CN107403308A - Data managing method, system, computer-readable recording medium and computer equipment - Google Patents
Data managing method, system, computer-readable recording medium and computer equipment Download PDFInfo
- Publication number
- CN107403308A CN107403308A CN201710666914.5A CN201710666914A CN107403308A CN 107403308 A CN107403308 A CN 107403308A CN 201710666914 A CN201710666914 A CN 201710666914A CN 107403308 A CN107403308 A CN 107403308A
- Authority
- CN
- China
- Prior art keywords
- user
- level authority
- mark
- data
- working condition
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/105—Human resources
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/10—File systems; File servers
- G06F16/17—Details of further file system functions
- G06F16/1734—Details of monitoring file system events, e.g. by the use of hooks, filter drivers, logs
Abstract
The present invention relates to a kind of data managing method, system, computer-readable recording medium and computer equipment, user's mark and user right corresponding to resolve user identity are obtained first, user right includes one-level authority and two level authority, and the Permission Levels of two level authority are higher than the Permission Levels of the one-level authority;Gather daily record data corresponding to user's mark of preset term overall planning data and one-level authority;The working condition grade of user's mark of one-level authority is obtained according to daily record data, and the working condition grade that the user of one-level authority is identified is sent to component belonging to user's mark of two level authority;The working condition grade and preset term overall planning data identified according to the user of one-level authority, the work plan of user's mark of one-level authority is determined by component belonging to user's mark of two level authority, such data managing method without staff's manual analyzing due to calculating, the live load of staff can thus be mitigated, lift operating efficiency.
Description
Technical field
The present invention relates to technical field of information management, more particularly to a kind of data managing method, system, computer-readable
Storage medium and computer equipment.
Background technology
With developing rapidly for human resources management theory and management practice, the professional level of human resource management carries
Rise be human resource management function expand and in-depth key, in the specialized lifting process of human resources, data analysis and
Management plays vital role.
Human resources are the final bases of national wealth, and capital and resource are passive production factors, and people is to build up capital,
Develop natural resources, establish society, economic and politics and the leading force for promoting country to advance, human resources and sent out in society
Important role is all act as in all previous change of exhibition, occupies highly important position, compared with other types of resource, people
Power resource is of crucial importance extremely valuable, therefore the country of innovative development all attaches great importance to the exploitation of human resources in the world
And utilization, as the important impetus that can promote country's progress and development.Human resources are to refer to promote society
It can be able to be brain worker and the general name of physical labourer of social creativity wealth, form human resources simultaneously with economic development
The cumulative of simple manpower quantity, and refer in it the values of labourer, level of skill and knowledge deposit.People
Although important resource, how rationally appropriate this resource of utilization, creates the wealth for the development of enterprise.
Traditional human resource data management belongs to labor management, and the work of personnel management personnel includes daily complicated letter
Typing work is ceased, because population in the world increases and department service extension, business scale, staff size are in up-trend, occurrences in human life
The pressure of department is increasing, and live load is increasingly heavy, and artificial amount of calculation is big, and operating efficiency is not high.
The content of the invention
Based on this, it is necessary in view of the above-mentioned problems, provide a kind of data managing method for improving operating efficiency, system,
Computer-readable recording medium and computer equipment.
A kind of data managing method, including step:
Obtain user's mark and user right corresponding to resolve user identity, user right include one-level authority and two level
Authority, the Permission Levels of two level authority are higher than the Permission Levels of one-level authority;
Gather daily record data corresponding to user's mark of preset term overall planning data and one-level authority;
The working condition grade of user's mark of one-level authority is obtained according to daily record data, and the user of one-level authority is marked
The working condition grade of knowledge is sent to component belonging to user's mark of two level authority;
The working condition grade and preset term overall planning data identified according to the user of one-level authority, passes through two level
Component belonging to user's mark of authority determines the work plan data of user's mark of one-level authority.
A kind of computer-readable recording medium, is stored thereon with computer program, and the program is realized when being executed by processor
The step of above method.
A kind of computer equipment, including memory, processor and storage can be run on a memory and on a processor
Computer program, the step of realizing the above method during computing device program.
