CN108301414A - A kind of shearing slot structure and its construction method for underwater concrete back cover - Google Patents

A kind of shearing slot structure and its construction method for underwater concrete back cover Download PDF

Info

Publication number
CN108301414A
CN108301414A CN201810272379.XA CN201810272379A CN108301414A CN 108301414 A CN108301414 A CN 108301414A CN 201810272379 A CN201810272379 A CN 201810272379A CN 108301414 A CN108301414 A CN 108301414A
Authority
CN
China
Prior art keywords
angle steel
building enclosure
rebound
flush pipe
buried
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810272379.XA
Other languages
Chinese (zh)
Inventor
胡云华
陈建斌
彭定新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Municipal Engineering Design and Research Institute Co Ltd
Original Assignee
Wuhan Municipal Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Municipal Engineering Design and Research Institute Co Ltd filed Critical Wuhan Municipal Engineering Design and Research Institute Co Ltd
Priority to CN201810272379.XA priority Critical patent/CN108301414A/en
Publication of CN108301414A publication Critical patent/CN108301414A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes

Abstract

The present invention relates to a kind of shearing slot structures and its construction method for underwater concrete back cover, it includes the foundation pit excavated in ground to shear slot structure, building enclosure is surrounded with around foundation pit, it further include angle steel pair, rebound and pre-buried flush pipe, angle steel is circumferentially positioned on the inside of building enclosure interval, and two angle steel relative spacings setting of angle steel centering, between the upper and lower every being embedded with two rows of anchor bars corresponding with angle steel in building enclosure, anchor bar is stretched out close to one end of angle steel pair after building enclosure to be fixedly connected with corresponding angle steel, between two angle steel that rebound is arranged in angle steel pair, pre-buried flush pipe is arranged in building enclosure, and multiple apopores are equipped with towards rebound to corresponding position with angle steel in pre-buried flush pipe.The shearing slot structure of the present invention so that there is reliable connection between bottom concrete and building enclosure, ensure the watertightness of bottom concrete and the hole huge water pressure in bottom can be born.

