another side Hand 8, repeats the above steps, and only secondary crane 2 first moves, and inverts, the slightly petty action after of main crane 1, reversion, until reaching next layer Building continues to repeat the above steps until reaching bottom or purpose floor.
Calling empty wagons meets people:
When empty wagons, pedal 14 and handle 8 are in tip-up state, at this time by the push button being fixed on wall, normal conditions mobile jib at this time Be in floor one end, secondary crane 2 will first slightly petty action, rotate forward, if special circumstances mobile jib is in turnover platform one end, then main crane will First slightly petty action rotates forward, and two kinds of situations are mobile jib 7 to be first pulled to 24 stage casing of stair gap, then chief and vice crane moves together, by mobile jib 7 draw or put to demand floor, the slightly petty action again of secondary crane 2, and reversion puts mobile jib 7 to the floor levels end in stair gap 24 21, wait for work.

Claims (3)

1. a kind of pedestrian stairway installs suspension type elevator additional, it is characterized in that:
The railing for reinforcing balustrade both ends is expanded with keeping the firm of balustrade close to the gap at the railing of both ends, so that Pedal can be dug herein.
2. a kind of pedestrian stairway installs suspension type elevator additional, it is characterized in that:
Ear climbs the spindle central company that the height of [16] makes connecting rod [18] and its hinge joint deviate pedal-rod [19] and handle [8] Line avoids passing through connecting rod [18] come movement dead when handle [8] and pedal-rod [19] being made to link, makes this hinge joint in shaft water Horizontal line each 45 ° of angle swinging up and down, this is most steerable swing angle.
3. a kind of pedestrian stairway installs the use process of suspension type elevator additional, it is characterized in that:
First say building:
People and mobile jib [7] are in bottom or certain floor, will first be pressed under handle [8], and handle [8] drives pedal by connecting rod [18] [14] level is translated under, people can stand upper pedal [14], open the button switch startup power supply at handle [8], main crane [1] is first Dynamic, rotate forward, stop after drawing mobile jib [7] to rise a lattice step, secondary crane] [2] move, rotate forward, its hawser [4] oblique pulling afterwards Mobile jib [7] tilts uplink, and the idler wheel [15] on pedal-rod [19] and handle [8] is respectively along balustrade [6] and band iron guide rail [1] 0 roll, guiding mobile jib [7] and people along stair inclination go upward to pedal [14] with turnover platform it is equal, stop, people take a step to turn It is folded flat platform, pedal [14] is dug automatically under the action of torsional spring [22], while handle [8] being driven also to dig, at people and mobile jib [7] In turnover platform, continues upstairs, to press the handle [8] of another side, repeat the above steps, be only changed to secondary crane [2] and first move master Crane [1] moves afterwards, until reaching next level, continues to repeat the above steps until reaching purpose floor;
Besides downstairs:
Mobile jib [7] is in certain floor, will first be pressed under handle [8], and handle [8] is driven by connecting rod [18] and translates into water under pedal [14] Flat, people can stand upper pedal [14], open the button switch startup power supply at handle [8], and main crane [1] is first moved, and inverts, it Hawser [4] is oblique to be put mobile jib [7] and tilts downlink, the rolling [15] on pedal-rod [19] and handle [8] respectively along balustrade [6] and Band iron guide rail [10] rolls, and guiding mobile jib [7] and people tilt downlink along stair, secondary crane slightly petty action during this, instead Turn, it is a bit of that its hawser [4] puts mobile jib [7], makes mobile jib [7] that can just come downwards to pedal [14] equal with platform of transferring, stops Vehicle, people take a step to turnover platform, pedal [14] is dug under the action of torsional spring [22], while handle [8] being driven also to dig, people and Mobile jib [7] is in turnover platform, continues to go downstairs, and presses the handle [8] of another side, repeats the above steps, and only secondary crane [2] is first It is dynamic, reversion, main crane [1] slightly petty action after, reversion, until the lower first floor of arrival, continues to repeat the above steps until reaching Bottom or purpose floor;
Calling empty wagons meets people:
When empty wagons, pedal [14] and handle [8] are in tip-up state, and at this time by the push button being fixed on wall, normal conditions are at this time Mobile jib be in floor one end, secondary crane [2] will first slightly petty action, rotate forward, if special circumstances mobile jib is in turnover platform one end, then lead Crane will first slightly petty action, rotate forward, two kinds of situations are that mobile jib [7] is first pulled to stair gap [24] stage casing, then major-minor crane It is neat dynamic, mobile jib [7] is drawn or is put to demand floor, secondary crane [2] slightly petty action again, reversion puts mobile jib [7] to stair gap [24] floor levels end [21] waits for work.
CN201810158728.5A 2015-01-12 2015-01-12 Pedestrian stairway installs suspension type elevator additional Active CN108341323B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810158728.5A CN108341323B (en) 2015-01-12 2015-01-12 Pedestrian stairway installs suspension type elevator additional

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201510012370.1A CN105836577B (en) 2015-01-12 2015-01-12 Pedestrian stairway installs suspension type elevator additional
CN201810158728.5A CN108341323B (en) 2015-01-12 2015-01-12 Pedestrian stairway installs suspension type elevator additional

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201510012370.1A Division CN105836577B (en) 2015-01-12 2015-01-12 Pedestrian stairway installs suspension type elevator additional

Publications (2)

Publication Number Publication Date
CN108341323A true CN108341323A (en) 2018-07-31
CN108341323B CN108341323B (en) 2019-08-23

