CN108331525B - It is a kind of to soak mine device on the spot - Google Patents
It is a kind of to soak mine device on the spot Download PDFInfo
- Publication number
- CN108331525B CN108331525B CN201810063357.2A CN201810063357A CN108331525B CN 108331525 B CN108331525 B CN 108331525B CN 201810063357 A CN201810063357 A CN 201810063357A CN 108331525 B CN108331525 B CN 108331525B
- Authority
- CN
- China
- Prior art keywords
- cavity
- water pipe
- guide runner
- guide
- slider guide
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B1/00—Percussion drilling
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22B—PRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
- C22B3/00—Extraction of metal compounds from ores or concentrates by wet processes
- C22B3/02—Apparatus therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P10/00—Technologies related to metal processing
- Y02P10/20—Recycling
Abstract
Mine device is soaked on the spot the invention discloses a kind of, the boring the ground mechanism of the ore soaking machine body right end is set including ore soaking machine body and articulated connection, the first pedestal to be articulated and connected with the first support arm other end is installed on the ore soaking machine body right end end face, the second pedestal is equipped at the top of first pedestal, the first guide runner is equipped in the ore soaking machine body, the first slider guide is slidably connected in first guide runner, the first motor is embedded in the inner wall of first guide runner left end, the first slider guide screw-internal thread fit is connected with the adjusting threaded rod that left and right extends, the adjusting threaded rod left end extending end is connected by power with the first motor right end end, what transition fit connection extended downwardly in first slider guide has multiple-segment telescopic tube;The configuration of the present invention is simple, it is easy to operate, convenient for storage, it is moved easily and carries, meanwhile, improve mineral leaching efficiency and effect.
Description
Technical field
It is specifically a kind of to soak mine device on the spot the present invention relates to leaching mine equipment technical field.
Background technique
Novel species substance is all being sought in the whole world at present, constantly extracts various new elements from ore kind, is then tested,
But there are bottlenecks for current mining technique on the spot, since required ore is all to carry general large size positioned at remote mountain area
It is time-consuming and laborious to soak mine equipment, and general leaching mine equipment is all several equipment work in combination, required operator's quantity is more, behaviour
Make complexity, it is more to soak the required liquid slag inclusion quantity extracted after mine, it is difficult to it extracts, brings a major problem to leaching mine overall work,
Therefore, it is badly in need of a kind of leaching mine device on the spot at present.
Summary of the invention
Mine device is soaked on the spot technical problem to be solved by the invention is to provide a kind of, is able to solve above-mentioned present technology
The problems in.
The present invention is achieved through the following technical solutions: a kind of leaching mine device, including ore soaking machine on the spot of the invention
Body and articulated connection are arranged in the boring the ground mechanism of the ore soaking machine body right end, the boring the ground mechanism be equipped with the first support arm,
Second support arm and electric hammer head body, first support arm one end and second support arm one end are articulated and connected, institute
The second support arm other end is stated to be fixedly connected with electric hammer head body left end end face, it is solid on the ore soaking machine body right end end face
Equipped with the first pedestal to be articulated and connected with the first support arm other end, crus secunda is equipped at the top of first pedestal
Seat, the ore soaking machine body is interior to be equipped with the first guide runner, is slidably connected with the first slider guide in first guide runner, described
The first motor is embedded in first guide runner left end inner wall, the first slider guide screw-internal thread fit is connected with what left and right extended
Threaded rod is adjusted, the adjusting threaded rod left end extending end is connected by power with the first motor right end end, and described the
What transition fit connection extended downwardly in one slider guide has multiple-segment telescopic tube, and the multiple-segment telescopic tube runs through first slider guide
Bottom end face, be embedded in first slider guide at the top of the multiple-segment telescopic tube being connected to the multiple-segment telescopic tube and
The first water pipe upwardly extended is also embedded in first slider guide to be connected to first water pipe and extend to the left
Second water pipe, second water pipe left end extending end is in first slider guide left end end face, first guide runner
The third water pipe for being equipped with and extending to the left, the first slide guide slot position are communicated in the left end inner wall at the top of first motor
In being equipped with metal hose for being connected to second water pipe and third water pipe, the third water in first slider guide left end
Pipe left end extending end, which communicates, is equipped with the 4th water pipe that upwardly extends, and for being equipped with and extending to the right is communicated in the middle part of the 4th water pipe
Five water pipes, the 5th water pipe right end extending end are communicated equipped with water outlet pump, are equipped with barrier gate in the middle part of the 5th water pipe, it is described go out
Suction pump is equipped at the top of water pump, suction pump left end end communicates to be equipped with and interlink with extending end at the top of the 4th water pipe
The 7th water pipe connect, suction pump right end end communicate the 8th water pipe for being equipped with and extending to the right, the first guide runner top
Equipped with the first cavity, the first cavity top inner wall is connected with the 8th water pipe, and square is equipped in the middle part of first cavity
Shape filter frame, the top cap frame outside are fixedly connected with the first cavity vertical inner wall, the top cap frame
Frame is fixedly provided with filter screen, and described first cavity or so end, which communicates, is equipped with symmetrical storage slag chamber, in first cavity rear end
Connection is equipped with the second guide runner in wall, and driving scraping mechanism is equipped in second guide runner.
Preferably technical solution, the first support arm top end surface are installed with third pedestal, the third pedestal
It is hingedly connected with the first hydraulically extensible column between second pedestal, is installed with the 4th on the first support arm bottom end face
Pedestal is installed with the 5th pedestal on the second support arm bottom end face, cuts with scissors between the 4th pedestal and the 5th pedestal
It is connected to the second hydraulic column in succession.
Preferably technical solution, the metal hose have enough surpluses in the first guide runner.
Preferably technical solution, is equipped with the second cavity that Open Side Down in the body of the electric hammer head, and described second
Cavity bottom is sequentially communicated from top to bottom is equipped with the third guide runner extended downwardly, the third cavity that Open Side Down, the third
Cavity left end top inner wall is communicated equipped with the 4th cavity, and second cavity left end is equipped with the 5th cavity extended up and down, described
It is rotatably assorted in inner wall between second cavity and the 5th cavity and is connected with the first rotation axis that left and right extends, described the
One rotation axis right end extending end puts in second cavity and is installed with the first cam, the first cam long section right end end
Face is hingedly connected with the connecting rod extended downwardly, and the connecting rod bottom end is put in the third guide runner, the third
The second slider guide of top end surface and connecting rod articulated connection, the third guide runner are slidably connected in guide runner
It is interior to be connected with piston positioned at the second slider guide basal sliding, it is rotatably assorted in the third cavity and is connected with outer cone tooth
Jacket cylinder, the outer cone flute profile sleeve is interior to be equipped with the 6th cavity, is slidably connected with third slider guide in the 6th cavity,
The first push rod upwardly extended is equipped at the top of the third slider guide, first push rod is put in the third guide runner, institute
It states and is slidably connected with the auger spindle extended up and down in the 6th cavity bottom inner wall, extending end puts in institute at the top of the auger spindle
It states in the 6th cavity and is fixedly connected with the third slider guide bottom end face, auger spindle bottom extending end stretches out the electricity
Outside tup portion organism bottom end face, first rotation axis left end extending end is put in the 5th cavity and in end power
It is connected with the second motor, second motor outer surface is embedded in the inner wall of the 5th cavity left end and company fixed thereto
Connect, first rotation axis is located at the part in the 5th cavity equipped with the first sprocket wheel, the first sprocket wheel cochain be connected to
Lower extension chain is rotatably assorted between the 4th cavity and the 5th cavity and is connected with the second rotation axis of left and right extension, institute
The second rotation axis left end extending end is stated to put in the 5th cavity and be installed with the second chain to connect with the chain
Wheel, the second rotation axis right end extending end put in the 4th cavity and be installed with to the outer cone flute profile sleeve
Ratcheting first bevel gear.
Preferably technical solution, the driving scraping mechanism include sliding with top cap frame roof end face
The slide plate being slidably connected in the scraper plate and second guide runner being connected with, the slide plate front end surface
It is fixedly connected with scraper plate rear end end, the 4th guide runner extended up and down, second slide guide is equipped in the slide plate
It is embedded with third motor in the inner wall of slot rear end, the third motor front end has been connected by power the second cam, and described
Two cam front end surfaces are equipped with the support rod to be slidably connected with the 4th guide runner.
Preferably technical solution, the multiple-segment telescopic tube respectively save between be slidably connected.
Preferably technical solution, there are four wheels for the setting of ore soaking machine body bottom.
The beneficial effects of the present invention are: the configuration of the present invention is simple, easy to operate, it is hingedly connected with by ore soaking machine body left end
Effectively boring the ground punching on the spot may be implemented in boring the ground mechanism, convenient for the progress that subsequent leaching miner makees, solves the maximum for soaking mine on the spot
Problem is slidably connected with the further through opening the first guide runner to the right is provided in ore soaking machine body in the first guide runner
One slider guide, the first slider guide screw-internal thread fit are connected with the adjusting threaded rod that left and right extends, and adjust threaded rod left end and extend end
End has been connected by power the first motor, and the first motor outer surface is embedded in the first guide runner left end inner wall, and fixed thereto
Connection, the first slider guide is interior to be equipped with the multiple-segment telescopic tube that Open Side Down, communicates at the top of multiple-segment telescopic tube and runs through equipped with left end end
Second water pipe of the first slider guide left end end face, the interior perforation of the first guide runner left end inner wall are embedded with the third water that left and right extends
Pipe, the interior metal being connected with second water pipe and third water pipe being equipped with positioned at the first slider guide left end of the first guide runner
Hose, third water pipe left end end are connected the 4th water pipe extended up and down, and right end is equipped with water outlet pump in the middle part of the 4th water pipe, out
It is communicated between water pump and the 4th water pipe equipped with the 5th water pipe, the 5th water pipe is equipped with barrier gate, and the 4th water pipe top end right end is set
There is suction pump, suction pump left end end is connected with the 4th water pipe end, and suction pump right end is communicated equipped with the 7th water pipe, and first
The first cavity is equipped at the top of guide runner, the first cavity top inner wall is connected with the 7th water pipe right end end, in the first cavity
Equipped with rectangular sieve frame, it is equipped with filter screen in rectangular sieve frame, communicates in the first cavity rear end inner wall equipped with the second slide guide
Slot, the second guide runner is interior to be equipped with driving screeding device, communicates in the first cavity both ends inner wall equipped with symmetrical storage slag chamber, thus
It realizes automatic note ore leachate and absorbs the solution after leaching mine, required solution obtains purer extracting solution by filtering, can be with
It carries out leaching miner in maximum magnitude to make, time saving and energy saving, cheap, easy to remove, high degree of automation, meanwhile, it improves just
The efficiency and effect of ground leaching mine.
Detailed description of the invention
The present invention is described in detail by following specific embodiments and drawings for ease of explanation,.
Fig. 1 is a kind of leaching mine device overall structure diagram on the spot of the invention;
Fig. 2 is the structural schematic diagram of A in Fig. 1;
Fig. 3 is the structural schematic diagram of B in Fig. 2;
Fig. 4 is the structural schematic diagram of electric hammer head body of the invention.
Specific embodiment
As Figure 1-Figure 4, a kind of leaching mine device on the spot of the invention, including ore soaking machine body 2 and articulated connection setting
In the boring the ground mechanism of 2 right end of ore soaking machine body, the boring the ground mechanism is equipped with the first support arm 4, the second support arm 5 and electricity
Tup portion body 6, described first support arm, 4 one end and described second support arm, 5 one end are articulated and connected, second support arm 5
The other end is fixedly connected with 6 left end end face of electric hammer head body, be installed on the 2 right end end face of ore soaking machine body to
First pedestal 28 of 4 other end of the first support arm articulated connection is equipped with the second pedestal 29, institute at the top of first pedestal 28
It states and is equipped with the first guide runner 21 in ore soaking machine body 2, be slidably connected with the first slider guide 3, institute in first guide runner 21
It states and is embedded with the first motor 211 in 21 left end inner wall of the first guide runner, 3 screw-internal thread fit of the first slider guide is connected with a left side
The adjusting threaded rod 212 of right extension, the 212 left end extending end of adjusting threaded rod and 211 right end of the first motor end
End is connected by power, and what transition fit connection extended downwardly in first slider guide 3 has multiple-segment telescopic tube 32, the multi-joint telescoping
Pipe 32 runs through 3 bottom end face of the first slider guide, is embedded in first slider guide 3 at 32 top of multiple-segment telescopic tube
To the first water pipe 31 for being connected to and upwardly extending with the multiple-segment telescopic tube 32, also it is embedded in first slider guide 3 useful
With the second water pipe 33 for being connected to first water pipe 31 and extending to the left, the 33 left end extending end of the second water pipe runs through institute
3 left end end face of the first slider guide is stated, is located in the left end inner wall at 211 top of the first motor in first guide runner 21
The third water pipe 214 for being equipped with and extending to the left is communicated, first guide runner 21, which is located to be equipped in 3 left end of the first slider guide, to be used
In the metal hose 213 for being connected to second water pipe 33 and third water pipe 214, the 214 left end extending end phase of third water pipe
It is logical to be equipped with the 4th water pipe 26 upwardly extended, the 5th water pipe 241 for being equipped with and extending to the right, institute are communicated in the middle part of the 4th water pipe 26
It states 241 right end extending end of the 5th water pipe to communicate equipped with water outlet pump 24, barrier gate 242 is equipped in the middle part of the 5th water pipe 241, it is described
Suction pump 25 is equipped at the top of water outlet pump 24, the 25 left end end of suction pump, which communicates, to be equipped with and extend at the top of the 4th water pipe 26
The 7th water pipe 252 that end is connected, the 25 right end end of suction pump communicate the 8th water pipe 252 for being equipped with and extending to the right,
The first cavity 22,22 top inner wall of the first cavity and 252 phase of the 8th water pipe are equipped at the top of first guide runner 21
It is connected to, top cap frame 221,221 outside of top cap frame and described first is equipped in the middle part of first cavity 22
22 vertical inner wall of cavity is fixedly connected, and the top cap frame 221 is fixedly provided with filter screen 224, first cavity 22
Left and right end, which communicates, is equipped with symmetrical storage slag chamber 23, and connection is equipped with the second guide runner 27, institute in the 22 rear end inner wall of the first cavity
It states and is equipped with driving scraping mechanism in the second guide runner 27.
Valuably, 4 top end surface of the first support arm is installed with third pedestal 41, the third pedestal 41 and described the
It is hingedly connected with the first hydraulically extensible column 42 between two pedestals 29, is installed with the 4th foot on 4 bottom end face of the first support arm
Seat 43 is installed with the 5th pedestal 51, the 4th pedestal 43 and the 5th pedestal 51 on second support arm, 5 bottom end face
Between be hingedly connected with the second hydraulic column 44, realize any activity of electric hammer head body 6 that automatically controls, be leaching mine in maximum magnitude
Punching improves the effect of leaching mine.
Valuably, the metal hose 213 has enough surpluses in the first guide runner 21, wear-resisting and prevent from being drawn
It is disconnected.
Valuably, the second cavity 61 that Open Side Down, 61 bottom of the second cavity are equipped in electric hammer head body 6
It is sequentially communicated from top to bottom and is equipped with the third guide runner 63 extended downwardly, the third cavity 64 that Open Side Down, the third cavity
64 left end top inner walls are communicated equipped with the 4th cavity 65, and 61 left end of the second cavity is equipped with the 5th cavity 62 extended up and down,
It is rotatably assorted in inner wall between second cavity 61 and the 5th cavity 62 and is connected with the first rotation that left and right extends
Axis 611, the 611 right end extending end of the first rotation axis put in second cavity 61 and are installed with the first cam 612, institute
It states the long section right end end face of the first cam 612 and is hingedly connected with the connecting rod 613 extended downwardly, 613 bottom end of connecting rod
It puts in the third guide runner 63, is slidably connected with top end surface and the connecting rod in the third guide runner 63
Second slider guide 631 of 613 articulated connections, the third guide runner 63 is interior to match positioned at 631 basal sliding of the second slider guide
Conjunction is connected with piston 632, is rotatably assorted in the third cavity 64 and is connected with outer cone flute profile sleeve 641, the outer cone flute profile set
It is equipped with the 6th cavity 642 in cylinder 641, is slidably connected with third slider guide 6421, the third in the 6th cavity 643
The first push rod 643 upwardly extended is equipped at the top of slider guide 6421, first push rod 643 puts in the third guide runner 63
It is interior, the auger spindle 644 extended up and down, 644 top of auger spindle are slidably connected in the 642 bottom interior wall body of the 6th cavity
Extending end puts in the 6th cavity 642 and is fixedly connected with 6421 bottom end face of third slider guide, the auger spindle
644 bottom extending ends stretch out outside 6 bottom end face of electric hammer head body, the 611 left end extending end of the first rotation axis
It puts in the 5th cavity 62 and has been connected by power the second motor 622 in end, 622 outer surface of the second motor is embedding
In the 62 left end inner wall of the 5th cavity and connection fixed thereto, first rotation axis 611 are located at the 5th cavity
Part in 62 is equipped with the first sprocket wheel 621, and 621 cochain of the first sprocket wheel, which is connected to, extends downwardly chain 623, the 4th cavity
It is rotatably assorted between 65 and the 5th cavity 62 and is connected with the second rotation axis 624 of left and right extension, second rotation axis 624 is left
End extending end puts in the 5th cavity 62 and is installed with the second sprocket wheel 625 to connect with the chain 623, described
Second rotation axis, 624 right end extending end put in the 4th cavity 65 and be installed with to the outer cone flute profile sleeve
641 ratcheting first bevel gears 651 increase drilling efficiency to realize vertical tremor and the rotation of auger spindle.
Valuably, the driving scraping mechanism includes being slidably connected with 221 top end surface of top cap frame
The slide plate 273 being slidably connected in some scraper plates 222 and second guide runner 27,273 front end of slide plate
End face is fixedly connected with the 222 rear end end of scraper plate, is equipped with the 4th guide runner extended up and down in the slide plate 273
2731, third motor 272,272 front end of third motor are embedded in the 27 rear end inner wall of the second guide runner
It is connected by power the second cam 271,271 front end surface of the second cam is equipped with to slide with the 4th guide runner 2731
The support rod 274 of mating connection realizes the left and right working in reciprocating mode for automatically controlling scraper plate, prevents filter screen from blocking.
Valuably, it is slidably connected between each section of the multiple-segment telescopic tube 32, realizes and etchant depth capacity is soaked into mine.
Valuably, there are four wheel, devices easy to remove for 2 bottom of the ore soaking machine body setting.
When original state, the first support arm 4 is located at vertical position, and the second support arm 5 is horizontally situated, the first slider guide
3 are located at 21 right end of the first guide runner, and multiple-segment telescopic tube 32 is shunk completely in the first slider guide, and support rod 274 is located at second
Above 271 center line of cam, slide plate 273 is located at 27 middle part of the second guide runner, and scraper plate 222 is made to be located at 22 middle part of the first cavity, the
The long section of one cam 612 is located at center line back end, at this point, the second slider guide 631 is located at the middle part of sliding stroke, third slider guide
6421 are located at 642 top of the 6th cavity, and 643 depth capacity of the first push rod protrudes into third guide runner 63, at this point, piston 632
Bottom presses 643 top end of the first push rod.
When need to soak miner make when, device is moved integrally to the position of required leaching mine, at this point, automatically controlling first hydraulic
5 free extension of telescopic mast 4 and the second hydraulically extensible column, the ore position to drill needed for contacting electric hammer head body 6, meanwhile,
It controls the second motor 622 and drives the rotation of the first rotation axis 611, the first rotation axis 611 drives the first sprocket wheel 621 and the first cam
612 rotations, the first cam 612 drive connecting rod 613 that the second slider guide 631 is pushed to move back and forth up and down, when the first cam 612 is long
When section is located at bottom, the second slider guide 631 is located at the bottommost of sliding stroke, and 631 impact piston 632 of the second slider guide makes to live
Plug 632 forms huge impact force, so that the first push rod 643 is quickly moved down and third slider guide 6421 is driven to move down, third slide guide
Block 6421 drives auger spindle 644 quickly to move down, and when the long section of the first cam 612 is located at top, the second slider guide 631 is located at sliding
The top of stroke quickly moves up at this point, top pressure spring 6422 presses third slider guide 6421, and drives 643 He of the first push rod
Auger spindle 644 quickly moves up, 643 impact piston 632 of the first push rod, makes piston 632 that there is mobile inertia to move up a distance,
It successively moves back and forth, realizes boring the ground work, meanwhile, the first sprocket wheel 621 drives chain 623 to rotate, and chain 623 drives the second sprocket wheel
625 rotations, the second sprocket wheel 625 drive the rotation of the second rotation axis 624, and the second rotation axis 624 drives first bevel gear 651 to rotate,
First bevel gear 651 drives external tooth type sleeve 641 to rotate, and external tooth type sleeve 641 drives auger spindle 644 to rotate, to accelerate boring the ground
First support arm 4 and the second support arm 5 are restored to initial position when completing boring the ground work, at this point, control first by speed
Motor 211, which drives, adjusts the rotation of threaded rod 212, moves to right the first slider guide 3 and skids off outside the first guide runner 21, works as multi-joint telescoping
When pipe 32 is located at the top of institute bore position, the first motor 211 of control shuts down, by the elongation of multiple-segment telescopic tube 32 to being drilled
Bottom, at this point, opening barrier gate 242, the control operating of water outlet pump 24 fills solvent into drilling, when soaking mine completion, closes barrier gate
242, control suction pump 25 extracts the solution in drilling out, and solution, which enters in the first cavity 22, to be sprinkling upon on filter screen 224, at this point,
It controls third motor 272 and drives the rotation of the second cam 271, the second cam 271 drives support rod 274 to rotate, and keeps slide plate 273 left
It moves right, slide plate 273 drives scraper plate 222 to move left and right, and the indissoluble composition granule on filter screen 224 is blown into storage slag chamber 23.
The beneficial effects of the present invention are: the configuration of the present invention is simple, easy to operate, it is hingedly connected with by ore soaking machine body left end
Effectively boring the ground punching on the spot may be implemented in boring the ground mechanism, convenient for the progress that subsequent leaching miner makees, solves the maximum for soaking mine on the spot
Problem is slidably connected with the further through opening the first guide runner to the right is provided in ore soaking machine body in the first guide runner
One slider guide, the first slider guide screw-internal thread fit are connected with the adjusting threaded rod that left and right extends, and adjust threaded rod left end and extend end
End has been connected by power the first motor, and the first motor outer surface is embedded in the first guide runner left end inner wall, and fixed thereto
Connection, the first slider guide is interior to be equipped with the multiple-segment telescopic tube that Open Side Down, communicates at the top of multiple-segment telescopic tube and runs through equipped with left end end
Second water pipe of the first slider guide left end end face, the interior perforation of the first guide runner left end inner wall are embedded with the third water that left and right extends
Pipe, the interior metal being connected with second water pipe and third water pipe being equipped with positioned at the first slider guide left end of the first guide runner
Hose, third water pipe left end end are connected the 4th water pipe extended up and down, and right end is equipped with water outlet pump in the middle part of the 4th water pipe, out
It is communicated between water pump and the 4th water pipe equipped with the 5th water pipe, the 5th water pipe is equipped with barrier gate, and the 4th water pipe top end right end is set
There is suction pump, suction pump left end end is connected with the 4th water pipe end, and suction pump right end is communicated equipped with the 7th water pipe, and first
The first cavity is equipped at the top of guide runner, the first cavity top inner wall is connected with the 7th water pipe right end end, in the first cavity
Equipped with rectangular sieve frame, it is equipped with filter screen in rectangular sieve frame, communicates in the first cavity rear end inner wall equipped with the second slide guide
Slot, the second guide runner is interior to be equipped with driving screeding device, communicates in the first cavity both ends inner wall equipped with symmetrical storage slag chamber, thus
It realizes automatic note ore leachate and absorbs the solution after leaching mine, required solution obtains purer extracting solution by filtering, can be with
It carries out leaching miner in maximum magnitude to make, time saving and energy saving, cheap, occupied area is small, easy to remove, high degree of automation, together
When, improve the efficiency and effect for soaking mine on the spot.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any
The change or replacement expected without creative work, should be covered by the protection scope of the present invention.Therefore, of the invention
Protection scope should be determined by the scope of protection defined in the claims.
Claims (7)
1. a kind of soak mine device on the spot, the boring the ground machine of the ore soaking machine body right end is set including ore soaking machine body and articulated connection
Structure, it is characterised in that: the boring the ground mechanism is equipped with the first support arm, the second support arm and electric hammer head body, and described the
One support arm one end and second support arm one end are articulated and connected, the second support arm other end and electric hammer head machine
Body left end end face is fixedly connected, and is installed on the ore soaking machine body right end end face to hinged with the first support arm other end
First pedestal of connection, the first pedestal top are equipped with the second pedestal, and the first guide runner is equipped in the ore soaking machine body, described
The first slider guide is slidably connected in first guide runner, it is electronic to be embedded with first in the inner wall of first guide runner left end
Machine, the first slider guide screw-internal thread fit are connected with the adjusting threaded rod that left and right extends, and the adjusting threaded rod left end extends
End is connected by power with the first motor right end end, and what transition fit connection extended downwardly in first slider guide has
Multiple-segment telescopic tube, the multiple-segment telescopic tube runs through the first slider guide bottom end face, described at the top of the multiple-segment telescopic tube
The first water pipe to be connected to and upwardly extend with the multiple-segment telescopic tube, first slider guide are embedded in first slider guide
Inside also it is embedded with the second water pipe to be connected to first water pipe and extend to the left, second water pipe left end extending end
Through first slider guide left end end face, in first guide runner in the left end inner wall at the top of first motor
The third water pipe for being equipped with and extending to the left is communicated, first guide runner, which is located in first slider guide left end, to be equipped with for being connected to
The metal hose of second water pipe and third water pipe, third water pipe left end extending end communicate for being equipped with and upwardly extending
Four water pipes, the 4th water pipe middle part communicate the 5th water pipe for being equipped with and extending to the right, the 5th water pipe right end extending end phase
It is logical to be equipped with water outlet pump, it is equipped with barrier gate in the middle part of the 5th water pipe, is equipped with suction pump, the suction pump left end at the top of the water outlet pump
End communicates the 7th water pipe being equipped with extending end is connected at the top of the 4th water pipe, suction pump right end end phase
It is logical to be equipped with the 8th water pipe extended to the right, the first cavity, the first cavity top inner wall are equipped at the top of first guide runner
Be connected with the 8th water pipe, be equipped with top cap frame in the middle part of first cavity, outside the top cap frame with
The first cavity vertical inner wall is fixedly connected, and the top cap lower portion is installed with filter screen, and first cavity is left
Right end, which communicates, is equipped with symmetrical storage slag chamber, and connection is equipped with the second guide runner in the inner wall of first cavity rear end, and described second leads
Driving scraping mechanism is equipped in sliding slot.
2. a kind of leaching mine device on the spot according to claim 1, it is characterised in that: the first support arm top end surface is solid
Equipped with third pedestal, it is hingedly connected with the first hydraulically extensible column between the third pedestal and second pedestal, described first
It is installed with the 4th pedestal on support arm bottom end face, is installed with the 5th pedestal on the second support arm bottom end face, described
The second hydraulic column is hingedly connected between four pedestals and the 5th pedestal.
3. a kind of leaching mine device on the spot according to claim 1, it is characterised in that: the metal hose is in the first guide runner
Inside there are enough surpluses.
4. a kind of leaching mine device on the spot according to claim 1, it is characterised in that: be equipped with and open in the body of the electric hammer head
The second downward cavity of mouth, second cavity bottom is sequentially communicated from top to bottom to be equipped with the third guide runner extended downwardly, opens
The downward third cavity of mouth, third cavity left end top inner wall are communicated equipped with the 4th cavity, and second cavity left end is set
There is the 5th cavity extended up and down, is rotatably assorted in the inner wall between second cavity and the 5th cavity and is connected with a left side
First rotation axis of right extension, the first rotation axis right end extending end is put in second cavity and to be installed with first convex
Wheel, the first cam long section right end end face are hingedly connected with the connecting rod extended downwardly, and the connecting rod bottom end is put in
In the third guide runner, top end surface and connecting rod articulated connection are slidably connected in the third guide runner
Second slider guide, the third guide runner is interior to be connected with piston, the third positioned at the second slider guide basal sliding
It is rotatably assorted in cavity and is connected with outer cone flute profile sleeve, the 6th cavity, the 6th cavity are equipped in the outer cone flute profile sleeve
It is inside slidably connected with third slider guide, is equipped with the first push rod upwardly extended at the top of the third slider guide, described first
Push rod is put in the third guide runner, is slidably connected with the brill extended up and down in the 6th cavity bottom inner wall
Axis, auger spindle top extending end put in the 6th cavity and are fixedly connected with the third slider guide bottom end face,
Auger spindle bottom extending end stretches out outside the electric hammer head organism bottom end face, first rotation axis left end extending end
It puts in the 5th cavity and has been connected by power the second motor in end, second motor outer surface is embedded at described
In 5th cavity left end inner wall and connection fixed thereto, first rotation axis is located at the part in the 5th cavity equipped with the
One sprocket wheel, the first sprocket wheel cochain, which is connected to, extends downwardly chain, rotates and matches between the 4th cavity and the 5th cavity
Conjunction is connected with left and right and extends the second rotation axis, and second rotation axis left end extending end puts in the 5th cavity and fixed
Have the second sprocket wheel to connect with the chain, the second rotation axis right end extending end put in the 4th cavity and
It is installed with to the first bevel gear ratcheting with the outer cone flute profile sleeve.
5. a kind of mine device is soaked on the spot according to claim 1, it is characterised in that: the driving scraping mechanism includes and institute
It states and is slidably connected in the scraper plate and second guide runner that top cap frame roof end face is slidably connected with
Slide plate, the slide plate front end surface is fixedly connected with scraper plate rear end end, is equipped in the slide plate upper downward
The 4th guide runner stretched is embedded with third motor, third motor front end end in the inner wall of second guide runner rear end
End has been connected by power the second cam, and the second cam front end surface is equipped with to be slidably connected with the 4th guide runner
Support rod.
A kind of soak mine device on the spot 6. according to claim 1, it is characterised in that: the multiple-segment telescopic tube respectively save between cunning
It is dynamic to be cooperatively connected.
7. a kind of leaching mine device on the spot according to claim 1, it is characterised in that: ore soaking machine body bottom is provided with four
A wheel, device easy to remove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810063357.2A CN108331525B (en) | 2018-01-23 | 2018-01-23 | It is a kind of to soak mine device on the spot |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810063357.2A CN108331525B (en) | 2018-01-23 | 2018-01-23 | It is a kind of to soak mine device on the spot |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108331525A CN108331525A (en) | 2018-07-27 |
CN108331525B true CN108331525B (en) | 2019-01-22 |
Family
ID=62925615
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810063357.2A Active CN108331525B (en) | 2018-01-23 | 2018-01-23 | It is a kind of to soak mine device on the spot |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108331525B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110259372A (en) * | 2019-06-19 | 2019-09-20 | 嘉兴缔华贸易有限公司 | A kind of oil content exploring equipment |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4221433A (en) * | 1978-07-20 | 1980-09-09 | Occidental Minerals Corporation | Retrogressively in-situ ore body chemical mining system and method |
CN101915073B (en) * | 2010-08-03 | 2012-08-15 | 江西稀有金属钨业控股集团有限公司 | In situ leaching injection process |
CN102392129B (en) * | 2011-11-17 | 2014-01-08 | 五矿(北京)稀土研究院有限公司 | Method and system of in-situ ore leaching and leachate discharge of ion adsorption type ore |
CN203655249U (en) * | 2013-12-23 | 2014-06-18 | 新疆中核天山铀业有限公司 | In-situ leaching uranium mining process well |
CN104694746B (en) * | 2015-03-25 | 2016-10-26 | 江西理工大学 | A kind of method of ion adsorption type re in_situ leaching and leaching ore deposit system thereof |
-
2018
- 2018-01-23 CN CN201810063357.2A patent/CN108331525B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN108331525A (en) | 2018-07-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201714392U (en) | Rock drilling device | |
CN105804764A (en) | Drilling and bursting type heading machine | |
CN102094668B (en) | High-pressure hydraulic tunneling, pressure releasing and protrusion removing method for upper drainage roadway | |
CN108222931B (en) | A kind of rotary rock drill splits all-in-one machine | |
CN214616516U (en) | Multifunctional mining manipulator | |
CN201835744U (en) | Multifunctional movable arm folding hydraulic drill | |
CN115075728B (en) | Petroleum geological exploration drill rod device | |
CN108331525B (en) | It is a kind of to soak mine device on the spot | |
CN108331526B (en) | It is a kind of to soak mine equipment on the spot | |
CN213022418U (en) | A soil sampling device for saline and alkaline land afforestation | |
CN203978467U (en) | From moving platform-type brill anchor car | |
CN103821454B (en) | Tunneling boring construction gas drainage under suction drill carriage | |
CN107762402B (en) | A kind of efficient rock drill | |
CN106854881A (en) | Rig on excavator with quartering hammer | |
CN108729850A (en) | A kind of novel leaching mine device on the spot | |
CN205348702U (en) | Automatic change milling cutter type fluting ware | |
CN214424409U (en) | Drilling mechanism for mine exploitation blasting | |
CN112796358A (en) | Underground mining prying scraper and mining method thereof | |
CN113650511A (en) | Colliery is battery electric locomotive charging device in pit with heat dissipation function | |
CN209556981U (en) | A kind of tool for removing drilling deep Remaining debris | |
CN206428738U (en) | Rig on excavator with quartering hammer | |
CN206521780U (en) | Rig in excavator arm with quartering hammer | |
CN208252044U (en) | One kind being used for engineering the drilling device | |
CN202212213U (en) | Hydraulic crusher for tunnel bottom heaves | |
CN206752541U (en) | A kind of roadway repair operating mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20181211 Address after: 221000 North Longitudinal Third Road, No. 3, Third Industrial Park, Xuzhou High-tech Industrial Development Zone, Jiangsu Province Applicant after: Xuzhou Juke Mechanical and Electrical Equipment Co., Ltd. Address before: 441100 Xiangyang, Hubei, Xiangzhou District, central China, 24 of the bright market 5 Applicant before: Hong Jie |
|
GR01 | Patent grant | ||
GR01 | Patent grant |