CN108301272A - 一种简易安全的飞机迫降跑道 - Google Patents
一种简易安全的飞机迫降跑道 Download PDFInfo
- Publication number
- CN108301272A CN108301272A CN201710020667.1A CN201710020667A CN108301272A CN 108301272 A CN108301272 A CN 108301272A CN 201710020667 A CN201710020667 A CN 201710020667A CN 108301272 A CN108301272 A CN 108301272A
- Authority
- CN
- China
- Prior art keywords
- forced landing
- runway
- landing runway
- soil
- mixed mud
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C9/00—Special pavings; Pavings for special parts of roads or airfields
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
- Cultivation Of Plants (AREA)
Abstract
本发明公开了一种简易安全的飞机迫降跑道,包括在平地上挖出一长方形坑,将坑底夯实,先在跑道底浇注三合一混泥土,混泥土中间放一层钢筋网,混泥土上面铺无石子的泥土,使之与周围持平,最后在飞机迫降跑道的泥土上种上草皮花卉或庄稼。在具体实施飞机迫降前把整个迫降跑道浇足水。本跑道底层结实抗冲压,而上层的泥土和草皮花卉或庄稼则较柔软,有一定弹性,浇足水后更光滑,缓冲作用更强,还有一定降温作用,适用飞机起落架发生故障时的飞机安全着陆。
Description
技术领域
本发明涉及飞机起落架发生故障时的安全着落设施领域,具体涉及一种飞机迫降跑道。
背景技术
当前飞机迫降主要有两种方式,一是飞机在现有的飞机跑道上着陆,俗称“硬着陆”;二是飞机在平地上着陆,俗称“软着陆”。两种飞机迫降方式各有利弊,都存在一定的风险,“硬着陆”的风险是机身与机场跑道摩擦可能引起火灾,而“软着陆”的风险则是由于平地的土地松紧不一,机身容易钻入泥土深处而使飞机机身断裂。而今围绕飞机迫降发明专利大体可分为两大类,一类是改进飞机起落架的发明创造专利,另一类则是用人造器械跑道协助飞机迫降。前者虽然能把飞机起落架故障降到很低,但它仍属于机械类的东西,难免还会出现故障;而后者则构造复杂,制造维修难度较大,且飞机迫降对接时需高超的技术水平,稍有差错则后果不堪设想。
发明内容
本发明要解决的技术问题是提供一种既能剔除故障飞机“硬着陆”与“软着陆”的缺点,又能集两种迫降方式优点于一身的飞机迫降跑道。从而大大提高故障飞机迫降的安全性。
本发明专利通过以下技术方案实现:
一种简易安全的飞机迫降跑道,包括能容下迫降跑道的土坑,三合一混泥土底层,钢筋网,无石子的泥土层与土层上的草皮花卉或庄稼。
本发明的进一步方案是,挖出一个长200m,宽50m和深1.2m的土坑(数字可根据机场规模进行调整)。
本发明的进一步方案是,所述跑道底浇注0.6m三合一混泥土,混泥土中间放一层直径为1cm纵横间隔距离均为10cm的钢筋网,跑道底层结实抗冲压。
本发明的进一步方案是,所述跑道三合一混泥土上面铺无石子的泥土。
本发明的进一步方案是,泥土层上种草皮花卉或庄稼,具体实施故障飞机迫降前把整个迫降跑道浇足水,这样泥土和草皮花卉或庄稼较柔软,具有一定弹性,光滑,缓冲作用强,还有一定降温作用。
本发明专利与现有技术相比,具有以下优点:
一、本发明迫降跑道的混泥土层结实抗冲压,可防止机身钻入地下而折断,而混泥土上层的泥土层较松软具有弹性,摩擦系数小,可防止机身与地面摩擦着火,这好比在机场跑道上安放上了一张巨大的泥土质“席梦思床垫”,将以往的“硬着陆”和“软着陆”两种迫降方式有机地结合起来,既剔除了它们的缺馅,又完整地保留了它们的优点。
二、浇足水的草地花卉或庄稼也有一定弹性,很滑溜可降低阻力,还可降低故障机身的温度,进一步确保了飞机迫降的安全性。
三、本飞机迫降跑道构造简单,成本低廉,养护容易,不独立占用场地,平常它就是一块绿地或庄稼地。
附图说明
图1为飞机迫降跑道的侧面剖视图。
图2为飞机迫降跑道的俯视图。
在图1,图2所示的实施例中,1.迫降跑道,2.三合一混泥土,3.钢筋网,4.泥土层,5.草皮花卉或庄稼,6.土坑。
具体实施方式
任何平地,只要平整且具有一定的长度和宽度均可。
如图1,图2所示,迫降跑道(1)底部夯实的土坑(6),迫降跑道(1)底层的三合一混泥土(2),混泥土(2)中的钢筋网(3),混泥土(2)上层的无石子泥土层(4),泥土层(4)种上草皮花卉或庄稼(5)。
故障飞机需要迫降前将跑道(1)浇足水。
Claims (5)
1.一种简易安全的飞机迫降跑道,其特征在于:
所述飞机迫降跑道(1)下面的土坑(6),坑底夯实。
2.所述飞机迫降跑道(1)底层的三合一混泥土(2)。
3.所述飞机迫降跑道(1)底层三合一混泥土中的钢筋网(3)。
4.所述飞机迫降跑道(1)中层的无石子的泥土层(4)。
5.所述飞机迫降跑道(1)上层的草皮花卉或庄稼(5)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710020667.1A CN108301272A (zh) | 2017-01-12 | 2017-01-12 | 一种简易安全的飞机迫降跑道 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710020667.1A CN108301272A (zh) | 2017-01-12 | 2017-01-12 | 一种简易安全的飞机迫降跑道 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108301272A true CN108301272A (zh) | 2018-07-20 |
Family
ID=62871673
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710020667.1A Withdrawn CN108301272A (zh) | 2017-01-12 | 2017-01-12 | 一种简易安全的飞机迫降跑道 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108301272A (zh) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1775627A (zh) * | 2005-12-08 | 2006-05-24 | 唐金元 | 飞机紧急迫降专用跑道 |
CN201071585Y (zh) * | 2007-06-11 | 2008-06-11 | 葛加君 | 三抗复合型地面面层 |
CN105292512A (zh) * | 2015-10-27 | 2016-02-03 | 林国强 | 飞机着陆器及其着陆系统 |
-
2017
- 2017-01-12 CN CN201710020667.1A patent/CN108301272A/zh not_active Withdrawn
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1775627A (zh) * | 2005-12-08 | 2006-05-24 | 唐金元 | 飞机紧急迫降专用跑道 |
CN201071585Y (zh) * | 2007-06-11 | 2008-06-11 | 葛加君 | 三抗复合型地面面层 |
CN105292512A (zh) * | 2015-10-27 | 2016-02-03 | 林国强 | 飞机着陆器及其着陆系统 |
Non-Patent Citations (1)
Title |
---|
颜艳等: "南方机场飞行区草地建植技术研究", 《广州大学学报(自然科学版)》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6946181B2 (en) | Artificial grass for landscaping | |
CN204393005U (zh) | 乔灌木裸根定杆喷浆栽植机 | |
CN206776568U (zh) | 一种在种植田上防控黄曲条跳甲的系统 | |
CN203904793U (zh) | 一种绿化透水砖 | |
CN108301272A (zh) | 一种简易安全的飞机迫降跑道 | |
CN103155746A (zh) | 拖拉机配套的挖坑机 | |
Chheng et al. | Tree-based approach to evaluate size dependence of residual tree damage caused by selective logging: Case study in tropical semi-evergreen forests of Cambodia | |
Cecconi et al. | Deep roots planting for surface slope protection | |
CN204047408U (zh) | 一种运用于梭梭属植物保护的防护管件 | |
CN203120424U (zh) | 拖拉机配套的挖坑机 | |
CN205189028U (zh) | 一种灌注桩成孔装置 | |
CN204681762U (zh) | 一种上大下小的螺旋钻杆 | |
CN105724202A (zh) | 一种直通大树根部的水肥补给装置 | |
CN107905240A (zh) | 一种植被锚杆固坡方法 | |
CN205875181U (zh) | 边坡加固防护装置 | |
CN205776270U (zh) | 一种大坡度边坡的固定结构 | |
CN105421472B (zh) | 用于90°边坡的边坡护理方法及其结构 | |
CN105532368B (zh) | 一种浅井侧渗灌节水灌溉方法 | |
CN205422812U (zh) | 一种废弃矿山斜井回填结构 | |
Gonçalves et al. | Red-Yellow Latosol penetration resistance under different subsoiling depths | |
Bosco et al. | Agricultural effects on air–soil exchange and slope instability | |
CN204681771U (zh) | 一种粉垄装置用螺旋钻杆 | |
Makar et al. | Channel Changes on the Middle Rio Grande | |
Piciullo et al. | The importance of accounting vegetation on unsaturated slopes prone to rainfall-induced instabilities-a case study in Norway | |
Richmond et al. | Comparing single-wheel attachable tracks to chains and bare tires on skidders for mitigating soil disturbance during harvesting operations |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180720 |
|
WW01 | Invention patent application withdrawn after publication |