Family

ID=57177910

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201810158728.5A Active CN108341323B (en) 2015-01-12 2015-01-12 Pedestrian stairway installs suspension type elevator additional
CN201510012370.1A Active CN105836577B (en) 2015-01-12 2015-01-12 Pedestrian stairway installs suspension type elevator additional

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201510012370.1A Active CN105836577B (en) 2015-01-12 2015-01-12 Pedestrian stairway installs suspension type elevator additional

Country Status (1)

Country Link
CN (2) CN108341323B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3922511A1 (en) * 1989-07-08 1991-01-17 Kaessbohrer Fahrzeug Karl Folding platform for laying over vehicle steps - has self-contained drive and linkage on mounting bracket for quick attachment to vehicle
JPH06156944A (en) * 1992-11-18 1994-06-03 Daido Kogyo Co Ltd Stairs elevator
US5947231A (en) * 1996-09-27 1999-09-07 Raase Lifts Pivoting wheel chair lift device
CN1829651A (en) * 2003-06-30 2006-09-06 阿兰·布儒瓦 Elevater
CN201092504Y (en) * 2007-08-15 2008-07-30 马骥 Staircase elevating gear
CN201592936U (en) * 2010-01-16 2010-09-29 贾梦洋 Skip floor type indoor lifting stair

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2701981C2 (en) * 1977-01-19 1986-01-02 Günter 4800 Bielefeld Hätte Stair elevator
CN201770384U (en) * 2010-07-06 2011-03-23 竺圣刚 Folding pedal mechanism for escalator
CN202449698U (en) * 2012-02-10 2012-09-26 王添旺 Modified structure of stair lifting chair
CN204454169U (en) * 2014-08-26 2015-07-08 郑永如 Pedestrian stairway installs tractor elevator additional
CN204454160U (en) * 2015-01-12 2015-07-08 郑永如 Pedestrian stairway installs suspension type elevator additional

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3922511A1 (en) * 1989-07-08 1991-01-17 Kaessbohrer Fahrzeug Karl Folding platform for laying over vehicle steps - has self-contained drive and linkage on mounting bracket for quick attachment to vehicle
JPH06156944A (en) * 1992-11-18 1994-06-03 Daido Kogyo Co Ltd Stairs elevator
US5947231A (en) * 1996-09-27 1999-09-07 Raase Lifts Pivoting wheel chair lift device
CN1829651A (en) * 2003-06-30 2006-09-06 阿兰·布儒瓦 Elevater
CN201092504Y (en) * 2007-08-15 2008-07-30 马骥 Staircase elevating gear
CN201592936U (en) * 2010-01-16 2010-09-29 贾梦洋 Skip floor type indoor lifting stair

Also Published As

Publication number Publication date
CN108341323B (en) 2019-08-23
CN105836577A (en) 2016-08-10
CN105836577B (en) 2018-04-06

Similar Documents

Publication Publication Date Title
CN105000482B (en) Tower crane with walking mechanism
CN105507572B (en) The scaffold that can be walked
CN205241002U (en) Corridor jib seat elevator
CN105645226A (en) Household corridor suspender seat elevator
CN105084170A (en) Corridor boom-seat elevator
KR20140003277U (en) A lift for a high place work
CN105329802B (en) Flat step pneumatic elevator upstairs
CN103422662A (en) Integral mobile construction platform for cast-in-place of elevator shaft and method for using same
CN201116259Y (en) Concealed persons-goods construction elevator
CN206645674U (en) Two-sided chute type stair lift
CN204454160U (en) Pedestrian stairway installs suspension type elevator additional
CN207192536U (en) One kind tensioning flexible guide rail formula Household simple elevator
CN205527186U (en) Domestic corridor jib seat elevator
CN111039130A (en) Bearing beam self-elevating hoistway construction elevator
CN105836577B (en) Pedestrian stairway installs suspension type elevator additional
CN111115412A (en) Collapsible arch bridge formula bearing beam subassembly and spandrel girder for well construction elevator
KR20180070002A (en) Ramp variable stairs
KR102599944B1 (en) Overhead moving type gondola apparatus
CN105776092A (en) Stretching type basket device and construction method thereof
CN211769642U (en) Bearing beam self-elevating hoistway construction elevator
CN205476384U (en) Scaffold that can walk
CN211769629U (en) Collapsible arch bridge formula bearing beam subassembly and spandrel girder for well construction elevator
CN107055264A (en) A kind of passageway lift with drive mechanism
KR100992596B1 (en) Elevarator with an open car moving between two stories
CN207072733U (en) A kind of passageway lift with drive mechanism

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201214

Address after: 277000 east side of North Head of Changbaishan Road, Taozhuang Town, Xuecheng District, Zaozhuang City, Shandong Province

Patentee after: Zaozhuang Xuecheng Hongxiang Transportation Co.,Ltd.

Address before: Room 907, No. 4, Lane 251, Liuting Street, Haishu District, Ningbo City, Zhejiang Province, 315010

Patentee before: Zheng Yongru

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Installing suspended elevators on pedestrian stairs

Effective date of registration: 20231114

Granted publication date: 20190823

Pledgee: Postal Savings Bank of China Co.,Ltd. Zaozhuang City Xuecheng Sub branch

Pledgor: Zaozhuang Xuecheng Hongxiang Transportation Co.,Ltd.

Registration number: Y2023980065736