CN108277924A - The cable tension method of truss string structure - Google Patents

The cable tension method of truss string structure Download PDF

Info

Publication number
CN108277924A
CN108277924A CN201810207885.0A CN201810207885A CN108277924A CN 108277924 A CN108277924 A CN 108277924A CN 201810207885 A CN201810207885 A CN 201810207885A CN 108277924 A CN108277924 A CN 108277924A
Authority
CN
China
Prior art keywords
drag
line
cable tension
rope
string structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810207885.0A
Other languages
Chinese (zh)
Inventor
厉广永
李贤进
陈强
王平
孙家宽
杜磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Permanent Gang Gou Co Ltd In Jiangsu
Original Assignee
Permanent Gang Gou Co Ltd In Jiangsu
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Permanent Gang Gou Co Ltd In Jiangsu filed Critical Permanent Gang Gou Co Ltd In Jiangsu
Priority to CN201810207885.0A priority Critical patent/CN108277924A/en
Publication of CN108277924A publication Critical patent/CN108277924A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of cable tension methods of truss string structure, including step:By engineering design requirements in the assembled good inverted triangle frame of predetermined position;Drag-line is placed to suitable position with reference to the position of the inverted triangle frame, and the cord clip for clamping drag-line is installed in predetermined position;Hauling rope is set according to the placement location of the drag-line, while traction enhancement jack being suitably positioned according to design requirement;The rope head of the drag-line is fixed, hauling rope described in tensioning, while the cord clip is snapped onto into predetermined position, realizes tension operation;Cable tension method safety provided by the invention, take most easily mode to drag-line carry out tensioning, on the one hand can speed up the work, ensure it is consistent with construction speed, another aspect, improve construction efficiency, be worthy to be popularized.

Description

The cable tension method of truss string structure
Technical field
The present invention relates to a kind of cable tension methods of engineering equipment construction field more particularly to truss string structure.
Background technology
It in truss mega project, generally requires and drag-line is set between the both sides span of truss, setting drag-line can be one The construction environment of one safety of offer in degree is provided, meanwhile, there is certain tensioning effect to truss, having landscape condition in this way Under, it is ensured that the stability of truss;But since the span of truss is bigger, the length of drag-line and weight is resulted in increase in this way Add so that the installation process of drag-line becomes abnormal difficult, cause drag-line installation can not mounting design requirement carry out it is accurate Installation, meanwhile, the duration can be also influenced, construction progress is caused to be delayed, construction efficiency is relatively low.
Invention content
It is an object of the invention to for the technical problems in the prior art, provide a kind of drag-line of truss string structure Pulling method, specific technical solution are as follows:
A kind of cable tension method of truss string structure, includes the following steps:
By engineering design requirements in the assembled good inverted triangle frame of predetermined position;
Drag-line is placed to suitable position with reference to the position of the inverted triangle frame, and is installed in predetermined position for clamping drag-line Cord clip;
Hauling rope is set according to the placement location of the drag-line, while traction enhancement jack is placed into conjunction according to design requirement It sets right position;
The rope head of the drag-line is fixed, hauling rope described in tensioning, while the cord clip is snapped onto into predetermined position, realized and open Pulling process.
The collar extension of further improvement of the present invention, the cord clip has been designed to that a changeover portion, the changeover portion are round and smooth shape.
Further improvement of the present invention, the drag-line are implemented to put rope operation by dedicated rope turntable of putting.
Further improvement of the present invention further includes step, installs safe and reliable tension operation platform.
The tension operation of further improvement of the present invention, the drag-line further includes step:
Jack supporting rack, tool pull rod and steel spike are installed at suitable position;
The position that every time drag-line should be pulled to is set, is gradually slowly increased, and be adjusted according to actual conditions.
The stretching process of further improvement of the present invention, the drag-line is implemented by mobile Ping Fache, and is provided with limited The mobile Ping Fache of quantity installs preset distance setting between any two.
In design scheme provided by the invention, a kind of method for stretching of drag-line between large-span truss is provided, choosing is passed through It selects and suitably puts rope turntable and the drag-line platform of hauling rope, cord clip and installing safety, cooperation thousand are set in preset position Equipment, the drag-lines such as jin top, mobile Ping Fache can be installed accurately according to design position, to make drag-line in entire engineering Maximum effect can be played in project;Method letter provided by the invention has prodigious operability, in the work for being related to drag-line In journey project, a kind of quickly and effectively installation method can be provided, to ensure that constructs is normally carried out, is worth promoting.
Description of the drawings
Fig. 1 is the flow diagram of the method for the invention;
Fig. 2 show moulding bed pattern schematic diagram;
Fig. 3 show cable operation platform structure schematic diagram of the present invention.
Indicate explanation:1- tension operations platform, 11- cat ladders, 12- safety barriers, 13- reinforced supports, 14- top braces Bar, 2- inverted triangles mechanism, 21- inverted triangles, 22- columns, 23- moving trolleys.
Specific implementation mode
In order to enable those skilled in the art to better understand the solution of the present invention, below in conjunction in the embodiment of the present invention Attached drawing, technical scheme in the embodiment of the invention is clearly and completely described.Obviously, described embodiment is only A part of the embodiment of the present invention gives presently preferred embodiments of the present invention instead of all the embodiments in attached drawing.The present invention can To realize in many different forms, however it is not limited to embodiment described herein, on the contrary, provide the mesh of these embodiments Be to make the disclosure of the present invention more thorough and comprehensive.Based on the embodiments of the present invention, the common skill in this field The every other embodiment that art personnel are obtained without creative efforts belongs to the model that the present invention protects It encloses.
Refering to fig. 1, in embodiments of the present invention, a kind of cable tension method of truss string structure is provided, the method is used Drag-line in accurately installation steel truss building, specifically includes step:
S1:By engineering design requirements in the assembled good inverted triangle frame of predetermined position;
In conjunction with Fig. 2, in embodiments of the present invention, inverted triangle frame 21 is installed on two columns 22, and is pacified between two columns 22 On a preset pedestal, meanwhile, moving trolley is arranged in the underface of inverted triangle frame, the side of convenient then stretching rope Convenient to operate.
S2:Drag-line is placed to suitable position with reference to the position of the inverted triangle frame, and cord clip is installed in predetermined position;
In embodiment, it again, is considered as special rope turntable of putting since guy cable length is long and puts rope.Putting rope process In, because of the eccentric force of the elasticity and traction generation of rope disk itself, the rotation of rope disk can make to generate acceleration when turntable, cause to dissipate disk, easily Jeopardizing safety of workers, being had to when because putting rope slowly, at the uniform velocity, brake gear is arranged in turntable when necessary;Meanwhile it being put down by Suo Yunzhi After lying under the up-side down triangle arch of assembled forming, cord clip is transported under each corresponding strut node, organizing construction personnel press Installing Cable-clamp position of the original mark on cable body carries out the installation of cord clip.
Preferably, drag-line is implemented to put rope operation by dedicated rope turntable of putting.
Preferably, the collar extension of cord clip is designed to the changeover portion of a round and smooth shape by the embodiment of the present invention, to protect drag-line External protective case, to achieve the effect that extend drag-line service life.
S3:Hauling rope is set according to the placement location of the drag-line, while by traction enhancement jack according to design requirement It is suitably positioned;And fix the rope head of the drag-line, tensioning hauling rope, while cord clip is snapped onto into predeterminated position Place realizes tension operation.
Specifically, since drag-line is long and heavy, and the shape of drag-line is in fish belly shape, according to this feature, the special peace by drag-line The both ends that dress method is thought of as rope screw on drawing head, use steel strand wires as hauling rope, and steel strand wires first penetrate support lug, in truss Both ends pull hauling rope with punching hydraulic jack, complete drag-line and are promoted.
In conjunction with Fig. 3, in embodiments of the present invention, when tensioning drag-line, realized by a tension operation platform 1, a is in figure The vertical view of tension operation platform, b be tension operation platform side view, further, tension operation platform include cat ladder 11, Safety barrier 12, reinforced support 13 and top supporting frame 14;After setting tension operation platform 1, installed at suitable position Jack supporting rack, tool pull rod and steel spike;Meanwhile during tensioning drag-line, using Software of structural computation and analysis into Row auxiliary calculates analysis, least favorable state when rope being selected to draw to design position(Curve radian is minimum)Establish structural model into Row calculates.
In embodiments of the present invention, after the installation of traction enhancement jack is in place, you can tensioning hauling rope carries drag-line It rises;In lifting process, with the target in order to control of the cord clip position among span, when promoting cable body and close to each strut lower end, First the rope head of one end is promoted and introduces in support lug and is fixed with axis pin, and is gradually drawn to the stretching end of rope head;Start purlin Cord clip is connect by the oil pump of frame one end with strut one by one from rope head one end to the other end, promotes cord clip with chain block when necessary, Strut is rotated, cord clip is made to be caught in strut lower end;Meanwhile before tensioning hauling rope, to the key of assembled up-side down triangle arch Point is monitored, and is surveyed and is read initial value, wherein the liftoff height of the distance and terrain clearance and arch peak between two arch springing bearings Degree must survey reading.To monitor the midpoint of rope as key in installation, finely tune at any time.
In embodiment, when cable tension, dual control is carried out to displacement and Suo Li, reaches the control node position that design side proposes It moves and drag-line internal force requires, within the scope of its allowable error;For truss string structure after installation is complete, the stretching end of drag-line should remain can The state of adjusting, to be adjusted when needed to the pulling force of drag-line;Specifically, the stretching process of the drag-line passes through Mobile Ping Fache is implemented, and is provided with the mobile Ping Fache of limited quantity, installs preset distance setting between any two.
In design scheme provided by the invention, a kind of method for stretching of drag-line between large-span truss is provided, choosing is passed through It selects and suitably puts rope turntable and the drag-line platform of hauling rope, cord clip and installing safety, cooperation thousand are set in preset position Equipment, the drag-lines such as jin top, mobile Ping Fache can be installed accurately according to design position, to make drag-line in entire engineering Maximum effect can be played in project;Method letter provided by the invention has prodigious operability, in the work for being related to drag-line In journey project, a kind of quickly and effectively installation method can be provided, to ensure that constructs is normally carried out, is worth promoting.
The foregoing is merely a prefered embodiment of the invention, the scope of the claims of the present invention is not intended to limit, although with reference to aforementioned reality Applying example, invention is explained in detail, still can be to aforementioned each tool for those skilled in the art comes Technical solution recorded in body embodiment is modified, or carries out equivalence replacement to which part technical characteristic.Every profit The equivalent structure made of description of the invention and accompanying drawing content is directly or indirectly used in other related technical areas, Similarly within scope of patent protection of the present invention.

Claims (6)

1. the cable tension method of truss string structure, which is characterized in that include the following steps:
By engineering design requirements in the assembled good inverted triangle frame of predetermined position;
Drag-line is placed to suitable position with reference to the position of the inverted triangle frame, and is installed in predetermined position for clamping drag-line Cord clip;
Hauling rope is set according to the placement location of the drag-line, while traction enhancement jack is placed into conjunction according to design requirement It sets right position;
The rope head of the drag-line is fixed, hauling rope described in tensioning, while the cord clip is snapped onto into predetermined position, realized and open Pulling process.
2. the cable tension method of truss string structure according to claim 1, which is characterized in that the collar extension of the cord clip designs Cheng Youyi changeover portions, the changeover portion are round and smooth shape.
3. the cable tension method of truss string structure according to claim 1, which is characterized in that the drag-line passes through dedicated It puts the implementation of rope turntable and puts rope operation.
4. the cable tension method of truss string structure according to claim 1, which is characterized in that further include step, installation peace Complete reliable tension operation platform.
5. the cable tension method of truss string structure according to claim 1, which is characterized in that the tension operation of the drag-line It further include step:
Jack supporting rack, tool pull rod and steel spike are installed at suitable position;
The position that every time drag-line should be pulled to is set, is gradually slowly increased, and be adjusted according to actual conditions.
6. the cable tension method of truss string structure according to claim 1, which is characterized in that the stretching process of the drag-line Implemented by mobile Ping Fache, and be provided with the mobile Ping Fache of limited quantity, preset distance is installed between any two and is set It is fixed.
CN201810207885.0A 2018-03-14 2018-03-14 The cable tension method of truss string structure Pending CN108277924A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810207885.0A CN108277924A (en) 2018-03-14 2018-03-14 The cable tension method of truss string structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810207885.0A CN108277924A (en) 2018-03-14 2018-03-14 The cable tension method of truss string structure

Publications (1)

Publication Number Publication Date
CN108277924A true CN108277924A (en) 2018-07-13

Family

ID=62809501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810207885.0A Pending CN108277924A (en) 2018-03-14 2018-03-14 The cable tension method of truss string structure

Country Status (1)

Country Link
CN (1) CN108277924A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764517A (en) * 2020-07-14 2020-10-13 陕西建工机械施工集团有限公司 Large-span truss string guiding traction high-altitude cable loading method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102182251A (en) * 2011-04-08 2011-09-14 浙江东南网架股份有限公司 Bottom chord node fastening device of multi-suspend structure and fastening tension method thereof
JP2014139372A (en) * 2013-01-21 2014-07-31 Yamamoto Komuten Co Ltd Gabled roof frame structure
CN105089163A (en) * 2015-06-24 2015-11-25 浙江东南网架股份有限公司 Lower-chord panel point fastening device of crossed truss string structure and fastening tensioning method
CN205475697U (en) * 2016-02-05 2016-08-17 中国航空规划设计研究总院有限公司 It opens string structure to be fit for huge prestressing force of super large span coal yard confined
CN106836497A (en) * 2016-12-22 2017-06-13 浙江精工钢结构集团有限公司 A kind of pair of rope separate type truss string structure and its construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102182251A (en) * 2011-04-08 2011-09-14 浙江东南网架股份有限公司 Bottom chord node fastening device of multi-suspend structure and fastening tension method thereof
JP2014139372A (en) * 2013-01-21 2014-07-31 Yamamoto Komuten Co Ltd Gabled roof frame structure
CN105089163A (en) * 2015-06-24 2015-11-25 浙江东南网架股份有限公司 Lower-chord panel point fastening device of crossed truss string structure and fastening tensioning method
CN205475697U (en) * 2016-02-05 2016-08-17 中国航空规划设计研究总院有限公司 It opens string structure to be fit for huge prestressing force of super large span coal yard confined
CN106836497A (en) * 2016-12-22 2017-06-13 浙江精工钢结构集团有限公司 A kind of pair of rope separate type truss string structure and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764517A (en) * 2020-07-14 2020-10-13 陕西建工机械施工集团有限公司 Large-span truss string guiding traction high-altitude cable loading method

Similar Documents

Publication Publication Date Title
JP3716316B2 (en) Demolition and removal method of arch bridge
CN103321416B (en) Construction method for prestress of cable-stayed grid structure
CN102561788B (en) Guide track series for helicopter assemblage power transmission line iron tower
CN104746883B (en) A kind of arcuate space truss lifts construction method of installation with three machines
CN104264999B (en) A kind of assembling of large-scale Roof Latticed Truss Structure and installation method
CN111140169B (en) Method for assembling small-sized drilling equipment for climbing slope
CN101284628A (en) Hoisting method for framework of large tonnage pressing machine
CN108277924A (en) The cable tension method of truss string structure
CN106758862B (en) Lattice tubular tower and frame peace tears platform open
CN106012841A (en) Cable crane and installation method thereof
CN105781210B (en) A kind of conical tower and its tool section assist punching construction method for lifting whole
CN207760727U (en) A kind of fixing device of circular-sectioned pier safety climbing ladder interface channel
CN203514326U (en) Connection structure of fish-bellied steel truss of foundation pit
CN205294694U (en) Independent gin pole hoist device of movable
CN101074087A (en) Self-raising tower crane
CN202023149U (en) Hanging basket used in construction
CN213417600U (en) Hanging basket protection device for bridge construction
CN212866926U (en) Movable supporting beam dismounting device
CN205369044U (en) Integration prestressing force stretch -draw frame construction
CN209584864U (en) Anchor device after a kind of external hanging type for pushing tow steel truss girder
CN112627045A (en) Hang basket template scissors cat ladder
CN113005909A (en) Construction method for modifying hoisting positioning device by corrugated steel web asynchronous cradle
CN207846233U (en) A kind of holder transverse direction integral translation device
JP5189914B2 (en) Cable crane
CN104533481B (en) Fully mechanized mining face support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180713

RJ01 Rejection of invention patent application after publication