Above-mentioned data managing method, computer-readable recording medium and computer equipment, user's mark is obtained first simultaneously
User right corresponding to resolve user identity, user right include one-level authority and two level authority, the authority level of two level authority
Not Gao Yu one-level authority Permission Levels;Corresponding to the user's mark for gathering preset term overall planning data and one-level authority
Daily record data;The working condition grade that the user of one-level authority identifies is obtained according to daily record data, and by the user of one-level authority
The working condition grade of mark is sent to component belonging to user's mark of two level authority;The work identified according to the user of one-level authority
Make state grade and preset term overall planning data, one-level authority is determined by component belonging to user's mark of two level authority
User mark work plan data, such data managing method due to without staff's manual analyzing calculate, thus
The live load of staff can be mitigated, improve operating efficiency.
A kind of data management system, including:
User identity resolution module, for obtaining user's mark and user right, Yong Huquan corresponding to resolve user identity
Limit includes one-level authority and two level authority, and the Permission Levels of two level authority are higher than the Permission Levels of one-level authority;
Data acquisition module, for gathering corresponding to user's mark of preset term overall planning data and one-level authority
Daily record data;
Working condition grade acquisition module, the working condition that the user for obtaining one-level authority according to daily record data identifies
Grade, and the working condition grade that the user of one-level authority is identified is sent to component belonging to user's mark of two level authority;
Work plan determining module, for the working condition grade and preset term identified according to the user of one-level authority
Overall planning data, the work plan number of user's mark of one-level authority is determined by component belonging to user's mark of two level authority
According to.
Above-mentioned data management system, including:User identity resolution module, for obtaining user's mark and resolve user identity
Corresponding user right, user right include one-level authority and two level authority, and the Permission Levels of two level authority are weighed higher than one-level
The Permission Levels of limit;Data acquisition module, the user for gathering preset term overall planning data and one-level authority identify
Corresponding daily record data;Working condition grade acquisition module, the user for obtaining the one-level authority according to daily record data mark
The working condition grade of knowledge, and the working condition grade that the user of one-level authority is identified is sent to user's mark of two level authority
Affiliated component;Work plan determining module, for the working condition grade identified according to the user of one-level authority and default item
Mesh overall planning data, the work plan of user's mark of one-level authority is determined by component belonging to user's mark of two level authority
Data, such data management system can mitigate the work of staff due to being calculated without staff's manual analyzing
Make load, improve operating efficiency.
Brief description of the drawings
Fig. 1 is the schematic flow sheet of data managing method in one embodiment;
Fig. 2 is the structural representation of data management system in one embodiment;
Fig. 3 is the structural representation of data management system in one embodiment.
Embodiment
As shown in figure 1, a kind of data managing method, including step:
S100, obtain user mark and user right corresponding to resolve user identity, user right include one-level authority with
And two level authority, the Permission Levels of two level authority are higher than the Permission Levels of one-level authority.
User's mark is set to distinguish different users, and user right refers to that user identifies allowed operation,
For example in enterprise, each employee can correspond to user's mark, keeper identifies to different users and sets different use
Family authority, user right can include one-level authority and two level authority, and the Permission Levels of two level authority are higher than the power of one-level authority
Rank is limited, can be specifically that the Permission Levels of one-level authority can only fill in the related data information of oneself, Wu Facha as requested
Other people information is seen, and the Permission Levels of two level authority can then check the data message of the mark of each user after collecting, with
Just work is planned as a whole.
S200, gather daily record data corresponding to user's mark of preset term overall planning data and one-level authority.
Import preset term overall planning data, such as the quantized data of the specific works content of some project, daily record number
According to each user is referred to periodically according to daily record template completion action, regularly the time can be work on a daily or weekly basis
Content includes the information such as the time of each task completion, the cost completed.
S300, the working condition grade that the user of one-level authority identifies is obtained according to daily record data, and by one-level authority
The working condition grade of user's mark is sent to component belonging to user's mark of two level authority.
Analyzed from the daily record data of each user of collection, the working condition grade of each user is obtained, specifically, according to day
The step of working condition grade that the user that will data obtain one-level authority identifies, includes:
Extract the predetermined keyword in daily record data and key message numerical value corresponding with predetermined keyword;
By key message numerical value compared with the preset value of key message numerical value, user's mark of one-level authority is obtained
Working condition grade.
Predetermined keyword can be task A deadline, task A completion cost, and key message numerical value can be appointed
It is engaged in A specific deadline, such as 1.5 days, task A specific completion cost, such as the specific how many fund of human cost, material resources
The specific how many fund of cost.It is after extracting key message numerical value, key message numerical value is corresponding with key message numerical value pre-
If value is compared, the working condition grade for the user's mark for drawing one-level authority, working condition grade can include outstanding, good
Good, qualified and unqualified four kinds of grades, such as the values of task A deadline include:[- 2 days 1 day], [2 days-
4 days], [- 6 days 4 days], [one week or more], it is outstanding to represent within [- 2 days 1 day] that task A is completed, represents within [- 4 days 2 days] that task A is completed
Well, represent within [- 6 days 4 days] that task A completions are qualified, it is unqualified to represent within [one week or more] that task A is completed, by task A completion
Time carries out matching comparison with preset range, the completion status feedback for the A that must go out on missions.The work shape of user's mark of one-level authority
State grade can integrate several dimensions and consider, for example can complete cost with comprehensive task deadline and task, can be specifically
It is good or outstanding that task completion time and task, which complete cost, then it is assumed that the working condition grade of the user belongs to good level
Not, and by the working condition grade of the user of single one-level authority send to the user of two level authority, so as to two level authority
The progress of user's overall planning project and the work for preferably arranging each primary user.
S400, the working condition grade and preset term overall planning data identified according to the user of one-level authority, lead to
Component belonging to crossing user's mark of two level authority determines the work plan data of user's mark of one-level authority.
Preset term overall planning data refer to complete the various information required for a certain project, for example complete a certain project
Need the employee of rear-service department how many, how many of the employee of technology department, Network Dept. employees how much, and the project specifically includes
Buying link, research and development link etc..
The working condition grade and preset term overall planning data identified according to the user of one-level authority, passes through two level
Component belonging to user's mark of authority determines that the step of work plan data of user's mark of one-level authority can specifically include:
Information and real-time cost information are consumed when the working condition grade identified according to the user of one-level authority obtains real-time;
Consume when obtaining default total in preset term overall planning and preset totle drilling cost;
According to it is real-time when consume information, real-time cost information, it is default total when consume and preset totle drilling cost, pass through two level authority
Component belonging to user's mark determines the work plan data of user's mark of one-level authority.
For example a project includes task A links, task A needs the users of multiple one-level authorities to have shared out the work and helped one another
Into after the working condition grade of the plurality of user is obtained, the tool of unique user can be known from their working condition grade
Information and cost information are consumed during body, then in conjunction with being consumed when presetting total and presetting totle drilling cost, to the user's distribution for completing task A
Different workload so that task efficient quality guaranteeing complete.
A kind of computer-readable recording medium, is stored thereon with computer program, and the program is realized when being executed by processor
The step of above method.
A kind of computer equipment, including memory, processor and storage can be run on a memory and on a processor
Computer program, the step of realizing the above method during computing device program.
Above-mentioned data managing method, computer-readable recording medium and computer equipment, user's mark is obtained first simultaneously
User right corresponding to resolve user identity, user right include one-level authority and two level authority, the authority level of two level authority
Not Gao Yu the one-level authority Permission Levels;Gather user's mark pair of preset term overall planning data and one-level authority
The daily record data answered;The working condition grade that the user of one-level authority identifies is obtained according to daily record data, and by one-level authority
The working condition grade of user's mark is sent to component belonging to user's mark of two level authority;Identified according to the user of one-level authority
Working condition grade and preset term overall planning data, one-level is determined by component belonging to the user of two level authority mark
Authority user mark work plan, such data managing method due to without staff's manual analyzing calculate, thus
The live load of staff, raising operating efficiency, and the user of two level authority can be mitigated because Permission Levels are higher than one-level
The user of authority, the work plan data of the user of each one-level authority can be determined by the user of two level authority, so as to two level
User's overall arrangement work of authority.
