CN108334724A - 一种土建bim工程量模型的构建方法 - Google Patents
一种土建bim工程量模型的构建方法 Download PDFInfo
- Publication number
- CN108334724A CN108334724A CN201810430821.7A CN201810430821A CN108334724A CN 108334724 A CN108334724 A CN 108334724A CN 201810430821 A CN201810430821 A CN 201810430821A CN 108334724 A CN108334724 A CN 108334724A
- Authority
- CN
- China
- Prior art keywords
- bim
- hard spot
- models
- initial models
- quantities
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- General Physics & Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明公开了一种土建BIM工程量模型的构建方法,包括如下步骤:获取或者构建BIM初始模型;获取BIM初始模型的硬点文件,所述硬点文件中至少包括所述BIM初始模型的各硬点的位置信息;读取硬点文件中各硬点的坐标数值,形成一个可修改的硬点表;对所述BIM初始模型进行参数化处理,使所述BIM初始模型与硬点表建立关联,并发布BIM初始模型中已关联的各硬点;在所构建的BIM初始模型中插入虚拟参数作动器,虚拟参数作动器用于驱动参数变化,与BIM初始模型中的各参数建立关系后,在指定的范围内对硬点表进行变动,BIM初始模型根据所得的硬点表进行自主变动,输出BIM工程量模型。本发明可以提高工程量模型构建的效率。
Description
技术领域
本发明涉及土建工程领域,具体涉及一种土建BIM工程量模型的构建方法。
背景技术
现有的基于BIM技术的土建计算和统计方法分两种,一是直接从BIM设计模型中提取工程量数据,并将其导入到通用的统计文档中;二是通过插件或第三方软件将BIM工程模型与图形算量软件相关联。对于第一种方法,由于BIM模型构建是由设计师设计并生成的,在构建时不会完全遵循版本号为GB50854-2013的《房屋建筑与装饰工程工程量计算规范》计算规则,因此直接从BIM模型提取工程量数据是不准确、不完整和不规范的。而第二种方案,BIM工程模型在关联图形软件时需要大量的复杂操作,在关联后BIM模型出的工程量存在一定的数据损失;BIM工程模型变更后,需要重新关联和出量。
发明内容
为解决上述问题,本发明提供了一种土建BIM工程量模型的构建方法。
为实现上述目的,本发明采取的技术方案为:
一种土建BIM工程量模型的构建方法,包括如下步骤:
S1、获取或者构建BIM初始模型;
S2、获取BIM初始模型的硬点文件,所述硬点文件中至少包括所述BIM初始模型的各硬点的位置信息;
S3、读取硬点文件中各硬点的坐标数值,形成一个可修改的硬点表;
S4、对所述BIM初始模型进行参数化处理,使所述BIM初始模型与硬点表建立关联,并发布BIM初始模型中已关联的各硬点;
S5、在所构建的BIM初始模型中插入虚拟参数作动器,所述虚拟参数作动器用于驱动参数变化,与BIM初始模型中的各参数建立关系后,在指定的范围内对硬点表进行变动;
S6、所述的BIM初始模型根据所得的硬点表进行自主变动,输出BIM工程量模型。
优选地,所述虚拟参数作动器通过驱动仿真分析模块针对不同的参数进行计算求解,从而输出对应的硬点表。
优选地,所述虚拟参数作动器还用于根据硬点表驱动对应的BIM模型作动模块进行BIM初始模型的改变。
优选地,所述BIM作动模块内设有若干模型变化算法。
优选地,所述硬点表通过以下步骤建立:
使用Matlab读取所述硬点文件中各硬点的坐标数值导入一EXCEL文件中,在所述EXCEL文件的第一表单中存放有所述各硬点名称、坐标数值以及相邻两个坐标之间的距离;在所述EXCEL文件的第二表单的第一列放置硬点坐标名称,第二列链接到第一表单中相应的坐标数值,第三列连接到第一表单中的相应的两个坐标之间的距离,所述EXCEL文件即为所述可修改的硬点表。
优选地,所述步骤S4具体包括如下步骤:
使用CATIA软件的参数输入功能将所述硬点表中的坐标名称及其数值以长度参数的形式导入所述BIM初始模型中;
使用CATIA软件的设计表工具把所述硬点表以设计表的形式导入到所述BIM初始模型,导入时指明导入硬点表EXCEL文件第二表单;
使用CATIA软件的公式编辑器工具把BIM初始模型中各硬点的坐标数值换成相应的设计参数;
使用CATIA软件的发布工具发布所述BIM初始模型中的各硬点。
本发明具有以下有益效果:
通过可修改的硬点表以及自定义的虚拟作动器进行模型的驱动,从而减少工作量,提高工程量模型构建的效率。
具体实施方式
为了使本发明的目的及优点更加清楚明白,以下结合实施例对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。
本发明实施例提供了一种土建BIM工程量模型的构建方法,包括如下步骤:
S1、获取或者构建BIM初始模型;
S2、获取BIM初始模型的硬点文件,所述硬点文件中至少包括所述BIM初始模型的各硬点的位置信息;
S3、读取硬点文件中各硬点的坐标数值,形成一个可修改的硬点表;所述硬点表通过以下步骤建立:
使用Matlab读取所述硬点文件中各硬点的坐标数值导入一EXCEL文件中,在所述EXCEL文件的第一表单中存放有所述各硬点名称、坐标数值以及相邻两个坐标之间的距离;在所述EXCEL文件的第二表单的第一列放置硬点坐标名称,第二列链接到第一表单中相应的坐标数值,第三列连接到第一表单中的相应的两个坐标之间的距离,所述EXCEL文件即为所述可修改的硬点表。
S4、对所述BIM初始模型进行参数化处理,使所述BIM初始模型与硬点表建立关联,并发布BIM初始模型中已关联的各硬点;具体的:
使用CATIA软件的参数输入功能将所述硬点表中的坐标名称及其数值以长度参数的形式导入所述BIM初始模型中;
使用CATIA软件的设计表工具把所述硬点表以设计表的形式导入到所述BIM初始模型,导入时指明导入硬点表EXCEL文件第二表单;
使用CATIA软件的公式编辑器工具把BIM初始模型中各硬点的坐标数值换成相应的设计参数;
使用CATIA软件的发布工具发布所述BIM初始模型中的各硬点。
S5、在所构建的BIM初始模型中插入虚拟参数作动器,所述虚拟参数作动器用于驱动参数变化,与BIM初始模型中的各参数建立关系后,在指定的范围内对硬点表进行变动;
S6、所述的BIM初始模型根据所得的硬点表进行自主变动,输出BIM工程量模型。
所述虚拟参数作动器通过驱动仿真分析模块针对不同的参数进行计算求解,从而输出对应的硬点表。所述虚拟参数作动器还用于根据硬点表驱动对应的BIM模型作动模块进行BIM初始模型的改变。
所述BIM作动模块内设有若干模型变化算法。
以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以作出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。
Claims (6)
1.一种土建BIM工程量模型的构建方法,其特征在于,包括如下步骤:
S1、获取或者构建BIM初始模型;
S2、获取BIM初始模型的硬点文件,所述硬点文件中至少包括所述BIM初始模型的各硬点的位置信息;
S3、读取硬点文件中各硬点的坐标数值,形成一个可修改的硬点表;
S4、对所述BIM初始模型进行参数化处理,使所述BIM初始模型与硬点表建立关联,并发布BIM初始模型中已关联的各硬点;
S5、在所构建的BIM初始模型中插入虚拟参数作动器,所述虚拟参数作动器用于驱动参数变化,与BIM初始模型中的各参数建立关系后,在指定的范围内对硬点表进行变动;
S6、所述的BIM初始模型根据所得的硬点表进行自主变动,输出BIM工程量模型。
2.如权利要求1所述的一种土建BIM工程量模型的构建方法,其特征在于,所述虚拟参数作动器通过驱动仿真分析模块针对不同的参数进行计算求解,从而输出对应的硬点表。
3.如权利要求1所述的一种土建BIM工程量模型的构建方法,其特征在于,所述虚拟参数作动器还用于根据硬点表驱动对应的BIM模型作动模块进行BIM初始模型的改变。
4.如权利要求3所述的一种土建BIM工程量模型的构建方法,其特征在于,所述BIM作动模块内设有若干模型变化算法。
5.如权利要求1所述的一种土建BIM工程量模型的构建方法,其特征在于,所述硬点表通过以下步骤建立:
使用Matlab读取所述硬点文件中各硬点的坐标数值导入一EXCEL文件中,在所述EXCEL文件的第一表单中存放有所述各硬点名称、坐标数值以及相邻两个坐标之间的距离;在所述EXCEL文件的第二表单的第一列放置硬点坐标名称,第二列链接到第一表单中相应的坐标数值,第三列连接到第一表单中的相应的两个坐标之间的距离,所述EXCEL文件即为所述可修改的硬点表。
6.如权利要求1所述的一种土建BIM工程量模型的构建方法,其特征在于,所述步骤S4具体包括如下步骤:
使用CATIA软件的参数输入功能将所述硬点表中的坐标名称及其数值以长度参数的形式导入所述BIM初始模型中;
使用CATIA软件的设计表工具把所述硬点表以设计表的形式导入到所述BIM初始模型,导入时指明导入硬点表EXCEL文件第二表单;
使用CATIA软件的公式编辑器工具把BIM初始模型中各硬点的坐标数值换成相应的设计参数;
使用CATIA软件的发布工具发布所述BIM初始模型中的各硬点。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810430821.7A CN108334724A (zh) | 2018-05-08 | 2018-05-08 | 一种土建bim工程量模型的构建方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810430821.7A CN108334724A (zh) | 2018-05-08 | 2018-05-08 | 一种土建bim工程量模型的构建方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108334724A true CN108334724A (zh) | 2018-07-27 |
Family
ID=62934939
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810430821.7A Pending CN108334724A (zh) | 2018-05-08 | 2018-05-08 | 一种土建bim工程量模型的构建方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108334724A (zh) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109657290A (zh) * | 2018-11-28 | 2019-04-19 | 中国电建集团贵阳勘测设计研究院有限公司 | 基于CATIA与Excel的心墙坝设计方法 |
CN110059121A (zh) * | 2019-03-12 | 2019-07-26 | 广州明珞汽车装备有限公司 | 一种快速导出物料清单的方法、系统、装置和存储介质 |
CN111241660A (zh) * | 2019-12-31 | 2020-06-05 | 湖南高速铁路职业技术学院 | 一种基于云计算技术的土木工程实验检测系统及方法 |
CN111369226A (zh) * | 2020-03-27 | 2020-07-03 | 陕西工业职业技术学院 | 一种基于bim的工程进度监督系统 |
CN111914380A (zh) * | 2019-05-09 | 2020-11-10 | 广州汽车集团股份有限公司 | 零件模型的确定方法、装置、计算机设备和存储介质 |
CN111985034A (zh) * | 2020-08-25 | 2020-11-24 | 成都建工装饰装修有限公司 | 一种学校土建bim工程量模型的构建方法及其系统 |
CN112182736A (zh) * | 2020-11-06 | 2021-01-05 | 上海水业设计工程有限公司 | 基于特征模型的地下构筑物参数化bim构建方法 |
CN112395677A (zh) * | 2020-11-19 | 2021-02-23 | 温岭市第一建筑工程有限公司 | 一种土建bim工程量模型的构建方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104657510A (zh) * | 2015-03-19 | 2015-05-27 | 中铁二局第五工程有限公司 | 一种利用bim实现钢桁拱桥快速建模的方法及装置 |
CN105302978A (zh) * | 2015-11-10 | 2016-02-03 | 上海建工集团股份有限公司 | 一种工程量计算方法和设备 |
CN106650069A (zh) * | 2016-12-12 | 2017-05-10 | 黄河科技学院 | 一种绿色建筑的分析与设计方法 |
CN107301278A (zh) * | 2017-05-26 | 2017-10-27 | 西安航空学院 | 一种模拟新型建筑工程规划系统 |
CN107704703A (zh) * | 2017-10-19 | 2018-02-16 | 广州中建亿信科技有限公司 | 一种土建bim工程量模型的构建方法 |
-
2018
- 2018-05-08 CN CN201810430821.7A patent/CN108334724A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104657510A (zh) * | 2015-03-19 | 2015-05-27 | 中铁二局第五工程有限公司 | 一种利用bim实现钢桁拱桥快速建模的方法及装置 |
CN105302978A (zh) * | 2015-11-10 | 2016-02-03 | 上海建工集团股份有限公司 | 一种工程量计算方法和设备 |
CN106650069A (zh) * | 2016-12-12 | 2017-05-10 | 黄河科技学院 | 一种绿色建筑的分析与设计方法 |
CN107301278A (zh) * | 2017-05-26 | 2017-10-27 | 西安航空学院 | 一种模拟新型建筑工程规划系统 |
CN107704703A (zh) * | 2017-10-19 | 2018-02-16 | 广州中建亿信科技有限公司 | 一种土建bim工程量模型的构建方法 |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109657290A (zh) * | 2018-11-28 | 2019-04-19 | 中国电建集团贵阳勘测设计研究院有限公司 | 基于CATIA与Excel的心墙坝设计方法 |
CN110059121A (zh) * | 2019-03-12 | 2019-07-26 | 广州明珞汽车装备有限公司 | 一种快速导出物料清单的方法、系统、装置和存储介质 |
CN110059121B (zh) * | 2019-03-12 | 2021-09-03 | 广州明珞汽车装备有限公司 | 一种快速导出物料清单的方法、系统、装置和存储介质 |
CN111914380A (zh) * | 2019-05-09 | 2020-11-10 | 广州汽车集团股份有限公司 | 零件模型的确定方法、装置、计算机设备和存储介质 |
CN111241660A (zh) * | 2019-12-31 | 2020-06-05 | 湖南高速铁路职业技术学院 | 一种基于云计算技术的土木工程实验检测系统及方法 |
CN111241660B (zh) * | 2019-12-31 | 2023-05-12 | 湖南高速铁路职业技术学院 | 一种基于云计算技术的土木工程实验检测系统及方法 |
CN111369226A (zh) * | 2020-03-27 | 2020-07-03 | 陕西工业职业技术学院 | 一种基于bim的工程进度监督系统 |
CN111985034A (zh) * | 2020-08-25 | 2020-11-24 | 成都建工装饰装修有限公司 | 一种学校土建bim工程量模型的构建方法及其系统 |
CN112182736A (zh) * | 2020-11-06 | 2021-01-05 | 上海水业设计工程有限公司 | 基于特征模型的地下构筑物参数化bim构建方法 |
CN112395677A (zh) * | 2020-11-19 | 2021-02-23 | 温岭市第一建筑工程有限公司 | 一种土建bim工程量模型的构建方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108334724A (zh) | 一种土建bim工程量模型的构建方法 | |
CN107562833B (zh) | 基于等高线的复杂地形三维离散单元法数值模型建模方法 | |
CN104217063B (zh) | 用于钢轨轧制孔型的仿真设计方法 | |
CN107491610A (zh) | 汽车覆盖件模具智能设计系统及设计方法 | |
CN105242538B (zh) | 基于图层的零件多加工工序mbd模型及实现方法 | |
CN105447253B (zh) | 一种三维工艺数据的集成方法 | |
CN101673276B (zh) | 一种数据模板的动态生成方法和装置 | |
Jong et al. | Automatic process planning of mold components with integration of feature recognition and group technology | |
CN107392998A (zh) | 一种基于三维模型的工艺设计方法及系统 | |
CN105700466A (zh) | 高速数控加工轨迹的曲率光顺方法 | |
CN102332049B (zh) | 钣金件工艺耳片快速设计方法 | |
CN108647450A (zh) | 一种基于bim技术的预埋大地脚螺栓施工方法 | |
CN103869755B (zh) | 一种调整加工代码进给速度来保证机床输出功率平滑的方法 | |
CN106650069A (zh) | 一种绿色建筑的分析与设计方法 | |
CN109086495A (zh) | Bim出精装施工图的方法 | |
CN106994483A (zh) | 一种汽车覆盖件拉延模具精确型面加工的方法 | |
CN106570303A (zh) | 一种基于用户自定义特征的壁板零件mbd工序模型设计方法 | |
CN103106313B (zh) | 轧后件顺序重构方法 | |
CN110990923A (zh) | 水利水电工程双曲拱坝的快速工程计算方法、系统及介质 | |
CN103729516B (zh) | 三维工艺的逆序建模方法及装置 | |
CN103065020A (zh) | 一种渐开线齿轮精指形铣刀cad 制图应用方法 | |
CN111832113A (zh) | 基于bim技术的铝合金模板配模方法 | |
CN103942397A (zh) | 基于幂函数的修形齿轮数字化建模方法 | |
CN115774946A (zh) | 基于slp的三维设施规划与物流分析方法、系统及应用 | |
CN110222385A (zh) | 一种基于参数化的船用旋塞快速建模方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180727 |
|
RJ01 | Rejection of invention patent application after publication |