Description

A kind of shearing slot structure and its construction method for underwater concrete back cover
Technical field
The present invention relates to underground engineering design and technical field of construction more particularly to a kind of for underwater concrete back cover Shear slot structure and its construction method.
Background technology
In the numerous cities in China, generally development has the artesian aquifer and the higher weak soil of water content of multi-layered thickness stabilization Layer.With the development of urban transportation and the underground space, the excavation of deep big foundation pit has been directed to these layer of position.Residing for foundation pit Environmental condition becomes increasingly complex, and requires to be increasingly stringenter to the control of foundation pit deformation, therefore in Deep Excavation, not only need Hole bottom artesian water is punished with prevent it is prominent gush destruction and jeopardize engineering safety, also to avoid pressure-bearing water cure is improper from causing The outer earth's surface in hole or building enclosure self-deformation is excessive causes damages to periphery buildings or structures.In engineering practice generally use every Water, decompression or hole bottom reinforce the measures such as back cover or many kinds of measures is used in combination method reduces artesian water water level, realizes base Dry excavation is cheated to ensure construction safety and quality, and prevents the various environmental problems caused by simple precipitation.Above-mentioned measure pair Cutting depth is smaller and water seal curtain to completely penetrate through the base pit engineering of artesian aquifer be applicable, had accumulated suitable work already Journey experience.But big to cutting depth, artesian aquifer thickness and buried depth greatly cause water seal curtain to be difficult to completely penetrate through and hold The ultra-deep foundation pit engineering that there are extremely sensitive buildings or structures within the scope of pressure water-bearing layer, influence of foundation excavation, is held using aforementioned Pressure water Disposal Measures and arrangement and method for construction have been difficult to meet requirement of engineering, or even can cause various engineering accidents.At artesian water Set improper and design mistake it is unreasonable caused by foundation pit accident it is commonplace.
Invention content
The technical problem to be solved by the present invention is to solve the above shortcomings of the prior art and to provide one kind being used for underwater coagulation The shearing slot structure and its construction method at grave bottom.
The technical solution that the present invention solves above-mentioned technical problem is as follows:A kind of shearing slot knot for underwater concrete back cover Structure, including excavate and be surrounded with the building enclosure being above the ground level around the foundation pit on ground, the foundation pit, further include angle steel To, rebound and pre-buried flush pipe, the angle steel is circumferentially positioned on the inside of the building enclosure interval, and the angle steel centering The setting of two angle steel relative spacings, and be located at the both sides up and down on ground, the building enclosure interior building enclosure is between the upper and lower Every being embedded with two rows of anchor bars corresponding with the angle steel, the anchor bar is close to described in the stretching of one end of the angle steel pair Be fixedly connected with the corresponding angle steel after building enclosure, two angle steel that the rebound is arranged in the angle steel pair it Between, the pre-buried flush pipe is arranged in the building enclosure on the inner wall of the angle steel side, and in the pre-buried flush pipe Multiple apopores, the pre-buried flush pipe and external high pressure water are equipped with towards the rebound to corresponding position with the angle steel Source is connected to, and the high pressure water flow sprayed from the apopore can be rinsed cutting process to the rebound.
Before into the foundation pit, casting concrete forms bottom concrete, first by the pre-buried flush pipe and external high pressure Water source is connected to, and the high pressure water flow sprayed from the apopore is rinsed cutting process to the rebound, waits for the rebound Into the foundation pit, casting concrete forms bottom concrete again after removing.With pouring for bottom concrete, two institutes It states and is full of concrete in the region between angle steel, the building enclosure is made to form entirety with the bottom concrete.
The beneficial effects of the invention are as follows:The shearing slot structure for underwater concrete back cover of the present invention, using going along with sb. to guard him Angle steel pair is designed on the inside of structure, and rebound is internally set to reserve space on the inside of the building enclosure in angle steel, and By being embedded on the outside of building enclosure the anchor bar in soil matrix by the angle steel to further fixing, will first be poured in foundation pit mixed Solidifying soil simultaneously forms bottom concrete, then again rinses the rebound by pre-buried flush pipe and cuts and remove, then to foundation pit Interior casting concrete, and the region between two angle steel of the angle steel centering is full of concrete, it can make back cover in this way There is reliable connection between concrete and building enclosure, ensure watertightness and energy of the building enclosure with bottom concrete joint face Bear the hole huge water pressure in bottom.
Based on the above technical solution, the present invention can also be improved as follows:
Further:Several main reinforcements, the angle steel and every main ribs are vertically arranged at intervals on the inside of the building enclosure It is fixedly connected with.
The advantageous effect of above-mentioned further scheme is:By the way that the angle steel is fixedly connected with main ribs, it is ensured that The angle steel can obtain firm support, improve the structural strength of shearing slot, and be not in dystopy during construction, protect The high pressure water flow for demonstrate,proving the apopore outgoing in the pre-buried flush pipe can be by the rebound between the upper and lower angle steel smoothly Cleaning cutting.
Further:The pre-buried flush pipe is vertically provided between adjacent two main ribs, the pre-buried flush pipe Top is higher than the top of main ribs, and difference in height between the two is not less than 50cm.
The advantageous effect of above-mentioned further scheme is:By the way that the pre-buried flush pipe is vertically provided at described in adjacent two Between main reinforcement, adjacent two main ribs can be made to be effectively protected the pre-buried flush pipe, and will not occupy Extra space, easy for construction, structure is beautiful, by the top that the top of the pre-buried flush pipe is set above to main ribs End, with facilitate can be in order to which the construction of pre-buried flush pipe, another party can be so that the pre-buried flush pipe interior energy be formed enough Hydraulic pressure, so that smoothly the rebound is cut.
Further:The pre-buried flush pipe is steel pipe or pvc pipe.
The advantageous effect of above-mentioned further scheme is:Steel pipe or pvc pipe structural strength are larger, can bear larger hydraulic pressure, High pressure water flow convenient for being emitted from the apopore, which can smoothly rinse the rebound, to be cut and removes, convenient for subsequently applying Work.
Further:The angle steel is to horizontally disposed, and two angle steel of the angle steel centering and two rows institute State anchor bar and be symmetricly set on ground both sides up and down, and two rows of anchor bar stretch out one end of the building enclosure with Two angle steel correspondences of the angle steel centering are welded and fixed.
The advantageous effect of above-mentioned further scheme is:By by two angle steel of the angle steel centering and upper and lower two Arrange the anchor bar and be symmetricly set on ground both sides up and down, can entirely to shear slot withstand forces it is more balanced, entirely Structural strength is larger.
Further:The distance between two described angle steel of the angle steel centering are no more than the bottoming concrete thickness Half.
The advantageous effect of above-mentioned further scheme is:Between two angle steel by controlling the angle steel centering away from From the half no more than the bottoming concrete thickness, it is ensured that the intensity of entire bottom concrete so that back cover is mixed Solidifying soil coordinates the angle steel and anchor bar preferably to support the building enclosure.
Further:The rebound includes wood wool board and/or plastic foamboard, and the wood wool board and/or foamed plastics The plate angle steel corresponding with upper and lower both sides is fixedly connected.
The advantageous effect of above-mentioned further scheme is:Wood wool board and plastic foamboard light weight, density ratio water are small, pass through height It forms powder after pressure flow flushing cutting and swims in the water surface and flow away, can make to rinse cutting by institute by high pressure water flow in this way It states wood wool board and/or plastic foamboard is removed totally, be convenient for subsequent construction.
The present invention also provides a kind of construction methods of the shearing slot structure for underwater concrete back cover, including such as Lower step:
Step 1:In ground excavation pit, and the building enclosure being above the ground level around setting around the foundation pit, and Around setting angle steel pair on the inside of the building enclosure, wherein relative spacing is arranged two angle steel of the angle steel centering up and down, and It is located at the both sides up and down on ground;
Step 2:Between the upper and lower every being embedded with two rows of anchor bars corresponding with the angle steel, and general in the building enclosure The anchor bar is stretched out close to one end of the angle steel pair after the building enclosure to be fixedly connected with the corresponding angle steel; Rebound is set between two angle steel of the angle steel centering on the inside of building enclosure;
Step 3:The pre-buried flush pipe being connected to external high pressure water source, and the pre-buried punching are set in the building enclosure It washes angle steel described in Guan Shangyu and multiple apopores is equipped with towards the rebound to corresponding position;
Step 4:It is passed through high-pressure water to the pre-buried flush pipe, the high pressure water flow sprayed from the apopore is to the mistake Cab apron is rinsed cutting process, until rebound removing finishes;
Step 5:The casting concrete into the foundation pit, up to being full of concrete in the region between two angle steel, And it solidifies and forms bottom concrete.
The construction method of the shearing slot structure for underwater concrete back cover of the present invention, sets using on the inside of building enclosure Angle steel pair is counted, and rebound is internally set to reserve space on the inside of the building enclosure, and by being embedded in angle steel Anchor bar on the outside of building enclosure in soil matrix to further fixing, first by casting concrete in foundation pit and forms the angle steel Then the rebound is rinsed by pre-buried flush pipe and cuts and remove, then pours coagulation into foundation pit by bottom concrete again Soil, and the region between two angle steel of the angle steel centering is full of concrete, it can make bottom concrete in this way and enclose There is reliable connection between protection structure, ensure the watertightness of bottom concrete and the hole huge water pressure in bottom can be born.
Description of the drawings
Fig. 1 is the structural schematic diagram of the shearing slot structure for underwater concrete back cover of the present invention;
Fig. 2 is the Section A-A schematic diagram of Fig. 1;
Fig. 3 is the section B-B schematic diagram of Fig. 2;
Fig. 4 is the pre-buried flush pipe structural schematic diagram of the present invention.
In attached drawing, parts list represented by the reference numerals are as follows:
1, building enclosure, 2, angle steel pair, 3, rebound, 4, pre-buried flush pipe, 5, anchor bar, 6, bottom concrete;
11, main reinforcement, 21, angle steel, 31, wood wool board, 32, plastic foamboard.
Specific implementation mode
The principle and features of the present invention will be described below with reference to the accompanying drawings, and the given examples are served only to explain the present invention, and It is non-to be used to limit the scope of the present invention.
As shown in Figure 1, Figure 2, Figure 3 and Figure 4, a kind of shearing slot structure for underwater concrete back cover, including excavate in The foundation pit on ground is surrounded with the building enclosure 1 being above the ground level around the foundation pit, further includes angle steel pair 2,3 and of rebound More pre-buried flush pipes 4, the interval of the angle steel pair 2 are circumferentially positioned at 1 inside of the building enclosure, and in the angle steel pair 2 Two 21 relative spacing of angle steel settings, and the both sides up and down on ground are located at, 1 about 1 interior building enclosure of the building enclosure Interval is embedded with two rows of anchor bars 5 corresponding with the angle steel 21, and the anchor bar 5 is close to one end of the angle steel pair 2 It is fixedly connected with the corresponding angle steel 21 after stretching out the building enclosure 1, the rebound 3 is arranged in the angle steel pair 1 Two angle steel 21 between, the pre-buried flush pipe 4 is arranged in the building enclosure 1 on 21 side inner wall of the angle steel, And multiple apopores 41, institute are equipped with towards the rebound 3 in the pre-buried flush pipe 4 with 2 corresponding position of the angle steel pair It states pre-buried flush pipe 4 to be connected to external high pressure water source, and the high pressure water flow sprayed from the apopore 41 can be to the rebound 3 It is rinsed cutting process.
It is first that the pre-buried flush pipe 4 and outside is high before into the foundation pit, casting concrete forms bottom concrete 6 Water source connection is pressed, the high pressure water flow sprayed from the apopore 41 is rinsed cutting process to the rebound 3, waits for the mistake The removing of cab apron 3 finishes, then the casting concrete into the foundation pit forms bottom concrete 6, with pouring for bottom concrete 6, It is full of concrete in region between two angle steel 21, so that the building enclosure 1 is formed with the bottom concrete 6 whole Body.
The shearing slot structure for underwater concrete back cover of the present invention designs angle steel pair using in 1 inside of building enclosure 2, and rebound 3 is set so that 1 inside of the building enclosure is reserved space in angle steel pair 2, and gone along with sb. to guard him by being embedded in Anchor bar 5 in 1 outside soil matrix of structure further fixes the angle steel pair 2, in the casting concrete shape into the foundation pit Before bottom concrete 6, first the pre-buried flush pipe 4 is connected to external high pressure water source, the height sprayed from the apopore 41 Pressure flow is rinsed cutting process to the rebound 3, waits for pouring into the foundation pit again after the rebound 3 is removed Concrete forms bottom concrete 6.With pouring for bottom concrete 6, i.e. full of mixed in the region between two angle steel Solidifying soil, makes the building enclosure 1 form entirety with the bottom concrete 6, can make bottom concrete 6 in this way and go along with sb. to guard him knot There is reliable connection between structure 1, ensure the watertightness of bottom concrete 6 and the hole huge water pressure in bottom can be born.
In the above-described embodiments, the inside of the building enclosure 1 is vertically arranged at intervals with several main reinforcements 11, the angle steel 21 with Every main ribs 11 are fixedly connected with.By the way that the angle steel 21 is fixedly connected with main ribs 11, it is ensured that the angle Steel 21 can obtain firm support, improve the structural strength of shearing slot, and be not in dystopy during construction, ensure institute The high pressure water flow for stating the outgoing of apopore 41 in pre-buried flush pipe 4 can be smooth by the rebound 3 between the upper and lower angle steel 21 Cleaning cutting.
In practice, the quantity of main ribs 11 and density of setting (or interval) need to be according to excavation of foundation pit depth and Rock And Soil objects It manages mechanical property and calculates determination, also need two angle steel in the thickness and the angle steel pair 2 according to bottom concrete 6 The distance between 21 are adjusted.
Preferably, in the above-described embodiments, the pre-buried flush pipe 4 be vertically provided at adjacent two main ribs 11 it Between.Between the pre-buried flush pipe 4 is vertically provided at adjacent two main ribs 11, it can make described in adjacent two Main reinforcement 11 is effectively protected the pre-buried flush pipe 4, and will not occupy extra space, easy for construction, architectonic beauty It sees.
It should be pointed out that in practice, the quantity of the pre-buried flush pipe 4 can also be according to the bottom concrete 6 The distance between two described angle steel 21 in thickness and the angle steel pair 2 are adjusted.For example, adjacent two pre-buried punchings Setting one, two can be spaced or more with main ribs 11 by washing between pipe 4.
It is highly preferred that in the above-described embodiments, the top of the pre-buried flush pipe 4 is higher than the top of main ribs 11, and Difference in height between the two is not less than 50cm.By the way that the top of the pre-buried flush pipe 4 is set above main ribs 11 Top, with facilitate can be in order to which the construction of pre-buried flush pipe 4, another party can be so that 4 interior energy of pre-buried flush pipe be formed Enough hydraulic pressure, smoothly to cut the rebound 3.
In the embodiment of the present invention, the pre-buried flush pipe 4 is steel pipe or pvc pipe.Steel pipe or pvc pipe structural strength are larger, Larger hydraulic pressure can be born, the high pressure water flow convenient for being emitted from the apopore 41 can smoothly cut the flushing of the rebound 3 It cuts and removes, be convenient for subsequent construction.
Preferably, in the above-described embodiments, the angle steel pair 2 is horizontally disposed, and two angles in the angle steel pair 2 Anchor bar 5 described in steel 21 and two rows is symmetricly set on ground both sides up and down, and two rows of anchor bars 5 stretch out One end of the building enclosure 1 is corresponding with two angle steel 21 in the angle steel pair 2 to be welded and fixed.By by the angle steel Ground or more both sides are symmetricly set on to anchor bar 5 described in two angle steel 21 and two rows in 2, can be made Entirely shearing slot endurance it is more balanced, total intensity is larger.
It is highly preferred that in the above-described embodiments, the specific setting quantity of angle steel pair 2 and rebound 3 can be according to back cover coagulation The thickness of soil 6 carries out calculating determination.In general, the distance between two angle steel 21 in the angle steel pair 2 are not more than institute State the half of 6 thickness of bottom concrete.By controlling the distance between two described angle steel 21 in the angle steel pair 2 no More than the half of 6 thickness of the bottom concrete, it is ensured that the intensity of entire bottom concrete 6 so that back cover coagulation 6 cooperation of the soil angle steel 21 and anchor bar 5 preferably support the building enclosure 1.
In the embodiment of the present invention, the rebound 3 preferably includes wood wool board 31 and/or plastic foamboard 32, and described Wood wool board 31 and/or corresponding with the upper and lower both sides angle steel of plastic foamboard 32 21 are fixedly connected.When the rebound 3 is wood When filament plate 31 or plastic foamboard 32, the quantity of the wood wool board 31 or plastic foamboard 32 can be one piece can or polylith, and When the wood wool board 31 or plastic foamboard 32 are polylith, wood wool board 31 or the inside and outside fitting of plastic foamboard 32 are set described in polylith Between setting two angle steel 21 in the angle steel pair 1, and polylith wood wool board 31 or plastic foamboard 32 with upper and lower both sides pair The angle steel 21 answered is fixedly connected.When the rebound 3 is wood wool board 31 and plastic foamboard 32,31 He of the wood wool board Between two angle steel 21 that the inside and outside fitting of the plastic foamboard 32 is arranged in the angle steel pair 1, and 31 He of the wood wool board Corresponding with the upper and lower both sides angle steel 21 of the plastic foamboard 32 is fixedly connected.32 matter of wood wool board 31 and plastic foamboard Amount is light, density ratio water is small, is flowed away by forming powder after high pressure water flow flushing cutting and swimming in the water surface, can make to lead in this way It crosses high pressure water flow flushing cutting to remove the wood wool board 31 and/or plastic foamboard 32 totally, is convenient for subsequent construction.
The present invention also provides a kind of construction methods of the shearing slot structure for underwater concrete back cover, including such as Lower step:
Step 1:In ground excavation pit, and the building enclosure 1 being above the ground level around setting around the foundation pit, and 1 inside of the building enclosure is around setting angle steel pair 2, wherein two angle steel, about 21 relative spacing in the angle steel pair 2 is set It sets, and is located at the both sides up and down on ground;
Step 2:Between the upper and lower every being embedded with two rows of anchor bars 5 corresponding with the angle steel 21 in the building enclosure 1, And the anchor bar 5 is stretched out close to one end of the angle steel pair 2 after the building enclosure 1 and is consolidated with the corresponding angle steel 21 Fixed connection;It is located between two angle steel 21 in the angle steel pair 2 in 1 inside of building enclosure and rebound 3 is set;
Step 3:The pre-buried flush pipe 4 being connected to external high pressure water source is set in the building enclosure 1, and described pre-buried In flush pipe 4 multiple apopores 41 are equipped with towards the rebound 3 with 2 corresponding position of the angle steel pair;
Step 4:It is passed through high-pressure water to the pre-buried flush pipe 4, the high pressure water flow sprayed from the apopore 41 is to institute It states rebound 3 and is rinsed cutting process, until the removing of the rebound 3 finishes;
Step 5:The casting concrete into the foundation pit, up to being full of coagulation in the region between two angle steel 21 Soil, and solidify and form bottom concrete 6.
The construction method of the shearing slot structure for underwater concrete back cover of the present invention, using in 1 inside of building enclosure Angle steel pair 2 is designed, and rebound 3 is set so that 1 inside of the building enclosure is reserved space in angle steel pair 2, and is passed through The anchor bar 5 being embedded in 1 outside soil matrix of building enclosure further fixes the angle steel pair 2, will first be poured in foundation pit mixed Solidifying soil simultaneously forms bottom concrete 6, then again rinses the rebound 3 by pre-buried flush pipe 4 and cuts and remove, then to base Casting concrete in hole, and the region between two angle steel 21 in the angle steel pair 2 is full of concrete, it can make in this way There is reliable connection between bottom concrete 6 and building enclosure 1, ensure the watertightness of bottom concrete 6 and hole bottom can be born Huge water pressure.
In the above-described embodiments, the step rebound 3 is wood wool board 31 and/or plastic foamboard 32, and the wood wool Plate 31 and/or corresponding with the upper and lower both sides angle steel of plastic foamboard 32 21 are fixedly connected.Wood wool board 31 and plastic foamboard 32 light weights, density ratio water are small, are flowed away by forming powder after high pressure water flow flushing cutting and swimming in the water surface, can be made in this way It obtains to rinse to cut by high pressure water flow and removes the wood wool board 31 and/or plastic foamboard 32 totally, be convenient for subsequent construction.
Preferably, in the above-described embodiments, 1 inside of the building enclosure is provided with several vertical spaced main reinforcements 11, the angle steel 21 is fixedly connected with every main ribs 11.By the way that the angle steel 21 is fixedly connected with main ribs 11, It can ensure that the angle steel 21 can obtain firm support, improve the structural strength of shearing slot, and will not during construction There is dystopy, ensure high pressure water flow that the apopore 41 in the pre-buried flush pipe 4 is emitted can will the upper and lower angle steel 21 it Between rebound 3 smoothly clean cutting.
In the present invention, the pre-buried flush pipe 4 is vertically provided between adjacent two main ribs 11.By will be described pre- It buries flush pipe 4 to be vertically provided between adjacent two main ribs 11, adjacent two main ribs 11 can be made to described pre- It buries flush pipe 4 to be effectively protected, and extra space will not be occupied, easy for construction, structure is beautiful.
It is highly preferred that the difference in height between the top and the top of main ribs 11 of the pre-buried flush pipe 4 is not less than 50cm.By the way that the top of the pre-buried flush pipe 4 to be set above to the top of main ribs 11, with facilitate can be in order to pre-buried The construction of flush pipe 4, another party can be so that 4 interior energy of pre-buried flush pipe form enough hydraulic pressure, so as to smoothly by institute Rebound 3 is stated to be cut.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all the present invention spirit and Within principle, any modification, equivalent replacement, improvement and so on should all be included in the protection scope of the present invention.

Claims (8)

1. a kind of shearing slot structure for underwater concrete back cover, including excavate the ring around the foundation pit on ground, the foundation pit It is provided around the building enclosure (1) being above the ground level, it is characterised in that:Further include that angle steel is pre-buried to (2), rebound (3) and more Flush pipe (4), the angle steel is circumferentially positioned on the inside of the building enclosure (1) (2) interval, and the angle steel is in (2) Relative spacing is arranged two angle steel (21) up and down, and is located at the both sides up and down on ground, in the building enclosure (1) between the upper and lower Every being embedded with two rows of anchor bars (5) corresponding with the angle steel (21), the anchor bar (5) is close to the angle steel to (2) One end stretch out the building enclosure (1) and be fixedly connected afterwards with the corresponding angle steel (21), the rebound (3) is arranged in institute Angle steel is stated between two angle steel (21) in (1), pre-buried flush pipe (4) setting is in the building enclosure (1) close to institute State on the inner wall of angle steel (21) side, and in the pre-buried flush pipe (4) with the angle steel to (2) corresponding position towards the mistake Cab apron (3) is equipped with multiple apopores (41), and the pre-buried flush pipe (4) is connected to external high pressure water source, and from the apopore (41) high pressure water flow sprayed can be rinsed cutting process to the rebound (3).
2. being used for the shearing slot structure of underwater concrete back cover according to claim 1, it is characterised in that:The building enclosure (1) inside is vertically arranged at intervals with several main reinforcements (11), and the angle steel (21) is fixedly connected with every main ribs (11).
3. being used for the shearing slot structure of underwater concrete back cover according to claim 2, it is characterised in that:The pre-buried flushing Pipe (4) is vertically provided between adjacent two main ribs (11), and the top of the pre-buried flush pipe (4) is higher than main ribs (11) top, and difference in height between the two is not less than 50cm.
4. being used for the shearing slot structure of underwater concrete back cover according to claim 3, it is characterised in that:The pre-buried flushing It is steel pipe or pvc pipe to manage (4).
5. being used for the shearing slot structure of underwater concrete back cover according to claim 1, it is characterised in that:The angle steel pair (2) be horizontally disposed with, and the angle steel in (2) two angle steel (21) and two rows described in anchor bar (5) it is equal Ground both sides up and down are symmetricly set on, and two rows of anchor bars (5) stretch out one end of the building enclosure (1) and the angle Steel is welded and fixed two angle steel (21) correspondences in (2).
6. being used for the shearing slot structure of underwater concrete back cover according to claim 5, it is characterised in that:The angle steel pair (2) the distance between two described angle steel (21) in are not more than the half of the bottom concrete (6) thickness.
7. according to the shearing slot structure for being used for underwater concrete back cover described in any one of claim 1 to 6, it is characterised in that:Institute It includes wood wool board (31) and/or plastic foamboard (32) to state rebound (3), and the wood wool board (31) and/or plastic foamboard (32) angle steel (21) corresponding with upper and lower both sides is fixedly connected.
8. a kind of construction method of shearing slot structure such as claim 1-7 any one of them for underwater concrete back cover, It is characterised in that it includes following steps:
Step 1:In ground excavation pit, and the building enclosure (1) being above the ground level around setting around the foundation pit, and in institute It states on the inside of building enclosure (1) around setting angle steel to (2), wherein the angle steel is opposite up and down to two angle steel (21) in (2) Interval setting, and it is located at the both sides up and down on ground;
Step 2:Between the upper and lower every being embedded with two rows of anchor bars corresponding with the angle steel (21) in the building enclosure (1) (5), and by the anchor bar (5) close to the angle steel to the one end of (2) stretch out the building enclosure (1) afterwards with corresponding institute Angle steel (21) is stated to be fixedly connected;It is arranged between two angle steel (21) in (2) positioned at the angle steel on the inside of building enclosure (1) Rebound (3);
Step 3:The pre-buried flush pipe (4) that setting is connected to external high pressure water source in the building enclosure (1), and it is described pre-buried Multiple apopores (41) are equipped with towards the rebound (3) to (2) corresponding position with the angle steel in flush pipe (4);
Step 4:It is passed through high-pressure water to the pre-buried flush pipe (4), the high pressure water flow sprayed from the apopore (41) is to institute It states rebound (3) and is rinsed cutting process, until the rebound (3) removing finishes;
Step 5:The casting concrete into the foundation pit, up to being full of concrete in the region between two angle steel (21), And it solidifies and forms bottom concrete (6).
CN201810272379.XA 2018-03-29 2018-03-29 A kind of shearing slot structure and its construction method for underwater concrete back cover Pending CN108301414A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810272379.XA CN108301414A (en) 2018-03-29 2018-03-29 A kind of shearing slot structure and its construction method for underwater concrete back cover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810272379.XA CN108301414A (en) 2018-03-29 2018-03-29 A kind of shearing slot structure and its construction method for underwater concrete back cover

Publications (1)

Publication Number Publication Date
CN108301414A true CN108301414A (en) 2018-07-20

Family

ID=62847872

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810272379.XA Pending CN108301414A (en) 2018-03-29 2018-03-29 A kind of shearing slot structure and its construction method for underwater concrete back cover

Country Status (1)

Country Link
CN (1) CN108301414A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024924A (en) * 2018-09-01 2018-12-18 哈尔滨鸿盛房屋节能体系研发中心 The steel plate chamber structure and connecting structure connected by cast-in-place concrete

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102864791A (en) * 2012-10-10 2013-01-09 中国建筑第八工程局有限公司 Construction method for liquid expansion rubber waterstop through pre-dissolvable mold
JP2015031020A (en) * 2013-08-01 2015-02-16 西松建設株式会社 Earth-retaining wall and construction method of its lower part
CN105002913A (en) * 2015-08-06 2015-10-28 中铁隆工程集团有限公司 Strongly-permeable stratum deep foundation pit bottom sealing water stopping structure and construction method thereof
CN105672250A (en) * 2016-01-20 2016-06-15 中铁隆工程集团有限公司 Rabbet connecting mechanism and construction method for underground diaphragm wall and underwater concrete
CN208056066U (en) * 2018-03-29 2018-11-06 武汉市政工程设计研究院有限责任公司 A kind of shearing slot structure for underwater concrete back cover

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102864791A (en) * 2012-10-10 2013-01-09 中国建筑第八工程局有限公司 Construction method for liquid expansion rubber waterstop through pre-dissolvable mold
JP2015031020A (en) * 2013-08-01 2015-02-16 西松建設株式会社 Earth-retaining wall and construction method of its lower part
CN105002913A (en) * 2015-08-06 2015-10-28 中铁隆工程集团有限公司 Strongly-permeable stratum deep foundation pit bottom sealing water stopping structure and construction method thereof
CN105672250A (en) * 2016-01-20 2016-06-15 中铁隆工程集团有限公司 Rabbet connecting mechanism and construction method for underground diaphragm wall and underwater concrete
CN208056066U (en) * 2018-03-29 2018-11-06 武汉市政工程设计研究院有限责任公司 A kind of shearing slot structure for underwater concrete back cover

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024924A (en) * 2018-09-01 2018-12-18 哈尔滨鸿盛房屋节能体系研发中心 The steel plate chamber structure and connecting structure connected by cast-in-place concrete

Similar Documents

Publication Publication Date Title
CN105041349B (en) A kind of excavating construction method that station is digged on the basis of Subway Tunnel shield tunnel
CN106400813B (en) A kind of foundation pit support system and its construction method
CN105239578B (en) Water-rich sand layer deep foundation pit underwater construction method
CN109235493A (en) Basement beam slab is backbreak and short formwork construction method in a kind of contrary sequence method
CN1307348C (en) Construction method for underground structure through half reverse course of action of inverting connection
CN201943086U (en) Underground building wall body
CN103572764A (en) Watertight structure for retaining wall of ultra-deep manually excavated pile and construction method thereof
CN110258622B (en) Pile plate type retaining wall and construction method thereof
CN107326928A (en) A kind of part is related to the construction method in the deeper subsurface garage of basement
CN106285032B (en) Basement reconstruction construction with raft foundation building
CN105040707B (en) Combine the construction method of close pile deep foundation pit support building enclosure
CN208056066U (en) A kind of shearing slot structure for underwater concrete back cover
CN103741651B (en) A kind of concrete teeth groove stiling basin and construction method thereof
CN108301414A (en) A kind of shearing slot structure and its construction method for underwater concrete back cover
JP2019015100A (en) Removing method of earth retaining wall
CN107503355A (en) Shaped steel formula double-row pile foundation pit supporting system and its construction method are inserted after outer row
CN207452889U (en) Artificial digging pile assembled retaining wall
CN206956707U (en) It is a kind of to be used for the ground-connecting-wall that ultra-deep foundation pit is gone along with sb. to guard him in water-rich sand layer stratum
CN213014373U (en) Basement outer wall post-cast strip structure
CN108104112A (en) A kind of underground wall body construction method based on the slurrying of original soil original position
CN212225231U (en) Protective structure for bias tunnel portal
CN102322065B (en) Bottom channel inner support of foundation pit supporting structure
CN107299649A (en) A kind of post-cast strip advance water stop construction method for plentiful level of ground water
CN106337421A (en) Lattice concrete composite retaining pile wall and construction method based on BIM
CN207512723U (en) A kind of structure construction for promoting diaphram wall surface concrete quality

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination