CN108269018A - A kind of enterprises using the labor is made a plan management system - Google Patents
A kind of enterprises using the labor is made a plan management system Download PDFInfo
- Publication number
- CN108269018A CN108269018A CN201810057710.6A CN201810057710A CN108269018A CN 108269018 A CN108269018 A CN 108269018A CN 201810057710 A CN201810057710 A CN 201810057710A CN 108269018 A CN108269018 A CN 108269018A
- Authority
- CN
- China
- Prior art keywords
- module
- plan
- processing unit
- central processing
- network connection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to Techniques of Enterprise Management fields, especially a kind of enterprises using the labor is made a plan management system, including central processing unit, the input terminal of the central processing unit passes through network connection data transmission module output terminal, the input terminal of the data transmission module passes through network connection input module input terminal, input module inputs the work plan of formulation, central processing unit is transferred to by data transmission module again, central processing unit is used for the management of work plan, the output terminal of the central processing unit has data memory module by network connection, planned assignment module, schedule regeneration module and communication module.The present invention can realize the monitoring for situation of doing one's duty to calendar progress, it is ensured that task is implemented completely in time, is formed supervisor's mechanism and feedback mechanism, is established rational rewards and punishments evaluation mode, promote the raising of working efficiency.
Description
Technical field
It makes a plan management system the present invention relates to Techniques of Enterprise Management field more particularly to a kind of enterprises using the labor.
Background technology
No matter either unit or individual, do what, should all have a plan in advance and arrange, will formulate work
Plan.Plan is an important function of management, and every management activity in any tissue all be unable to do without plan.Plan pass through by
The active task of tissue over a period to come is decomposed to each department, link and the individual of tissue, so as to not be only these portions
Door, link and the personal work in the period provide specific foundation.There is work plan, work just has specific target
With specific step, it is possible to coordinate everybody action, enhance the initiative of work, reduce blindness, make work without any confusion
Ground carries out.Meanwhile plan is the appraisal standards to job schedule and quality again in itself, has stronger constraint to everybody and supervises work
With.So planning to the existing directive function that works, and there is impetus, do work plan well, be to establish normal order of work,
Improve the important means of working efficiency.But increasing now with work plan, planned assignment go down after not there are one
The process that good supervision progress is done one's duty, it is impossible to ensure that each department's post basic duty item is implemented in time with major tasks item
In place.
Invention content
The purpose of the present invention is to solve existing in the prior art the shortcomings that process of supervision is poor, and a kind of enterprise proposed
System is managed with work plan.
To achieve these goals, present invention employs following technical solutions:
It designs a kind of enterprises using the labor to make a plan management system, including central processing unit, the input terminal of the central processing unit passes through
Network connection data transmission module output terminal, the input terminal of the data transmission module are inputted by network connection input module
End, input module inputs the work plan of formulation, then is transferred to central processing unit, centre by data transmission module
The management that device is used for work plan is managed, the output terminal of the central processing unit has data memory module, plan by network connection
Distribution module, schedule regeneration module and communication module, the output terminal network connection plan execution module of the planned assignment module
Module input is submitted in input terminal, the output terminal network connection plan of the plan execution module, and module is submitted in the plan
Output terminal and central processing unit network connection, planned assignment module is practicable to being allocated for work plan, plans execution module
The progress performed for employee to be checked to plan, plan are submitted module and are submitted for that will perform the plan completed, schedule regeneration module
For the work plan that timely updates, job schedule or work change situation are conveniently checked, while the data of change are stored into number
According in memory module, the information for the change that works is passed to and performs employee by communication module, so as to fulfill work promptness, is avoided out
Existing unnecessary loss, by the planned database of network connection, plan database is used to store number the data memory module
According to the work plan inside memory module.
Preferably, the central processing unit has enquiry module by network connection, and enquiry module is used for inquiry plan data
Work plan in library, and return to query result.
Preferably, the central processing unit has display module by network connection, and display module is used to show work plan
Progress and alteration.
Preferably, the central processing unit has data statistics module by network connection, can be with by data statistics module
Easily count performance level of the employee to work plan.
Preferably, the central processing unit has performance appraisal module by network connection, can be with by performance appraisal module
Work plan is completed and unfinished employee carries out rewards and punishments processing, so as to improve enthusiasm of the employee to work.
Preferably, the communication module includes Advise By Wire module and short massage notice module, by Advise By Wire module and
Short massage notice module helps the work plan of change notifying related personnel in time, staff is made to do work plan
Go out correct adjustment, effectively avoid the economic loss of company.
Preferably, the central processing unit has resource configuration module by network connection, and the resource configuration module includes
Personnel depaly module, fund configuration module and apparatus configuration module, by resource configuration module to outfit required for work plan
Personnel, fund and apparatus be allocated.
A kind of enterprises using the labor proposed by the present invention is made a plan management system, and advantageous effect is:The present invention can be realized to work
The progress of making a plan is done one's duty the monitoring of situation, it is ensured that task is implemented completely in time, is formed supervisor's mechanism and feedback mechanism, is established conjunction
The rewards and punishments evaluation mode of reason, promotes the raising of working efficiency.
Description of the drawings
Fig. 1 is that a kind of enterprises using the labor proposed by the present invention is made a plan the system block diagram of management system;
Fig. 2 is that a kind of enterprises using the labor proposed by the present invention is made a plan the communication module system block diagram of management system;
Fig. 3 is that a kind of enterprises using the labor proposed by the present invention is made a plan the resource configuration module system block diagram of management system.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.
With reference to Fig. 1-3, a kind of enterprises using the labor is made a plan management system, including central processing unit, the input of central processing unit
End is inputted by network connection data transmission module output terminal, the input terminal of data transmission module by network connection input module
End, input module inputs the work plan of formulation, then is transferred to central processing unit, centre by data transmission module
The management that device is used for work plan is managed, the output terminal of central processing unit has data memory module, planned assignment by network connection
Module, schedule regeneration module and communication module, the output terminal network connection plan execution module input terminal of planned assignment module, meter
Module input is submitted in the output terminal network connection plan for drawing execution module, and the output terminal and central processing unit of module are submitted in plan
Network connection, planned assignment module are practicable to being allocated for work plan, and plan execution module is used to check that employee's plan is held
Capable progress, plan submit module to be used to that the plan submission completed will to be performed, and schedule regeneration module is based on the work that timely updates
It draws, conveniently checks job schedule or work change situation, while the data of change are stored into data memory module, communicate mould
The information for the change that works is passed to and performs employee by block, so as to fulfill work promptness, avoids the occurrence of unnecessary loss, data
Memory module is by the planned database of network connection, and plan database is by storing based on the work inside data memory module
It draws.
Central processing unit has enquiry module by network connection, and enquiry module is based on the work in inquiry plan database
It draws, and returns to query result.
Central processing unit has display module by network connection, and display module is used to show progress and the change of work plan
Situation.
Central processing unit has data statistics module by network connection, can easily be counted by data statistics module
Employee is to the performance level of work plan.
Central processing unit has performance appraisal module by network connection, can be complete to work plan by performance appraisal module
Into with unfinished employee rewards and punishments processing is carried out, so as to improve enthusiasm of the employee to work.
Communication module includes Advise By Wire module and short massage notice module, passes through Advise By Wire module and short massage notice mould
Block helps the work plan of change notifying related personnel in time, staff is made to make correct tune to work plan
It is whole, effectively avoid the economic loss of company.
Central processing unit has resource configuration module by network connection, and resource configuration module includes personnel depaly module, money
Golden configuration module and apparatus configuration module, by resource configuration module to the personnel, fund and the use that are equipped with required for work plan
Tool is allocated.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto,
Any one skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its
Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.
Claims (7)
- The management system 1. a kind of enterprises using the labor is made a plan, including central processing unit, which is characterized in that the central processing unit it is defeated Enter end by network connection data transmission module output terminal, the input terminal of the data transmission module inputs mould by network connection Block input terminal, input module inputs the work plan of formulation, then is transferred to central processing unit by data transmission module, Central processing unit is used for the management of work plan, and the output terminal of the central processing unit has data to store mould by network connection Block, planned assignment module, schedule regeneration module and communication module, the output terminal network connection plan of the planned assignment module are held Module input is submitted in row module input, the output terminal network connection plan of the plan execution module, and the plan is submitted The output terminal of module and central processing unit network connection, planned assignment module is practicable to being allocated for work plan, and plan is held Row module is used to check the progress that employee plans execution, and plan submits module to be used to that the plan submission completed will to be performed, and plan is more New module conveniently checks job schedule or work change situation, while the data of change are deposited for the work plan that timely updates Store up into data memory module, communication module by work change information pass to perform employee, so as to fulfill work promptness, Unnecessary loss is avoided the occurrence of, the data memory module is used for by the planned database of network connection, plan database Store the work plan inside data memory module.
- The management system 2. a kind of enterprises using the labor according to claim 1 is made a plan, which is characterized in that the central processing unit There is enquiry module by network connection, enquiry module is used for the work plan in inquiry plan database, and returns to query result.
- The management system 3. a kind of enterprises using the labor according to claim 1 is made a plan, which is characterized in that the central processing unit There is display module by network connection, display module is used to show the progress and alteration of work plan.
- The management system 4. a kind of enterprises using the labor according to claim 1 is made a plan, which is characterized in that the central processing unit There is data statistics module by network connection, employee can easily be counted to the complete of work plan by data statistics module Into degree.
- The management system 5. a kind of enterprises using the labor according to claim 1 is made a plan, which is characterized in that the central processing unit Have performance appraisal module by network connection, work plan can be completed by performance appraisal module and unfinished employee into Row rewards and punishments are handled, so as to improve enthusiasm of the employee to work.
- The management system 6. a kind of enterprises using the labor according to claim 1 is made a plan, which is characterized in that the communication module packet Advise By Wire module and short massage notice module are included, by Advise By Wire module and short massage notice module, is contributed to the work of change It makes a plan and notifies related personnel in time, staff is made to make correct adjustment to work plan, effectively avoids company Economic loss.
- The management system 7. a kind of enterprises using the labor according to claim 1 is made a plan, which is characterized in that the central processing unit There is resource configuration module by network connection, the resource configuration module includes personnel depaly module, fund configuration module and use Have configuration module, the personnel, fund and the apparatus that are equipped with required for work plan are allocated by resource configuration module.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810057710.6A CN108269018A (en) | 2018-01-22 | 2018-01-22 | A kind of enterprises using the labor is made a plan management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810057710.6A CN108269018A (en) | 2018-01-22 | 2018-01-22 | A kind of enterprises using the labor is made a plan management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108269018A true CN108269018A (en) | 2018-07-10 |
Family
ID=62776214
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810057710.6A Pending CN108269018A (en) | 2018-01-22 | 2018-01-22 | A kind of enterprises using the labor is made a plan management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108269018A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109284977A (en) * | 2018-09-10 | 2019-01-29 | 宋卫 | A method of plan is managed using social means in software, is supervised |
CN116797084A (en) * | 2023-06-16 | 2023-09-22 | 广东铭太信息科技有限公司 | Digital supervision and assessment system and method |
CN116894639A (en) * | 2023-07-14 | 2023-10-17 | 重庆满惠网络科技有限公司 | Multi-information fusion plan management system and method for Internet of things |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1484180A (en) * | 2002-09-17 | 2004-03-24 | 英业达股份有限公司 | Work progress rate management method and system |
US20040083118A1 (en) * | 2002-06-21 | 2004-04-29 | Atul Thakkar | System and method for an event planner |
CN101271548A (en) * | 2008-04-22 | 2008-09-24 | 盛中华 | Distributed multimedia task management system based on workflow and its implementing method |
CN101789965A (en) * | 2010-01-07 | 2010-07-28 | 广东三和管桩有限公司 | Production management system based on WiFi and Windows Mobile |
CN102708460A (en) * | 2012-05-18 | 2012-10-03 | 苏州万图明电子软件有限公司 | Remote enterprise management system |
CN103136618A (en) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | On-line management method for project progress plan |
CN104636889A (en) * | 2015-03-10 | 2015-05-20 | 刘升 | Personnel information comprehensive management system |
CN105096047A (en) * | 2015-07-30 | 2015-11-25 | 国网青海省电力公司 | Overall process task control and assessment system and realization method thereof |
CN105574662A (en) * | 2015-12-11 | 2016-05-11 | 芜湖乐锐思信息咨询有限公司 | Work performance evaluation system |
CN105956778A (en) * | 2016-05-06 | 2016-09-21 | 长沙市麓智信息科技有限公司 | Work schedule management system and management method thereof |
CN107346467A (en) * | 2017-06-01 | 2017-11-14 | 广西群创科技有限公司 | A kind of work plan management system |
-
2018
- 2018-01-22 CN CN201810057710.6A patent/CN108269018A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040083118A1 (en) * | 2002-06-21 | 2004-04-29 | Atul Thakkar | System and method for an event planner |
CN1484180A (en) * | 2002-09-17 | 2004-03-24 | 英业达股份有限公司 | Work progress rate management method and system |
CN101271548A (en) * | 2008-04-22 | 2008-09-24 | 盛中华 | Distributed multimedia task management system based on workflow and its implementing method |
CN101789965A (en) * | 2010-01-07 | 2010-07-28 | 广东三和管桩有限公司 | Production management system based on WiFi and Windows Mobile |
CN103136618A (en) * | 2011-11-29 | 2013-06-05 | 北京建龙重工集团有限公司 | On-line management method for project progress plan |
CN102708460A (en) * | 2012-05-18 | 2012-10-03 | 苏州万图明电子软件有限公司 | Remote enterprise management system |
CN104636889A (en) * | 2015-03-10 | 2015-05-20 | 刘升 | Personnel information comprehensive management system |
CN105096047A (en) * | 2015-07-30 | 2015-11-25 | 国网青海省电力公司 | Overall process task control and assessment system and realization method thereof |
CN105574662A (en) * | 2015-12-11 | 2016-05-11 | 芜湖乐锐思信息咨询有限公司 | Work performance evaluation system |
CN105956778A (en) * | 2016-05-06 | 2016-09-21 | 长沙市麓智信息科技有限公司 | Work schedule management system and management method thereof |
CN107346467A (en) * | 2017-06-01 | 2017-11-14 | 广西群创科技有限公司 | A kind of work plan management system |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109284977A (en) * | 2018-09-10 | 2019-01-29 | 宋卫 | A method of plan is managed using social means in software, is supervised |
CN116797084A (en) * | 2023-06-16 | 2023-09-22 | 广东铭太信息科技有限公司 | Digital supervision and assessment system and method |
CN116894639A (en) * | 2023-07-14 | 2023-10-17 | 重庆满惠网络科技有限公司 | Multi-information fusion plan management system and method for Internet of things |
CN116894639B (en) * | 2023-07-14 | 2024-02-02 | 重庆满惠网络科技有限公司 | Multi-information fusion plan management system and method for Internet of things |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108269018A (en) | A kind of enterprises using the labor is made a plan management system | |
CN109784781A (en) | A kind of project management system served as theme with project progress, method and storage medium | |
CN104200334B (en) | A kind of mass-rent project management control system and method based on SaaS patterns | |
CN108932589A (en) | A kind of IT application in enterprises project implementation management system | |
CN102347983A (en) | ESB (Enterprise Service Bus) system in SOA (Service-Oriented Architecture) | |
CN109063153A (en) | The search system and method for bottom-up optimization | |
CN109118350A (en) | Financial accounting business packed transaction adaptive device and system | |
CN114037311A (en) | Information system engineering supervision project risk assessment method | |
CN110472864A (en) | A kind of enterprise information management system based on cloud computing platform | |
CN110084485B (en) | Park-associated enterprise incubation management method | |
CN110599041A (en) | Enterprise target management method, cloud and system based on artificial intelligence technology | |
CN108428061A (en) | Intelligent Tenders Decision system based on DEA-GA-BP and tender Evaluation Method | |
CN109255528A (en) | Identify industry production management system | |
CN109784789A (en) | Mine business cooperation job control method, device, system and storage medium | |
CN110390487A (en) | A kind of technological project management system applied to medium-sized and small enterprises | |
CN106952045A (en) | Standardized information management system and information management method | |
CN107403308A (en) | Data managing method, system, computer-readable recording medium and computer equipment | |
CN116630082A (en) | Method and device for allocating production resources, electronic equipment and storage medium | |
CN105184460A (en) | Patent application management system based on enterprise management system | |
CN110264075A (en) | A kind of highway workflow management control method and system | |
Alzaben et al. | Maintenance planning in a saudi arabian hospital | |
CN109960231A (en) | A kind of production management system and its method based on Internet of Things | |
CN111008766A (en) | Public building operation quality management system and method based on PDCA and target decomposition | |
CN107194199A (en) | Pharmacist's networked services method and system | |
CN111667251A (en) | Salary issuing method and device based on real-name system attendance data |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180710 |