A kind of tile laying multi-panel synchronization bonder
Technical field
The invention patent relates to robot fields, and in particular to a kind of tile laying multi-panel synchronization bonder.
Background technology
With the development of society, people’s lives level is higher and higher, also change is occurring for aesthetic standards, present
Requirement of the people to finishing is higher and higher in house decoration.Metope stickup ceramic tile is especially common during house decoration, works as wall
When having exposed water pipe on face, the water pipe for being exposed to outside is surrounded with ceramic tile and is pasted, paste at present the method that generally uses for
Three tile corners are pasted into positioning with adhesive tape in advance, are then surrounded water pipe with it, then by cement with yellow sand mixture from
On fill up the gap between ceramic tile, water pipe and metope three down, but porcelain during construction in this way
Brick does not only exist in transitory state and is susceptible to shift phenomenon and when tape-stripping is in cleaning since adhesive tape is affixed directly to
So being difficult to clean up on ceramic tile.Therefore, there is an urgent need to a kind of devices can well solve the above problem now.
Invention content
The present invention relates to a kind of tile laying multi-panels to synchronize bonder, clever structure, by three brick folding slot middle clamp plates
Coordination uniformly get off.
The present invention is achieved by the following technical solutions:
A kind of tile laying multi-panel synchronization bonder, including frame body, linkage mechanism, the first brick folding slot and two second
Brick folding slot;The first brick folding slot is set to the medium position of frame body;Described two second brick folding slots are symmetrical arranged, and are connected to
On first brick folding slot;First brick folding slot and the second brick folding slot structure it is identical and it is internal be both provided with clamping plate, the linkage mechanism is set
It is placed on frame body, and is flexibly connected with the clamping plate on the first brick folding slot and the second brick folding slot, the linkage mechanism makes described in three
Clamping plate moves synchronously.
Through the above technical solutions, linkage mechanism makes three clamping plate synchronous clampings or synchronizes to loosen, to realize to porcelain
The clamping of brick and loosen, to realize that multi-panel ceramic tile synchronizes bonding.
As a further improvement on the present invention, the linkage mechanism includes screw rod, sliding block, first connecting rod, telescopic rod, first
One end of push rod, the second push rod and strut, the screw rod is movably connected in the middle part of frame body, and the cunning is threadedly coupled on screw rod
Block, first push rod one end are fixed on sliding block, and the other end of the first push rod is connected on the clamping plate inside the first brick folding slot,
Described strut one end is fixed on the second brick folding slot, and the strut other end is pivotally connected the middle part of the first connecting rod, and second
Push rod one end is fixedly connected on the clamping plate inside the second brick folding slot, and the other end of the second push rod is movably connected in the one of first connecting rod
End, one end of the telescopic rod are articulated on sliding block, and the other end of telescopic rod is articulated in the other end of first connecting rod.By above-mentioned
Technical solution, linkage mechanism to move synchronously with the clamping plate in brick folding slot.
As a further improvement on the present invention, bar shaped groove, the other end of second push rod are provided on first connecting rod
It is movably connected in bar shaped groove.Through the above technical solutions, during carrying out pushing or pull on dynamic to clamping plate, bar shaped is logical
Slot makes the second push rod have along bar shaped groove there are one scope of activities, is not stuck or locked.
As a further improvement on the present invention, further include pedestal, column, sliding sleeve and second connecting rod, the two ends of frame body are each
A sliding sleeve is fixed, sliding sleeve is socketed on column, and uprights vertical is fixed on the base, and second connecting rod one end is flexibly connected the cunning
Set, the other end of second connecting rod, which is articulated on sliding block, deviates from first brick folding slot one end.Through the above technical solutions, foundation, column
With the setting of sliding sleeve etc. so that overall structure is more stable, and the clamping of ceramic tile is more effective and stablizes.
As a further improvement on the present invention, two opposite sides of the sliding sleeve are both provided with and are connected to inside sliding sleeve
Guide cylinder, fore-set is both provided with inside two guide cylinders, and one end of second connecting rod is pivotally connected the fore-set.Pass through above-mentioned technical side
The setting of case, fore-set and guide cylinder can increase the friction of sliding sleeve column so that locking is more secured, and structure is more stable.
As a further improvement on the present invention, the frame body is arc frame.Through the above technical solutions, frame body is arc
Frame, the well-balanced beauty of overall structure are stable and compact.
As a further improvement on the present invention, further include guide sleeve, the other end of the first push rod is on the first brick folding slot
Guide sleeve is fixedly connected on the clamping plate inside the first brick folding slot, and second push rod one end passes through the guide sleeve on the second brick folding slot to fix company
It is connected on the clamping plate inside the second brick folding slot.Through the above technical solutions, the first push rod of guide sleeve pair plays limit and guiding role, make
It is more precisely apparent to the effect of clamping plate to obtain the first push rod, the second push rod.
As a further improvement on the present invention, the binding face of the clamping plate and ceramic tile is equipped with elastic rubber fitting.By above-mentioned
On the one hand technical solution, elastic rubber fitting can make clamped ceramic tile from injury, on the other hand ceramic tile can be made to be clamped more secured, most
Elastic rubber fitting the first brick folding slot of compensation and the second brick folding slot inner splint chucking power different to ceramic tile can also be passed through afterwards.
As a further improvement on the present invention, the first brick folding slot moves towards being symmetrically arranged with for both ends along slot and extends outwardly
Extension bar, each second brick folding slot is correspondingly sleeved on by an adjusting rod on extension bar respectively.Pass through above-mentioned technical side
Case, the position-adjustable between the first brick folding slot and the second brick folding slot so that overall structure is more flexible controllable.
As a further improvement on the present invention, the cross section of the first brick folding slot is U-shaped, the cross of the second brick folding slot (8)
Section is U-shaped.Through the above technical solutions, the brick folding slot of U-shaped is more easy to clamp ceramic tile, to complete effective fitting of pairs of ceramic tile.
Advantageous effect of the present invention has:
(1) it can efficiently realize the synchronous fitting to ceramic tile, to form C-shaped ceramic tile face, ceramic tile encirclement is carried out to pipeline etc..
(2) simple and ingenious structure, three brick folding slot middle clamp plates can synchronize ceramic tile under the action of linkage mechanism on folder
Tightly, the trouble with tape-stripping is eliminated, while making tile paste more perfect.
Description of the drawings
Fig. 1 is general assembly structural schematic diagram of the present invention;
Fig. 2 is ceramic tile clamping device upward view of the present invention;
Fig. 3 is sliding sleeve part section structural representation of the present invention.
In figure:1 pedestal;2 columns;3 sliding sleeves;4 arc frames;5 screw rods;6 sliding blocks;7 first brick folding slots;71 extension bars;8 second
Brick folding slot;81 adjusting rods;9 first connecting rods;91 bar shaped grooves;10 clamping plates;11 first push rods;12 telescopic rods;13 guide cylinders;14
Two connecting rods;15 second push rods;16 struts;17 fore-sets;18 guide sleeves.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, ordinary skill staff are obtained all without making creative work
Other embodiment shall fall within the protection scope of the present invention.
- 3 are please referred to Fig.1, the present invention provides a kind of technical solution:
A kind of tile laying multi-panel synchronization bonder, arc frame 4 is semicircular structure, and the two ends of arc frame 4 are solid
There are sliding sleeve 3, arc frame 4 to be socketed on column 2 by sliding sleeve 3, column 2 is vertically fixed on pedestal 1, the middle part of arc frame 4 surely
It is fixedly connected with the first brick folding slot 7, the cross section of the first brick folding slot 7 is U-shaped, and the cross section of the second brick folding slot (8) is U-shaped.First
Brick folding slot 7 moves towards to be symmetrically arranged with outwardly extending extension bar 71 at the U-shaped opening at both ends along slot, and 71 cross section of extension bar is side
Shape, the first brick folding slot 7 and the identical second brick folding slot 8 of two structures are arranged in C fonts, and two the second brick folding slots 8 pass through respectively
Adjusting rod 81 is correspondingly sleeved on the extension bar 71 of 7 both sides of the first brick folding slot and is bolted connection, 7 He of the first brick folding slot
Second brick folding slot, 8 structure it is identical and it is internal be both provided with clamping plate 10, clamping plate 10 is bonded with elastic rubber fitting on the binding face of ceramic tile,
On the one hand elastic rubber fitting is the compensation that clamping plates 10 inside three brick folding slots apply ceramic tile with different clamping forces, be on the other hand for
It reduces clamping plate 10 and cushioning effect is played to the pinch shock of ceramic tile.
As shown in Fig. 2, one end of screw rod 5 is movably connected in the middle part of arc frame 4, the other end of screw rod 5 is perpendicularly oriented to two
The center line between column 2 is organized, is connected through a screw thread sliding block 6 on screw rod 5, two opposite sides of guide sleeve 3 are both provided with and guide sleeve 3
The guide cylinder 13 of inside connection, fore-set 17 is both provided with inside two guide cylinders 13, and 14 one end of second connecting rod passes through pin rod activity
Fore-set 17 is connected, the other end of second connecting rod 14 is movably connected on sliding block 6 on the pin rod of 7 one end of the first brick folding slot.
First push rod, 11 one end is fixed on sliding block 6, and the other end of the first push rod 11 passes through the guide sleeve on the first brick folding slot 7
18 are vertically fixedly connected on the clamping plate 10 inside the first brick folding slot 7;
The lateral surface of two the second brick folding slots 8 is both provided with clamp system, and clamp system includes first connecting rod 9, second pushes away
Bar 15, strut 16, telescopic rod 12, strut 16 are vertically fixed on the lateral surface of the second brick folding slot 8, the middle part activity of first connecting rod 9
It is connected on the pin rod of 16 end point of strut, 15 one end of the second push rod passes through the guide sleeve 18 on the second brick folding slot 8 is vertically fixed to connect
It connects on the clamping plate 10 inside the second brick folding slot 8, the other end of the second push rod 15 is movably connected in by pin rod on first connecting rod 9
Inside bar shaped groove 91, one end of telescopic rod 12 is movably connected on the pin rod at 6 middle part of sliding block, the logical pin of the other end of telescopic rod 12
Bar is movably connected in one end end that first connecting rod 9 is directed toward sliding sleeve 3.
During actually using the invention, between two the second brick folding slots 8 of width adjustment of patch block position
Away from adjustment process is as follows:Unscrew the bolt between adjusting rod 81 and corresponding extension bar 71, regulate two the second brick folding slots 8 it
Between spacing, while adjusting the length of telescopic rod 12, then again revolve the bolt between adjusting rod 81 and corresponding extension bar 71
Tightly;
Before peace turns ceramic tile to the inside of brick folding slot, arc frame 4 is promoted to tile paste position height, then by ceramic tile
Corresponding to be mounted on inside each brick folding slot, as shown in Fig. 2, rotating screw rod 5 forward or backwards, screw rod 5 is driven by screw-driven
Sliding block 6 moves linearly to the left, and moving to left for sliding block 6 drives second connecting rod 14 around second connecting rod 14 and 17 junction of fore-set by pin rod
Rotation, the rotation of second connecting rod 14 apply thrust to fore-set 17, fore-set 17 under the action of guide cylinder 13 to column 2 close to and with
2 contact squeeze of column, the frictional force increased between sliding sleeve 3 and column 2 make sliding sleeve 3 be fixed on column 2;
Sliding block 6 drives the first push rod 11 to synchronize and moves to left while moving to left, the first push rod 11, which synchronizes, to be pushed in the first brick folding slot 7
The clamping plate 10 in portion clamps ceramic tile, also drives telescopic rod 12 around telescopic rod 12 by the pin rod at 6 middle part of sliding block while sliding block 6 moves to left
Rotated with the junction of first connecting rod 9, while telescopic rod 12 rotates to first connecting rod 9 apply thrust drive first connecting rod 9 around
The pin rod of 16 end of strut rotates, according to lever principle, by bar shaped groove 91 to the while first connecting rod 9 rotates
The pin rod of two push rods, 15 end applies thrust and pushes 8 inside clamping plate 10 of the second brick folding slot to the close fitting of ceramic tile, realizes to ceramic tile
Be fixedly clamped, stop operating screw rod 5 when ceramic tile clamping is firm not to be fallen, and then ceramic tile is directed at sticky position by mobile base 1
It sets, and carries out casting cement and yellow sand.
After ceramic tile sizing, reversely or screw rod 5 is rotated forward, screw rod 5 passes through screw-driven band movable slider 6, and straight line moves to the right
Dynamic, moving to right for sliding block 6 drives second connecting rod 14 to be reversely rotated around second connecting rod 14 and 17 junction of fore-set by pin rod, and second connects
The reverse rotation of bar 14 applies pulling force to fore-set 17, and fore-set 17 is under the action of guide cylinder 13 far from column 2, fore-set 17 and column
The effect of power is not generated between 2;
Sliding block 6 drives the first push rod 11 to synchronize and moves to right while moving to right, the first push rod 11, which synchronizes, to be pushed in the first brick folding slot 7
The clamping plate 10 in portion unclamps ceramic tile, also drives telescopic rod 12 around telescopic rod 12 by the pin rod at 6 middle part of sliding block while sliding block 6 moves to right
It is reversely rotated with the junction of first connecting rod 9, applying pulling force to first connecting rod 9 while telescopic rod 12 reversely rotates drives first
Pin rod of the connecting rod 9 around 16 end of strut does reverse rotation motion, logical while first connecting rod 9 reversely rotates according to lever principle
It crosses bar shaped groove 91 pulling force is applied to the pin rod of 15 end of the second push rod and pull 8 inside clamping plate 10 of the second brick folding slot far from ceramic tile,
The effect for not generating power to ceramic tile, clamping plate 10 inside each brick folding slot stop operating screw rod 5 when being kept completely separate with ceramic tile, so
Arc frame 4 is moved up afterwards and releases pedestal 1 so that brick folding slot and ceramic tile separate, and prepare the stickup of next group ceramic tile.
The basic principles, main features and advantages of the present invention have been shown and described above.The technology of the industry
Staff person is described in the above embodiment and specification to be only it should be appreciated that the present invention is not limited to the above embodiments
The preference of the present invention, is not intended to limit the present invention, without departing from the spirit and scope of the present invention, the present invention can also
There are various changes and modifications, these changes and improvements all fall within the protetion scope of the claimed invention.Claimed model
It encloses and is defined by the appending claims and its equivalent thereof.