In one embodiment, the work of user's mark of one-level authority is obtained in data managing method according to daily record data
Also include after the step of state grade:
The working condition grade identified according to the user of one-level authority, phase is extracted from default operating condition rank list
The working condition grade feedback information answered, and by working condition grade feedback information send to one-level authority user mark belonging to
Component.
For example user A working condition grade belongs to good levels, the good levels in default operating condition rank list
Working condition grade corresponding to working condition grade feedback information be that the completion that works at this stage is pretty good, keep punching;And if
User B working condition grade belongs to unqualified rank, then in default operating condition table of grading unqualified rank work shape
Working condition grade feedback information corresponding to state grade is then to work to complete bad, it is necessary to refuel at this stage, passes through working condition
Grade feedback information, the work incentive of one-level authority user can be lifted.Specifically, working condition grade feedback information may be used also
To complete task A, task B etc. situation in real time including specifically some specific tasks performances, such as user A and preset
Completion task A, task B situation, by such working condition grade feedback information each one-level authority can be helped to understand work
Make progress, improve operating efficiency.
In one embodiment, in data managing method according to the user of one-level authority identify working condition grade and
Preset term overall planning data, the work of user's mark of one-level authority is determined by component belonging to user's mark of two level authority
Also include after the step of data of making a plan:
Work plan data are accordingly sent to component belonging to user's mark of one-level authority.
The user of two level authority grasps composition item according to the task schedule and project aggregate scheduling of one-level authority user
The when consumption and cost of each task of purpose, summarizes advantage and deficiency, corresponding work plan is formulated in adjustment, and specifically implements to each one
The user of level authority, sends its corresponding work plan, so not only may insure that project efficiently ensures to complete, and can also give one
The user of level authority provides operative orientation.
In one embodiment, as shown in Fig. 2 a kind of data management system includes:
User identity resolution module 100, for obtaining user's mark, and user right corresponding to resolve user identity, use
Family authority includes one-level authority and two level authority, and the Permission Levels of two level authority are higher than the Permission Levels of one-level authority;
Data acquisition module 200, for gathering user's mark pair of preset term overall planning data and one-level authority
The daily record data answered;
Working condition grade acquisition module 300, the work that the user for obtaining one-level authority according to daily record data identifies
State grade, and the working condition grade that the user of one-level authority is identified is sent to group belonging to user's mark of two level authority
Part;
Work plan determining module 400, for the working condition grade identified according to the user of one-level authority and preset
Project overall planning data, the work meter of user's mark of one-level authority is determined by component belonging to user's mark of two level authority
Draw data.
Above-mentioned data management system, including:User identity resolution module 100, identify for obtaining user and parse user
User right corresponding to mark, user right include one-level authority and two level authority, and the Permission Levels of two level authority are higher than one
The Permission Levels of level authority;Data acquisition module 200, for gathering the use of preset term overall planning data and one-level authority
Daily record data corresponding to the mark of family;Working condition grade acquisition module 300, for obtaining the one-level authority according to daily record data
User's mark working condition grade, and the working condition grade that the user of one-level authority is identified is sent to two level authority
Component belonging to user's mark;Work plan determining module 400, for the working condition grade identified according to the user of one-level authority
And preset term overall planning data, the user for determining one-level authority by component belonging to user's mark of two level authority identify
Work plan data, such data management system thus can mitigate work due to being calculated without staff's manual analyzing
Make the live load of personnel, improve operating efficiency, and the user of two level authority is higher than the user of one-level authority due to Permission Levels,
The work plan data of the user of each one-level authority can be determined by the user of two level authority, are united so as to the user of two level authority
Raise and arrange work.
In one embodiment, working condition grade acquisition module includes in data management system:
Feature extraction unit, for extracting predetermined keyword and key corresponding with predetermined keyword in daily record data
Information value;
Characteristics comparing unit, for compared with the preset value of key message numerical value, key message numerical value to be obtained into one
The working condition grade of user's mark of level authority.
In one embodiment, work plan determining module includes in data management system:
Real-time signal analysis unit, the working condition grade for being identified according to the user of one-level authority consume when obtaining real-time
Information and real-time cost information;
Presupposed information acquiring unit, consume during for obtaining default total in preset term overall planning data and default total
Cost;
Work plan generation unit, for according to it is real-time when consume information, real-time cost information, it is default total when consume and default
Totle drilling cost, the work plan data of user's mark of one-level authority are determined by component belonging to user's mark of two level authority.
In one embodiment, as shown in figure 3, a kind of data management system includes salary management module, action mould
Block, log management module, task scheduling module, performance indicators library module, performance management module and analysis module, wherein wage
Management module is used for the wage information for importing employee, and cost information is provided in analysis module;Action module is used to manage
Post specification, to post specification arrange and input system forms action, and department content can be carried out
Distribution, individual can be operated the customization of content while department content is inherited;Log management module is used for daily record
Fill in, check, reflecting on oneself and data summarization, for when consumption cost analysis basic data is provided;Task scheduling module user is to employee's
Task scheduling is managed and given a mark, and director carries out Task Progress maintenance, and person approving exercises supervision to Task Progress and to appointing
Result of being engaged in marking;Performance indicators library module is used for the index for managing non-procedural, the index that corresponding existing most of company uses
System, higher level enter the distribution of row index to subordinate;Performance management module is used to carry out subordinate performance marking, and main data are come
Two parts are come from, a part is the task score of task scheduling module, and this is the process point quantified, and a part is performance indicators storehouse
The score of specific targets, this is the index score obtained from outside, and two parts data determine final performance score;Analysis module
The analysis to process, including when consume cost analysis, task scheduling progress analysis, task performance scoring analysis and performance analysis.
When consume cost analysis from each granularity and dimension to analyze when consume cost, mainly from company's entirety, department, project and the grain of individual
Degree, the analysis of cost is consumed during progress;Task scheduling progress analysis provides the management of real-time monitor task target advance to manager
Instrument, task performance scoring analysis then obtains Performance Rating data in real time by task scheduling score, process and fructufy
When be combined together;And the Performance Rating of employee is then conveniently checked by performance analysis.More specifically, can be according to daily record pipe
Manage module, the business activities of enterprise are analyzed with the activity-based cost analysis method in financial field, with reference to importing human capital into
Notebook data, judge whether the business activities of enterprise are reasonable and valuable, meanwhile, employee can also manage while daily record is filled in
Manage the time of oneself, the daily record that Comprehensive Correlation has been filled in the past, introspect whether current arrangement is reasonable, and whether adjustment order can carry
High efficiency and lifting work quality.The design concept of task scheduling module is the implementation capacity of enterprise, helps manager to work
Make a plan applied, distributed, importance ranking, the module of prompting and progress chasing, subordinate can directly submit plan of application,
Higher level's examination & verification is by plan and then is implemented;At the same time, higher level can assign a task to subordinate at any time, and check down at any time
Belong to the schedule of all tasks, and then the newest progress of real-time tracking task, the setting of task scheduling can be realized to the shape that works
State is clear fingers and palms, reduces invalid communication, improves operating efficiency;And performed by the subdivision of task, the proceduring pipe of result index
Reason, will qualitatively indices quantification.Performance indicators library module and performance management module are according to the performance appraisal of quantization, by above
The tracking of task, directly having terminated for task is given a mark at any time, result index to be fused into process in managing
In, the evaluation to task result directly serves in performance appraisal;Given a mark evaluation and accreditation to employee work achievement by performance,
Employee work is encouraged, employee is experienced sense of work accomplishment, strengthens responsibility consciousness, moulds professional behavior, one is provided for employee
Fair performance management platform, employee is allowed to improve performance by examination, build the external rings that an excitation employee strives to make progress
Border, by the result of appraisal it can be found that the strong point of employee is with insufficient, so as to provide direction to enterprises ' training.When to every member
After the performance appraisal of work is completed, the analysis of entirety can be carried out in analytical table, so can to the overall strength of department and
Employee's ability height has a comprehensive understanding.By analysis module can obtain project when consumption and human cost, department
Consumption and cost during work, manager can from job duty, when the various aspects such as consumption, cost, project employee is carried out in detail
Solution, the analysis of enterprises big data is formed, so as to realize for enterprise strategic programming and strategic objective and provide data reference.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality
Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, the scope that this specification is recorded all is considered to be.
Embodiment described above only expresses the several embodiments of the present invention, and its description is more specific and detailed, but simultaneously
Can not therefore it be construed as limiting the scope of the patent.It should be pointed out that come for one of ordinary skill in the art
Say, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention
Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (10)
1. a kind of data managing method, it is characterised in that including step:
User is obtained identify and parse user right corresponding to user mark, the user right including one-level authority and
Two level authority, the Permission Levels of the two level authority are higher than the Permission Levels of the one-level authority;
Gather daily record data corresponding to user's mark of preset term overall planning data and the one-level authority;
The working condition grade that the user of the one-level authority identifies is obtained according to the daily record data, and by the one-level authority
User mark working condition grade send to the two level authority user mark belonging to component;
The working condition grade and the preset term overall planning data identified according to the user of the one-level authority, passes through
Component belonging to user's mark of the two level authority determines the work plan data of user's mark of the one-level authority.
2. data managing method according to claim 1, it is characterised in that described according to obtaining the daily record data
The step of working condition grade of user's mark of one-level authority, includes:
Extract the predetermined keyword in the daily record data and key message numerical value corresponding with the predetermined keyword;
By the key message numerical value compared with the preset value of the key message numerical value, the use of the one-level authority is obtained
The working condition grade of family mark.
3. data managing method according to claim 1, it is characterised in that described to be marked according to the user of the one-level authority
The working condition grade of knowledge and the preset term overall planning data, pass through group belonging to user's mark of the two level authority
Part determines that the step of work plan data of user's mark of the one-level authority includes:
Information and real-time cost information are consumed when the working condition grade identified according to the user of the one-level authority obtains real-time;
Consume when obtaining default total in the preset term overall planning data and preset totle drilling cost;
According to it is described in real time when consume information, the cost information in real time, it is described default total when the consumption and default totle drilling cost, lead to
Component belonging to crossing user's mark of the two level authority determines the work plan data of user's mark of the one-level authority.
4. data managing method according to claim 1, it is characterised in that described according to obtaining the daily record data
Also include after the step of working condition grade of user's mark of one-level authority:
The working condition grade identified according to the user of the one-level authority, phase is extracted from default operating condition rank list
The working condition grade feedback information answered, and the working condition grade feedback information is sent to the user of the one-level authority
Component belonging to mark.
5. data managing method according to claim 1, it is characterised in that described to be marked according to the user of the one-level authority
The working condition grade of knowledge and the preset term overall planning data, pass through group belonging to user's mark of the two level authority
Part determines also to include after the step of work plan data of user's mark of the one-level authority:
The work plan data are accordingly sent to component belonging to user's mark of the one-level authority.
A kind of 6. data management system, it is characterised in that including:
User identity resolution module, identify for obtaining user and parse user right corresponding to user mark, the use
Family authority includes one-level authority and two level authority, and the Permission Levels of the two level authority are higher than the authority level of the one-level authority
Not;
Data acquisition module, for gathering corresponding to user's mark of preset term overall planning data and the one-level authority
Daily record data;
Working condition grade acquisition module, the work that the user for obtaining the one-level authority according to the daily record data identifies
State grade, and the working condition grade that the user of the one-level authority is identified is sent to user's mark of the two level authority
Affiliated component;
Work plan determining module, for the working condition grade that is identified according to the user of the one-level authority and described default
Project overall planning data, the user for determining the one-level authority by component belonging to user's mark of the two level authority identify
Work plan data.
7. data management system according to claim 6, it is characterised in that the working condition grade acquisition module bag
Include:
Feature extraction unit, for extracting predetermined keyword in the daily record data and corresponding with the predetermined keyword
Key message numerical value;
Characteristics comparing unit, for the key message numerical value compared with the preset value of the key message numerical value, to be obtained
The working condition grade identified to the user of the one-level authority.
8. data management system according to claim 6, it is characterised in that the work plan determining module includes:
Real-time signal analysis unit, the working condition grade for being identified according to the user of the one-level authority consume when obtaining real-time
Information and real-time cost information;
Presupposed information acquiring unit, consume during for obtaining default total in the preset term overall planning data and default total
Cost;
Work plan generation unit, for according to it is described in real time when consume information, the cost information in real time, it is described default total when consume
And the default totle drilling cost, the user for determining the one-level authority by component belonging to user's mark of the two level authority mark
The work plan data of knowledge.
9. a kind of computer-readable recording medium, is stored thereon with computer program, it is characterised in that described program is by processor
The step of any one methods described in claim 1-5 is realized during execution.
10. a kind of computer equipment, including memory, processor and storage are on a memory and the meter that can run on a processor
Calculation machine program, it is characterised in that any one methods described in claim 1-5 is realized during the computing device described program
The step of.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710666914.5A CN107403308B (en) | 2017-08-07 | 2017-08-07 | Data management method, system, computer readable storage medium and computer device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710666914.5A CN107403308B (en) | 2017-08-07 | 2017-08-07 | Data management method, system, computer readable storage medium and computer device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107403308A true CN107403308A (en) | 2017-11-28 |
CN107403308B CN107403308B (en) | 2021-05-25 |
Family
ID=60402056
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710666914.5A Active CN107403308B (en) | 2017-08-07 | 2017-08-07 | Data management method, system, computer readable storage medium and computer device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107403308B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108133355A (en) * | 2017-12-11 | 2018-06-08 | 广州供电局有限公司 | Electric field business management method, device, storage medium and computer equipment |
CN111125642A (en) * | 2018-10-31 | 2020-05-08 | 北京数聚鑫云信息技术有限公司 | Method and device for managing API, storage medium and computer equipment |
US11734625B2 (en) | 2020-08-18 | 2023-08-22 | Asana, Inc. | Systems and methods to characterize units of work based on business objectives |
US11803814B1 (en) * | 2021-05-07 | 2023-10-31 | Asana, Inc. | Systems and methods to facilitate nesting of portfolios within a collaboration environment |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101295378A (en) * | 2008-06-12 | 2008-10-29 | 宁波钢铁有限公司 | Execution management system and implicit knowledge explicating method |
CN102073927A (en) * | 2010-12-30 | 2011-05-25 | 浪潮集团山东通用软件有限公司 | Cooperative office-based project type working plan management system |
US20120166485A1 (en) * | 2010-12-27 | 2012-06-28 | International Business Machines Corporation | Information Processor, Privilege Management Method, Program, and Recording Medium |
CN103678415A (en) * | 2012-09-25 | 2014-03-26 | 腾讯科技(深圳)有限公司 | Method and device for processing project log data |
CN105654254A (en) * | 2016-03-22 | 2016-06-08 | 成都甲图乙网络科技有限公司 | Multiparty interactive project management method and system |
CN106203956A (en) * | 2016-07-05 | 2016-12-07 | 吴本刚 | Project management system based on cloud computing |
CN106251082A (en) * | 2016-08-08 | 2016-12-21 | 青岛金智高新技术有限公司 | System for managing stock service of business |
CN106408254A (en) * | 2016-09-06 | 2017-02-15 | 江苏智通交通科技有限公司 | Highway engineering project supervision system |
CN106570624A (en) * | 2016-10-26 | 2017-04-19 | 东北电力大学 | Economy management system |
-
2017
- 2017-08-07 CN CN201710666914.5A patent/CN107403308B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101295378A (en) * | 2008-06-12 | 2008-10-29 | 宁波钢铁有限公司 | Execution management system and implicit knowledge explicating method |
US20120166485A1 (en) * | 2010-12-27 | 2012-06-28 | International Business Machines Corporation | Information Processor, Privilege Management Method, Program, and Recording Medium |
CN102073927A (en) * | 2010-12-30 | 2011-05-25 | 浪潮集团山东通用软件有限公司 | Cooperative office-based project type working plan management system |
CN103678415A (en) * | 2012-09-25 | 2014-03-26 | 腾讯科技(深圳)有限公司 | Method and device for processing project log data |
CN105654254A (en) * | 2016-03-22 | 2016-06-08 | 成都甲图乙网络科技有限公司 | Multiparty interactive project management method and system |
CN106203956A (en) * | 2016-07-05 | 2016-12-07 | 吴本刚 | Project management system based on cloud computing |
CN106251082A (en) * | 2016-08-08 | 2016-12-21 | 青岛金智高新技术有限公司 | System for managing stock service of business |
CN106408254A (en) * | 2016-09-06 | 2017-02-15 | 江苏智通交通科技有限公司 | Highway engineering project supervision system |
CN106570624A (en) * | 2016-10-26 | 2017-04-19 | 东北电力大学 | Economy management system |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108133355A (en) * | 2017-12-11 | 2018-06-08 | 广州供电局有限公司 | Electric field business management method, device, storage medium and computer equipment |
CN111125642A (en) * | 2018-10-31 | 2020-05-08 | 北京数聚鑫云信息技术有限公司 | Method and device for managing API, storage medium and computer equipment |
CN111125642B (en) * | 2018-10-31 | 2022-06-03 | 北京数聚鑫云信息技术有限公司 | Method and device for managing API, storage medium and computer equipment |
US11734625B2 (en) | 2020-08-18 | 2023-08-22 | Asana, Inc. | Systems and methods to characterize units of work based on business objectives |
US11803814B1 (en) * | 2021-05-07 | 2023-10-31 | Asana, Inc. | Systems and methods to facilitate nesting of portfolios within a collaboration environment |
Also Published As
Publication number | Publication date |
---|---|
CN107403308B (en) | 2021-05-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Tripathi | Decision support system is a tool for making better decisions in the organization | |
CN107403308A (en) | Data managing method, system, computer-readable recording medium and computer equipment | |
CN103745424A (en) | Hospital comprehensive performance information processing system and method | |
CN104361445B (en) | Labour's real-time management system and management method | |
Stefanini et al. | Performance analysis in emergency departments: a data-driven approach | |
CN108335041A (en) | A kind of control system of business data performance appraisal | |
CN101996364A (en) | Method for modifying labor time standard and labor time standard management system | |
Gupta et al. | An empirical study on productivity analysis of Indian leather industry | |
JP2020205124A (en) | Information processor and program | |
Hao | Optimal allocation of human resource structure based on capability maturity model integration | |
CN106910383A (en) | A kind of hotel business tutoring system | |
CN110544007A (en) | Establishment method for enterprise performance management and quantification and information system device | |
CN115496337A (en) | Data system for supporting brain of enterprise | |
CN114493217A (en) | Method for analyzing and evaluating bearing capacity based on personnel grade | |
Aziz et al. | Space Inventory Management in the Malaysian Public Universities | |
Astafurova et al. | Identification of possible scenarios for the development of the labor market in the digital transformation of the economy | |
CN104537469A (en) | Power grid enterprise team work load quantitative method | |
CN110931113A (en) | Hospital management operation system and method based on Internet cloud platform | |
Elekwachi | Business intelligence system strategies and organizational success in public hospitals in Rivers State, Nigeria | |
CN108198609A (en) | A kind of employee's sort method based on Hospital Logistic delivery system | |
CN103268564A (en) | Social insurance collecting and managing system | |
Telizhenko et al. | Organizational and Economic Factors of Health System Optimization | |
RU2700397C1 (en) | Computer-implemented method for automated processing and analysis of data to assess the efficiency of execution of instructions | |
Suharev | Industrial production in Russia: research methods and development tasks | |
Zhang | Research on the Application of Analytic Hierarchy Process in Human Resource Post Evaluation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |