CN108286810A - Water heater and its control method - Google Patents

Water heater and its control method Download PDF

Info

Publication number
CN108286810A
CN108286810A CN201710014083.3A CN201710014083A CN108286810A CN 108286810 A CN108286810 A CN 108286810A CN 201710014083 A CN201710014083 A CN 201710014083A CN 108286810 A CN108286810 A CN 108286810A
Authority
CN
China
Prior art keywords
water
period
temperature
water heater
water period
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710014083.3A
Other languages
Chinese (zh)
Other versions
CN108286810B (en
Inventor
李伟泺
张宗贺
曲绍鹤
吴海涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhu Midea Smart Kitchen Appliance Manufacturing Co Ltd
Original Assignee
Midea Group Co Ltd
Wuhu Midea Kitchen and Bath Appliances Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Midea Group Co Ltd, Wuhu Midea Kitchen and Bath Appliances Manufacturing Co Ltd filed Critical Midea Group Co Ltd
Priority to CN201710014083.3A priority Critical patent/CN108286810B/en
Publication of CN108286810A publication Critical patent/CN108286810A/en
Application granted granted Critical
Publication of CN108286810B publication Critical patent/CN108286810B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/20Arrangement or mounting of control or safety devices
    • F24H9/2007Arrangement or mounting of control or safety devices for water heaters
    • F24H9/2014Arrangement or mounting of control or safety devices for water heaters using electrical energy supply
    • F24H9/2021Storage heaters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/18Water-storage heaters
    • F24H1/20Water-storage heaters with immersed heating elements, e.g. electric elements or furnace tubes
    • F24H1/201Water-storage heaters with immersed heating elements, e.g. electric elements or furnace tubes using electric energy supply
    • F24H1/202Water-storage heaters with immersed heating elements, e.g. electric elements or furnace tubes using electric energy supply with resistances

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

The present invention discloses a kind of water heater and its control method, wherein water heater control method includes the following steps:Count each water period of every day in preceding cycle with waterside number, when being greater than or equal to the first preset times with waterside number of water period, the period is the high frequency water period;When being greater than or equal to the second preset times with waterside number and being less than the first preset times of water period, which is the intermediate frequency water period;When being less than the second preset times with waterside number of water period, the period are the low frequency water period;It obtains and currently uses the water period;According to the current working condition for adjusting water heater with the water period.Technical solution of the present invention, user is divided into high frequency water period, intermediate frequency water period and low frequency water period by water heater with the water period, then the working condition of water heater is adjusted with regimen condition according to the different periods, while alloing water heater to meet user's water, the energy consumption of water heater is reduced.

Description

Water heater and its control method
Technical field
The present invention relates to technical field of water heaters, more particularly to a kind of water heater and its control method.
Background technology
With people's improvement of living standard, people are also higher and higher to the power conservation requirement of water heater.The control of existing water heater System usually only includes booting circulating-heating and shutdown both of which, and when shutdown, user cannot timely use hot water, when following When ring heating mode, often electric energy is wasted due to being heated repeatedly to water so that the promptness of user's water and energy Utilization rate cannot be unified, and cannot meet the needs of user uses water heater.
Invention content
The main object of the present invention is to provide a kind of water heater, it is intended to improve the promptness and energy of user's water of water heater Measure utilization rate.
To achieve the above object, the control method of water heater proposed by the present invention, which is characterized in that include the following steps:
Count each water period of every day in preceding cycle with waterside number, when water period waterside number When more than or equal to the first preset times, which is the high frequency water period;
When water period with waterside number be greater than or equal to the second preset times and less than the first preset times when, this when Between section be the intermediate frequency water period;
When water period is less than the second preset times with waterside number, which is the low frequency water period;
It obtains and currently uses the water period;
According to the current working condition for adjusting water heater with the water period.
Preferably, the basis includes currently with the step of heating power of water period adjustment water heater:
When with the water period being currently the high frequency water period, the working condition of water heater is adjusted to heated condition;
When with the water period being currently the intermediate frequency water period, the working condition of water heater is adjusted to keeping warm mode;
When with the water period being currently the low frequency water period, the working condition of water heater is adjusted to dormant state.
Preferably, the basis includes currently with the step of heating power of water period adjustment water heater:
When with the water period being currently the high frequency water period, average consumption of the high frequency with the water period is calculated, when average use When water is more than or equal to the first default water consumption, current water period is high-temperature time section;
By the water temperature heating in water heater to the first preset temperature in section between at high temperature.
Preferably, the basis includes currently with the step of heating power of water period adjustment water heater:
When with the water period being currently the high frequency water period, average consumption of the high frequency with the water period is calculated, when average use When water is less than the first default water consumption, current water period is the low temperature period;
By the water temperature heating in water heater to the second preset temperature within the low temperature period.
Preferably, the basis includes currently with the step of heating power of water period adjustment water heater:
When with the water period being currently the intermediate frequency water period, average consumption of the intermediate frequency with the water period is calculated, when average use When water is more than or equal to the second default water consumption, current water period is soaking time section;
In soaking time section, the working condition of water heater is adjusted to keep the temperature.
Present invention further propose that a kind of water heater, including:
Statistical module, for count each water period of every day in preceding cycle with waterside number, when with water Between section with waterside number be greater than or equal to the first preset times when, the period be the high frequency water period;When water period When being greater than or equal to the second preset times with waterside number and being less than the first preset times, which is the intermediate frequency water period;When When being less than the second preset times with waterside number of water period, the period are the low frequency water period;
Acquisition module currently uses the water period for obtaining;
Control module, for according to currently with the working condition of water period adjustment water heater.
Preferably, the control module includes:
Heating unit, for when with the water period being currently the high frequency water period, the working condition of water heater to be adjusted to Heated condition;
Heat-insulation unit, for when with the water period being currently the intermediate frequency water period, the working condition of water heater to be adjusted to Keeping warm mode;
Suspend mode unit, for when with the water period being currently the low frequency water period, the working condition of water heater to be adjusted to Dormant state.
Preferably, the control module includes:
First computing unit is flat with the water period for when with the water period being currently the high frequency water period, calculating high frequency Equal water consumption, when average consumption is more than or equal to the first default water consumption, current water period is high-temperature time section;
First heating unit, by the water temperature heating in water heater to the first preset temperature in section between being used at high temperature.
Preferably, the control module includes:
Second computing unit is flat with the water period for when with the water period being currently the high frequency water period, calculating high frequency Equal water consumption, when average consumption is less than the first default water consumption, current water period is the low temperature period;
Second heating unit is used for the water temperature heating in water heater to the second preset temperature within the low temperature period.
Preferably, the control module includes:
Third computing unit is flat with the water period for when with the water period being currently the intermediate frequency water period, calculating intermediate frequency Equal water consumption, when average consumption is more than or equal to the second default water consumption, current water period is soaking time section;
Heat-insulation unit, in soaking time section, the working condition of water heater being adjusted to keep the temperature.
In the present invention, water heater count first each water period of every day in preceding cycle with waterside number, In, water period includes high frequency water period, intermediate frequency water period and low frequency water period;Water is used when water period When number is greater than or equal to the first preset times, which is the high frequency water period;When water period is big with waterside number In or equal to the second preset times and less than the first preset times when, the period be the intermediate frequency water period;Work as water period With waterside number be less than the second preset times when, the period be the low frequency water period;Current use is obtained further according to current time The water period;Then according to currently with the working condition of water period adjustment water heater;In above-mentioned technical proposal, water heater is by user's It is divided into high frequency water period, intermediate frequency water period and low frequency water period with the water period, then according to the use of different periods Regimen condition is adjusted the working condition of water heater so that while water heater can meet user's water, reduces water heater Energy consumption.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with The structure shown according to these attached drawings obtains other attached drawings.
Fig. 1 is the structural schematic diagram of an embodiment of water heater of the present invention;
Fig. 2 is the flow diagram of one embodiment of control method of water heater of the present invention;
Fig. 3 is the flow diagram of another embodiment of control method of water heater of the present invention;
Fig. 4 is the high-level schematic functional block diagram of an embodiment of water heater of the present invention;
Fig. 5 is the high-level schematic functional block diagram of another embodiment of water heater of the present invention.
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiment is only a part of the embodiment of the present invention, instead of all the embodiments.Base Embodiment in the present invention, those of ordinary skill in the art obtained without creative efforts it is all its His embodiment, shall fall within the protection scope of the present invention.
It is to be appreciated that the directional instruction (such as up, down, left, right, before and after ...) of institute is only used in the embodiment of the present invention In explaining relative position relation, motion conditions etc. under a certain particular pose (as shown in the picture) between each component, if should When particular pose changes, then directionality instruction also correspondingly changes correspondingly.
In addition, the description for being related to " first ", " second " etc. in the present invention is used for description purposes only, and should not be understood as referring to Show or imply its relative importance or implicitly indicates the quantity of indicated technical characteristic." first ", " are defined as a result, Two " feature can explicitly or implicitly include at least one of the features.In addition, the technical solution between each embodiment can To be combined with each other, but must can be implemented as basis with those of ordinary skill in the art, when the combination of technical solution occurs Conflicting or cannot achieve when, will be understood that the combination of this technical solution is not present, also not the present invention claims protection model Within enclosing.
Referring to figs. 1 to Fig. 5, for the water heater that the present invention controls by taking electric heater as an example, which includes for storing water Liner 200, water supply heating heating device 300, be arranged outside liner 200, for protect liner 200 and heat preservation water Shell 100, the temperature detector for detecting water temperature and the display panel 500 for showing water temperature.Wherein, temperature is examined Device 400 is surveyed, for detecting the water temperature in water heater liner 200;Temperature-detecting device 400 can be temperature-sensing probe, Huo Zheqi It can detect the temperature sensor of water temperature.The result of water temperature detection can be the last detection as a result, can also Average value in unit interval after repeated detection.For example, the temperature that last time is detected can be by temperature-detecting device 400 Temperature is detected, can also continuously be detected in 2s 5 times, then using this 5 times testing result as detected value.It is worth explanation It is that technical scheme of the present invention is suitable for storage-type electric water heater, including electric-heating water-storage formula, fires hot storage-type, and use other energy The storage-type electric water heater of source heating.
Below according to a kind of control method for water heater that the structure of water heater above proposes, include the following steps:
In S10, statistics preceding cycle each water period of every day with waterside number, use water when water period When number is greater than or equal to the first preset times, which is the high frequency water period;When water period is big with waterside number In or equal to the second preset times and less than the first preset times when, the period be the intermediate frequency water period;Work as water period With waterside number be less than the second preset times when, the period be the low frequency water period;
In the present embodiment, the period for 21 days, will be divided into six periods daily, and respectively 3:00~7:00、7:00~ 11:00、11:00~15:00、15:00~19:00、19:00~23:00、23:00~3:00.Within each period, record is used Family with waterside number and each water consumption.The total water number of water period is that this uses the water time in a cycle 21 days The interior total degree with water, it is daily in each period may be different with waterside number, such as Mon-Fri 7:00~11:00 It is average with waterside number be 0.5, the 7 of Saturday and Sunday:00~11:00 be averaged with waterside number is 3.5.First preset times with For 11 times, the second preset times are for 6 times, certainly, can be configured according to the demand of user in some embodiments. When being more than or equal to 11 times with waterside number in the certain time period i.e. as user in 21 days, which is arranged to high frequency With the water period, with the period 19:00~23:For 00;Be more than with waterside number in certain time period in 21 days as user or Person be equal to 6 times, but less than 11 times when, which is arranged to the intermediate frequency water period, with the period 7:00~11:For 00; When user is less than 6 times in the certain time period in 21 days with waterside number, which is arranged to the low frequency water period, with Period 3:00~7:For 00.By the statistics to total water number in water period, water period is divided into high frequency With water period, intermediate frequency water period and low frequency water period.
Certainly, it before statistics, needs to carry out period setting to computer heating control, and to each cycle time length and use water Period is divided, and is recorded each with the use regimen condition of user in the water time, i.e., with waterside number, with water frequency, use water Temperature and water consumption.This process, in the learning process of water heater, in a cycle, what user was not arranged is joined with water Number installation parameter preset operation, such as heating time are preset as daily 19:00~23:00 and 7:00~11:00, dormancy time Section is preset as 23:00~3:00 etc..Second period excessively was then configured with reference to user's a cycle with regimen condition, third Period then being adjusted with regimen condition with reference to a cycle and second round.
S20, it obtains and currently uses the water period;
It is provided with timing device in the present embodiment, on water heater or when water heater can obtain current by network Between.Water heater obtains the current time first, is then obtained and the current time pair with the mapping table of water period according to the time That answers uses the water period.For example, the current time is 20:When 00, with 20:The corresponding period is 19 when 00:00~23:00, then when The preceding period is the high frequency water period;Similarly, if the current time is 3:When 00, with 4:00 corresponding period was 3:00~7:00, Then present period is the low frequency water period.
S30, basis are currently with the working condition of water period adjustment water heater.
In the present embodiment, in high frequency with the water period, user with water often, water consumption is big, at this point, water heater can select High-power heating device is selected, and selects longer heating time.In intermediate frequency with the water period, user's is few with waterside number, Water consumption is little, at this point, water heater can select lower-powered heating device, and will shorten heating time.It is used in low frequency The water period, user's is few with waterside number, and water consumption is few, at this point, the heating device that water heater can select power small, and will add The hot time further shortens.Above-mentioned is the direction of water heater working state, and specific heating mode and heated condition can roots Make further adjustment according to the water habits and adjusting in real time of user.For example, low frequency is in the water period, water heater can according to The water habits at family are set as dormant state, even off-mode.
In the present embodiment, water heater count first each water period of every day in preceding cycle with waterside number, Wherein, water period includes high frequency water period, intermediate frequency water period and low frequency water period;When the use of water period When waterside number is greater than or equal to the first preset times, which is the high frequency water period;When water period waterside number When more than or equal to the second preset times and less than the first preset times, which is the intermediate frequency water period;When with the water time When being less than the second preset times with waterside number of section, the period are the low frequency water period;It is obtained further according to current time current With the water period;Then according to currently with the working condition of water period adjustment water heater;In above-mentioned technical proposal, water heater is by user Be divided into high frequency water period, intermediate frequency water period and low frequency water period with the water period, then according to the different periods The working condition of water heater is adjusted with regimen condition so that while water heater can meet user's water, reduce hot water The energy consumption of device.
The energy consumption of water heater is reduced while in order to further increase water supply of water heater promptness, the basis currently uses water Period adjust water heater heating power the step of include:
S31, when with the water period being currently the high frequency water period, the working condition of water heater is adjusted to heated condition; In high frequency with the water period, user with water often, water consumption is big, at this point, water heater can select high-power heating device It is heated.Certainly, during heating, specific add, can be set according to the instruction of the water habits of user or user Enthusiasm condition.
S32, when with the water period being currently the intermediate frequency water period, the working condition of water heater is adjusted to keeping warm mode; In intermediate frequency in the water period, user's is less with waterside number, and the demand of hot water is smaller, at this point, keeping warm mode is arranged in water heater, Or low-temperature heat state, you can meet user uses water.Heat preservation in the present embodiment refers to that the water in liner is maintained at one Fixed preset temperature, the temperature are 30 DEG C~45 DEG C.
S33, when with the water period being currently the low frequency water period, the working condition of water heater is adjusted to dormant state. In low frequency water period, user's is considerably less with waterside number, and hot water demand's amount is small, and number sets water heater to suspend mode shape State, to reduce the energy consumption of water heater.
For more accurate heat hot water, the basis currently use the water period adjustment water heater heating power the step of Including:
When with the water period being currently the high frequency water period, average consumption of the high frequency with the water period is calculated, when average use When water is more than or equal to the first default water consumption, current water period is high-temperature time section;
In the present embodiment, in high frequency in the water period, counting in all high frequency water periods the water consumption for using water each time, It calculates the total water consumption in each period high frequency water period, recycle total water consumption divided by with the total number of days of water, obtains the period The average consumption of water is used in interior each period daily.For example, first calculating daily 19 in 21 days:00~23:00 water consumption, Then 21 period water consumptions in the period are added, obtain the period 19:00~23:Total water consumption in 00 period, then use Total water consumption divided by period number of days 21 days then obtain period daily average consumption.Average consumption and first are preset Water consumption is compared, when average consumption is more than or equal to the first default water consumption, when the average consumption is corresponding Between section be high-temperature time section.First default water consumption is by taking 20L as an example, i.e., when the period 19:00~23:00 average consumption is big When 20L, the period 19:00~23:00 is high-temperature time section.It is corresponding, when average consumption is less than first in advance If when water consumption, the average consumption corresponding period is the low temperature period.First default water consumption is worked as by taking 20L as an example Period 7:00~11:When 00 average consumption is less than 20L, the period 7:00~11:00 is the low temperature period.
By the water temperature heating in water heater to the first preset temperature in section between at high temperature.
When with the water period being currently high-temperature time section, the water temperature heating in liner to first is preset by heating device Water temperature.First default water temperature can be the included setting of water heater, or set by user.The water temperature of first default water temperature is Higher water temperature, such as 70 DEG C, in high-temperature time section, all larger with water frequency and water consumption, only higher water temperature could meet The demand of user.
In order to improve the energy-saving efficiency of water heater, the basis currently uses the step of the heating power of water period adjustment water heater Suddenly include:
When with the water period being currently the high frequency water period, average consumption of the high frequency with the water period is calculated, when average use When water is less than the first default water consumption, current water period is the low temperature period;It will be in water heater within the low temperature period Water temperature heating to the second preset temperature.
In the present embodiment, the second default water temperature be less than the first default water temperature, in the low temperature period, user with waterside number compared with More but each water consumptions is relatively low.To ensure that user's uses water, and energy is not wasted, by water temperature heating to water more default than first The second low default water temperature of temperature is extraordinary selection.As for the specific numerical value of the second default water temperature, can be write from memory by water heater Recognize setting, can also be arranged according to actual demand by user.It is of course also possible to which there are the comparisons of a water temperature and water consumption Table, how many water consumption just correspond to how high water temperature.By the setting of low temperature period, and will be in water heater in the low temperature period Water temperature heating is to the second default water temperature, and while meeting user's water, practice every conceivable frugality electric energy, avoids hot water superfluous.
In order to improve the energy-saving efficiency of water heater, the basis currently uses the step of the heating power of water period adjustment water heater Suddenly include:
When with the water period being currently the intermediate frequency water period, average consumption of the intermediate frequency with the water period is calculated, when average use When water is more than or equal to the second default water consumption, current water period is soaking time section;It, will in soaking time section The working condition of water heater is adjusted to keep the temperature.
In the present embodiment, in intermediate frequency in the water period, counting in all intermediate frequency water periods the water consumption for using water each time, It calculates the total water consumption in each period intermediate frequency water period, recycle total water consumption divided by with the total number of days of water, obtains the period The average consumption of water is used in interior each period daily.For example, first calculating daily 7 in 21 days:00~11:00 water consumption, Then 21 period water consumptions in the period are added, obtain the period 7:00~11:Total water consumption in 00 period, then with always Water consumption divided by period number of days 21 days then obtain period daily average consumption.By average consumption and the second default use Water is compared, when average consumption is more than or equal to the second default water consumption, the average consumption corresponding time Section is soaking time section.Second default water consumption is by taking 10L as an example, i.e., when the period 7:00~11:00 average consumption is more than Or when equal to 10L, the period 7:00~11:00 is soaking time section.It is corresponding, when average consumption is less than the second default use When water, the average consumption corresponding period is stand-by time section.Second default water consumption works as the time by taking 10L as an example Section 3:00~7:When 00 average consumption is less than 10L, the period 3:00~7:00 is stand-by time section.
Present invention further propose that a kind of water heater, including:
Statistical module 10, for count each water period of every day in preceding cycle with waterside number, when with water When being greater than or equal to the first preset times with waterside number of period, the period are the high frequency water period;Work as water period With waterside number be greater than or equal to the second preset times and less than the first preset times when, the period be the intermediate frequency water period; When water period is less than the second preset times with waterside number, which is the low frequency water period;
In the present embodiment, the period for 21 days, will be divided into six periods daily, and respectively 3:00~7:00、7:00~ 11:00、11:00~15:00、15:00~19:00、19:00~23:00、23:00~3:00.Within each period, record is used Family with waterside number and each water consumption.The total water number of water period is that this uses the water time in a cycle 21 days The interior total degree with water, it is daily in each period may be different with waterside number, such as Mon-Fri 7:00~11:00 It is average with waterside number be 0.5, the 7 of Saturday and Sunday:00~11:00 be averaged with waterside number is 3.5.First preset times with For 11 times, the second preset times are for 6 times, certainly, can be configured according to the demand of user in some embodiments. When being more than or equal to 11 times with waterside number in the certain time period i.e. as user in 21 days, which is arranged to high frequency With the water period, with the period 19:00~23:For 00;Be more than with waterside number in certain time period in 21 days as user or Person be equal to 6 times, but less than 11 times when, which is arranged to the intermediate frequency water period, with the period 7:00~11:For 00; When user is less than 6 times in the certain time period in 21 days with waterside number, which is arranged to the low frequency water period, with Period 3:00~7:For 00.By the statistics to total water number in water period, water period is divided into high frequency With water period, intermediate frequency water period and low frequency water period.
Certainly, it before statistics, needs to carry out period setting to computer heating control, and to each cycle time length and use water Period is divided, and is recorded each with the use regimen condition of user in the water time, i.e., with waterside number, with water frequency, use water Temperature and water consumption.This process, in the learning process of water heater, in a cycle, what user was not arranged is joined with water Number installation parameter preset operation, such as heating time are preset as daily 19:00~23:00 and 7:00~11:00, dormancy time Section is preset as 23:00~3:00 etc..Second period excessively was then configured with reference to user's a cycle with regimen condition, third Period then being adjusted with regimen condition with reference to a cycle and second round.
Acquisition module 20 currently uses the water period for obtaining;
It is provided with timing device in the present embodiment, on water heater or when water heater can obtain current by network Between.Water heater obtains the current time first, is then obtained and the current time pair with the mapping table of water period according to the time That answers uses the water period.For example, the current time is 20:When 00, with 20:The corresponding period is 19 when 00:00~23:00, then when The preceding period is the high frequency water period;Similarly, if the current time is 3:When 00, with 4:00 corresponding period was 3:00~7:00, Then present period is the low frequency water period.
Control module 30, for according to currently with the working condition of water period adjustment water heater.
In the present embodiment, in high frequency with the water period, user with water often, water consumption is big, at this point, water heater can select High-power heating device is selected, and selects longer heating time.In intermediate frequency with the water period, user's is few with waterside number, Water consumption is little, at this point, water heater can select lower-powered heating device, and will shorten heating time.It is used in low frequency The water period, user's is few with waterside number, and water consumption is few, at this point, the heating device that water heater can select power small, and will add The hot time further shortens.Above-mentioned is the direction of water heater working state, and specific heating mode and heated condition can roots Make further adjustment according to the water habits and adjusting in real time of user.For example, low frequency is in the water period, water heater can according to The water habits at family are set as dormant state, even off-mode.
In the present embodiment, water heater count first each water period of every day in preceding cycle with waterside number, Wherein, water period includes high frequency water period, intermediate frequency water period and low frequency water period;When the use of water period When waterside number is greater than or equal to the first preset times, which is the high frequency water period;When water period waterside number When more than or equal to the second preset times and less than the first preset times, which is the intermediate frequency water period;When with the water time When being less than the second preset times with waterside number of section, the period are the low frequency water period;It is obtained further according to current time current With the water period;Then according to currently with the working condition of water period adjustment water heater;In above-mentioned technical proposal, water heater is by user Be divided into high frequency water period, intermediate frequency water period and low frequency water period with the water period, then according to the different periods The working condition of water heater is adjusted with regimen condition so that while water heater can meet user's water, reduce hot water The energy consumption of device.
The energy consumption of water heater, the control module packet are reduced while in order to further increase water supply of water heater promptness It includes:
Heating unit 31, for when with the water period being currently the high frequency water period, the working condition of water heater to be adjusted For heated condition;In high frequency with the water period, user with water often, water consumption is big, at this point, water heater can select power big Heating device heated.Certainly, during heating, can be set according to the instruction of the water habits of user or user Set specific heating state.
Heat-insulation unit 32, for when with the water period being currently the intermediate frequency water period, the working condition of water heater to be adjusted For keeping warm mode;In intermediate frequency in the water period, user's is less with waterside number, and the demand of hot water is smaller, at this point, water heater is set Set keeping warm mode or low-temperature heat state, you can meet user uses water.Heat preservation in the present embodiment, referring to will be in liner Water be maintained at certain preset temperature, the temperature be 30 DEG C~45 DEG C.
Suspend mode unit 33, for when with the water period being currently the low frequency water period, the working condition of water heater to be adjusted For dormant state.In low frequency water period, user's is considerably less with waterside number, and hot water demand's amount is small, and number is by water heater It is set as dormant state, to reduce the energy consumption of water heater.
For more accurate heat hot water, the control module includes:
First computing unit is flat with the water period for when with the water period being currently the high frequency water period, calculating high frequency Equal water consumption, when average consumption is more than or equal to the first default water consumption, current water period is high-temperature time section;
In the present embodiment, in high frequency in the water period, counting in all high frequency water periods the water consumption for using water each time, It calculates the total water consumption in each period high frequency water period, recycle total water consumption divided by with the total number of days of water, obtains the period The average consumption of water is used in interior each period daily.For example, first calculating daily 19 in 21 days:00~23:00 water consumption, Then 21 period water consumptions in the period are added, obtain the period 19:00~23:Total water consumption in 00 period, then use Total water consumption divided by period number of days 21 days then obtain period daily average consumption.Average consumption and first are preset Water consumption is compared, when average consumption is more than or equal to the first default water consumption, when the average consumption is corresponding Between section be high-temperature time section.First default water consumption is by taking 20L as an example, i.e., when the period 19:00~23:00 average consumption is big When 20L, the period 19:00~23:00 is high-temperature time section.It is corresponding, when average consumption is less than first in advance If when water consumption, the average consumption corresponding period is the low temperature period.First default water consumption is worked as by taking 20L as an example Period 7:00~11:When 00 average consumption is less than 20L, the period 7:00~11:00 is the low temperature period.
First heating unit, by the water temperature heating in water heater to the first preset temperature in section between being used at high temperature.
When with the water period being currently high-temperature time section, the water temperature heating in liner to first is preset by heating device Water temperature.First default water temperature can be the included setting of water heater, or set by user.The water temperature of first default water temperature is Higher water temperature, such as 70 DEG C, in high-temperature time section, all larger with water frequency and water consumption, only higher water temperature could meet The demand of user.
In order to improve the energy-saving efficiency of water heater, the control module includes:
Second computing unit is flat with the water period for when with the water period being currently the high frequency water period, calculating high frequency Equal water consumption, when average consumption is less than the first default water consumption, current water period is the low temperature period;Second heating Unit is used for the water temperature heating in water heater to the second preset temperature within the low temperature period.
In the present embodiment, the second default water temperature be less than the first default water temperature, in the low temperature period, user with waterside number compared with More but each water consumptions is relatively low.To ensure that user's uses water, and energy is not wasted, by water temperature heating to water more default than first The second low default water temperature of temperature is extraordinary selection.As for the specific numerical value of the second default water temperature, can be write from memory by water heater Recognize setting, can also be arranged according to actual demand by user.It is of course also possible to which there are the comparisons of a water temperature and water consumption Table, how many water consumption just correspond to how high water temperature.By the setting of low temperature period, and will be in water heater in the low temperature period Water temperature heating is to the second default water temperature, and while meeting user's water, practice every conceivable frugality electric energy, avoids hot water superfluous.
In order to improve the energy-saving efficiency of water heater, the control module includes:
Third computing unit is flat with the water period for when with the water period being currently the intermediate frequency water period, calculating intermediate frequency Equal water consumption, when average consumption is more than or equal to the second default water consumption, current water period is soaking time section; Heat-insulation unit, in soaking time section, the working condition of water heater being adjusted to keep the temperature.
In the present embodiment, in intermediate frequency in the water period, counting in all intermediate frequency water periods the water consumption for using water each time, It calculates the total water consumption in each period intermediate frequency water period, recycle total water consumption divided by with the total number of days of water, obtains the period The average consumption of water is used in interior each period daily.For example, first calculating daily 7 in 21 days:00~11:00 water consumption, Then 21 period water consumptions in the period are added, obtain the period 7:00~11:Total water consumption in 00 period, then with always Water consumption divided by period number of days 21 days then obtain period daily average consumption.By average consumption and the second default use Water is compared, when average consumption is more than or equal to the second default water consumption, the average consumption corresponding time Section is soaking time section.Second default water consumption is by taking 10L as an example, i.e., when the period 7:00~11:00 average consumption is more than Or when equal to 10L, the period 7:00~11:00 is soaking time section.It is corresponding, when average consumption is less than the second default use When water, the average consumption corresponding period is stand-by time section.Second default water consumption works as the time by taking 10L as an example Section 3:00~7:When 00 average consumption is less than 10L, the period 3:00~7:00 is stand-by time section.
The foregoing is merely the preferred embodiment of the present invention, are not intended to limit the scope of the invention, every at this Under the inventive concept of invention, using equivalent structure transformation made by description of the invention and accompanying drawing content, or directly/use indirectly In the scope of patent protection that other related technical areas are included in the present invention.

Claims (10)

1. a kind of control method of water heater, which is characterized in that include the following steps:
Count each water period of every day in preceding cycle with waterside number, when water period is more than with waterside number Or when equal to the first preset times, which is the high frequency water period;
When water period waterside number is greater than or equal to the second preset times and is less than the first preset times, the period For the intermediate frequency water period;
When water period is less than the second preset times with waterside number, which is the low frequency water period;
It obtains and currently uses the water period;
According to the current working condition for adjusting water heater with the water period.
2. the control method of water heater as described in claim 1, which is characterized in that the basis currently uses water period adjustment heat The step of heating power of hydrophone includes:
When with the water period being currently the high frequency water period, the working condition of water heater is adjusted to heated condition;
When with the water period being currently the intermediate frequency water period, the working condition of water heater is adjusted to keeping warm mode;
When with the water period being currently the low frequency water period, the working condition of water heater is adjusted to dormant state.
3. the control method of water heater as claimed in claim 1 or 2, which is characterized in that the basis currently uses water period tune The step of heating power of whole water heater includes:
When with the water period being currently the high frequency water period, the high frequency average consumption of water period is calculated, average consumption is worked as When more than or equal to the first default water consumption, current water period is high-temperature time section;
By the water temperature heating in water heater to the first preset temperature in section between at high temperature.
4. the control method of water heater as claimed in claim 1 or 2, which is characterized in that the basis currently uses water period tune The step of heating power of whole water heater includes:
When with the water period being currently the high frequency water period, the high frequency average consumption of water period is calculated, average consumption is worked as When less than the first default water consumption, current water period is the low temperature period;
By the water temperature heating in water heater to the second preset temperature within the low temperature period.
5. the control method of water heater as claimed in claim 1 or 2, which is characterized in that the basis currently uses water period tune The step of heating power of whole water heater includes:
When with the water period being currently the intermediate frequency water period, the intermediate frequency average consumption of water period is calculated, average consumption is worked as When more than or equal to the second default water consumption, current water period is soaking time section;
In soaking time section, the working condition of water heater is adjusted to keep the temperature.
6. a kind of water heater, which is characterized in that including:
Statistical module, for count each water period of every day in preceding cycle with waterside number, work as water period With waterside number be greater than or equal to the first preset times when, the period be the high frequency water period;Water is used when water period When number is greater than or equal to the second preset times and is less than the first preset times, which is the intermediate frequency water period;When with water When being less than the second preset times with waterside number of period, the period are the low frequency water period;
Acquisition module currently uses the water period for obtaining;
Control module, for according to currently with the working condition of water period adjustment water heater.
7. water heater as claimed in claim 6, which is characterized in that the control module includes:
Heating unit, for when with the water period being currently the high frequency water period, the working condition of water heater being adjusted to heat State;
Heat-insulation unit, for when with the water period being currently the intermediate frequency water period, the working condition of water heater being adjusted to keep the temperature State;
Suspend mode unit, for when with the water period being currently the low frequency water period, the working condition of water heater to be adjusted to suspend mode State.
8. water heater as claimed in claims 6 or 7, which is characterized in that the control module includes:
First computing unit, for when with the water period being currently the high frequency water period, calculating average use of the high frequency with the water period Water, when average consumption is more than or equal to the first default water consumption, current water period is high-temperature time section;
First heating unit, by the water temperature heating in water heater to the first preset temperature in section between being used at high temperature.
9. water heater as claimed in claims 6 or 7, which is characterized in that the control module includes:
Second computing unit, for when with the water period being currently the high frequency water period, calculating average use of the high frequency with the water period Water, when average consumption is less than the first default water consumption, current water period is the low temperature period;
Second heating unit is used for the water temperature heating in water heater to the second preset temperature within the low temperature period.
10. water heater as claimed in claim 6, which is characterized in that the control module includes:
Third computing unit, for when with the water period being currently the intermediate frequency water period, calculating average use of the intermediate frequency with the water period Water, when average consumption is more than or equal to the second default water consumption, current water period is soaking time section;
Heat-insulation unit, in soaking time section, the working condition of water heater being adjusted to keep the temperature.
CN201710014083.3A 2017-01-09 2017-01-09 Water heater and control method thereof Active CN108286810B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710014083.3A CN108286810B (en) 2017-01-09 2017-01-09 Water heater and control method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710014083.3A CN108286810B (en) 2017-01-09 2017-01-09 Water heater and control method thereof

Publications (2)

Publication Number Publication Date
CN108286810A true CN108286810A (en) 2018-07-17
CN108286810B CN108286810B (en) 2020-08-07

Family

ID=62819797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710014083.3A Active CN108286810B (en) 2017-01-09 2017-01-09 Water heater and control method thereof

Country Status (1)

Country Link
CN (1) CN108286810B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110398063A (en) * 2019-07-05 2019-11-01 芜湖美的厨卫电器制造有限公司 Water heater and its control method and computer readable storage medium
CN110398068A (en) * 2019-07-05 2019-11-01 芜湖美的厨卫电器制造有限公司 Water heater and its collecting method and computer readable storage medium
CN110553405A (en) * 2019-08-19 2019-12-10 广东万和热能科技有限公司 Control method, device and equipment of water heater and storage medium
WO2021004043A1 (en) * 2019-07-05 2021-01-14 芜湖美的厨卫电器制造有限公司 Water heater and control method thereof and computer-readable storage medium
WO2021004036A1 (en) * 2019-07-05 2021-01-14 芜湖美的厨卫电器制造有限公司 Water heater and heating control method therefor, and computer-readable storage medium
WO2021004034A1 (en) * 2019-07-05 2021-01-14 芜湖美的厨卫电器制造有限公司 Water heater and control method therefor, and computer-readable storage medium
WO2021004035A1 (en) * 2019-07-05 2021-01-14 芜湖美的厨卫电器制造有限公司 Water heater and control method thereof, and computer readable storage medium
CN113959097A (en) * 2021-10-29 2022-01-21 深圳供电局有限公司 Method for adjusting power consumption of household water heater
CN114294824A (en) * 2021-12-15 2022-04-08 广东芬尼克兹节能设备有限公司 Water use habit analysis method and device, terminal equipment and storage medium
CN114963553A (en) * 2021-08-03 2022-08-30 青岛经济技术开发区海尔热水器有限公司 Water heater and control method and device thereof
CN115046315A (en) * 2022-06-24 2022-09-13 国网安徽省电力有限公司淮北供电公司 Control system and control method of heat accumulating type electric boiler
CN115183465A (en) * 2022-06-23 2022-10-14 青岛海尔空调电子有限公司 Control method and control device for heat pump water heater, heat pump water heater and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6199055A (en) * 1984-10-22 1986-05-17 Matsushita Electric Ind Co Ltd Control circuit for electric water heater
CN103808013A (en) * 2013-09-25 2014-05-21 林宇 Self-learning type energy-saving electric water boiler group system and control method thereof
CN105698397A (en) * 2016-03-25 2016-06-22 芜湖美的厨卫电器制造有限公司 Electric water heater and heating control method thereof
CN105865037A (en) * 2016-04-11 2016-08-17 浙江大学 Automatic water heater group control system with learning algorithm in building
CN106123349A (en) * 2016-06-16 2016-11-16 福建工程学院 A kind of method and system monitoring water heater service condition

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6199055A (en) * 1984-10-22 1986-05-17 Matsushita Electric Ind Co Ltd Control circuit for electric water heater
CN103808013A (en) * 2013-09-25 2014-05-21 林宇 Self-learning type energy-saving electric water boiler group system and control method thereof
CN105698397A (en) * 2016-03-25 2016-06-22 芜湖美的厨卫电器制造有限公司 Electric water heater and heating control method thereof
CN105865037A (en) * 2016-04-11 2016-08-17 浙江大学 Automatic water heater group control system with learning algorithm in building
CN106123349A (en) * 2016-06-16 2016-11-16 福建工程学院 A kind of method and system monitoring water heater service condition

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021004035A1 (en) * 2019-07-05 2021-01-14 芜湖美的厨卫电器制造有限公司 Water heater and control method thereof, and computer readable storage medium
CN110398063A (en) * 2019-07-05 2019-11-01 芜湖美的厨卫电器制造有限公司 Water heater and its control method and computer readable storage medium
CN110398063B (en) * 2019-07-05 2021-06-22 芜湖美的厨卫电器制造有限公司 Water heater, control method thereof and computer-readable storage medium
WO2021004043A1 (en) * 2019-07-05 2021-01-14 芜湖美的厨卫电器制造有限公司 Water heater and control method thereof and computer-readable storage medium
WO2021004036A1 (en) * 2019-07-05 2021-01-14 芜湖美的厨卫电器制造有限公司 Water heater and heating control method therefor, and computer-readable storage medium
WO2021004034A1 (en) * 2019-07-05 2021-01-14 芜湖美的厨卫电器制造有限公司 Water heater and control method therefor, and computer-readable storage medium
CN110398068A (en) * 2019-07-05 2019-11-01 芜湖美的厨卫电器制造有限公司 Water heater and its collecting method and computer readable storage medium
CN110553405A (en) * 2019-08-19 2019-12-10 广东万和热能科技有限公司 Control method, device and equipment of water heater and storage medium
CN114963553A (en) * 2021-08-03 2022-08-30 青岛经济技术开发区海尔热水器有限公司 Water heater and control method and device thereof
CN113959097A (en) * 2021-10-29 2022-01-21 深圳供电局有限公司 Method for adjusting power consumption of household water heater
CN113959097B (en) * 2021-10-29 2023-01-03 深圳供电局有限公司 Method for adjusting power consumption of household water heater
CN114294824A (en) * 2021-12-15 2022-04-08 广东芬尼克兹节能设备有限公司 Water use habit analysis method and device, terminal equipment and storage medium
CN115183465A (en) * 2022-06-23 2022-10-14 青岛海尔空调电子有限公司 Control method and control device for heat pump water heater, heat pump water heater and storage medium
CN115046315A (en) * 2022-06-24 2022-09-13 国网安徽省电力有限公司淮北供电公司 Control system and control method of heat accumulating type electric boiler

Also Published As

Publication number Publication date
CN108286810B (en) 2020-08-07

Similar Documents

Publication Publication Date Title
CN108286810A (en) Water heater and its control method
CN108286811A (en) Water heater and its control method
CN101900419B (en) Controlling method of air-source water heater
CN108286795A (en) Water heater and its control method
CN104422137B (en) Water heater appointment heating control method and system
CN109425117B (en) Intelligent operation-free control method of water heater and water heater
CN104896733B (en) Control method, device and the Teat pump boiler of Teat pump boiler
CN103363670B (en) Air energy water heater and control method and device thereof
CN108613379B (en) Appointment control method for direct-expansion solar heat pump water heater and water heater
CN106123305A (en) The method for heating and controlling of electric heater and electric heater
CN103363671B (en) Air energy water heater and control method and device thereof
CN107101382B (en) Water heater temperature control method, water heater and readable storage medium
CN105157169A (en) Air conditioner, air conditioner control method and air conditioner control device
CN105222361B (en) A kind of heat-pump water heater control method, device and Teat pump boiler
CN106196483B (en) Air conditioner progress control method and device
CN109405268A (en) Gas water heater and control method
CN105020898A (en) Water heater with hot water cruising function and method for automatically setting heating temperature
CN111306797A (en) Water temperature adjusting method and device for water heater, control equipment and water heater
CN108286814A (en) Electric heater and its control method
CN108286816A (en) Electric heater and its control method
CN106196621B (en) Air energy water heater and its energy-saving control method and device
CN104791282A (en) Speed adjusting method for infrared temperature-control electric fan
CN109812936A (en) A kind of air-conditioning and its air conditioning exhausting temperature control method and device
JP2011220647A (en) Reduced fuel cost calculating device, and solar hot water supply system
CN103836801A (en) Water heater and control method and device thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221031

Address after: 241000 west side of 3 / F, No.5 office building, new energy and new materials gathering area, Fuzhou Road, Jiangbei District, Wuhu City, Anhui Province

Patentee after: Wuhu Midea intelligent kitchen electricity Manufacturing Co.,Ltd.

Address before: 241009 Wan Chun East Road, East District, Wuhu economic and Technological Development Zone, Anhui

Patentee before: WUHU MIDEA KITCHEN AND BATH APPLIANCES MFG. Co.,Ltd.

Patentee before: MIDEA GROUP Co.,Ltd.

TR01 Transfer of patent right