CN108307924A - Afforest arbor fixing device - Google Patents
Afforest arbor fixing device Download PDFInfo
- Publication number
- CN108307924A CN108307924A CN201810208762.9A CN201810208762A CN108307924A CN 108307924 A CN108307924 A CN 108307924A CN 201810208762 A CN201810208762 A CN 201810208762A CN 108307924 A CN108307924 A CN 108307924A
- Authority
- CN
- China
- Prior art keywords
- fixing device
- strap
- root
- trunk
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G17/00—Cultivation of hops, vines, fruit trees, or like trees
- A01G17/04—Supports for hops, vines, or trees
- A01G17/14—Props; Stays
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G13/00—Protecting plants
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G7/00—Botany in general
- A01G7/06—Treatment of growing trees or plants, e.g. for preventing decay of wood, for tingeing flowers or wood, for prolonging the life of plants
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Environmental Sciences (AREA)
- Biodiversity & Conservation Biology (AREA)
- Ecology (AREA)
- Forests & Forestry (AREA)
- Botany (AREA)
- Engineering & Computer Science (AREA)
- Wood Science & Technology (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Toxicology (AREA)
- Supports For Plants (AREA)
Abstract
The present invention provides a kind of greening arbor fixing device, it includes trunk fixing device and root fixing device;Trunk fixing device is for encircling trunk and being fixedly connected with trunk, and root fixing device is for being embedded in soil;Trunk fixing device is fixedly connected with root fixing device, is also connected by more oblique ropes between trunk fixing device and root fixing device.A kind of greening arbor fixing device provided by the invention, is fixedly connected by using trunk fixing device with root fixing device, and the scheme of oblique rope oblique pull reinforcing is arranged, and disclosure satisfy that the requirement of the windproof solid root under the conditions of shallow planting soil.The construction profile of the present invention is beautiful, and root fixing device is hidden in planting soil, with environmental harmony, has preferable market application value.
Description
Technical field
The present invention relates to afforestation apparatus field, especially a kind of greening arbor fixing device.
Background technology
With the propulsion of urbanization process, the development of urban construction is like a raging fire, and high building stands in great numbers in city, in a compact mass.
And bring therewith, it is that green coverage is greatly reduced in city, the urban issues such as tropical island effect are increasingly prominent, city and nature
Contact constantly isolate.Afforestation is limited in urban afforestation land used as the important means for alleviating Urban Ecological Problems
Under conditions of, improve afforestation efficiency, it is ensured that afforestation survival rate is very crucial.
It in the East Coastals city such as Shanghai, is influenced by extreme weathers such as typhoons, for the wind resistance of arbor in afforestation
It can be more demanding.Afforestation transplanting, new plantation arbor, especially large-scale arbor, are susceptible to down since the system of fibrous root is undeveloped
Volt, needs to ensure its survival rate by fixing device.Especially in the important afforesting type of city high density area --- roof is green
In change, since wind-force is big, soil layer is thin, and the windproof solid root demand of arbor is especially prominent.
The existing fixing device type in market is more single, mainly has and builds support using cedar or bamboo pole progress holder
Fixation, fixation etc. of fixing and pull strings using iron lantern ring.These device entirety fixed efficiencies are not high, to windproof solid root requirement
The afforested areas such as high roof greening, existing apparatus cannot meet its demand resistant to lodging mostly, therefore on existing built roof
In greening, mostly ground cover plant, shrub or small-sized arbor, large-scale arbor by roof technique for fixing due to being limited, rare kind
It plants.Meanwhile the modes such as the existing exposed supporting rod of fixing device large area is larger to place landscape impact, and iron hoop is reinforced are also
The proper flow that sap can seriously be interfered, causes greatly to damage to cambial activity, or even causes new rotten.
Increasingly in short supply in urban afforestation land used, roof greening becomes increasingly popular instantly, and arbor fixing device demand constantly increases
Add, it is desirable that constantly promoted.It works out efficient beauty, can solve the problems, such as that the fixing device of the windproof solid root of arbor is significant conscientiously.
104584969 A of Chinese patent literature CN describe a kind of windproof solid method for root of roof greening arbor plant, pass through
Be arranged armored concrete consolidate the tree crown wind resistance frame of root frame, trunk fixed frame and steel construction respectively to transplant the root of arbor, trunk,
Tree crown is reinforced, and to form three-dimensional wind resistance reinforcing from top to bottom, effectively raises roof planting arbor
Wind resistance so that roof greening and planting arbor especially transplants large-scale arbor and becomes possible to so that urban architecture Afforestation Landscape
More aesthetically pleasing, three-dimensional, diversity, it is also safer reliable.But the structure, there are intensity deficiency, installation, dismounting and transplanting are equal
Extremely difficult problem.The shape that trunk fixes frame support structure is also not beautiful enough.
Invention content
Technical problem to be solved by the invention is to provide a kind of greening arbor fixing devices, have preferable effect resistant to lodging
Fruit can solve windproof the technical issues of consolidating root under the conditions of shallow planting soil.It, being capable of intelligent monitoring lodging-prevention in preferred scheme
Effect, hidden danger was eliminated in the budding stage, can avoid fixing device to Tree growth damage with it is rotten.It can control
The growth of arbor reduces the cost of later maintenance.
In order to solve the above technical problems, the technical solution adopted in the present invention is:A kind of greening arbor fixing device, it is wrapped
Include trunk fixing device and root fixing device;For trunk fixing device for encircling trunk and being fixedly connected with trunk, root is solid
Device is determined for being embedded in soil;
Trunk fixing device is fixedly connected with root fixing device, is also passed through between trunk fixing device and root fixing device more
Root oblique rope connects.
In preferred scheme, in the trunk fixing device, the strap of two section camber structures is with respect to cloth
It sets, strap spacing body is equipped between strap, strap spacing body is connect by expanding rope with strap.
In preferred scheme, the bottom of strap is fixedly connected by fixedly connected part with root fixing device, solid
The top of clamp plate is equipped with multiple fixing bolts,
In root, fixing device is equipped with pre-buried draw ring close to the position of outer rim;Fixing bolt is connect by oblique rope with pre-buried draw ring.
In preferred scheme, multiple small fixing bolts are equipped in strap and strap spacing body, expansion rope passes through small solid
Determine bolt strap and strap spacing body link together;
Or it is equipped with fixing bolt in strap, it is equipped with the first pressing plate, screw bolt and nut, the knot of fixing bolt in strap spacing body
Structure is:Fixing bolt is fixedly connected after passing through strap, the second pressing plate, clamp nut with draw ring nut, and draw ring nut is used for
Connect with oblique rope, expansion rope be pressed on strap by the second pressing plate and clamp nut, expansion rope pass through the first pressing plate,
Screw bolt and nut is pressed on strap spacing body.
In preferred scheme, it is equipped with flexible pad in the inner wall of strap and strap spacing body, to avoid damage trunk
Epidermis.
In preferred scheme, pulling force sensor is equipped on oblique rope;
It is equipped with expansion sensor in expansion rope;
Pulling force sensor and expansion sensor are electrically connected with embedded module, and embedded module is by wirelessly or non-wirelessly mode and far
Journey terminal connects.
In preferred scheme, it is additionally provided with alarming device, alarming device is electrically connected with embedded module.
In preferred scheme, the oblique rope is steel wire rope, and tensioning equipment is equipped on oblique rope.
In preferred scheme, in the root fixing device, Gu the edge of root frame is equipped with adjutage, adjutage is equipped with
Multiple pre-buried draw rings apart from arbor different distance;
The fixedly connected part is two boards positioned opposite, the centre of two boards be equipped with for trunk by trunk it is logical
Hole is equipped with solid root frame connecting hole and flange connecting hole in fixedly connected part;
In trunk fixing device, the strap of two section camber structures is positioned opposite, is equipped between strap
Strap spacing body, strap spacing body are connect by expanding rope with strap;It is equipped with connection method in the bottom of strap
It is blue;
It is equipped with multiple pre-embedded bolts on solid root frame, solid root frame connecting hole is equipped in fixedly connected part, pre-embedded bolt passes through solid
Root frame connecting hole is fixedly connected with nut;
Flange connecting hole is fixedly connected by screw bolt and nut with connecting flange.
It is equipped with multiple columns in the bottom of solid root frame.
In preferred scheme, the column is fixedly connected with bottom plate;
Or the fixation earth anchor on the column and bottom plate, it is detachably secured connection.
In preferred scheme, it is additionally provided with connecting cross beam between position of the column close to bottom, is formed between column
The side wall and bottom wall in space be equipped with limit root net, limit root on the net be equipped with only for arbor fibrous root by hole.
A kind of greening arbor fixing device provided by the invention, it is solid by using trunk fixing device and root fixing device
Fixed connection, and the scheme of oblique rope oblique pull reinforcing is set, it disclosure satisfy that the requirement of the windproof solid root under the conditions of shallow planting soil.It is preferred that
Scheme in, the connection structure of original creation keeps the device of the invention installation, dismounting and transplanting all very convenient, and unique trunk is solid
Determine apparatus structure, the growth to arbor trunk can be avoided to impact.Further, the intelligent monitor system of use, energy
The stress of enough basic arbors of monitoring in real time, the hidden danger of lodging was eliminated in the budding stage, can by Intellectualized monitoring
Avoid fixing device to the growth of arbor trunk damage with it is rotten, the management cost of administrative staff is greatly reduced, especially
Appearance can be largely avoided by security risk caused by lodging.The limit root web frame of setting, can control arbor
The speed of growth, reduce administrative staff's later maintenance cost.The component that the fixing device of the present invention uses is that market is common
Part and standard component, implementation cost be not high.The construction profile of the present invention is beautiful, and root fixing device is hidden in planting soil, with ring
Border is coordinated, and has preferable market application value.
Description of the drawings
The invention will be further described with reference to the accompanying drawings and examples:
Main structure diagram when Fig. 1 is the use of the present invention.
Fig. 2 is the stereogram of root fixing device in the present invention.
Fig. 3 is the stereogram of trunk fixing device in the present invention.
Fig. 4 is the stereogram of fixedly connected part in the present invention.
Fig. 5 is the stereogram of fixing device another preferred structure in root in the present invention.
Fig. 6 is the main structure diagram of preferred structure of the present invention.
Fig. 7 is the vertical view of Fig. 6.
Fig. 8 is the vertical view of trunk fixing device in the present invention.
Fig. 9 is the structural schematic diagram of Intellectualized monitoring in the present invention.
In figure:Trunk fixing device 1, strap 101, strap spacing body 102, fixing bolt 103, fixing bolt
1031, the second pressing plate 1032, draw ring nut 1033, clamp nut 1034, small fixing bolt 104, expansion rope 105, connecting flange
106, flexible pad 107, the first pressing plate 108, root fixing device 2, adjutage 21, Gu root frame 22, column 23, pre-buried draw ring 24,
Connecting cross beam 25, limit root net 26, sleeve 27, fixedly connected part 3, the first connecting plate 31, the second connecting plate 32, Gu root frame connecting hole
33, trunk through-hole 34, flange connecting hole 35, oblique rope 4, planting soil 5, bottom plate 6, fixed earth anchor 61, tensioning equipment 7, arbor 8,
Pulling force sensor 9 expands sensor 10, power module 11, embedded module 12, sending device 13, remote terminal 14, warning dress
Set 15.
Specific implementation mode
In Fig. 1, a kind of greening arbor fixing device, it includes trunk fixing device 1 and root fixing device 2;Trunk
Fixing device 1 is for encircling 8 trunk of arbor and being fixedly connected with trunk, and root fixing device 2 is for being embedded in soil;
Trunk fixing device 1 is fixedly connected with root fixing device 2, also logical between trunk fixing device 1 and root fixing device 2
Excessive root oblique rope 4 connects.Thus structure, using root fixing device 2 and the soil body, such as the binding force of the plantation soil body and itself
Gravity, increase arbor 8 power resistant to lodging.In windproof solid root demand large area, root fixing device 2 and place can be increased
It is anchored.
In preferred scheme such as Fig. 3,8, in the trunk fixing device 1, the geometrical clamp of two section camber structures
Plate 101 is positioned opposite, and strap spacing body 102 is equipped between strap 101, and strap spacing body 102 is restricted by expanding
105 connect with strap 101.Thus structure, can encircle the trunk of fixed arbor 8, and can according to the diameter of trunk into
Row is adjusted.
In preferred scheme such as Fig. 1,3,4,6,7, the bottom of strap 101 is fixed by fixedly connected part 3 with root
Device 2 is fixedly connected, and multiple fixing bolts 103 are equipped at the top of strap 101,
In root, fixing device 2 is equipped with pre-buried draw ring 24 close to the position of outer rim;Fixing bolt 103 passes through oblique rope 4 and pre-buried drawing
Ring 24 connects.
In preferred scheme such as Fig. 3, multiple small fixing bolts 104 are equipped in strap 101 and strap spacing body 102,
Expansion rope 105 is linked together strap 101 and strap spacing body 102 by small fixing bolt 104;The structure is more simple
Single, cost is relatively low.
Or in optional scheme such as Fig. 8, it is equipped with fixing bolt 103 in strap 101, is set in strap spacing body 102
There are the first pressing plate 108, the screw bolt and nut, the structure of fixing bolt 103 to be:Fixing bolt 1031 is pressed across strap 101, second
It is fixedly connected with draw ring nut 1033 after plate 1032, clamp nut 1034, draw ring nut 1033 expands for being connect with oblique rope 4
It opens rope 105 to be pressed on strap 101 by the second pressing plate 1032 and clamp nut 1034, expansion rope 105 passes through the first pressure
Plate 108, screw bolt and nut are pressed on strap spacing body 102.The structure is easily installed and adjusts.
In preferred scheme such as Fig. 6,8,9, pulling force sensor 9 is equipped on oblique rope 4;Thus structure is for detecting oblique pull
Pulling force suffered by rope 4, to judge the size of power resistant to lodging.
In further preferred scheme, expansion sensor 10 is equipped in expansion rope 105;Thus structure, for detecting expansion
The suffered pulling force size of rope 105, to judge whether to need that expansion rope 105 is adjusted pine, to adapt to the increase of trunk diameter.
In Fig. 9, pulling force sensor 9 and expansion sensor 10 are electrically connected with embedded module 12, embedded in this example
Module 12 uses sck embedded PCB plates, embedded module 12 by its internal sending device 13 by wireless or cable with
Remote terminal 14 connects.It is additionally provided with power module 11, power module 11 preferably uses solar energy module or alternating current.
In preferred scheme, it is additionally provided with alarming device 15, alarming device 15 is electrically connected with embedded module 12.In this example
Alarming device 15 preferably uses LED warning lamps.
In preferred scheme such as Fig. 1,6, the oblique rope 4 is steel wire rope, and tensioning equipment 7 is equipped on oblique rope 4.Institute
The tensioning equipment 7 stated is the opposite bolt of two thread rotary orientations of welding on a steel cord, and two bolts and nuts bush whorls connect
It connects, realizes that tensioning is adjusted with ut socket by rotation.Or the tensioning equipment 7 is the screw thread of welding on a steel cord
Sleeve, an opposite stud of both ends thread rotary orientation are threadedly coupled with screw shell, are opened by rotating stud and realizing
It is tight to adjust.
In preferred scheme such as Fig. 2,5,6,7, in the root fixing device 2, extend Gu the edge of root frame 22 is equipped with
Arm 21, adjutage 21 are equipped with multiple pre-buried draw rings 24 apart from 8 different distance of arbor;Thus structure, according to different anti-fall
The needs of Fu Li select the pre-buried draw ring 24 of different location to connect oblique rope 4.
The fixedly connected part 3 be two boards positioned opposite, the centre of two boards be equipped with for trunk by tree
Dry through-hole 34 is equipped with solid root frame connecting hole 33 and flange connecting hole 35 in fixedly connected part 3;
In trunk fixing device 1, the strap 101 of two section camber structures is positioned opposite, strap 101 it
Between be equipped with strap spacing body 102, strap spacing body 102 105 is connect by expanding rope with strap 101;In geometrical clamp
The bottom of plate 101 is equipped with connecting flange 106;
It is equipped with multiple pre-embedded bolts on solid root frame 22, solid root frame connecting hole 33 is equipped in fixedly connected part 3, pre-embedded bolt is worn
Root frame connecting hole 33 admittedly is crossed to be fixedly connected with nut;Multiple flange connecting holes 35, flange connecting hole are equipped in fixedly connected part 3
35 are fixedly connected by screw bolt and nut with connecting flange 106.Thus structure, more convenient, reliable realization trunk fix dress
1 is set to be fixedly connected with root fixing device 2.Preferably, fixedly connected part 3 is connected by the way of riveting with solid 22 fixation of root frame
It connects.
It is equipped with multiple columns 23 in the bottom of solid root frame 22.
In preferred scheme, the column 23 is fixedly connected with bottom plate 6;In this example by the way of pouring with bottom plate 6
It is connected as one, together with the reinforcement welding in bottom plate 6, the program is suitable for that arbor will not be transplanted certainly the reinforcing bar in column 23
8 occasion.It should be noted that bottom plate 6 described herein can be the top plate of underground garage or the roof of skyscraper.
Or the fixation earth anchor 61 on the column 23 and bottom plate 6, it is detachably secured connection.Such as Fig. 6
In, it is equipped with sleeve 27 in the bottom of column 23, has poured fixed earth anchor 61 in bottom plate 6, sleeve 27 is socketed with fixed earth anchor 61
Connection.Thus structure obtains enough power resistant to lodging, while also allowing for dismantling and transplant.Another optional scheme such as institute in Fig. 5
Show, is equipped with notch in the bottom of column 23, fixed earth anchor 61 has been poured in bottom plate 6, the position of notch and fixed earth anchor 61 are tied
Connection is tied up, which is suitble to small lot production, pours the occasion that precision is difficult to ensure.
In preferred scheme such as Fig. 6,7, it is additionally provided with connecting cross beam 25 between position of the column 23 close to bottom, in column
The side wall and bottom wall in the space formed between 23 are equipped with limit root net 26, limit root net 26 be equipped with only for 8 fibrous root of arbor by hole.
The frequency of beta pruning and topping is reduced in the growing space for limiting arbor 8 larger to control the speed of growth of arbor 8, reduces
Maintenance cost.
The above embodiments are only the preferred technical solution of the present invention, and are not construed as the limitation for the present invention, this Shen
Please in embodiment and embodiment in feature in the absence of conflict, mutually can arbitrarily combine.The protection model of the present invention
Enclose the equivalent replacement side of technical characteristic in the technical solution that should be recorded with claim, including the technical solution of claim record
Case is protection domain.Equivalent replacement i.e. within this range is improved, also within protection scope of the present invention.
Claims (10)
1. a kind of greening arbor fixing device, it is characterized in that:It includes trunk fixing device(1)With root fixing device(2);Tree
Dry fixing device(1)For encircling trunk and being fixedly connected with trunk, root fixing device(2)For being embedded in soil;
Trunk fixing device(1)With root fixing device(2)It is fixedly connected, trunk fixing device(1)With root fixing device(2)
Between also pass through more oblique ropes(4)Connection.
2. a kind of greening arbor fixing device according to claim 1, it is characterized in that:The trunk fixing device(1)
In, the strap of two section camber structures(101)It is positioned opposite, in strap(101)Between be equipped with strap
Spacing body(102), strap spacing body(102)It is restricted by expanding(105)With strap(101)Connection.
3. a kind of greening arbor fixing device according to claim 2, it is characterized in that:Strap(101)Bottom it is logical
Cross fixedly connected part(3)With root fixing device(2)It is fixedly connected, in strap(101)Top be equipped with multiple fixing bolts
(103),
In root fixing device(2)It is equipped with pre-buried draw ring close to the position of outer rim(24);Fixing bolt(103)Pass through oblique rope(4)
With pre-buried draw ring(24)Connection.
4. a kind of greening arbor fixing device according to claim 2, it is characterized in that:In strap(101)And fixation
Clamping plate spacing body(102)Equipped with multiple small fixing bolts(104), expansion rope(105)Pass through small fixing bolt(104)By strap
(101)With strap spacing body(102)It links together;
Or in strap(101)Equipped with fixing bolt(103), in strap spacing body(102)Equipped with the first pressing plate(108)、
Screw bolt and nut, fixing bolt(103)Structure be:Fixing bolt(1031)Across strap(101), the second pressing plate
(1032), clamp nut(1034)Afterwards with draw ring nut(1033)It is fixedly connected, draw ring nut(1033)For with oblique rope(4)
Connection, expansion rope(105)Pass through the second pressing plate(1032)And clamp nut(1034)It is pressed on strap(101)On, expansion
Rope(105)Pass through the first pressing plate(108), screw bolt and nut be pressed on strap spacing body(102)On.
5. a kind of greening arbor fixing device according to claim 4, it is characterized in that:In oblique rope(4)It is equipped with pulling force
Sensor(9);
It restricts in expansion(105)Equipped with expansion sensor(10);
Pulling force sensor(9)With expansion sensor(10)With embedded module(12)Electrical connection, embedded module(12)Pass through nothing
Line or wired mode and remote terminal(14)Connection.
6. a kind of greening arbor fixing device according to claim 5, it is characterized in that:It is additionally provided with alarming device(15), alert
Showing device(15)With embedded module(12)Electrical connection.
7. a kind of greening arbor fixing device according to claim 1, it is characterized in that:The oblique rope(4)For steel wire
Rope, in oblique rope(4)It is equipped with tensioning equipment(7).
8. a kind of greening arbor fixing device according to claim 1, it is characterized in that:The root fixing device(2)
In, Gu root frame(22)Edge be equipped with adjutage(21), adjutage(21)It is equipped with multiple apart from arbor(8)Different distance it is pre-
Bury draw ring(24);
The fixedly connected part(3)For two boards positioned opposite, the centre of two boards be equipped with for trunk by trunk
Through-hole(34), in fixedly connected part(3)It is equipped with solid root frame connecting hole(33)And flange connecting hole(35);
In trunk fixing device(1)In, the strap of two section camber structures(101)It is positioned opposite, in strap
(101)Between be equipped with strap spacing body(102), strap spacing body(102)It is restricted by expanding(105)With strap
(101)Connection;In strap(101)Bottom be equipped with connecting flange(106);
In solid root frame(22)Multiple pre-embedded bolts are equipped with, in fixedly connected part(3)It is equipped with solid root frame connecting hole(33), pre-buried
Bolt passes through solid root frame connecting hole(33)It is fixedly connected with nut;
Flange connecting hole(35)Pass through screw bolt and nut and connecting flange(106)It is fixedly connected;
In solid root frame(22)Bottom be equipped with multiple columns(23).
9. a kind of greening arbor fixing device according to claim 8, it is characterized in that:The column(23)With bottom plate
(6)It is fixedly connected;
Or the column(23)With bottom plate(6)On fixation earth anchor(61), it is detachably secured connection.
10. a kind of greening arbor fixing device according to claim 8, it is characterized in that:In column(23)Close to bottom
Connecting cross beam is additionally provided between position(25), in column(23)Between the side wall in space that is formed and bottom wall be equipped with limit root net
(26), limit root net(26)It is equipped with only for arbor(8)Fibrous root by hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810208762.9A CN108307924B (en) | 2018-03-14 | 2018-03-14 | Greening arbor fixing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810208762.9A CN108307924B (en) | 2018-03-14 | 2018-03-14 | Greening arbor fixing device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108307924A true CN108307924A (en) | 2018-07-24 |
CN108307924B CN108307924B (en) | 2020-01-21 |
Family
ID=62902541
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810208762.9A Active CN108307924B (en) | 2018-03-14 | 2018-03-14 | Greening arbor fixing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108307924B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109588187A (en) * | 2018-12-11 | 2019-04-09 | 广州普邦园林股份有限公司 | A method of lodging trees righting restores survival rate after improving typhoon calamity |
US20220095552A1 (en) * | 2020-09-30 | 2022-03-31 | Cambridge Research & Development, Inc. | Methods for cultivation using protected growing wells and related structures |
IT202100028523A1 (en) * | 2021-11-10 | 2023-05-10 | Bagaglini Prefabbricati S R L | INTEGRATED ROW CROPS CONTROL SYSTEM |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2977449A1 (en) * | 2011-07-06 | 2013-01-11 | Pepinieres Guillaume | Bio-degradable protective and staking device for vine plant in e.g. agricultural field, has outer protective tubular sleeve whose bottom end is closed under roots to form container, where container is filled with culturing substrate |
CN204232016U (en) * | 2014-11-24 | 2015-04-01 | 李洋 | Forestry sapling Anti-inclining support |
CN104584969A (en) * | 2014-12-26 | 2015-05-06 | 上海聚隆绿化发展有限公司 | Wind-preventing root-strengthening method for roof greening arbor plantation |
CN204392989U (en) * | 2014-12-26 | 2015-06-17 | 上海聚隆绿化发展有限公司 | The solid root device that roof greening arbor is planted |
CN205596768U (en) * | 2016-04-25 | 2016-09-28 | 上海绿泽园艺有限公司 | A simple and easy secret fixing device that after is arranged in small dimension nursery stock to transplant |
CN107114205A (en) * | 2017-05-08 | 2017-09-01 | 深圳文科园林股份有限公司 | A kind of method of arbor support and support regulation |
-
2018
- 2018-03-14 CN CN201810208762.9A patent/CN108307924B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2977449A1 (en) * | 2011-07-06 | 2013-01-11 | Pepinieres Guillaume | Bio-degradable protective and staking device for vine plant in e.g. agricultural field, has outer protective tubular sleeve whose bottom end is closed under roots to form container, where container is filled with culturing substrate |
CN204232016U (en) * | 2014-11-24 | 2015-04-01 | 李洋 | Forestry sapling Anti-inclining support |
CN104584969A (en) * | 2014-12-26 | 2015-05-06 | 上海聚隆绿化发展有限公司 | Wind-preventing root-strengthening method for roof greening arbor plantation |
CN204392989U (en) * | 2014-12-26 | 2015-06-17 | 上海聚隆绿化发展有限公司 | The solid root device that roof greening arbor is planted |
CN205596768U (en) * | 2016-04-25 | 2016-09-28 | 上海绿泽园艺有限公司 | A simple and easy secret fixing device that after is arranged in small dimension nursery stock to transplant |
CN107114205A (en) * | 2017-05-08 | 2017-09-01 | 深圳文科园林股份有限公司 | A kind of method of arbor support and support regulation |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109588187A (en) * | 2018-12-11 | 2019-04-09 | 广州普邦园林股份有限公司 | A method of lodging trees righting restores survival rate after improving typhoon calamity |
CN109588187B (en) * | 2018-12-11 | 2021-09-24 | 广州普邦园林股份有限公司 | Method for improving recovery survival rate of lodging trees after typhoon disaster |
US20220095552A1 (en) * | 2020-09-30 | 2022-03-31 | Cambridge Research & Development, Inc. | Methods for cultivation using protected growing wells and related structures |
IT202100028523A1 (en) * | 2021-11-10 | 2023-05-10 | Bagaglini Prefabbricati S R L | INTEGRATED ROW CROPS CONTROL SYSTEM |
Also Published As
Publication number | Publication date |
---|---|
CN108307924B (en) | 2020-01-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108307924A (en) | Afforest arbor fixing device | |
CN104584969B (en) | The roof greening arbor windproof solid method for root of planting | |
CN204317148U (en) | Edible mushroom photovoltaic green-house | |
CN102613039B (en) | A kind of large-span sunshade net device | |
CN204426192U (en) | Roof arbor is planted the solid root device of Combined wind resistant | |
CN101999298B (en) | Three-dimensional afforestation method | |
CN207201529U (en) | A kind of frame for passion fruit | |
CN206821384U (en) | Tree straightening frame for afforestation | |
CN107896762A (en) | A kind of novel magnesite material fruit tree antifreezing support device | |
CN209527395U (en) | A kind of Water saving type watering arrangement | |
CN208227894U (en) | A kind of nursery stock radix saposhnikoviae frigid-proof device for virescence maintenance | |
CN105794587A (en) | Water-power-engineering big-old-tree transplanting tree-body fixing device and installing method | |
CN202998971U (en) | Fixing device for transplanting trees | |
CN205922271U (en) | Tree fixing device | |
CN109430007A (en) | A kind of Water saving type watering arrangement | |
CN101874458A (en) | Novel light gutter-connected plastic tent | |
CN107926365A (en) | A kind of shore bank band vertical greening planting equipment and its implantation methods | |
CN206380413U (en) | A kind of peach grows branch-pulling device | |
CN205082334U (en) | Novel dragon fruit built structure | |
CN206314327U (en) | The multi-functional tree transplanting protection device of roadside greening | |
CN209964738U (en) | Flower box capable of planting arbor | |
CN111436320B (en) | Ornamental trees and shrubs protective apparatus in winter | |
CN205755833U (en) | Packaging cultivation box set greatly wind-proof fixer | |
CN104350977A (en) | Photovoltaic greenhouse used for edible mushrooms | |
CN209314447U (en) | A kind of fruit tree fixed frame that planting fruit trees protection effect is good |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |