CN108305052A - A kind of equipment management system - Google Patents

A kind of equipment management system Download PDF

Info

Publication number
CN108305052A
CN108305052A CN201810158512.9A CN201810158512A CN108305052A CN 108305052 A CN108305052 A CN 108305052A CN 201810158512 A CN201810158512 A CN 201810158512A CN 108305052 A CN108305052 A CN 108305052A
Authority
CN
China
Prior art keywords
equipment
module
maintenance
date
management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810158512.9A
Other languages
Chinese (zh)
Inventor
刘存辉
张超
钟磊
杨黎治
高光昀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Wei Man Technology Co Ltd
Original Assignee
Yunnan Wei Man Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Wei Man Technology Co Ltd filed Critical Yunnan Wei Man Technology Co Ltd
Priority to CN201810158512.9A priority Critical patent/CN108305052A/en
Publication of CN108305052A publication Critical patent/CN108305052A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0645Rental transactions; Leasing transactions

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Accounting & Taxation (AREA)
  • Operations Research (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Finance (AREA)
  • Development Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of equipment management systems, the system comprises equipment purchase modules, equipment acceptance module, equipment installs module, plant asset management module, equipment account management module, measuring equipment management module, equipment BOM inventory managements, equipment shift module, equipment leasing module, equipment scrapping module, equipment Removal module, equipment starting module, equipment out of use module, corrective maintenance module, Maintenance Module, equipment technological transformation module, equipment lubrication module, plant maintenance module, equipment routing inspection module, equipment point-detecting module, equipment warning module, special equipment personal management and mobile terminal data processing module.Advantageous effect of the present invention is, is integrated with effective management to equipment to greatest extent, i.e., carries out information system management from according to the life cycle of equipment, can be more suitable for the systematization, informationization, centralization of equipment management.

Description

A kind of equipment management system
Technical field
The present invention relates to the technical field of management system, and in particular to the equipment management system based on mobile information application.
Background technology
Existing equipment management mode more falls behind, and typically uses original artificial statistical management mode, not only efficiency Lowly, labor intensive, and it is susceptible to deviation.Although having there is the management platform for the software realization developed, work(is managed Can often relatively simple dispersion, lack unified management platform.
Invention content
In view of the deficiencies in the prior art, the present invention intends to provide a kind of equipment management system applied based on mobile information System, the system can cover existing equipment management comprehensively.
To achieve the goals above, the technical solution adopted by the present invention is as follows:
A kind of equipment management system, the system comprises equipment purchase module, equipment peaces to check and accept module, equipment installs mould Block, equipment account management module, equipment shift module, equipment leasing module, equipment scrapping module, equipment Removal module, equipment Starting module, corrective maintenance module, Maintenance Module, equipment lubrication module, equipment routing inspection module, is set equipment out of use module Standby warning module and special equipment personal management module;
The equipment that the equipment purchase module is used for planned purchases;
The equipment acceptance module is for auditing whether equipment meets acceptance criteria;
The equipment installation module to the equipment of acceptance(check) for carrying out installation distribution;
The equipment account management module is for being managed existing equipment;
The equipment shift module is used to apply the transfer of equipment;
The equipment leasing module is used to examine the external lease of equipment;
Whether the equipment scrapping module, which is used to examine equipment to meet, scraps program;
The equipment out of use module is for examining whether equipment meets dead program(me);
The corrective maintenance module is used to carry out maintenance application to the equipment for entering time-based maintenance;
The Maintenance Module is for proposing that equipment meets the examination & approval of maintenance procedure;
The equipment lubrication module is used to be lubricated assessment and record to the lubricating component of equipment;
The equipment routing inspection module is used to carry out regularly inspection and record to equipment;
The equipment warning module is used for the prompting of the maintenance of equipment next time;
Management of the special equipment personal management module for the specific people of special equipment.
It should be noted that the field that the equipment purchase module includes at least:Buying odd numbers or plan odd numbers, equipment are adopted Purchase application odd numbers, date of application, application numbers, requiring department or factory or work centre), device name, quantity, model, meter It draws total price, planned unit price, outsourcing/self-control, the sources of funds, manufactory, country /region, designing unit, apply to purchase type, type selecting, Shen It please reason, equipment management department opinion, company leader's written instructions.
It should be noted that the field that the equipment acceptance module includes at least:Check and accept odd numbers, device name, manufacture volume Code, unpack odd numbers, unit type, number of casing, apply to purchase department, specification, plan number, contract number, equipment price, manufactory, It is the date of production, arrival date, supply unit, Packing Condition, equipment appearance, the date of unpacking, Data storage, technical data, attached Equipment, tool, examination problem log, participation inspector, equipment use department's opinion, equipment management department opinion.
It should be noted that the field that the equipment installation module includes at least:Odd numbers is installed, odd numbers is checked and accepted, checks and accepts day Phase, apply to purchase department, contract number, installation unit or factory, peace turns place or functional location, installed date, installation personnel, installation Quality, uses unit opinion, installation unit opinion, equipment management department opinion, facility information at trial operation situation.
It should be noted that the field that the equipment account management module includes at least:Device coding, device name, rule Lattice number item name, ABC, production firm, the date of production, increase mode, begins to use the time, has counted and carry month, using the moon Limit, behaviour in service, measurement unit, former coin initial value, moon amount of depreciation, accumulated depreciation, net value, factory use department, infield Or functional location, plan factory, assets card or financial assets coding, equipment Quick Response Code.
It should be noted that the field that the equipment shift module includes at least:Device coding, asset number, implementor name Title, unit type, ABC, production firm, the vertical card date, service life, initial value, accumulated depreciation, the enlistment age, recall, net value, transfer Odd numbers, move dress the date, move dress before using department, move fill preceding infield, move dress after using unit, move dress after infield, move Equipment situation, shifting dress reason, remarks before dress.
It should be noted that the field that the equipment leasing module includes at least:Device coding, asset number, implementor name Title, unit type, ABC, production firm, the vertical card date, service life, initial value, accumulated depreciation, the enlistment age, recall, net value, lease Odd numbers, lease date, term of a lease, the lease amount of money.
It should be noted that the field that the equipment scrapping module includes at least:Device coding, asset number, implementor name Title, unit type, primary and secondary, ABC, production firm, the date of production, the vertical card date, service life, initial value, accumulated depreciation, the enlistment age, Net value, using department, place to use, scrap odd numbers, scrap or be put in storage the date, new degree, cleaning up cost, net residual value, scrap reason, Using accessory, technical appraisement, current device situation.
It should be noted that the field that the equipment out of use module includes at least:Device coding, asset number, implementor name Title, ABC, production firm, the date of production, the vertical card date, service life, initial value, net value, uses department, installation ground at unit type Point deactivates odd numbers, deactivates the date, deactivate reason, deactivate preceding status of equipment, remarks.
It should be noted that the field that the corrective maintenance module includes at least:Device coding, device name, in maintenance Appearance, maintenance project code, maintenance project name, plan factory, upkeep cost, maintenance man hours, the time started, is cut at maintenance period Only time, formulation time;The field that the Maintenance Module includes at least:Device coding, device name, maintenance content, dimension When protecting period, Maintenance Significant Items coding, Maintenance Significant Items title, plan factory, maintenance cost, maintenance man-hours, time started, cut-off Between, formulate the time, performance, maintenance dates, remarks;The field that the equipment lubrication module includes at least:Device coding is set Standby title, device type, specification, factory, functional location, equipment lubrication standard odd numbers, lubricant housings, lubrication interval, lubricating oil, Lubricating system;The field that the equipment routing inspection module includes at least:Device coding, device name, device type, factory, inspection Plan odd numbers, monitoring time, inspection group;The field that the equipment warning module includes at least:There are maintenance period and last guarantor The time is supported, determines specific time for maintaining next time, the equipment for needing to maintain and specific is reminded before service time does not reach The time of maintenance;The field that the special equipment personal management module includes at least:Name, gender, educational background, telephone number, work Factory, work centre, operation card type, operation card kind intermediate item, extraordinary operation card number, data of issue, issuing unit, certificate have Effect phase, effective marker, remarks, personnel ID, operation card Check Date, operation card next Check Date, certificate attachment, remarks.
Advantageous effect of the present invention is, is integrated with effective management to equipment to greatest extent, i.e., from the life according to equipment Period progress information system management is ordered, the systematization, informationization, centralization of equipment management can be more suitable for.
Description of the drawings
Fig. 1 is equipment purchase flow chart;
Fig. 2 is equipment acceptance flow chart;
Fig. 3 is equipment installation procedure figure;
Fig. 4 is equipment account management flow chart;
Fig. 5 is equipment transfer flow figure;
Fig. 6 is equipment leasing flow chart;
Fig. 7 is equipment scrapping flow chart;
Fig. 8 is equipment out of use flow chart;
Fig. 9 is maintenance of equipment flow chart.
Specific implementation mode
The invention will be further described below, it should be noted that the present embodiment premised on the technical program, Detailed embodiment and specific operating process are given, but protection scope of the present invention is not limited to the present embodiment.
The present invention is a kind of equipment management system, and the system comprises equipment purchase module, equipment peaces to check and accept module, equipment Module, equipment account management module, equipment shift module, equipment leasing module, equipment scrapping module, equipment Removal mould are installed Block, equipment starting module, equipment out of use module, corrective maintenance module, Maintenance Module, equipment lubrication module, equipment routing inspection Module, equipment warning module and special equipment personal management module;
The equipment that the equipment purchase module is used for planned purchases;
The equipment acceptance module is for auditing whether equipment meets acceptance criteria;
The equipment installation module to the equipment of acceptance(check) for carrying out installation distribution;
The equipment account management module is for being managed existing equipment;
The equipment shift module is used to apply the transfer of equipment;
The equipment leasing module is used to examine the external lease of equipment;
Whether the equipment scrapping module, which is used to examine equipment to meet, scraps program;
The equipment out of use module is for examining whether equipment meets dead program(me);
The corrective maintenance module is used to carry out maintenance application to the equipment for entering time-based maintenance;
The Maintenance Module is for proposing that equipment meets the examination & approval of maintenance procedure;
The equipment lubrication module is used to be lubricated assessment and record to the lubricating component of equipment;
The equipment routing inspection module is used to carry out regularly inspection and record to equipment;
The equipment warning module is used for the prompting of the maintenance of equipment next time;
Management of the special equipment personal management module for the specific people of special equipment.
It should be noted that the field that the equipment purchase module includes at least:Buying odd numbers or plan odd numbers, equipment are adopted Purchase application odd numbers, date of application, application numbers, requiring department or factory or work centre), device name, quantity, model, meter It draws total price, planned unit price, outsourcing/self-control, the sources of funds, manufactory, country /region, designing unit, apply to purchase type, type selecting, Shen It please reason, equipment management department opinion, company leader's written instructions.
It should be noted that the field that the equipment acceptance module includes at least:Check and accept odd numbers, device name, manufacture volume Code, unpack odd numbers, unit type, number of casing, apply to purchase department, specification, plan number, contract number, equipment price, manufactory, It is the date of production, arrival date, supply unit, Packing Condition, equipment appearance, the date of unpacking, Data storage, technical data, attached Equipment, tool, examination problem log, participation inspector, equipment use department's opinion, equipment management department opinion.
It should be noted that the field that the equipment installation module includes at least:Odd numbers is installed, odd numbers is checked and accepted, checks and accepts day Phase, apply to purchase department, contract number, installation unit or factory, peace turns place or functional location, installed date, installation personnel, installation Quality, uses unit opinion, installation unit opinion, equipment management department opinion, facility information at trial operation situation.
It should be noted that the field that the equipment account management module includes at least:Device coding, device name, rule Lattice number item name, ABC, production firm, the date of production, increase mode, begins to use the time, has counted and carry month, using the moon Limit, behaviour in service, measurement unit, former coin initial value, moon amount of depreciation, accumulated depreciation, net value, factory use department, infield Or functional location, plan factory, assets card or financial assets coding, equipment Quick Response Code.
It should be noted that the field that the equipment shift module includes at least:Device coding, asset number, implementor name Title, unit type, ABC, production firm, the vertical card date, service life, initial value, accumulated depreciation, the enlistment age, recall, net value, transfer Odd numbers, move dress the date, move dress before using department, move fill preceding infield, move dress after using unit, move dress after infield, move Equipment situation, shifting dress reason, remarks before dress.
It should be noted that the field that the equipment leasing module includes at least:Device coding, asset number, implementor name Title, unit type, ABC, production firm, the vertical card date, service life, initial value, accumulated depreciation, the enlistment age, recall, net value, lease Odd numbers, lease date, term of a lease, the lease amount of money.
It should be noted that the field that the equipment scrapping module includes at least:Device coding, asset number, implementor name Title, unit type, primary and secondary, ABC, production firm, the date of production, the vertical card date, service life, initial value, accumulated depreciation, the enlistment age, Net value, using department, place to use, scrap odd numbers, scrap or be put in storage the date, new degree, cleaning up cost, net residual value, scrap reason, Using accessory, technical appraisement, current device situation.
It should be noted that the field that the equipment out of use module includes at least:Device coding, asset number, implementor name Title, ABC, production firm, the date of production, the vertical card date, service life, initial value, net value, uses department, installation ground at unit type Point deactivates odd numbers, deactivates the date, deactivate reason, deactivate preceding status of equipment, remarks.
It should be noted that the field that the corrective maintenance module includes at least:Device coding, device name, in maintenance Appearance, maintenance project code, maintenance project name, plan factory, upkeep cost, maintenance man hours, the time started, is cut at maintenance period Only time, formulation time;The field that the Maintenance Module includes at least:Device coding, device name, maintenance content, dimension When protecting period, Maintenance Significant Items coding, Maintenance Significant Items title, plan factory, maintenance cost, maintenance man-hours, time started, cut-off Between, formulate the time, performance, maintenance dates, remarks;The field that the equipment lubrication module includes at least:Device coding is set Standby title, device type, specification, factory, functional location, equipment lubrication standard odd numbers, lubricant housings, lubrication interval, lubricating oil, Lubricating system;The field that the equipment routing inspection module includes at least:Device coding, device name, device type, factory, inspection Plan odd numbers, monitoring time, inspection group;The field that the equipment warning module includes at least:There are maintenance period and last guarantor The time is supported, determines specific time for maintaining next time, the equipment for needing to maintain and specific is reminded before service time does not reach The time of maintenance;The field that the special equipment personal management module includes at least:Name, gender, educational background, telephone number, work Factory, work centre, operation card type, operation card kind intermediate item, extraordinary operation card number, data of issue, issuing unit, certificate have Effect phase, effective marker, remarks, personnel ID, operation card Check Date, operation card next Check Date, certificate attachment, remarks.
For those skilled in the art, technical solution that can be as described above and design are made other each Kind is corresponding to be changed and deforms, and all these change and deform the protection model that should all belong to the claims in the present invention Within enclosing.

Claims (10)

1. a kind of equipment management system, which is characterized in that the system comprises equipment purchase module, equipment peaces to check and accept module, sets Standby installation module, equipment account management module, equipment shift module, equipment leasing module, equipment scrapping module, equipment Removal mould Block, equipment starting module, equipment out of use module, corrective maintenance module, Maintenance Module, equipment lubrication module, equipment routing inspection Module, equipment warning module and special equipment personal management module;
The equipment that the equipment purchase module is used for planned purchases;
The equipment acceptance module is for auditing whether equipment meets acceptance criteria;
The equipment installation module to the equipment of acceptance(check) for carrying out installation distribution;
The equipment account management module is for being managed existing equipment;
The equipment shift module is used to apply the transfer of equipment;
The equipment leasing module is used to examine the external lease of equipment;
Whether the equipment scrapping module, which is used to examine equipment to meet, scraps program;
The equipment out of use module is for examining whether equipment meets dead program(me);
The corrective maintenance module is used to carry out maintenance application to the equipment for entering time-based maintenance;
The Maintenance Module is for proposing that equipment meets the examination & approval of maintenance procedure;
The equipment lubrication module is used to be lubricated assessment and record to the lubricating component of equipment;
The equipment routing inspection module is used to carry out regularly inspection and record to equipment;
The equipment warning module is used for the prompting of the maintenance of equipment next time;
Management of the special equipment personal management module for the specific people of special equipment.
2. equipment management system according to claim 1, which is characterized in that the word that the equipment purchase module includes at least Section:Purchase odd numbers or plan odd numbers, facilities procurement application number, date of application, application numbers, requiring department or factory or work Center), device name, quantity, model, plan total price, planned unit price, outsourcing/self-control, the sources of funds, manufactory, country/ground Area, designing unit apply to purchase type, type selecting, application reason, equipment management department opinion, company leader's written instructions.
3. equipment management system according to claim 1, which is characterized in that the word that the equipment acceptance module includes at least Section:Odd numbers is checked and accepted, device name, manufacture coding, unpack odd numbers, unit type, number of casing, applies to purchase department, specification, plan to compile Number, contract number, equipment price, manufactory, the date of production, arrival date, supply unit, Packing Condition, equipment appearance, unpack Date, Data storage, technical data, auxiliary device, tool, examination problem log, participation inspector, equipment are anticipated using department See, equipment management department opinion.
4. equipment management system according to claim 1, which is characterized in that the word that the equipment installation module includes at least Section:Installation odd numbers, check and accept odd numbers, date of inspection and receipt, apply to purchase department, contract number, installation unit or factory, peace turns place or function Position, installation personnel, installation quality, trial operation situation, uses unit opinion, installation unit opinion, equipment management at installed date Department's opinion, facility information.
5. equipment management system according to claim 1, which is characterized in that the equipment account management module includes at least Field:Device coding, specifications and models, item name, ABC, production firm, the date of production, increase mode, is opened device name Beginning usage time, counted carry month, using moon limit, behaviour in service, measurement unit, former coin initial value, moon amount of depreciation, accumulated depreciation, Net value, factory use department, infield or functional location, plan factory, assets card or financial assets coding, equipment two Tie up code.
6. equipment management system according to claim 1, which is characterized in that the word that the equipment shift module includes at least Section:Device coding, device name, unit type, ABC, production firm, the vertical card date, service life, initial value, tires out at asset number Meter depreciation, the enlistment age, recall, net value, transfer odd numbers, move dress the date, move dress before using department, move fill preceding infield, move dress after Use equipment situation, shifting dress reason, remarks before infield, shifting dress after unit, shifting dress.
7. equipment management system according to claim 1, which is characterized in that the word that the equipment leasing module includes at least Section:Device coding, device name, unit type, ABC, production firm, the vertical card date, service life, initial value, tires out at asset number Meter depreciation the enlistment age, recalls, net value, lease odd numbers, the lease date, term of a lease, leases the amount of money.
8. equipment management system according to claim 1, which is characterized in that the word that the equipment scrapping module includes at least Section:Device coding, device name, unit type, primary and secondary, ABC, production firm, the date of production, the vertical card date, makes asset number With the time limit, initial value, accumulated depreciation, the enlistment age, net value, using department, place to use, scrap odd numbers, scrap or be put in storage the date, is new Degree, net residual value, scraps reason, using accessory, technical appraisement, current device situation at cleaning up cost.
9. equipment management system according to claim 1, which is characterized in that the word that the equipment out of use module includes at least Section:Device coding, device name, unit type, ABC, production firm, the date of production, the vertical card date, uses year at asset number Limit, initial value, net value, using department, infield, deactivate odd numbers, deactivate the date, deactivate reason, deactivate before status of equipment, standby Note.
10. equipment management system according to claim 1, which is characterized in that the corrective maintenance module included at least Field:Device coding, device name, maintenance content, maintenance period, maintenance project code, maintenance project name, plan factory, Upkeep cost, the time started, deadline, formulates the time at maintenance man hours;The field that the Maintenance Module includes at least: Device coding, device name, maintenance content, maintenance period, Maintenance Significant Items coding, Maintenance Significant Items title, plan factory, maintenance expense With, maintenance man-hours, the time started, deadline, formulate time, performance, maintenance dates, remarks;The equipment lubrication mould The field that block includes at least:Device coding, device name, device type, specification, factory, functional location, equipment lubrication standard list Number, lubricant housings, lubrication interval, lubricating oil, lubricating system;The field that the equipment routing inspection module includes at least:Device coding, Device name, device type, factory, patrol plan odd numbers, monitoring time, inspection group;The equipment warning module includes at least Field:There are maintenance period and last service time, determines the specific time maintained next time, it is not reached in service time Preceding prompting needs the equipment maintained and the time specifically maintained;The field that the special equipment personal management module includes at least: Name, gender, educational background, telephone number, factory, work centre, operation card type, operation card kind intermediate item, extraordinary operation card are compiled Number, data of issue, issuing unit, the certificate term of validity, effective marker, remarks, personnel ID, operation card Check Date, operation card under Secondary Check Date, certificate attachment, remarks.
CN201810158512.9A 2018-02-26 2018-02-26 A kind of equipment management system Withdrawn CN108305052A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810158512.9A CN108305052A (en) 2018-02-26 2018-02-26 A kind of equipment management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810158512.9A CN108305052A (en) 2018-02-26 2018-02-26 A kind of equipment management system

Publications (1)

Publication Number Publication Date
CN108305052A true CN108305052A (en) 2018-07-20

Family

ID=62848681

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810158512.9A Withdrawn CN108305052A (en) 2018-02-26 2018-02-26 A kind of equipment management system

Country Status (1)

Country Link
CN (1) CN108305052A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109102376A (en) * 2018-09-07 2018-12-28 艺搭环保科技(上海)有限公司 A kind of shared system for building module
CN109543849A (en) * 2018-10-26 2019-03-29 甘肃省核与辐射安全中心 A kind of equipment management system based on .netExcel development platform
CN109767015A (en) * 2019-01-16 2019-05-17 山东奥晟达机械技术服务有限公司 M of e job management system and management method based on Internet technology
CN111178795A (en) * 2019-12-18 2020-05-19 云南云铝润鑫铝业有限公司 Accurate management system and method for aluminum electrolysis warehouse
CN112330267A (en) * 2020-10-19 2021-02-05 优利德(江苏)化工有限公司 Chemical plant production operation management system
CN112949876A (en) * 2021-03-19 2021-06-11 湖南美石信息技术有限公司 Intelligent management platform system based on Internet of things commercial concrete equipment
CN112950052A (en) * 2021-03-19 2021-06-11 湖南美石信息技术有限公司 Comprehensive intelligent service platform system based on commercial concrete management
CN113516360A (en) * 2021-05-16 2021-10-19 中国建材检验认证集团云南合信有限公司 Detection instrument equipment management informatization system and management method for detection mechanism

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109102376A (en) * 2018-09-07 2018-12-28 艺搭环保科技(上海)有限公司 A kind of shared system for building module
CN109543849A (en) * 2018-10-26 2019-03-29 甘肃省核与辐射安全中心 A kind of equipment management system based on .netExcel development platform
CN109767015A (en) * 2019-01-16 2019-05-17 山东奥晟达机械技术服务有限公司 M of e job management system and management method based on Internet technology
CN111178795A (en) * 2019-12-18 2020-05-19 云南云铝润鑫铝业有限公司 Accurate management system and method for aluminum electrolysis warehouse
CN112330267A (en) * 2020-10-19 2021-02-05 优利德(江苏)化工有限公司 Chemical plant production operation management system
CN112949876A (en) * 2021-03-19 2021-06-11 湖南美石信息技术有限公司 Intelligent management platform system based on Internet of things commercial concrete equipment
CN112950052A (en) * 2021-03-19 2021-06-11 湖南美石信息技术有限公司 Comprehensive intelligent service platform system based on commercial concrete management
CN113516360A (en) * 2021-05-16 2021-10-19 中国建材检验认证集团云南合信有限公司 Detection instrument equipment management informatization system and management method for detection mechanism

Similar Documents

Publication Publication Date Title
CN108305052A (en) A kind of equipment management system
Bazan et al. A review of mathematical inventory models for reverse logistics and the future of its modeling: An environmental perspective
Clottey et al. Forecasting product returns for remanufacturing operations
Tsai Quality cost measurement under activity‐based costing
Leung et al. A robust optimization model for multi-site production planning problem in an uncertain environment
Wood Principles of quality costs: financial measures for strategic implementation of quality management
JP6370757B2 (en) Profit / loss prediction apparatus and profit / loss prediction program
US20160110677A1 (en) Systems and techniques for ensuring the integrity of enterprise asset management data
US20150379456A1 (en) Systems and techniques for ensuring the integrity of enterprise asset management data
Angel et al. Designing reverse logistics network in an omnichannel environment in Asia
JP6242362B2 (en) Profit / loss prediction apparatus and profit / loss prediction program
WO2017116420A1 (en) Systems and techniques for ensuring the integrity of enterprise asset management data
Hekimoğlu Spare parts management of aging capital products
Oktarina et al. House of Risk (HOR) Analysis as a Supply Chain Risk Mitigation Method at CV. XYZ
Zhygalkevych et al. ANALYSIS OF LOGISTICS SUPPORT FOR CONSTRUCTION PROCESSES AT LLC" BMU-2019"
WO2024047919A1 (en) Corporate governance information provision device and method
MAI et al. The appraisal of power plants
Del Bufalo et al. Innovative Instruments and Techniques for Measurement System Operation Management
Antipenko et al. Function for Optimization Parameters of Power Engineering Objects
Pratiwi et al. Proposed improvement of performance calculation of supply chain management
Ind Indian accounting standard (ind as) 38 intangible assets
JP2004348403A (en) Corporate activity evaluation method and evaluation device
Nwankwojike et al. Cost performance analysis of small scale automotive maintenance firms in Calabar metropolis
Abosuliman Systems engineering of Natural gas distribution
Wanda Evaluation of forecasting methods for critical maintenance spare parts for the bus industry in South Africa

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180720