- CN108311752A CN108311752A CN201810034528.9A CN201810034528A CN108311752A CN 108311752 A CN108311752 A CN 108311752A CN 201810034528 A CN201810034528 A CN 201810034528A CN 108311752 A CN108311752 A CN 108311752A
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- cylinder
- motion bar
- riser
- cutting bed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23D—PLANING; SLOTTING; SHEARING; BROACHING; SAWING; FILING; SCRAPING; LIKE OPERATIONS FOR WORKING METAL BY REMOVING MATERIAL, NOT OTHERWISE PROVIDED FOR
- B23D45/00—Sawing machines or sawing devices with circular saw blades or with friction saw discs
- B23D45/12—Sawing machines or sawing devices with circular saw blades or with friction saw discs with a circular saw blade for cutting tubes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23D—PLANING; SLOTTING; SHEARING; BROACHING; SAWING; FILING; SCRAPING; LIKE OPERATIONS FOR WORKING METAL BY REMOVING MATERIAL, NOT OTHERWISE PROVIDED FOR
- B23D47/00—Sawing machines or sawing devices working with circular saw blades, characterised only by constructional features of particular parts
- B23D47/02—Sawing machines or sawing devices working with circular saw blades, characterised only by constructional features of particular parts of frames; of guiding arrangements for work-table or saw-carrier
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Sawing (AREA)
Abstract
The present invention relates to a kind of cutting equipment more particularly to a kind of construction steel pipe cutting equipments.The technical problem to be solved in the present invention is to provide it is a kind of saving time, cutting when safe, the not vulnerable construction steel pipe cutting equipment that compares of operating personnel.In order to solve the above technical problem, the present invention provides such a construction steel pipe cutting equipments, include cutting bed etc.;It is mounted on supporting leg at cutting bed bottom four corners, arc groove is provided at the top of cutting bed, cutting bed is equipped with regulating mechanism, and regulating mechanism is equipped with cutter device.The present invention adjusts the position of cutter device by regulating mechanism, and then has adjusted the length of pipe cutting, is cut to steel pipe by cutter device.
Description
Technical field
The present invention relates to a kind of cutting equipment more particularly to a kind of construction steel pipe cutting equipments.
Background technology
Construction refers to the production activity of engineering construction implementation phase, is the building course of all kinds of buildings, can also
It says it is various lines on design drawing, in specified place, becomes process in kind.It includes basic engineering construction, master
Body structure construction, roof construction, decorative engineering construction etc..The place of construction operation is known as " construction site " or cries
" construction site ", is also named building site.
It when construction, needs to cut steel pipe, manually carrying out cutting to steel pipe needs to take a substantial amount of time, cut
Operating personnel are easily injured when cutting, thus there is an urgent need for research and develop it is a kind of save the time, cutting when operating personnel compare safely, be not easy injury
Construction steel pipe cutting equipment.
Invention content
(1)Technical problems to be solved
The present invention in order to overcome manually to steel pipe carry out cutting need take a substantial amount of time, cut when operating personnel it is vulnerable
Disadvantage, the technical problem to be solved in the present invention is to provide it is a kind of save the time, cutting when operating personnel compare safely, be not easy by
The construction of wound steel pipe cutting equipment.
(2)Technical solution
In order to solve the above technical problem, the present invention provides such a construction steel pipe cutting equipments, include to cut
The ceding of Taiwan, supporting leg, regulating mechanism and cutter device are mounted on supporting leg at cutting bed bottom four corners, arc are provided at the top of cutting bed
Slot, cutting bed are equipped with regulating mechanism, and regulating mechanism is equipped with cutter device.
Preferably, regulating mechanism includes the first sliding block, N-shaped frame, the first sliding rail, the second sliding block, mounting plate and the first gas
Cylinder, cutting bed front and rear sides are provided with sliding slot, and slidingtype is equipped with the first sliding block in sliding slot, and N-shaped is equipped on the outside of the first sliding block
Frame, cutting bed are located in N-shaped frame, and two sides of left and right are mounted on the first sliding rail in N-shaped frame, and slidingtype is equipped on the inside of the first sliding rail
Second sliding block, is equipped with mounting plate between two second sliding blocks, the installation of N-shaped frame inner top there are two the first cylinder, the first cylinder
Telescopic rod is connect with mounting plate top.
Preferably, cutter device includes transverse slat, starting stave, first motor, the second riser, first bearing seat, first
Shaft and saw blade, are horizontally installed with transverse slat on the right side of mounting plate, and transverse slat right bottom is equipped with starting stave, on the left of starting stave under
Portion is equipped with first motor, and mounting plate bottom is equipped with the second riser, and the second bottom of the riser is equipped with first bearing seat, first axle
Bearing in bearing is connected with first rotating shaft, and the output shaft of first rotating shaft right end and first motor is connected by shaft coupling, and first
Shaft left end is equipped with saw blade.
Preferably, further include having cooling device, cooling device includes cam, compression cylinder, piston, the first motion bar, connects
Touch panel, the first spring, check valve, water inlet pipe, outlet pipe and nozzle, first rotating shaft right are equipped with cam, and cam is located at first
Between motor and first bearing seat, Embedded on transverse slat to be equipped with compression cylinder, compression cylinder inner sliding type is equipped with piston, piston bottom
First motion bar is installed, the first motion bar bottom end passes through compression cylinder bottom, and the first motion bar bottom end is equipped with contact among portion
Plate, contact plate and cam contact are connected with the first spring between contact plate top and compression cylinder bottom, and the first spring is wound on first
On motion bar, there are two check valves, two check valves to be connected to compression cylinder for installation at the top of compression cylinder, seals and connects on the check valve of right
Be connected to water inlet pipe, be sealedly connected with outlet pipe on the check valve of left, water outlet pipe end is connected with nozzle, nozzle be located at saw blade just on
Side.
Preferably, further include having pressing device, pressing device include cross bar, sleeve, the second motion bar, second spring and
Arc pressuring plate, the second riser left upper portion are equipped with two cross bars, and for nozzle between two cross bars, two cross bar left ends are equipped with set
Cylinder, sleeve inner sliding type are equipped with the second motion bar, second spring are connected between sleeve inner top at the top of the second motion bar, the
Two motion bar bottom ends are equipped with arc pressuring plate.
Preferably, further include having fixing device, fixing device includes third riser, the second cylinder and arc fixed plate,
Two sides are mounted on third riser before and after in the middle part of cutting bed, are mounted on the second cylinder on the inside of third riser, the second cylinder is stretched
Contracting bar inner end is mounted on arc fixed plate.
Preferably, further include having second bearing seat, the second shaft and roller, two Fang Jun of cutting bed or so is provided with straight slot, leads to
Front and back two side of slot is Embedded to be equipped with second bearing seat, and the bearing of front and back two second bearing seat is connected with the second shaft,
Roller is installed in the middle part of second shaft.
Operation principle:When using the present invention, steel pipe is first placed in the arc groove of cutting bed by operating personnel, operating personnel
Again by steel pipe toward moving right, after steel pipe movement is to suitable position, operating personnel can adjust cutting dress by regulating mechanism
The position set, after the position of device to be cut is adjusted, operating personnel can start cutter device and be cut to steel pipe, wait for steel
After pipe is cut, operating personnel close cutter device, then the steel pipe that cutting finishes is removed.
Because regulating mechanism includes the first sliding block, N-shaped frame, the first sliding rail, the second sliding block, mounting plate and the first cylinder,
Cutting bed front and rear sides are provided with sliding slot, and slidingtype is equipped with the first sliding block in sliding slot, and N-shaped frame is equipped on the outside of the first sliding block,
Cutting bed is located in N-shaped frame, and two sides of left and right are mounted on the first sliding rail in N-shaped frame, and slidingtype is equipped with the on the inside of the first sliding rail
Two sliding blocks are equipped with mounting plate between two second sliding blocks, and the installation of N-shaped frame inner top there are two the first cylinder, stretch by the first cylinder
Contracting bar is connect with mounting plate top.So operating personnel can move left and right N-shaped frame, to adjust the position of cutter device, into
And have adjusted the length of pipe cutting;After operating personnel start cutter device, operating personnel can control the elongation of the first cylinder, the
One cylinder drives cutter device to move down, to being cut to steel pipe, after waiting for steel pipe cutting, and operating personnel's control the
One cylinder shortens, you can so that cutter device up moves, after device to be cut is up moved to suitable position, operating personnel
The first cylinder is closed, steel pipe is cut again to convenient.
Because cutter device includes transverse slat, starting stave, first motor, the second riser, first bearing seat, first rotating shaft
And saw blade, mounting plate right side are horizontally installed with transverse slat, transverse slat right bottom is equipped with starting stave, starting stave left lower peace
Equipped with first motor, mounting plate bottom is equipped with the second riser, and the second bottom of the riser is equipped with first bearing seat, first bearing seat
Interior bearing is connected with first rotating shaft, and the output shaft of first rotating shaft right end and first motor is connected by shaft coupling, first rotating shaft
Left end is equipped with saw blade.So when steel pipe is located at below saw blade, operating personnel start first motor rotation, and first motor drives
First rotating shaft rotates, and first rotating shaft drives saw blade rotation, and under the cooperation of regulating mechanism, saw blade cuts steel pipe, waits for steel
After pipe is cut, operating personnel close first and reduce.
Because further including having cooling device, cooling device includes cam, compression cylinder, piston, the first motion bar, contact
Plate, the first spring, check valve, water inlet pipe, outlet pipe and nozzle, first rotating shaft right are equipped with cam, and cam is located at the first electricity
Between machine and first bearing seat, Embedded on transverse slat to be equipped with compression cylinder, compression cylinder inner sliding type is equipped with piston, piston base
Centre is equipped with the first motion bar, and the first motion bar bottom end passes through compression cylinder bottom, the first motion bar bottom end to be equipped with contact plate,
Contact plate and cam contact are connected with the first spring between contact plate top and compression cylinder bottom, and the first spring is wound on the first work
In lever, there are two check valves, two check valves to be connected to compression cylinder, be tightly connected on the check valve of right for installation at the top of compression cylinder
Have water inlet pipe, be sealedly connected with outlet pipe on the check valve of left, water outlet pipe end is connected with nozzle, nozzle be located at saw blade just on
Side.So operating personnel, by water inlet pipe external water source, first rotating shaft rotation band moving cam rotates, and the first motion bar of cam driven exists
It is ceaselessly moved up and down under the action of first spring, the first motion bar band piston ceaselessly moves up and down;It is moved down when piston is past
When dynamic, under the action of check valve, clear water is inhaled into compression cylinder, when piston up moves, under the action of check valve, and pressure
Clear water in contracting cylinder is ejected into from nozzle on saw blade by outlet pipe, so that when saw blade saws steel pipe, can be dropped to saw blade
Temperature, and then saw blade is protected not cross cause thermal damage.
Because further including having pressing device, pressing device includes cross bar, sleeve, the second motion bar, second spring and arc
Shape pressing plate, the second riser left upper portion are equipped with two cross bars, and for nozzle between two cross bars, two cross bar left ends are equipped with set
Cylinder, sleeve inner sliding type are equipped with the second motion bar, second spring are connected between sleeve inner top at the top of the second motion bar, the
Two motion bar bottom ends are equipped with arc pressuring plate.So when the second riser moves down, cross bar moves down therewith, and cross bar drives
Sleeve moves down, to drive arc pressuring plate to move down, after arc pressuring plate and steel pipe contact, in the effect of second spring
Under, the second motion bar can drive arc pressuring plate up to move, so that arc pressing plate compresses steel pipe, so that steel pipe
It will not be shaken when being cut, to improve the efficiency of pipe cutting, after to be cut, the second riser up moves band
Dynamic arc pressuring plate up moves, and then can unclamp the fixation to steel pipe.
Because further including having fixing device, fixing device includes third riser, the second cylinder and arc fixed plate, cutting
Two sides are mounted on third riser before and after in the middle part of platform, and the second cylinder, the telescopic rod of the second cylinder are mounted on the inside of third riser
Inner end is mounted on arc fixed plate.So before being cut to steel pipe, operating personnel can start the elongation of the second cylinder, the
Two cylinders drive arc fixed plate toward medial movement, and after arc fixed plate fixes steel pipe, operating personnel close the second gas
Cylinder, to which further steel pipe be fixed, after to be cut, operating personnel start the second cylinder and shorten, the second gas
Cylinder drives arc fixed plate to be moved to the outside, and then unclamps the fixation to steel pipe, the steel pipe that operating personnel can finish cutting
It takes out.
Because further including having second bearing seat, the second shaft and roller, two Fang Jun of cutting bed or so is provided with straight slot, straight slot
Front and back two side is Embedded to be equipped with second bearing seat, and the bearing of front and back two second bearing seat is connected with the second shaft, and second
Roller is installed in the middle part of shaft.So when operating personnel push steel pipe again, under the action of roller, steel can be more easily pushed
Pipe, while also saving the time.
(3)Advantageous effect
The present invention adjusts the position of cutter device by regulating mechanism, and then has adjusted the length of pipe cutting, is filled by cutting
It sets and steel pipe is cut, safe, the not vulnerable effect that operating personnel compare when saving time, cutting to reach.
Description of the drawings
Fig. 1 is the schematic cross-sectional view of the first front view of the present invention.
Fig. 2 is the first partial schematic sectional view of front view of the present invention.
Fig. 3 is the schematic cross-sectional view of the right view of regulating mechanism of the present invention.
Fig. 4 is the schematic cross-sectional view of second of front view of the present invention.
Fig. 5 is second of partial schematic sectional view of front view of the present invention.
Fig. 6 is the schematic cross-sectional view of the third front view of the present invention.
Fig. 7 is the third partial schematic sectional view of front view of the present invention.
Fig. 8 is the schematic cross-sectional view of the 4th kind of front view of the present invention.
Fig. 9 is the schematic cross-sectional view of the left view of fixing device of the present invention.
Label in attached drawing be:1- cutting beds, 2- supporting legs, 3- arc grooves, 4- regulating mechanisms, 5- cutter devices, 41- are slided
Slot, the first sliding blocks of 42-, 43-n type frame, the first sliding rails of 44-, the second sliding blocks of 45-, 46- mounting plates, the first cylinders of 47-, 51- are horizontal
Plate, 52- starting staves, 53- first motors, the second risers of 54-, 55- first bearing seats, 56- first rotating shafts, 57- saw blades, 6- are cold
But device, 601- cams, 602- compression cylinders, 603- pistons, the first motion bars of 604-, 605- contact plates, the first springs of 606-,
607- check valves, 608- water inlet pipes, 609- outlet pipes, 610- nozzles, 7- pressing devices, 71- cross bars, 72- sleeves, 73- second
Motion bar, 74- second springs, 75- arc pressuring plates, 8- fixing devices, 81- third risers, the second cylinders of 82-, 83- arcs are fixed
Plate, 9- straight slots, 10- second bearing seats, the second shafts of 11-, 12- rollers.
Specific implementation mode
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of construction steel pipe cutting equipment includes cutting bed 1, supporting leg 2, regulating mechanism 4 and cuts as shown in figs 1-9
Device 5 is cut, supporting leg 2 is mounted at 1 bottom four corners of cutting bed, 1 top of cutting bed is provided with arc groove 3, and cutting bed 1, which is equipped with, to be adjusted
Mechanism 4 is saved, regulating mechanism 4 is equipped with cutter device 5.
Embodiment 2
A kind of construction steel pipe cutting equipment includes cutting bed 1, supporting leg 2, regulating mechanism 4 and cuts as shown in figs 1-9
Device 5 is cut, supporting leg 2 is mounted at 1 bottom four corners of cutting bed, 1 top of cutting bed is provided with arc groove 3, and cutting bed 1, which is equipped with, to be adjusted
Mechanism 4 is saved, regulating mechanism 4 is equipped with cutter device 5.
Regulating mechanism 4 includes the first sliding block 42, N-shaped frame 43, the first sliding rail 44, the second sliding block 45, mounting plate 46 and
One cylinder 47,1 front and rear sides of cutting bed are provided with sliding slot 41, and slidingtype is equipped with the first sliding block 42, the first sliding block in sliding slot 41
42 outsides are equipped with N-shaped frame 43, and cutting bed 1 is located in N-shaped frame 43, and two sides of left and right are mounted on the first sliding rail 44 in N-shaped frame 43,
The inside of first sliding rail 44 slidingtype is equipped with the second sliding block 45, is equipped with mounting plate 46 between two second sliding blocks 45, in N-shaped frame 43
There are two the first cylinder 47, the telescopic rods of the first cylinder 47 to be connect with 46 top of mounting plate for top installation.
Embodiment 3
A kind of construction steel pipe cutting equipment includes cutting bed 1, supporting leg 2, regulating mechanism 4 and cuts as shown in figs 1-9
Device 5 is cut, supporting leg 2 is mounted at 1 bottom four corners of cutting bed, 1 top of cutting bed is provided with arc groove 3, and cutting bed 1, which is equipped with, to be adjusted
Mechanism 4 is saved, regulating mechanism 4 is equipped with cutter device 5.
Regulating mechanism 4 includes the first sliding block 42, N-shaped frame 43, the first sliding rail 44, the second sliding block 45, mounting plate 46 and
One cylinder 47,1 front and rear sides of cutting bed are provided with sliding slot 41, and slidingtype is equipped with the first sliding block 42, the first sliding block in sliding slot 41
42 outsides are equipped with N-shaped frame 43, and cutting bed 1 is located in N-shaped frame 43, and two sides of left and right are mounted on the first sliding rail 44 in N-shaped frame 43,
The inside of first sliding rail 44 slidingtype is equipped with the second sliding block 45, is equipped with mounting plate 46 between two second sliding blocks 45, in N-shaped frame 43
There are two the first cylinder 47, the telescopic rods of the first cylinder 47 to be connect with 46 top of mounting plate for top installation.
Cutter device 5 include transverse slat 51, starting stave 52, first motor 53, the second riser 54, first bearing seat 55,
First rotating shaft 56 and saw blade 57,46 right side of mounting plate are horizontally installed with transverse slat 51, and 51 right bottom of transverse slat is equipped with starting stave
52,52 left lower of starting stave is equipped with first motor 53, and 46 bottom of mounting plate is equipped with the second riser 54, the second riser 54
Bottom is equipped with first bearing seat 55, and the bearing in first bearing seat 55 is connected with first rotating shaft 56,56 right end of first rotating shaft with
The output shaft of first motor 53 is connected by shaft coupling, and 56 left end of first rotating shaft is equipped with saw blade 57.
Embodiment 4
A kind of construction steel pipe cutting equipment includes cutting bed 1, supporting leg 2, regulating mechanism 4 and cuts as shown in figs 1-9
Device 5 is cut, supporting leg 2 is mounted at 1 bottom four corners of cutting bed, 1 top of cutting bed is provided with arc groove 3, and cutting bed 1, which is equipped with, to be adjusted
Mechanism 4 is saved, regulating mechanism 4 is equipped with cutter device 5.
Regulating mechanism 4 includes the first sliding block 42, N-shaped frame 43, the first sliding rail 44, the second sliding block 45, mounting plate 46 and
One cylinder 47,1 front and rear sides of cutting bed are provided with sliding slot 41, and slidingtype is equipped with the first sliding block 42, the first sliding block in sliding slot 41
42 outsides are equipped with N-shaped frame 43, and cutting bed 1 is located in N-shaped frame 43, and two sides of left and right are mounted on the first sliding rail 44 in N-shaped frame 43,
The inside of first sliding rail 44 slidingtype is equipped with the second sliding block 45, is equipped with mounting plate 46 between two second sliding blocks 45, in N-shaped frame 43
There are two the first cylinder 47, the telescopic rods of the first cylinder 47 to be connect with 46 top of mounting plate for top installation.
Cutter device 5 include transverse slat 51, starting stave 52, first motor 53, the second riser 54, first bearing seat 55,
First rotating shaft 56 and saw blade 57,46 right side of mounting plate are horizontally installed with transverse slat 51, and 51 right bottom of transverse slat is equipped with starting stave
52,52 left lower of starting stave is equipped with first motor 53, and 46 bottom of mounting plate is equipped with the second riser 54, the second riser 54
Bottom is equipped with first bearing seat 55, and the bearing in first bearing seat 55 is connected with first rotating shaft 56,56 right end of first rotating shaft with
The output shaft of first motor 53 is connected by shaft coupling, and 56 left end of first rotating shaft is equipped with saw blade 57.
Further include having cooling device 6, cooling device 6 includes cam 601, compression cylinder 602, piston 603, the first motion bar
604, contact plate 605, the first spring 606, check valve 607, water inlet pipe 608, outlet pipe 609 and nozzle 610, first rotating shaft 56 are right
Side is equipped with cam 601, and cam 601 is between first motor 53 and first bearing seat 55, Embedded installation on transverse slat 51
There are compression cylinder 602,602 inner sliding type of compression cylinder to be equipped with piston 603, the first motion bar 604 is installed among 603 bottom of piston,
First motion bar, 604 bottom end passes through 602 bottom of compression cylinder, and 604 bottom end of the first motion bar is equipped with contact plate 605, contact plate 605
Contacted with cam 601, be connected with the first spring 606 between the top of contact plate 605 and 602 bottom of compression cylinder, the first spring 606 around
On the first motion bar 604, there are two check valve 607, two check valves 607 connect with compression cylinder 602 602 top installation of compression cylinder
It is logical, it is sealedly connected with water inlet pipe 608 on right check valve 607, outlet pipe 609 is sealedly connected on left check valve 607, is discharged
609 end of pipe is connected with nozzle 610, and nozzle 610 is located at right over saw blade 57.
Further include having pressing device 7, pressing device 7 includes cross bar 71, sleeve 72, the second motion bar 73, second spring
74 and arc pressuring plate 75,54 left upper portion of the second riser two cross bars 71 are installed, nozzle 610 is between two cross bars 71, two
71 left end of cross bar is equipped with sleeve 72, and 72 inner sliding type of sleeve is equipped with the second motion bar 73,73 top of the second motion bar and sleeve
Second spring 74 is connected between 72 inner tops, 73 bottom end of the second motion bar is equipped with arc pressuring plate 75.
Further include having fixing device 8, fixing device 8 includes third riser 81, the second cylinder 82 and arc fixed plate 83,
Two sides are mounted on third riser 81 before and after 1 middle part of cutting bed, and 81 inside of third riser is mounted on the second cylinder 82, the second gas
The telescopic rod inner end of cylinder 82 is mounted on arc fixed plate 83.
Further include having second bearing seat 10, the second shaft 11 and roller 12,1 or so two Fang Jun of cutting bed is provided with straight slot 9, leads to
Front and back two side of slot 9 is Embedded to be equipped with second bearing seat 10, and the bearing of front and back two second bearing seat 10 is connected with second
Shaft 11,11 middle part of the second shaft are equipped with roller 12.
Operation principle:When using the present invention, steel pipe is first placed in the arc groove 3 of cutting bed 1 by operating personnel, operator
Member is again by steel pipe toward moving right, and after steel pipe movement is to suitable position, operating personnel can be adjusted by regulating mechanism 4 and be cut
The position of device 5, after the position of device 5 to be cut is adjusted, operating personnel can start cutter device 5 and be cut to steel pipe
It cuts, after waiting for steel pipe cutting, operating personnel close cutter device 5, then the steel pipe that cutting finishes is removed.
Because regulating mechanism 4 includes the first sliding block 42, N-shaped frame 43, the first sliding rail 44, the second sliding block 45, mounting plate 46
With the first cylinder 47,1 front and rear sides of cutting bed are provided with sliding slot 41, and slidingtype is equipped with the first sliding block 42 in sliding slot 41, and first
42 outside of sliding block is equipped with N-shaped frame 43, and cutting bed 1 is located in N-shaped frame 43, and two sides of left and right are mounted on the first cunning in N-shaped frame 43
Rail 44,44 inside of the first sliding rail slidingtype are equipped with the second sliding block 45, mounting plate 46, N-shaped are equipped between two second sliding blocks 45
There are two the first cylinder 47, the telescopic rods of the first cylinder 47 to be connect with 46 top of mounting plate for the installation of 43 inner top of frame.So behaviour
N-shaped frame 43 can be moved left and right by making personnel, to adjust the position of cutter device 5, and then have adjusted the length of pipe cutting;Work as behaviour
After making personnel's startup cutter device 5, operating personnel can control the elongation of the first cylinder 47, the first cylinder 47 to drive cutter device 5 past
Lower movement, to be cut to steel pipe, after waiting for steel pipe cutting, operating personnel control the first cylinder 47 and shorten, you can make
It obtains cutter device 5 up to move, after device 5 to be cut is up moved to suitable position, operating personnel close the first cylinder 47
, steel pipe is cut again to convenient.
Because cutter device 5 includes transverse slat 51, starting stave 52, first motor 53, the second riser 54, first bearing seat
55, first rotating shaft 56 and saw blade 57,46 right side of mounting plate are horizontally installed with transverse slat 51, and it is perpendicular that 51 right bottom of transverse slat is equipped with first
Plate 52,52 left lower of starting stave are equipped with first motor 53, and 46 bottom of mounting plate is equipped with the second riser 54, the second riser
54 bottoms are equipped with first bearing seat 55, and the bearing in first bearing seat 55 is connected with first rotating shaft 56,56 right end of first rotating shaft
It is connect by shaft coupling with the output shaft of first motor 53,56 left end of first rotating shaft is equipped with saw blade 57.So when steel pipe is located at
When 57 lower section of saw blade, operating personnel start first motor 53 and rotate, and first motor 53 drives first rotating shaft 56 to rotate, first rotating shaft
56 drive saw blade 57 to rotate, and under the cooperation of regulating mechanism 4, saw blade 57 cuts steel pipe, after waiting for steel pipe cutting, behaviour
Make personnel and closes the first reduction.
Because further including having cooling device 6, cooling device 6 includes cam 601, compression cylinder 602, the work of piston 603, first
Lever 604, contact plate 605, the first spring 606, check valve 607, water inlet pipe 608, outlet pipe 609 and nozzle 610, first rotating shaft
56 rights are equipped with cam 601, and cam 601 is Embedded on transverse slat 51 between first motor 53 and first bearing seat 55
Compression cylinder 602 is installed, 602 inner sliding type of compression cylinder is equipped with piston 603, and piston is equipped with the first motion bar among 603 bottom
604,604 bottom end of the first motion bar passes through 602 bottom of compression cylinder, 604 bottom end of the first motion bar to be equipped with contact plate 605, contacts
Plate 605 is contacted with cam 601, and the first spring 606, the first spring are connected between 605 top of contact plate and 602 bottom of compression cylinder
606 are wound on the first motion bar 604, and the installation of the top of compression cylinder 602 is there are two check valve 607, and two check valves 607 are and compression cylinder
602 are connected to, and are sealedly connected with water inlet pipe 608 on right check valve 607, outlet pipe is sealedly connected on left check valve 607
609,609 end of outlet pipe is connected with nozzle 610, and nozzle 610 is located at right over saw blade 57.So operating personnel are by water inlet pipe
608 external water sources, the rotation band moving cam 601 of first rotating shaft 56 rotate, and cam 601 drives the first motion bar 604 in the first spring
It is ceaselessly moved up and down under the action of 606, the first motion bar 604 is ceaselessly moved up and down with piston 603;When piston 603 is past
When lower mobile, under the action of check valve 607, clear water is inhaled into compression cylinder 602, when piston 603 up moves, unidirectional
Under the action of valve 607, the clear water in compression cylinder 602 is ejected into from nozzle 610 on saw blade 57 by outlet pipe 609, so that
When saw blade 57 saws steel pipe, it can cool down to saw blade 57, and then saw blade 57 is protected not cross cause thermal damage.
Because further including having pressing device 7, pressing device 7 includes cross bar 71, sleeve 72, the second motion bar 73, second
Spring 74 and arc pressuring plate 75,54 left upper portion of the second riser are equipped with two cross bars 71, nozzle 610 be located at two cross bars 71 it
Between, two cross bars, 71 left end is equipped with sleeve 72, and 72 inner sliding type of sleeve is equipped with the second motion bar 73,73 top of the second motion bar with
Second spring 74 is connected between 72 inner top of sleeve, 73 bottom end of the second motion bar is equipped with arc pressuring plate 75.So when second
When riser 54 moves down, cross bar 71 moves down therewith, and cross bar 71 moves down with moving sleeve 72, to drive arc pressuring plate
75 move down, and after arc pressuring plate 75 and steel pipe contact, under the action of second spring 74, the second motion bar 73 can drive arc
Shape pressing plate 75 up moves, so that arc pressing plate compresses steel pipe, so that steel pipe will not shake when being cut
Dynamic, to improve the efficiency of pipe cutting, after to be cut, the second riser 54 is up mobile to drive arc pressuring plate 75 up
It is mobile, and then the fixation to steel pipe can be unclamped.
Because further including having fixing device 8, fixing device 8 includes that third riser 81, the second cylinder 82 and arc are fixed
Plate 83, two sides are mounted on third riser 81 before and after the middle part of cutting bed 1, and 81 inside of third riser is mounted on the second cylinder 82,
The telescopic rod inner end of second cylinder 82 is mounted on arc fixed plate 83.So before being cut to steel pipe, operating personnel
The elongation of the second cylinder 82 can be started, the second cylinder 82 drives arc fixed plate 83 toward medial movement, when arc fixed plate 83 is by steel
After pipe is fixed, operating personnel close the second cylinder 82, to which further steel pipe be fixed, after to be cut,
Operating personnel start the second cylinder 82 and shorten, and the second cylinder 82 drives arc fixed plate 83 to be moved to the outside, and then unclamp to steel
The fixation of pipe, the steel pipe that operating personnel can finish cutting take out.
Because further including having second bearing seat 10, the second shaft 11 and roller 12,1 or so two Fang Jun of cutting bed is provided with straight slot
9, front and back two side of straight slot 9 is Embedded to be equipped with second bearing seat 10, and the bearing of front and back two second bearing seat 10 is connected with
Second shaft 11,11 middle part of the second shaft are equipped with roller 12.So when operating personnel push steel pipe again, in the effect of roller 12
Under, steel pipe can be more easily pushed, while also saving the time.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously
Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art
For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (7)
1. a kind of construction steel pipe cutting equipment, which is characterized in that include cutting bed(1), supporting leg(2), regulating mechanism
(4)And cutter device(5), cutting bed(1)Supporting leg is mounted at bottom four corners(2), cutting bed(1)Top is provided with arc groove
(3), cutting bed(1)It is equipped with regulating mechanism(4), regulating mechanism(4)It is equipped with cutter device(5).
2. a kind of construction steel pipe cutting equipment according to claim 1, which is characterized in that regulating mechanism(4)Packet
The first sliding block is included(42), N-shaped frame(43), the first sliding rail(44), the second sliding block(45), mounting plate(46)With the first cylinder
(47), cutting bed(1)Front and rear sides are provided with sliding slot(41), sliding slot(41)Interior equal slidingtype is equipped with the first sliding block(42), first
Sliding block(42)Outside is equipped with N-shaped frame(43), cutting bed(1)Positioned at N-shaped frame(43)It is interior, N-shaped frame(43)Two Fang Junan of interior left and right
Equipped with the first sliding rail(44), the first sliding rail(44)The equal slidingtype in inside is equipped with the second sliding block(45), two second sliding blocks(45)Between
Mounting plate is installed(46), N-shaped frame(43)There are two the first cylinders for inner top installation(47), the first cylinder(47)Telescopic rod it is equal
With mounting plate(46)Top connects.
3. a kind of construction steel pipe cutting equipment according to claim 2, which is characterized in that cutter device(5)Packet
Transverse slat is included(51), starting stave(52), first motor(53), the second riser(54), first bearing seat(55), first rotating shaft
(56)And saw blade(57), mounting plate(46)Right side is horizontally installed with transverse slat(51), transverse slat(51)It is perpendicular that right bottom is equipped with first
Plate(52), starting stave(52)Left lower is equipped with first motor(53), mounting plate(46)Bottom is equipped with the second riser
(54), the second riser(54)Bottom is equipped with first bearing seat(55), first bearing seat(55)Interior bearing is connected with first turn
Axis(56), first rotating shaft(56)Right end and first motor(53)Output shaft connected by shaft coupling, first rotating shaft(56)Left end
Saw blade is installed(57).
4. a kind of construction steel pipe cutting equipment according to claim 3, which is characterized in that further include having cooling dress
It sets(6), cooling device(6)It include cam(601), compression cylinder(602), piston(603), the first motion bar(604), contact plate
(605), the first spring(606), check valve(607), water inlet pipe(608), outlet pipe(609)And nozzle(610), first rotating shaft
(56)Right is equipped with cam(601), cam(601)Positioned at first motor(53)And first bearing seat(55)Between, transverse slat
(51)It is above Embedded that compression cylinder is installed(602), compression cylinder(602)Inner sliding type is equipped with piston(603), piston(603)Bottom
First motion bar is installed among portion(604), the first motion bar(604)Bottom end passes through compression cylinder(602)Bottom, the first motion bar
(604)Bottom end is equipped with contact plate(605), contact plate(605)With cam(601)Contact, contact plate(605)Top and compression cylinder
(602)The first spring is connected between bottom(606), the first spring(606)It is wound on the first motion bar(604)On, compression cylinder
(602)There are two check valves for top installation(607), two check valves(607)And compression cylinder(602)Connection, right check valve
(607)On be sealedly connected with water inlet pipe(608), left check valve(607)On be sealedly connected with outlet pipe(609), outlet pipe
(609)End is connected with nozzle(610), nozzle(610)Positioned at saw blade(57)Surface.
5. a kind of construction steel pipe cutting equipment according to claim 4, which is characterized in that further include thering is compression to fill
It sets(7), pressing device(7)It include cross bar(71), sleeve(72), the second motion bar(73), second spring(74)With arc pressure
Plate(75), the second riser(54)Left upper portion is equipped with two cross bars(71), nozzle(610)Positioned at two cross bars(71)Between, two
Cross bar(71)Left end is equipped with sleeve(72), sleeve(72)Inner sliding type is equipped with the second motion bar(73), the second motion bar(73)
Top and sleeve(72)Second spring is connected between inner top(74), the second motion bar(73)Bottom end is equipped with arc pressuring plate
(75).
6. a kind of construction steel pipe cutting equipment according to claim 5, which is characterized in that further include having fixed dress
It sets(8), fixing device(8)It include third riser(81), the second cylinder(82)And arc fixed plate(83), cutting bed(1)In
Two sides are mounted on third riser before and after portion(81), third riser(81)Inside is mounted on the second cylinder(82), the second cylinder
(82)Telescopic rod inner end be mounted on arc fixed plate(83).
7. a kind of construction steel pipe cutting equipment according to claim 6, which is characterized in that further include having the second axis
Bearing(10), the second shaft(11)And roller(12), cutting bed(1)Two Fang Jun of left and right are provided with straight slot(9), straight slot(9)It is front and back
Two sides are Embedded to be equipped with second bearing seat(10), front and back two second bearing seat(10)Bearing be connected with the second shaft
(11), the second shaft(11)Middle part is equipped with roller(12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810034528.9A CN108311752A (en) | 2018-01-15 | 2018-01-15 | A kind of construction steel pipe cutting equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810034528.9A CN108311752A (en) | 2018-01-15 | 2018-01-15 | A kind of construction steel pipe cutting equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108311752A true CN108311752A (en) | 2018-07-24 |
Family
ID=62893736
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810034528.9A Pending CN108311752A (en) | 2018-01-15 | 2018-01-15 | A kind of construction steel pipe cutting equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108311752A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110253670A (en) * | 2019-05-30 | 2019-09-20 | 成都易态科技有限公司 | Sanction film machine for porous membrane |
CN117139722A (en) * | 2023-10-31 | 2023-12-01 | 福建祥鑫新能源汽车配件制造有限公司 | Aluminum alloy section bar cutting device for battery tray processing |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103658845A (en) * | 2012-09-25 | 2014-03-26 | 昆山尚达智机械有限公司 | Novel sawing machine |
CN204700371U (en) * | 2015-05-22 | 2015-10-14 | 南京金口机械集团有限公司 | A kind of pipe fitting blanking device |
CN204747654U (en) * | 2015-04-22 | 2015-11-11 | 浙江双森金属科技股份有限公司 | Cutting device of online processing machine of nonrust steel pipe |
CN205764183U (en) * | 2016-05-27 | 2016-12-07 | 林展秀 | A kind of water pipe cutter sweep |
CN206010009U (en) * | 2016-08-31 | 2017-03-15 | 浙江南湖建设有限公司 | Civic building construction Profile cut-off machine |
CN107575261A (en) * | 2017-10-30 | 2018-01-12 | 彭斌明 | A kind of constructing tunnel watering and lowering dust equipment |
-
2018
- 2018-01-15 CN CN201810034528.9A patent/CN108311752A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103658845A (en) * | 2012-09-25 | 2014-03-26 | 昆山尚达智机械有限公司 | Novel sawing machine |
CN204747654U (en) * | 2015-04-22 | 2015-11-11 | 浙江双森金属科技股份有限公司 | Cutting device of online processing machine of nonrust steel pipe |
CN204700371U (en) * | 2015-05-22 | 2015-10-14 | 南京金口机械集团有限公司 | A kind of pipe fitting blanking device |
CN205764183U (en) * | 2016-05-27 | 2016-12-07 | 林展秀 | A kind of water pipe cutter sweep |
CN206010009U (en) * | 2016-08-31 | 2017-03-15 | 浙江南湖建设有限公司 | Civic building construction Profile cut-off machine |
CN107575261A (en) * | 2017-10-30 | 2018-01-12 | 彭斌明 | A kind of constructing tunnel watering and lowering dust equipment |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110253670A (en) * | 2019-05-30 | 2019-09-20 | 成都易态科技有限公司 | Sanction film machine for porous membrane |
CN117139722A (en) * | 2023-10-31 | 2023-12-01 | 福建祥鑫新能源汽车配件制造有限公司 | Aluminum alloy section bar cutting device for battery tray processing |
CN117139722B (en) * | 2023-10-31 | 2023-12-29 | 福建祥鑫新能源汽车配件制造有限公司 | Aluminum alloy section bar cutting device for battery tray processing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107471318A (en) | A kind of timber efficient cutting of the Furniture manufacturing with decrease of noise functions | |
CN108311752A (en) | A kind of construction steel pipe cutting equipment | |
CN105798381A (en) | Electric rail sawing machine | |
CN107009234B (en) | High-temperature alloy casting cast gate grinding apparatus | |
CN106945105A (en) | A kind of medical stick-like medicinal material slicing device | |
CN112408068A (en) | Polyethylene sponge fixed-length processing method | |
CN208262481U (en) | Plank grinding apparatus | |
CN210359525U (en) | Building pipe cutting equipment | |
CN209580114U (en) | A kind of artificial quartz stone plate cutter device | |
CN205183939U (en) | Electronic reinforcement cutting shear of hand -held type | |
CN216633254U (en) | Welding device for pressure container | |
CN110328763A (en) | A kind of cement brick wire-electrode cutting device | |
CN206455489U (en) | A kind of timber rotary-grinding device | |
CN206779002U (en) | High-performance novel applied to pelleter automates fluid mixing cleaning device | |
CN113500250B (en) | Saw cutting device for brake shoe | |
CN105666758B (en) | Hollow small tyre descaling machine | |
CN209062724U (en) | The anti-flash cutter device of aluminum alloy plate materials | |
CN209521058U (en) | Non-evaporating cement foamed concrete segment cutting production line | |
CN209533578U (en) | Circular saw automatic clamping device | |
CN112935150A (en) | Steel bar cutting device | |
CN205928904U (en) | Plate cutting device | |
CN108544327A (en) | Plank grinding apparatus | |
CN206717012U (en) | A kind of automatic cutting machine with saw for being used to cut Flat bottom container dead head | |
CN220882567U (en) | 1.6 M synchronous belt numerical control cutting machine | |
CN113787629B (en) | Environment-friendly cutting method of beaded rope saw |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180724 |
|
RJ01 | Rejection of invention patent application after publication |