CN108330898A - 城市河湖水系布局结构 - Google Patents
城市河湖水系布局结构 Download PDFInfo
- Publication number
- CN108330898A CN108330898A CN201810366584.2A CN201810366584A CN108330898A CN 108330898 A CN108330898 A CN 108330898A CN 201810366584 A CN201810366584 A CN 201810366584A CN 108330898 A CN108330898 A CN 108330898A
- Authority
- CN
- China
- Prior art keywords
- river
- floodway
- mainstream
- water system
- wetland
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B1/00—Equipment or apparatus for, or methods of, general hydraulic engineering, e.g. protection of constructions against ice-strains
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/11—Hard structures, e.g. dams, dykes or breakwaters
Abstract
本发明公开了一种城市河湖水系布局结构和重构方法,尤其是一种用于水利与城市规划领域的城市河湖水系布局结构和重构方法。本发明所采用的城市河湖水系布局结构,包括干流河道、干流分洪道、调蓄湖,干流分洪道设置在中心城区的外围,流分洪道中游设置有湿地,所述中心城区景观湖通过渠道与湿地连通。本申请的城市河湖水系重构方法在干流河道上游修建调蓄湖,将干流河道的洪水引排至中心城市外,在干流分洪道的中游修建湿地,利用湿地将干流分洪道的水净化后补充到景观湖中。本发明可以充分利用城市河湖水系资源,有效解决城市防洪排涝问题,提高水系自净化能力,显著改善城市水环境质量。
Description
技术领域
本发明属于水利与城市规划领域,具体涉及城市水环境综合整治技术。
背景技术
水资源是城市居民生存和生活的重要资源,为提高城市居民生活品质,需要依托城市现有河湖水系,在保证水安全的前提下,如何对城市河湖水系进行重构,如何优化城市河湖水系,改善城市环境,提升城市品质,是水利与城市规划领域亟待解决的重要难题之一。
城市现有的河湖水系通常包括穿城而过的干流河道和部分流经中心城区支流河道,也有部分分布在中心城区外围的湿地等。现有的河湖水系如果治理不当容易引起洪涝灾害,污染随资源。在当前的城市建设过程中,对城市河湖水系进行重构布局主要围绕对水的三个个方面需求来进行:一、水安全的要求;二、水环境的要求;三、水生态的要求。针对上述三种需求,现有技术所采取的措施是:
一、对于城市河道的外来洪水灾害问题,通常会在河道上游修建水库拦洪滞蓄,或者对局部河段进行修建堤防以提高防洪能力,进而实现防洪的要求;
二、对于防范暴雨导致的城市内涝问题,通常采取提升市政管网排水能力等措施,将涝水引排至城市河道,从而缓解城区内涝问题;
三、对于城市水环境水生态质量不佳的问题,通常采取沿河修建景观小品改善景观,选取河道控制节点修建沉沙池、净化池等措施对河道水体进行净化处理。
前述措施没有充分利用城市已有的河湖水系,只能短暂地解决部分城市水环境问题,仅仅提升市政管网排水能力,如果遇到汛期洪水量较大时城市河道承载能力有限,无法再承受引排的涝水,修建的堤防在洪水长时间冲击下容易破坏,抗风险能力差,沉沙池和净化池运行成本高,处理能力有限。
发明内容
本发明所要解决的技术问题是提供一种可以充分利用城市河湖水系资源,有效解决城市防洪排涝问题,提高水系自净化能力,显著改善城市水环境质量的城市河湖水系布局结构。
本发明解决其技术问题所采用的城市河湖水系布局结构,包括干流河道,还包括干流分洪道和设置在干流河道上游的调蓄湖,所述调蓄湖一端通过进水建筑物与干流河道连通,另一端通过排水建筑物与干流河道连通,所述干流分洪道设置在中心城区的外围,所述干流分洪道的入口与干流河道的上游连通,干流分洪道的出口与干流河道的下游连通,所述干流分洪道的中游设置有湿地,所述中心城区内设置有景观湖,所述景观湖通过渠道与湿地连通。
进一步的是,在所述干流河道的上游设置有干流节制闸,所述干流节制闸位于分洪道入口的下游一侧。
进一步的是,还包括汇入干流河道的支流河道,所述支流河道上设置有支流节制闸,还包括支流分洪道,所述支流分洪道将干流河道和支流河道连通,所述支流分洪道位于支流节制闸和干流节制闸的上游侧。
进一步的是,在所述干流河道的下游设置有断面扩宽段。
进一步的是,所述湿地内部设置有水生植物和/或种植土和/或过滤墙体。
进一步的是,所述湿地为由上游向下游方向高度依次递减的阶梯型湿地。
本发明所要解决的另一个技术问题是提供一种可以充分利用城市河湖水系资源,有效解决城市防洪排涝问题,提高水系自净化能力,显著改善城市水环境质量的城市河湖水系重构方法。
本发明解决其技术问题所采用的城市河湖水系重构方法,在干流河道上游修建调蓄湖,在干流河道中游修建干流分洪道,将干流河道的洪水、泥沙及污水引排至中心城市外,,在干流分洪道的中游修建湿地,在中心城区内修建景观湖,利用湿地将干流分洪道的水净化后补充到景观湖中。
进一步的是,修建连通支流河道和干流河道的支流分洪道,将支流河道的洪水、泥沙及污水分流至中心城区外围。
进一步的是,在干流河道下游采取拓宽疏浚措施,增加河道行洪面积。
进一步的是,在干流河道的下游增大河道纵比降。
本发明的有益效果是:本发明设置的干流分洪道将干流河道的汛期洪水引排至城市郊区范围,确保主河道的洪水、泥沙及污水不入城。本发明沿干流分洪道构筑的湿地,同时具备滞洪、净化、补水功能,湿地滞洪能力高于原天然河段的滞洪能力,并且不增加下游河段的防洪负担;湿地与景观湖相连通,经过湿地净化处理的清水引入景观湖中,提升城市水体景观质量。本申请利用调蓄湖蓄洪补枯,并巧妙利用干流分洪道将洪水、泥砂和污水引流到中心城区外围构建的湿地生态体系对河水进行自然进化处理后,将清水引流至中心城区的景观湖中。本申请通过对城市河湖水系的布局调整,使洪水、泥砂和污水无法进入中心城区河道,在提高中心内城市河道承载内力,从根源上解决城市内涝问题的同时,大大降低了污水对城区环境的影响,充分利用湿地长期且稳定的天然净污能力,对水资源进行了多次有效利用,使居民居住的城区内只有清水流过没有污水流入,显著改善了城市水环境质量。
附图说明
图1是本申请的城市河湖水系布局示意图。
图中零部件、部位及编号:干流河道1、调蓄湖2、进水建筑物3、排水建筑物4、干流分洪道5、干流节制闸6、支流河道7、支流节制闸8、支流分洪道9、湿地10、景观湖11、渠道12、断面扩宽段13、中心城区14。
具体实施方式
下面结合附图对本发明作进一步说明。
如图1所示,本发明的城市河湖水系布局结构,包括干流河道1,还包括干流分洪道5和设置在干流河道1上游的调蓄湖2,所述调蓄湖2一端通过进水建筑物3与干流河道1连通,另一端通过排水建筑物4与干流河道1连通,所述干流分洪道5设置在中心城区14的外围,所述干流分洪道5的入口与干流河道1的上游连通,干流分洪道5的出口与干流河道1的下游连通,所述干流分洪道5的中游设置有湿地10,所述中心城区14内设置有景观湖11,所述景观湖11通过渠道12与湿地10连通。其中进水建筑物3包括进水闸、进水管等,排水建筑物4包括泄洪闸、溢洪道、退水管等。本发明在设置在干流河道1上游的调蓄湖2可以在汛期将干道河流中的洪水引蓄到湖中,在枯水期向干流河道1中补水,实现了河道水体的蓄洪补枯。本发明设置的干流分洪道5将干流河道1的汛期洪水引排至城市郊区范围,确保主河道的洪水、泥沙及污水不入城。本发明沿干流分洪道5构筑的湿地10,同时具备滞洪、净化、补水功能,湿地10滞洪能力高于原天然河段的滞洪能力,并且不增加下游河段的防洪负担;湿地10与景观湖11相连通,经过湿地10净化处理的清水引入景观湖11中,提升城市水体景观质量。本申请利用调蓄湖2蓄洪补枯,并巧妙利用干流分洪道5将洪水、泥砂和污水引流到中心城区14外围构建的湿地10生态体系对河水进行自然进化处理后,将清水引流至中心城区14的景观湖11中。本申请通过对城市河湖水系的布局调整,使洪水、泥砂和污水无法进入中心城区14河道,在提高中心内城市河道承载内力,从根源上解决城市内涝问题的同时,大大降低了污水对城区环境的影响,并通过与湿地10的搭配使用,提高水系整体滞洪能力的同时充分利用湿地10长期且稳定的天然净污能力,对水资源进行了多次有效利用,使居民居住的城区内只有清水流过没有污水流入,显著改善了城市水环境质量。
实施例1
本实施例在所述干流河道1的上游设置有干流节制闸6,所述干流节制闸6位于分洪道入口的下游一侧。本实施例利用节制闸调节上游水位、控制下泄水流流量。
实施例2
本实施在实施例1的基础上在有支流河道7的水系中设置有支流节制闸8和支流分洪道9,支流分洪道9将干流河道1和支流河道7连通,支流分洪道9位于支流节制闸8和干流节制闸6的上游侧。将支流河道7里洪水分流至中心城区14外围的干流河道1中,将支流河道7的洪水、泥沙及污水分流至中心城区14外围,确保洪水及污水不入城,再通过干流节制闸6支流和节制闸可根据各个河流的流量情况实现河道分流的人工调控。
实施例3
本实施例在前述河湖布局结构的基础上在所述干流河道1的下游设置有断面扩宽段13,增大河道行洪面积,以提升河道的行洪能力,能快速将引入河道中的城市涝水快速排出中心城区14外,从根本上解决解城区内涝问题。
实施例4
本实施例中,在湿地10内部设置有水生植物和/或种植土和/或过滤墙体,可以提高湿地10的净化能力。
实施例5
本实施例将湿地10设置为由上游向下游方向高度依次递减的阶梯型湿地10,可以使水中污染物与湿地10的生物净化环境更加充分的接触,可以进一步提高湿地10净化的效果。
本发明的城市河湖水系重构方法,在干流河道1上游修建调蓄湖2,在干流河道1中游修建干流分洪道5,将干流河道1的洪水、泥沙及污水引排至中心城市外,在干流分洪道5的中游修建湿地10,在中心城区14内修建景观湖11,利用湿地10将干流分洪道5的水净化后补充到景观湖11中。本发明在城市原因干流河道1的上增加调蓄湖2,使其可以在汛期将干道河流中的洪水引蓄到湖中,在枯水期向干流河道1中补水,实现了河道水体的蓄洪补枯。本发明设通过重新开挖的干流分洪道5将干流河道1的汛期洪水引排至城市郊区范围,确保主河道的洪水、泥沙及污水不入城。本发明沿干流分洪道5新构筑的湿地10,同时具备滞洪、净化、补水功能,且湿地10滞洪能力高于原天然河段的滞洪能力,并且不增加下游河段的防洪负担;湿地10与景观湖11相连通,经过湿地10净化处理的清水引入景观湖11中,提升城市水体景观质量。本申请利用调蓄湖2蓄洪补枯,并巧妙利用干流分洪道5将洪水、泥砂和污水引流到中心城区14外围构建的湿地10生态体系对河水进行自然进化处理后,将清水引流至中心城区14的景观湖11中。本申请通过对城市河湖水系布局的重构,使洪水、泥砂和污水无法进入中心城区14河道,在提高中心内城市河道承载内力,从根源上解决城市内问题的同时,大大降低了污水对城区环境的影响,并通过与湿地10的搭配使用,提高水系整体滞洪能力的同时充分利用湿地10长期且稳定的天然净污能力,对水资源进行了多次有效利用,使居民居住的城区内只有清水流过没有污水流入,显著改善了城市水环境质量。
对于有支流河道7的城市河湖水系,本发明新修建连通支流河道7和干流河道1的支流分洪道9,将支流河道7的洪水、泥沙及污水分流至中心城区14外围。
本申请在原有水系基础上,在干流河道1下游采取的拓宽疏浚措施,增加河道行洪面积,以提升河道的行洪能力,能快速将引如河道中的城市涝水快速排出中心城区14外,从根本上解决解城区内涝问题。
本申请还可以在在干流河道1的下游增大河道纵比降,结合河床疏浚,归顺河槽,减小河道淤积速率,进一步提高升河道的防洪标准与行洪能力,使城市涝水可以快速排出中心城区14外。
Claims (10)
1.城市河湖水系布局结构,包括干流河道(1),其特征在于:还包括干流分洪道(5)和设置在干流河道(1)上游的调蓄湖(2),所述调蓄湖(2)一端通过进水建筑物(3)与干流河道(1)连通,另一端通过排水建筑物(4)与干流河道(1)连通,所述干流分洪道(5)设置在中心城区(14)的外围,所述干流分洪道(5)的入口与干流河道(1)的上游连通,干流分洪道(5)的出口与干流河道(1)的下游连通,所述干流分洪道(5)的中游设置有湿地(10),所述中心城区(14)内设置有景观湖(11),所述景观湖(11)通过渠道(12)与湿地(10)连通。
2.如权利要求1所述的城市河湖水系布局结构,其特征在于:在所述干流河道(1)的上游设置有干流节制闸(6),所述干流节制闸(6)位于分洪道入口的下游一侧。
3.如权利要求2所述的城市河湖水系布局结构,其特征在于:还包括汇入干流河道(1)的支流河道(7),所述支流河道(7)上设置有支流节制闸(8),还包括支流分洪道(9),所述支流分洪道(9)将干流河道(1)和支流河道(7)连通,所述支流分洪道(9)位于支流节制闸(8)和干流节制闸(6)的上游侧。
4.如权利要求1所述的城市河湖水系布局结构,其特征在于:在所述干流河道(1)的下游设置有断面扩宽段(13)。
5.如权利要求1所述的城市河湖水系布局结构,其特征在于:所述湿地(10)内部设置有水生植物和/或种植土和/或过滤墙体。
6.如权利要求1至5任意权利要求所述的城市河湖水系布局结构,其特征在于:所述湿地(10)为由上游向下游方向高度依次递减的阶梯型湿地(10)。
7.城市河湖水系重构方法,其特征在于:在干流河道(1)上游修建权利要求1中所述的调蓄湖(2),在干流河道(1)中游修建权利要求1中所述的干流分洪道(5),将干流河道(1)的洪水、泥沙及污水引排至中心城市外,在干流分洪道(5)的中游修建湿地(10),在中心城区(14)内修建景观湖(11),利用湿地(10)将干流分洪道(5)的水净化后补充到景观湖(11)中。
8.如权利要求7所述的城市河湖水系重构方法,其特征在于:修建连通支流河道(7)和干流河道(1)的支流分洪道(9),将支流河道(7)的洪水、泥沙及污水分流至中心城区(14)外围。
9.如权利要求7所述的城市河湖水系重构方法,其特征在于:在干流河道(1)下游采取拓宽疏浚措施,增加河道行洪面积。
10.如权利要求7至9任意权利要求所述的城市河湖水系重构方法,其特征在于:在干流河道(1)的下游增大河道纵比降。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810366584.2A CN108330898A (zh) | 2018-04-23 | 2018-04-23 | 城市河湖水系布局结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810366584.2A CN108330898A (zh) | 2018-04-23 | 2018-04-23 | 城市河湖水系布局结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108330898A true CN108330898A (zh) | 2018-07-27 |
Family
ID=62934441
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810366584.2A Pending CN108330898A (zh) | 2018-04-23 | 2018-04-23 | 城市河湖水系布局结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108330898A (zh) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110184990A (zh) * | 2019-05-29 | 2019-08-30 | 北京水沃新华科技有限公司 | 基于调水储能的河湖连通 |
CN110184992A (zh) * | 2019-06-14 | 2019-08-30 | 中国水利水电建设工程咨询西北有限公司 | 一种基于水系连通的新型城市海绵体及蓄排水方法 |
CN111005421A (zh) * | 2019-12-06 | 2020-04-14 | 中国电建集团成都勘测设计研究院有限公司 | 一种用于湿地公园的引排水系统及其控制方法 |
CN111441307A (zh) * | 2020-04-03 | 2020-07-24 | 福建省水利水电勘测设计研究院 | 一种城市内河与湖泊水体分流隔离方法 |
CN112443024A (zh) * | 2020-11-20 | 2021-03-05 | 华东师范大学 | 一种城市水网的隐形改造与重构方法 |
CN112663727A (zh) * | 2020-12-07 | 2021-04-16 | 福建省水利水电勘测设计研究院 | 一种同步实现城市断头河水动力提升与湖泊水质安全的河湖连通方法 |
CN112726487A (zh) * | 2020-12-07 | 2021-04-30 | 福建省水利水电勘测设计研究院 | 一种通过水位控制保障城市河湖多功能的河湖连通方法 |
CN113204819A (zh) * | 2021-04-28 | 2021-08-03 | 浙江省水利河口研究院(浙江省海洋规划设计研究院) | 感潮水闸闸前橄榄型调蓄湖的布置方法 |
CN113216074A (zh) * | 2021-05-13 | 2021-08-06 | 中国科学院城市环境研究所 | 一种滨海城市河道水治理方法 |
CN114293514A (zh) * | 2021-11-10 | 2022-04-08 | 武汉景天园林有限公司 | 一种城市内陆河生态与堤岸园林景观综合治理方法 |
CN114656115A (zh) * | 2022-04-25 | 2022-06-24 | 中交上海航道勘察设计研究院有限公司 | 一种河道异位快速过滤方法及系统 |
CN115354616A (zh) * | 2022-10-21 | 2022-11-18 | 珠江水利委员会珠江水利科学研究院 | 城市群河湖水系连通布局系统 |
CN116623595A (zh) * | 2023-07-17 | 2023-08-22 | 成都市市政工程设计研究院有限公司 | 一种基于水动力系统构建城市内湖本底的物理方法 |
CN116676910A (zh) * | 2023-06-08 | 2023-09-01 | 生态环境部华南环境科学研究所(生态环境部生态环境应急研究所) | 一种利用潮汐动力进行生态补水的方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10244089A1 (de) * | 2002-09-23 | 2004-04-01 | Ständer, Wolfgang, Dr.Ing. | System zur Entnahme von uferfiltriertem Grundwasser in von Hochwasser gefährdeten Gebieten und unterirdische Verteilung desselben in hiervon entfernten höher gelegenen Gebieten |
CN102976546A (zh) * | 2011-09-06 | 2013-03-20 | 中国科学院生态环境研究中心 | 一种旁路离线河流净化方法及净化系统 |
CN103195015A (zh) * | 2013-04-25 | 2013-07-10 | 彭伟 | 基于围湖造河技术综合开发利用湖泊湿地的方法 |
CN104462773A (zh) * | 2014-11-10 | 2015-03-25 | 中国科学院南京地理与湖泊研究所 | 一种用于生物多样性保护的河流网络构建方法及其应用 |
CN105519274A (zh) * | 2015-12-07 | 2016-04-27 | 南京大学 | 一种大规模沿海新围垦滩涂农地生态化开发的集成方法 |
CN106049347A (zh) * | 2016-05-25 | 2016-10-26 | 山东省淡水渔业研究院 | 一种高含沙洪水胁迫下鱼类庇护所的构建方法 |
CN106320253A (zh) * | 2016-08-17 | 2017-01-11 | 安徽省水利水电勘测设计院 | 一种多塘生态补水系统构建方法 |
-
2018
- 2018-04-23 CN CN201810366584.2A patent/CN108330898A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10244089A1 (de) * | 2002-09-23 | 2004-04-01 | Ständer, Wolfgang, Dr.Ing. | System zur Entnahme von uferfiltriertem Grundwasser in von Hochwasser gefährdeten Gebieten und unterirdische Verteilung desselben in hiervon entfernten höher gelegenen Gebieten |
CN102976546A (zh) * | 2011-09-06 | 2013-03-20 | 中国科学院生态环境研究中心 | 一种旁路离线河流净化方法及净化系统 |
CN103195015A (zh) * | 2013-04-25 | 2013-07-10 | 彭伟 | 基于围湖造河技术综合开发利用湖泊湿地的方法 |
CN104462773A (zh) * | 2014-11-10 | 2015-03-25 | 中国科学院南京地理与湖泊研究所 | 一种用于生物多样性保护的河流网络构建方法及其应用 |
CN105519274A (zh) * | 2015-12-07 | 2016-04-27 | 南京大学 | 一种大规模沿海新围垦滩涂农地生态化开发的集成方法 |
CN106049347A (zh) * | 2016-05-25 | 2016-10-26 | 山东省淡水渔业研究院 | 一种高含沙洪水胁迫下鱼类庇护所的构建方法 |
CN106320253A (zh) * | 2016-08-17 | 2017-01-11 | 安徽省水利水电勘测设计院 | 一种多塘生态补水系统构建方法 |
Non-Patent Citations (4)
Title |
---|
"安阳市城市水系环境建设对策研究" * |
常青,李洪远,何迎: "北方城市干涸河流区域资源管理与环境整治模式――以滹沱河石家庄市区段生态恢复与重建模式为例" * |
梁浩华;梁华祥;: "宏村水系景观旅游发展的主要问题及对策" * |
王浩: "面向生态的城市水系治理" * |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110184990A (zh) * | 2019-05-29 | 2019-08-30 | 北京水沃新华科技有限公司 | 基于调水储能的河湖连通 |
CN110184992A (zh) * | 2019-06-14 | 2019-08-30 | 中国水利水电建设工程咨询西北有限公司 | 一种基于水系连通的新型城市海绵体及蓄排水方法 |
CN111005421A (zh) * | 2019-12-06 | 2020-04-14 | 中国电建集团成都勘测设计研究院有限公司 | 一种用于湿地公园的引排水系统及其控制方法 |
CN111441307A (zh) * | 2020-04-03 | 2020-07-24 | 福建省水利水电勘测设计研究院 | 一种城市内河与湖泊水体分流隔离方法 |
CN112443024A (zh) * | 2020-11-20 | 2021-03-05 | 华东师范大学 | 一种城市水网的隐形改造与重构方法 |
CN112663727A (zh) * | 2020-12-07 | 2021-04-16 | 福建省水利水电勘测设计研究院 | 一种同步实现城市断头河水动力提升与湖泊水质安全的河湖连通方法 |
CN112726487A (zh) * | 2020-12-07 | 2021-04-30 | 福建省水利水电勘测设计研究院 | 一种通过水位控制保障城市河湖多功能的河湖连通方法 |
CN113204819B (zh) * | 2021-04-28 | 2024-02-09 | 浙江省水利河口研究院(浙江省海洋规划设计研究院) | 感潮水闸闸前橄榄型调蓄湖的布置方法 |
CN113204819A (zh) * | 2021-04-28 | 2021-08-03 | 浙江省水利河口研究院(浙江省海洋规划设计研究院) | 感潮水闸闸前橄榄型调蓄湖的布置方法 |
CN113216074A (zh) * | 2021-05-13 | 2021-08-06 | 中国科学院城市环境研究所 | 一种滨海城市河道水治理方法 |
CN114293514A (zh) * | 2021-11-10 | 2022-04-08 | 武汉景天园林有限公司 | 一种城市内陆河生态与堤岸园林景观综合治理方法 |
CN114656115A (zh) * | 2022-04-25 | 2022-06-24 | 中交上海航道勘察设计研究院有限公司 | 一种河道异位快速过滤方法及系统 |
CN115354616A (zh) * | 2022-10-21 | 2022-11-18 | 珠江水利委员会珠江水利科学研究院 | 城市群河湖水系连通布局系统 |
CN116676910A (zh) * | 2023-06-08 | 2023-09-01 | 生态环境部华南环境科学研究所(生态环境部生态环境应急研究所) | 一种利用潮汐动力进行生态补水的方法 |
CN116676910B (zh) * | 2023-06-08 | 2024-01-26 | 生态环境部华南环境科学研究所(生态环境部生态环境应急研究所) | 一种利用潮汐动力进行生态补水的方法 |
CN116623595A (zh) * | 2023-07-17 | 2023-08-22 | 成都市市政工程设计研究院有限公司 | 一种基于水动力系统构建城市内湖本底的物理方法 |
CN116623595B (zh) * | 2023-07-17 | 2023-10-24 | 成都市市政工程设计研究院有限公司 | 一种基于水动力系统构建城市内湖本底的物理方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108330898A (zh) | 城市河湖水系布局结构 | |
CN202730934U (zh) | 初期雨水拦截、分流、调蓄及处理系统 | |
CN104480920B (zh) | 利用农田沟塘系统防治区域性农田面源污染的方法 | |
WO2016119298A1 (zh) | 平原地区灌排耦合生态型灌区水循环利用的节水减污方法 | |
CN104358302A (zh) | 分流制初期雨水的治理方法 | |
CN105735449B (zh) | 一种城市道路雨水收集处理系统 | |
CN103821218A (zh) | 一种初期雨水及雨污混合溢流水拦蓄渗流设施 | |
CN102976546A (zh) | 一种旁路离线河流净化方法及净化系统 | |
CN105800878A (zh) | 磁絮凝-前置库联用的分流制雨水处理系统 | |
CN203684373U (zh) | 提高城市防涝标准和控制水污染的设备 | |
CN105236501A (zh) | 利用沟塘系统防治平原水网区农田面源污染的方法 | |
CN205529944U (zh) | 一种海绵城市雨水滞蓄渗净用排系统管件 | |
CN107973494B (zh) | 一种入湖河道水质净化与水资源重复利用系统 | |
CN208533447U (zh) | 城市河湖水系布局结构 | |
CN208844656U (zh) | 雨水收集与恒压自渗植被补水网 | |
CN109403264A (zh) | 河渠入河口污水处理设施沉砂池采用人工弯道壅水的方法 | |
CN204779040U (zh) | 一种初期雨水的人工湿地处理系统 | |
CN206956909U (zh) | 一种地下阶梯式链状雨水调蓄水池 | |
CN113429017B (zh) | 一种河道治理系统 | |
CN204841189U (zh) | 一种雨水处理装置 | |
CN106065654B (zh) | 一种农业面源污染削减与再生水农业灌溉的联合系统 | |
CN105174513A (zh) | 过鱼式沉淀过滤池 | |
CN207243686U (zh) | 一种高架桥雨水处理系统 | |
CN112049185A (zh) | 一种多级分布式城市雨水综合利用系统及其构建方法 | |
CN204752462U (zh) | 一种道路初期雨水的人工湿地处理系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |