CN108286809A - Water heater and its control method - Google Patents

Water heater and its control method Download PDF

Info

Publication number
CN108286809A
CN108286809A CN201710014082.9A CN201710014082A CN108286809A CN 108286809 A CN108286809 A CN 108286809A CN 201710014082 A CN201710014082 A CN 201710014082A CN 108286809 A CN108286809 A CN 108286809A
Authority
CN
China
Prior art keywords
water
period
consumption
time section
water heater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710014082.9A
Other languages
Chinese (zh)
Other versions
CN108286809B (en
Inventor
李伟泺
吴海涛
曲绍鹤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhu Midea Smart Kitchen Appliance Manufacturing Co Ltd
Original Assignee
Midea Group Co Ltd
Wuhu Midea Kitchen and Bath Appliances Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Midea Group Co Ltd, Wuhu Midea Kitchen and Bath Appliances Manufacturing Co Ltd filed Critical Midea Group Co Ltd
Priority to CN201710014082.9A priority Critical patent/CN108286809B/en
Publication of CN108286809A publication Critical patent/CN108286809A/en
Application granted granted Critical
Publication of CN108286809B publication Critical patent/CN108286809B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/20Arrangement or mounting of control or safety devices
    • F24H9/2007Arrangement or mounting of control or safety devices for water heaters
    • F24H9/2014Arrangement or mounting of control or safety devices for water heaters using electrical energy supply
    • F24H9/2021Storage heaters

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

The present invention discloses a kind of water heater and its control method, wherein water heater control method includes the following steps:The total water number for counting each water period of every day in preceding cycle, when the total water number of water period is less than or equal to preset times, which is non-regular time section;The average consumption for calculating all non-regular time sections, when the water consumption of non-regular time section is less than or equal to average consumption, which is dormancy time section;It will be adjusted in water heater to dormant state in dormancy time section.Technical solution of the present invention realizes unification that is energy saving and being supplied with water.

Description

Water heater and its control method
Technical field
The present invention relates to technical field of water heaters, more particularly to a kind of water heater and its control method.
Background technology
With people's improvement of living standard, people are also higher and higher to the power conservation requirement of water heater.The control of existing water heater System usually only includes booting circulating-heating and shutdown both of which.When water heater is in shutdown mode, water heater does not work, When user needs with hot water, hot water cannot be timely got;When water heater is in circulating-heating pattern, it is often necessary to right Water is heated and wastes electric energy repeatedly so that the promptness of user's water and the utilization rate of energy cannot be unified, Bu Nengman The demand that sufficient user uses water heater.
Invention content
The main object of the present invention is to provide a kind of water heater, it is intended to improve the promptness and energy of user's water of water heater Measure utilization rate.
To achieve the above object, the present invention provides a kind of control method of water heater, and the control method of the water heater includes Following steps:
The total water number for counting each water period of every day in preceding cycle, when the total water of water period When number is less than or equal to preset times, which is non-regular time section;
The average consumption for calculating all non-regular time sections is put down when the water consumption of non-regular time section is less than or equal to When equal water consumption, which is dormancy time section;
It will be adjusted in water heater to dormant state in dormancy time section.
Preferably, the average consumption for calculating all non-regular time sections the step of after further include:
When the water consumption of non-regular time section is more than average consumption, which is the low temperature period;
By the water temperature heating in water heater to the first preset temperature within the low temperature period.
Preferably, it is described statistics preceding cycle in every day each water period with waterside number after also wrap It includes:
When water period is more than preset times with waterside number, which is regular time section;
By the water temperature heating in water heater to the second preset temperature in regular time section.
Preferably, described in dormancy time section by the step of adjustment in water heater to dormant state after further include:
It, will be hot from reaching third and presetting the time of water consumption when the water consumption on the same day, which reaches third, presets water consumption The water temperature heating of hydrophone is to third preset temperature.
Preferably, in the statistics preceding cycle each water period of every day with waterside number, when with water Between section with waterside number be less than or equal to preset times when, the period be non-regular time section the step of before further include:
Multiple work periods of computer heating control are set, and will be divided into every day in each work period and multiple use water Period records the use regimen condition of user in each water period.
In order to preferably realize foregoing invention purpose, the present invention further provides a kind of water heaters, including:
First statistical module, for count each water period of every day in preceding cycle with waterside number, when with When being less than or equal to preset times with waterside number of water period, the period are non-regular time section;
Second statistical module, the average consumption for calculating all non-regular time sections, when the use of non-regular time section When water is less than or equal to average consumption, which is dormancy time section;
Sleep block, for being adjusted in water heater to dormant state in dormancy time section.
Preferably, the water heater further includes:
Third statistical module is used for when the water consumption of non-regular time section is more than average consumption, the non-regular time Section is the low temperature period;
First heating module is used for the water temperature heating in water heater to the first preset temperature within the low temperature period.
Preferably, the water heater further includes:
4th statistical module, for when water period is more than preset times with waterside number, which to be rule Period;
Second heating module is used for the water temperature heating in water heater to the second preset temperature in regular time section.
Preferably, the water heater further includes:
Third heating module, for when the water consumption on the same day reaches third and presets water consumption, reaching certainly, third is default to be used From the time of water, by the water temperature heating of water heater to third preset temperature.
Preferably, the water heater further includes:
Preset statistical module, multiple work periods for computer heating control to be arranged, and will be in each work period It is divided into multiple water periods every day, records the use regimen condition of user in each water period.
In the present invention, the total water number of each water period of every day in preceding cycle is counted first, then is compared The total water number and preset times of each period, when the total water number of water period is less than or equal to preset times When, which is non-regular time section;In non-regular time section, the average consumption of all non-regular time sections is calculated, When the water consumption of non-regular time section is less than or equal to average consumption, which is dormancy time section; It will be adjusted in water heater to dormant state in dormancy time section;Through the above steps, realize water heater intelligent according to user's With regimen condition, water is heated, when the water consumption in non-regular time section is less directly by the working condition tune of water heater Whole is suspend mode, adequately ensures the sleep time of water heater, energy saving to realize;In the period that non-regular time section is thought It is interior, no matter water heater heat or keep the temperature, it can ensure the supply amount with water, therefore, the technical solution of the application is real Unification that is energy saving and being supplied with water is showed.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with The structure shown according to these attached drawings obtains other attached drawings.
Fig. 1 is the structural schematic diagram of an embodiment of water heater of the present invention;
Fig. 2 is the flow diagram of one embodiment of control method of water heater of the present invention;
Fig. 3 is the flow diagram of another embodiment of control method of water heater of the present invention;
Fig. 4 is the high-level schematic functional block diagram of an embodiment of water heater of the present invention;
Fig. 5 is the high-level schematic functional block diagram of another embodiment of water heater of the present invention.
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiment is only a part of the embodiment of the present invention, instead of all the embodiments.Base Embodiment in the present invention, those of ordinary skill in the art obtained without creative efforts it is all its His embodiment, shall fall within the protection scope of the present invention.
It is to be appreciated that the directional instruction (such as up, down, left, right, before and after ...) of institute is only used in the embodiment of the present invention In explaining relative position relation, motion conditions etc. under a certain particular pose (as shown in the picture) between each component, if should When particular pose changes, then directionality instruction also correspondingly changes correspondingly.
In addition, the description for being related to " first ", " second " etc. in the present invention is used for description purposes only, and should not be understood as referring to Show or imply its relative importance or implicitly indicates the quantity of indicated technical characteristic." first ", " are defined as a result, Two " feature can explicitly or implicitly include at least one of the features.In addition, the technical solution between each embodiment can To be combined with each other, but must can be implemented as basis with those of ordinary skill in the art, when the combination of technical solution occurs Conflicting or cannot achieve when, will be understood that the combination of this technical solution is not present, also not the present invention claims protection model Within enclosing.
Referring to figs. 1 to Fig. 5, for the water heater that the present invention controls by taking water heater as an example, which includes for storing water Liner 200, the heating device 300 of water supply heating, is arranged outside liner 200, for protecting liner 200 and keeping the temperature water Shell 100, the temperature detector for detecting water temperature and the display panel 500 for showing water temperature.Wherein, temperature detection Device 400, for detecting the water temperature in water heater liner 200;Temperature-detecting device 400 can be temperature-sensing probe or other The temperature sensor of water temperature can be detected.The result of water temperature detection can be the last detection as a result, can also be single Average value in the time of position after repeated detection.For example, the temperature that temperature-detecting device 400 can be detected last time is inspection Testing temperature can also continuously detect 5 times in 2s, then using this 5 times testing result as detected value.
Below according to a kind of control method for water heater that the structure of point water heater above proposes, include the following steps:
S10:The total water number for counting each water period of every day in preceding cycle, it is total when water period When being less than or equal to preset times with waterside number, which is non-regular time section;
In the present embodiment, the period for 21 days, will be divided into six periods daily, and respectively 3:00~7:00、7:00~ 11:00、11:00~15:00、15:00~19:00、19:00~23:00、23:00~3:00.Within each period, record is used Family with waterside number and each water consumption.The total water number of water period is that this uses the water time in a cycle 21 days The interior total degree with water, it is daily in each period may be different with waterside number, such as Mon-Fri 7:00~11:00 It is average with waterside number be 0.5, the 7 of Saturday and Sunday:00~11:00 be averaged with waterside number is 3.5.Preset times are with 11 For secondary, certainly, it can be configured according to the demand of user in some embodiments.Certain a period of time i.e. as user in 21 days Between when being more than or equal to 11 times with waterside number in section, which is arranged to regular time section, with the period 19:00~ 23:For 00.When user is less than 11 times in the certain time period in 21 days with waterside number, which is arranged to non-rule The period is restrained, with the period 11:00~15:For 00.By the statistics to total water number in water period, when will use water Between section be divided into regular time section and non-regular time section.
Certainly, it before statistics, needs to carry out period setting to computer heating control, and to each cycle time length and use water Period is divided, and is recorded each with the use regimen condition of user in the water time, i.e., with waterside number, with water frequency, use water Temperature and water consumption.This process, in the learning process of water heater, in a cycle, what user was not arranged is joined with water Number installation parameter preset operation, such as heating time are preset as daily 19:00~23:00 and 7:00~11:00, dormancy time Section is preset as 23:00~3:00 etc..Second period excessively was then configured with reference to user's a cycle with regimen condition, third Period then being adjusted with regimen condition with reference to a cycle and second round.
S20:The average consumption for calculating all non-regular time sections, when the water consumption of non-regular time section is less than or waits When average consumption, which is dormancy time section;
In the present embodiment, in non-regular time section, the water consumption for using water in all non-regular time sections each time is counted, The total water consumption of all non-regular time sections is calculated, the quantity of total water consumption divided by non-regular time section is then used, obtains non-rule Restrain the average consumption of period.
For example, the non-rule period is with 3:00~7:00、11:00~15:00 and 23:00~3:For 00 3 periods. First calculate 3 in 21 days daily:00~7:00、11:00~15:00 and 23:00~3:00 water consumption is calculated, as non- Then the water consumption of 21 in period non-rule periods is added by rule period daily water consumption, obtain the period 3:00~ 7:00、11:00~15:00 and 23:00~3:Total water consumption in 00 period, then with total water consumption divided by non-rule period number 3, then obtain the average consumption in the non-regular time section period.Average consumption is by taking 10L as an example.
Average consumption is compared with the water consumption in each non-regular time section period.I.e. with average consumption point Not with 21 3 in the period:00~7:The sum of 00 water consumption, 21 11:00~15:The sum of 00 water consumption, 21 23:00 ~3:The sum of 00 water consumption is compared.When the water consumption in a certain non-regular time section be less than average consumption when, this when Between section be dormancy time section.With 23:00~3:For 00, if 21 23:00~3:Total water consumption in 00 period be less than or Person is equal to average consumption, then and 23:00~3:00 is dormancy time section.It is put down when the water consumption in a certain non-regular time section is more than When equal water consumption, which is the low temperature period.With 11:00~15:For 00, if 21 11:00~15:00 water consumption The sum of be more than average consumption, then 11:00~15:00 is the low temperature period.
S30:It will be adjusted in water heater to dormant state in dormancy time section.
In the present embodiment, in dormancy time section, user's is all smaller with waterside number and water consumption, i.e., user with water need Ask small.If at this point, water heater long-time heating, is bound to cause hot water unmanned use for a long time, and wasting heating people and heat preservation water Energy.Dormant state includes shutdown status and minimum living temperature state, can specifically be selected according to the actual demand of user. For example, in certain time period, user is always without water, and water heater can do shutdown processing at this time;If in certain time period, using Family it is more with waterside number, but less than the first preset times or relatively low ambient temperature when (10 degrees Celsius or less), at this time Water heater can make isothermal holding, maintain water temperature at 20 degrees centigrades.Specifically, when user setting, with the setting of user Subject to, when water heater automatically adjusts, it is subject to energy saving and is supplied with water unified.
In the present embodiment, the total water number of each water period of every day in preceding cycle is counted first, then is compared To the total water number and preset times of each period, when the total water number of water period is less than or equal to preset times When, which is non-regular time section;In non-regular time section, the average consumption of all non-regular time sections is calculated, When the water consumption of non-regular time section is less than or equal to average consumption, which is dormancy time section; It will be adjusted in water heater to dormant state in dormancy time section;Through the above steps, realize water heater intelligent according to user's With regimen condition, water is heated, when the water consumption in non-regular time section is less directly by the working condition tune of water heater Whole is suspend mode, adequately ensures the sleep time of water heater, energy saving to realize;In the period that non-regular time section is thought It is interior, no matter water heater heat or keep the temperature, it can ensure the supply amount with water, therefore, the technical solution of the application is real Unification that is energy saving and being supplied with water is showed.
In order to quickly provide hot water to the user, in the average consumption for calculating all non-regular time sections Further include after step:
When the water consumption of non-regular time section is more than average consumption, which is the low temperature period; By the water temperature heating in water heater to the first preset temperature in the low temperature period.
In the present embodiment, the first preset temperature is lower water temperature, such as 30~50 degrees Celsius.Within the low temperature period, User's is less with waterside number, and water consumption is but relatively more, in this case, heats water to certain water temperature for user, has Water temperature heating to required temperature can quickly be obtained required hot water to be conducive to user at any time conducive to user. Meanwhile within this period, the first preset temperature is only heated water to, does not heat water to higher water temperature, to The waste for avoiding energy improves the utilization rate of energy.
In order to further ensure the supply amount of hot water, each water period of every day in the statistics preceding cycle Further include with after waterside number:When water period is more than preset times with waterside number, which is regular time Section;By the water temperature heating in water heater to the second preset temperature in regular time section.
In the present embodiment, in regular time section, user's is relatively high with water frequency, at this time, it may be necessary to heat water to the Two preset temperatures, to ensure that user has hot water use at any time within the period.Second preset temperature height is in the first default temperature Degree, for 50~65 degrees Celsius so that the water temperature in water heater keeps higher temperature.
Certainly, it in regular time section, can also be segmented according to actual with regimen condition is further.Count all rule The water consumption for using water in the period each time is restrained, the total water consumption in each regular time section period is calculated, recycles total use Water divided by with the total number of days of water, obtains the average consumption for using water in the period in each period daily.For example, first calculating 21 days Interior daily 19:00~23:Then 21 period water consumptions in period are added, obtain the period 19 by 00 water consumption:00~ 23:Total water consumption in 00 period, then with total water consumption divided by period number of days 21 days, then obtain period daily being averaged and use water Amount.Average consumption is compared with a default water consumption, when average consumption is more than or equal to the default water consumption, The average consumption corresponding period is high-temperature time section.The default water consumption is by taking 20L as an example, i.e., when the period 19:00~ 23:When 00 average consumption is more than or equal to 20L, the period 19:00~23:00 is high-temperature time section.It is corresponding, when flat When equal water consumption is less than the default water consumption, the average consumption corresponding period is the low temperature period.The default water consumption By taking 20L as an example, i.e., when the period 7:00~11:When 00 average consumption is less than 20L, the period 7:00~11:00 is low temperature Period, at this point, water temperature heating to third is preset water temperature, third presets water temperature and is more than the first default water temperature, and is less than second Default water temperature.
In order to ensure the sufficient use water of user, will be adjusted in water heater to dormant state in dormancy time section described Further include after step:
It, will be hot from reaching third and presetting the time of water consumption when the water consumption on the same day, which reaches third, presets water consumption The water temperature heating of hydrophone is to third preset temperature.
In the present embodiment, the second default water consumption is more than the first default water consumption, by taking 50L~70L as an example.Due to life Need, some when, the water consumption of family can encounter the phenomenon that being significantly increased suddenly, for example, there is guest to come.When the same day When total water consumption is more than or equal to the second default water consumption, illustrate that the water demand of user family today is especially big.At this point, hot Hydrophone is no longer limited by high-temperature time section, low temperature period and suspend mode, and water temperature heating to third is preset water temperature always.Third Default water temperature can be more than the first default water temperature, might be less that the first default water temperature, it might even be possible to refer to according to the control of user Order is adjusted and is arranged.By the setting of the second default water consumption, and the water consumption on the same day reaches the second default water consumption certainly Time from, by the water temperature heating of water heater to third preset temperature, adequately ensure that the water demand of user, be conducive to use Family preferably uses water heater.
The present invention further provides a kind of water heaters.Water heater includes:
First statistical module 10, for count each water period of every day in preceding cycle with waterside number, when When being less than or equal to preset times with waterside number of water period, the period are non-regular time section;
In the present embodiment, the period for 21 days, will be divided into six periods daily, and respectively 3:00~7:00、7:00~ 11:00、11:00~15:00、15:00~19:00、19:00~23:00、23:00~3:00.Within each period, record is used Family with waterside number and each water consumption.The total water number of water period is that this uses the water time in a cycle 21 days The interior total degree with water, it is daily in each period may be different with waterside number, such as Mon-Fri 7:00~11:00 It is average with waterside number be 0.5, the 7 of Saturday and Sunday:00~11:00 be averaged with waterside number is 3.5.Preset times are with 11 For secondary, certainly, it can be configured according to the demand of user in some embodiments.Certain a period of time i.e. as user in 21 days Between when being more than or equal to 11 times with waterside number in section, which is arranged to regular time section, with the period 19:00~ 23:For 00.When user is less than 11 times in the certain time period in 21 days with waterside number, which is arranged to non-rule The period is restrained, with the period 11:00~15:For 00.By the statistics to total water number in water period, when will use water Between section be divided into regular time section and non-regular time section.
Certainly, it before statistics, needs to carry out period setting to computer heating control, and to each cycle time length and use water Period is divided, and is recorded each with the use regimen condition of user in the water time, i.e., with waterside number, with water frequency, use water Temperature and water consumption.This process, in the learning process of water heater, in a cycle, what user was not arranged is joined with water Number installation parameter preset operation, such as heating time are preset as daily 19:00~23:00 and 7:00~11:00, dormancy time Section is preset as 23:00~3:00 etc..Second period excessively was then configured with reference to user's a cycle with regimen condition, third Period then being adjusted with regimen condition with reference to a cycle and second round.That is, the water heater further includes:Preset statistics Module, multiple work periods for computer heating control to be arranged, and every day in each work period is divided into multiple use The water period records the use regimen condition of user in each water period.
Second statistical module 20, the average consumption for calculating all non-regular time sections, when non-regular time section When water consumption is less than or equal to average consumption, which is dormancy time section;
In the present embodiment, in non-regular time section, the water consumption for using water in all non-regular time sections each time is counted, The total water consumption of all non-regular time sections is calculated, the quantity of total water consumption divided by non-regular time section is then used, obtains non-rule Restrain the average consumption of period.
For example, the non-rule period is with 3:00~7:00、11:00~15:00 and 23:00~3:For 00 3 periods. First calculate 3 in 21 days daily:00~7:00、11:00~15:00 and 23:00~3:00 water consumption is calculated, as non- Then the water consumption of 21 in period non-rule periods is added by rule period daily water consumption, obtain the period 3:00~ 7:00、11:00~15:00 and 23:00~3:Total water consumption in 00 period, then with total water consumption divided by non-rule period number 3, then obtain the average consumption in the non-regular time section period.Average consumption is by taking 10L as an example.
Average consumption is compared with the water consumption in each non-regular time section period.I.e. with average consumption point Not with 21 3 in the period:00~7:The sum of 00 water consumption, 21 11:00~15:The sum of 00 water consumption, 21 23:00 ~3:The sum of 00 water consumption is compared.When the water consumption in a certain non-regular time section be less than average consumption when, this when Between section be dormancy time section.With 23:00~3:For 00, if 21 23:00~3:Total water consumption in 00 period be less than or Person is equal to average consumption, then and 23:00~3:00 is dormancy time section.It is put down when the water consumption in a certain non-regular time section is more than When equal water consumption, which is the low temperature period.With 11:00~15:For 00, if 21 11:00~15:00 water consumption The sum of be more than average consumption, then 11:00~15:00 is the low temperature period.
Sleep block 30, for being adjusted in water heater to dormant state in dormancy time section.
In the present embodiment, in dormancy time section, user's is all smaller with waterside number and water consumption, i.e., user with water need Ask small.If at this point, water heater long-time heating, is bound to cause hot water unmanned use for a long time, and wasting heating people and heat preservation water Energy.Dormant state includes shutdown status and minimum living temperature state, can specifically be selected according to the actual demand of user. For example, in certain time period, user is always without water, and water heater can do shutdown processing at this time;If in certain time period, using Family it is more with waterside number, but less than the first preset times or relatively low ambient temperature when (10 degrees Celsius or less), at this time Water heater can make isothermal holding, maintain water temperature at 20 degrees centigrades.Specifically, when user setting, with the setting of user Subject to, when water heater automatically adjusts, it is subject to energy saving and is supplied with water unified.
In the present embodiment, the total water number of each water period of every day in preceding cycle is counted first, then is compared To the total water number and preset times of each period, when the total water number of water period is less than or equal to preset times When, which is non-regular time section;In non-regular time section, the average consumption of all non-regular time sections is calculated, When the water consumption of non-regular time section is less than or equal to average consumption, which is dormancy time section; It will be adjusted in water heater to dormant state in dormancy time section;Through the above steps, realize water heater intelligent according to user's With regimen condition, water is heated, when the water consumption in non-regular time section is less directly by the working condition tune of water heater Whole is suspend mode, adequately ensures the sleep time of water heater, energy saving to realize;In the period that non-regular time section is thought It is interior, no matter water heater heat or keep the temperature, it can ensure the supply amount with water, therefore, the technical solution of the application is real Unification that is energy saving and being supplied with water is showed.
In order to quickly provide hot water to the user, the water heater further includes:
Third statistical module is used for when the water consumption of non-regular time section is more than average consumption, the non-regular time Section is the low temperature period;First heating module, for presetting the water temperature heating in water heater to first within the low temperature period Temperature.
In the present embodiment, the first preset temperature is lower water temperature, such as 30~50 degrees Celsius.Within the low temperature period, User's is less with waterside number, and water consumption is but relatively more, in this case, heats water to certain water temperature for user, has Water temperature heating to required temperature can quickly be obtained required hot water to be conducive to user at any time conducive to user. Meanwhile within this period, the first preset temperature is only heated water to, does not heat water to higher water temperature, to The waste for avoiding energy improves the utilization rate of energy.
In order to further ensure the supply amount of hot water, the water heater further includes:
4th statistical module, for when water period is more than preset times with waterside number, which to be rule Period;Second heating module is used for the water temperature heating in water heater to the second preset temperature in regular time section.
In the present embodiment, in regular time section, user's is relatively high with water frequency, at this time, it may be necessary to heat water to the Two preset temperatures, to ensure that user has hot water use at any time within the period.Second preset temperature height is in the first default temperature Degree, for 50~65 degrees Celsius so that the water temperature in water heater keeps higher temperature.
Certainly, it in regular time section, can also be segmented according to actual with regimen condition is further.Count all rule The water consumption for using water in the period each time is restrained, the total water consumption in each regular time section period is calculated, recycles total use Water divided by with the total number of days of water, obtains the average consumption for using water in the period in each period daily.For example, first calculating 21 days Interior daily 19:00~23:Then 21 period water consumptions in period are added, obtain the period 19 by 00 water consumption:00~ 23:Total water consumption in 00 period, then with total water consumption divided by period number of days 21 days, then obtain period daily being averaged and use water Amount.Average consumption is compared with a default water consumption, when average consumption is more than or equal to the default water consumption, The average consumption corresponding period is high-temperature time section.The default water consumption is by taking 20L as an example, i.e., when the period 19:00~ 23:When 00 average consumption is more than or equal to 20L, the period 19:00~23:00 is high-temperature time section.It is corresponding, when flat When equal water consumption is less than the default water consumption, the average consumption corresponding period is the low temperature period.The default water consumption By taking 20L as an example, i.e., when the period 7:00~11:When 00 average consumption is less than 20L, the period 7:00~11:00 is low temperature Period, at this point, water temperature heating to third is preset water temperature, third presets water temperature and is more than the first default water temperature, and is less than second Default water temperature.
In order to ensure that user sufficient use water, the water heater further includes:
Third heating module, for when the water consumption on the same day reaches third and presets water consumption, reaching certainly, third is default to be used From the time of water, by the water temperature heating of water heater to third preset temperature.
In the present embodiment, the second default water consumption is more than the first default water consumption, by taking 50L~70L as an example.Due to life Need, some when, the water consumption of family can encounter the phenomenon that being significantly increased suddenly, for example, there is guest to come.When the same day When total water consumption is more than or equal to the second default water consumption, illustrate that the water demand of user family today is especially big.At this point, hot Hydrophone is no longer limited by high-temperature time section, low temperature period and suspend mode, and water temperature heating to third is preset water temperature always.Third Default water temperature can be more than the first default water temperature, might be less that the first default water temperature, it might even be possible to refer to according to the control of user Order is adjusted and is arranged.By the setting of the second default water consumption, and the water consumption on the same day reaches the second default water consumption certainly Time from, by the water temperature heating of water heater to third preset temperature, adequately ensure that the water demand of user, be conducive to use Family preferably uses water heater.
The foregoing is merely the preferred embodiment of the present invention, are not intended to limit the scope of the invention, every at this Under the inventive concept of invention, using equivalent structure transformation made by description of the invention and accompanying drawing content, or directly/use indirectly In the scope of patent protection that other related technical areas are included in the present invention.

Claims (10)

1. a kind of control method of water heater, which is characterized in that include the following steps:
The total water number for counting each water period of every day in preceding cycle, when the total water number of water period When less than or equal to preset times, which is non-regular time section;
The average consumption for calculating all non-regular time sections, when the water consumption of non-regular time section is less than or equal to average use When water, which is dormancy time section;
It will be adjusted in water heater to dormant state in dormancy time section.
2. the control method of water heater as described in claim 1, which is characterized in that calculate all non-regular time sections described Average consumption the step of after further include:
When the water consumption of non-regular time section is more than average consumption, which is the low temperature period;
By the water temperature heating in water heater to the first preset temperature within the low temperature period.
3. the control method of water heater as described in claim 1, which is characterized in that every day in the statistics preceding cycle Each water period with after waterside number further include:
When water period is more than preset times with waterside number, which is regular time section;
By the water temperature heating in water heater to the second preset temperature in regular time section.
4. the control method of water heater as described in claim 1, which is characterized in that it is described in dormancy time section by hot water It is adjusted in device and further includes to after the step of dormant state:
When the water consumption on the same day, which reaches third, presets water consumption, from reaching third and presetting the time of water consumption, by water heater Water temperature heating to third preset temperature.
5. the control method of water heater as described in claim 1, which is characterized in that every day in the statistics preceding cycle Each water period with waterside number, when water period is less than or equal to preset times with waterside number, the time Further include before the step of Duan Weifei regular time sections:
Multiple work periods of computer heating control are set, and will be divided into every day in each work period multiple with the water time Section records the use regimen condition of user in each water period.
6. a kind of water heater, which is characterized in that including:
First statistical module, for count each water period of every day in preceding cycle with waterside number, when with water Between section with waterside number be less than or equal to preset times when, the period be non-regular time section;
Second statistical module, the average consumption for calculating all non-regular time sections, when the water consumption of non-regular time section When less than or equal to average consumption, which is dormancy time section;
Sleep block, for being adjusted in water heater to dormant state in dormancy time section.
7. water heater as claimed in claim 6, which is characterized in that the water heater further includes:
Third statistical module, for when the water consumption of non-regular time section is more than average consumption, which to be The low temperature period;
First heating module is used for the water temperature heating in water heater to the first preset temperature within the low temperature period.
8. water heater as claimed in claim 6, which is characterized in that the water heater further includes:
4th statistical module, for when water period is more than preset times with waterside number, which to be regular time Section;
Second heating module is used for the water temperature heating in water heater to the second preset temperature in regular time section.
9. water heater as claimed in claim 6, which is characterized in that the water heater further includes:
Third heating module, for when the water consumption on the same day reaches third and presets water consumption, reaching third certainly and presetting water consumption Time from, by the water temperature heating of water heater to third preset temperature.
10. water heater as claimed in claim 6, which is characterized in that the water heater further includes:
Preset statistical module, multiple work periods for computer heating control to be arranged, and will be each in each work period It is divided into multiple water periods, records the use regimen condition of user in each water period.
CN201710014082.9A 2017-01-09 2017-01-09 Water heater and control method thereof Active CN108286809B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710014082.9A CN108286809B (en) 2017-01-09 2017-01-09 Water heater and control method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710014082.9A CN108286809B (en) 2017-01-09 2017-01-09 Water heater and control method thereof

Publications (2)

Publication Number Publication Date
CN108286809A true CN108286809A (en) 2018-07-17
CN108286809B CN108286809B (en) 2021-01-08

Family

ID=62819437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710014082.9A Active CN108286809B (en) 2017-01-09 2017-01-09 Water heater and control method thereof

Country Status (1)

Country Link
CN (1) CN108286809B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110398064A (en) * 2019-07-05 2019-11-01 芜湖美的厨卫电器制造有限公司 Water heater and its method for heating and controlling and computer readable storage medium

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100682250B1 (en) * 2006-04-21 2007-02-15 린나이코리아 주식회사 Device of detecting leak of water according to test working of boiler and method of detecting thereof
CN103808013A (en) * 2013-09-25 2014-05-21 林宇 Self-learning type energy-saving electric water boiler group system and control method thereof
CN105371510A (en) * 2015-12-02 2016-03-02 上海大学 Solar heater water supply system based on Internet of things and control method of solar heater water supply system
CN105605791A (en) * 2016-01-22 2016-05-25 广州松下空调器有限公司 Control method for pre-operation of water heater
CN105698397A (en) * 2016-03-25 2016-06-22 芜湖美的厨卫电器制造有限公司 Electric water heater and heating control method thereof
CN105865037A (en) * 2016-04-11 2016-08-17 浙江大学 Automatic water heater group control system with learning algorithm in building
CN106123305A (en) * 2016-07-29 2016-11-16 芜湖美的厨卫电器制造有限公司 The method for heating and controlling of electric heater and electric heater

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100682250B1 (en) * 2006-04-21 2007-02-15 린나이코리아 주식회사 Device of detecting leak of water according to test working of boiler and method of detecting thereof
CN103808013A (en) * 2013-09-25 2014-05-21 林宇 Self-learning type energy-saving electric water boiler group system and control method thereof
CN105371510A (en) * 2015-12-02 2016-03-02 上海大学 Solar heater water supply system based on Internet of things and control method of solar heater water supply system
CN105605791A (en) * 2016-01-22 2016-05-25 广州松下空调器有限公司 Control method for pre-operation of water heater
CN105698397A (en) * 2016-03-25 2016-06-22 芜湖美的厨卫电器制造有限公司 Electric water heater and heating control method thereof
CN105865037A (en) * 2016-04-11 2016-08-17 浙江大学 Automatic water heater group control system with learning algorithm in building
CN106123305A (en) * 2016-07-29 2016-11-16 芜湖美的厨卫电器制造有限公司 The method for heating and controlling of electric heater and electric heater

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110398064A (en) * 2019-07-05 2019-11-01 芜湖美的厨卫电器制造有限公司 Water heater and its method for heating and controlling and computer readable storage medium
CN110398064B (en) * 2019-07-05 2021-09-28 芜湖美的厨卫电器制造有限公司 Water heater, heating control method thereof and computer-readable storage medium

Also Published As

Publication number Publication date
CN108286809B (en) 2021-01-08

Similar Documents

Publication Publication Date Title
CN108286811A (en) Water heater and its control method
US11719456B2 (en) Thermostat temperature compensation modeling
CN108286810A (en) Water heater and its control method
CA2851257C (en) Strategic reduction of power usage in multi-sensing, wirelessly communicating learning thermostat
CN102519118A (en) Method and device for automatic reminding of cleanness of air conditioner
CN104110784A (en) Method and device for automatically controlling air conditioner
CN104295517A (en) Intelligent indoor temperature adjusting system
CN102538069B (en) Intelligent electric heating pre-controlling method
US20200248916A1 (en) Air conditioning apparatus and control method thereof
EP2410397A2 (en) Environmental sensor touchscreen interface for public areas
US9651955B2 (en) Controllers and methods of control of water heaters
CN108286795A (en) Water heater and its control method
CN102748864A (en) Heat storage electric water heater and temperature control method and device thereof
UA106909C2 (en) METHOD AND DEVICE FOR ADJUSTING TEMPERATURE IN THE BUILDING ROOMS GROUP
CN107209537A (en) Power supply for computer feedway and operation method with the fan control circuitry that stand-by power supply portion is cooled down under computer closed mode
CN103912914B (en) A kind of control method of floor heating
CN107101382A (en) Water heater temperature control method, water heater and readable storage medium storing program for executing
CN108286814A (en) Electric heater and its control method
CN206905097U (en) A kind of environmental protection and energy saving warmer
CN108286809A (en) Water heater and its control method
CN103629080A (en) Control method and device for oil heater and air conditioner
CN105423570B (en) Heating equipment control method and device
CN110068141B (en) Constant-temperature heating control method and device
CN108241393A (en) Control system, control method and the household electrical appliance of radio temperature sensor
US20200292192A1 (en) Blower properties used for user warning

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221101

Address after: 241000 west side of 3 / F, No.5 office building, new energy and new materials gathering area, Fuzhou Road, Jiangbei District, Wuhu City, Anhui Province

Patentee after: Wuhu Midea intelligent kitchen electricity Manufacturing Co.,Ltd.

Address before: 241009 Wan Chun East Road, East District, Wuhu economic and Technological Development Zone, Anhui

Patentee before: WUHU MIDEA KITCHEN AND BATH APPLIANCES MFG. Co.,Ltd.

Patentee before: MIDEA GROUP Co.,Ltd.