CN108265754A - Anechoic chamber's construction method - Google Patents

Anechoic chamber's construction method Download PDF

Info

Publication number
CN108265754A
CN108265754A CN201611262028.8A CN201611262028A CN108265754A CN 108265754 A CN108265754 A CN 108265754A CN 201611262028 A CN201611262028 A CN 201611262028A CN 108265754 A CN108265754 A CN 108265754A
Authority
CN
China
Prior art keywords
anechoic chamber
vertical wall
cast
outline border
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611262028.8A
Other languages
Chinese (zh)
Other versions
CN108265754B (en
Inventor
任洺名
贾卓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing No5 Construction Engineering Group Co Ltd
Original Assignee
Beijing No5 Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing No5 Construction Engineering Group Co Ltd filed Critical Beijing No5 Construction Engineering Group Co Ltd
Priority to CN201611262028.8A priority Critical patent/CN108265754B/en
Publication of CN108265754A publication Critical patent/CN108265754A/en
Application granted granted Critical
Publication of CN108265754B publication Critical patent/CN108265754B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • E02D29/05Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/08Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against transmission of vibrations or movements in the foundation soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Building Environments (AREA)

Abstract

The invention discloses a kind of anechoic chamber's construction method, which includes:Anechoic chamber's foundation pit is excavated, foundation depth is 15 30m;Sole plate is laid in bottom of foundation ditch, metal isolator is installed on sole plate;Anechoic chamber's frame structure is built, including:The vertical wall of outline border is poured into a mould in foundation pit surrounding, the cast vertical wall of outline border is divided into 25 times and pours into a mould, and installs acoustical panel by acoustical panel installed part and the vertical wall of outline border in cast upper surface installation acoustical panel installed part after cast every time.Anechoic chamber's inner frame structure is built, including:The frame bottom plate in metal isolator upper pours into a mould the vertical wall of inside casing on the inside of the vertical wall of outline border, and frame structure and inner frame structure are in foundation pit.

Description

Anechoic chamber's construction method
Technical field
The present invention relates to the realm of building construction, and in particular, to a kind of anechoic chamber's construction method.
Background technology
With the development of modern industry, the vibration of mechanical equipment, building hotel air conditioner, water pump pipeline and relevant device It is on the rise Deng the conduct vibrations noise propagated along building, vibration and noise destroy environment quiet, affect normal It practises and works.In order to reach the requirement of the standard of ambient vibration, mechanical equipment is vibrated outside in itself in addition to improving precision, reduction, It is required for carrying out necessary vibration insulation and noise reduction processing.It is main at present to be adopted as metal damping isolation spring;Using metal damping every It shakes after spring, because vibration isolator itself vibration frequency is very low, so its vibration isolating effect can reach more than 95%.However in many works It is found in journey, after being mounted with metal damping isolation spring, vibration isolating effect is simultaneously bad;The reason is that metal damping isolation spring is installed It is improper, it is impossible to reach vibration isolating effect, so needing to sum up effective construction method in noise reduction engineering, ensure metal damping Isolation spring is installed and other subdivisional work construction qualities meet noise reduction engine request, it is therefore necessary to research and develop a kind of soundproof effect Good anechoic chamber's construction method.
Invention content
The present invention proposes a kind of anechoic chamber's construction method, and the duration needed for anechoic chamber is built by anechoic chamber's construction method Time is short, makes resource input more harmonious, while has better erasure effect.
To achieve these goals, the present invention proposes a kind of anechoic chamber's construction method, excavates anechoic chamber's foundation pit, the base Hole depth is 15-30m;
Sole plate is laid in bottom of foundation ditch, metal isolator is installed on sole plate;
Anechoic chamber's frame structure is built, including:The vertical wall of outline border, the cast vertical wall of outline border are poured into a mould in foundation pit surrounding Body is divided into 2-5 times and pours into a mould, every time after cast in cast upper surface installation acoustical panel installed part, by acoustical panel installed part and The vertical wall installation acoustical panel of outline border.
Anechoic chamber's inner frame structure is built, including:The frame bottom plate in the metal isolator upper, it is vertical in the outline border The cast vertical wall of inside casing on the inside of wall, the frame structure and the inner frame structure are in the foundation pit.
Preferably, internal frame top plate and internal frame top plate beam are set up including being based on inner frame structure;It is set up based on the vertical wall of outline border Outline border top plate and outline border top plate beam.
Preferably, it is included in installation abatvoix on the inside of the vertical wall of inside casing.
Preferably, it is described to include in bottom of foundation ditch laying sole plate:Concrete cushion is poured into a mould in bottom of foundation ditch;In coagulation Soil padding upper sole plate and outer frame bottom plate.
Preferably, it is described to include in bottom of foundation ditch cast concrete cushion:The backup land during concrete cushion is poured into a mould Stake mouth, pile is driven underground at the pile mouth.
Preferably, frame bottom plate includes in the metal isolator upper:Frame bottom plate in advance formwork cast, then will Frame bottom plate is mounted on above the metal isolator in formwork cast.
Preferably, frame bottom plate includes in the metal isolator upper:Based on the metal isolator shape, in advance The metal isolator protection cap that cast matches with the metal isolator shape, in cast during frame bottom plate in advance by metal every Device protection cap of shaking is buckled on the metal isolator.
Preferably, the cast vertical wall of inside casing divides 2-4 completion.
Preferably, the vertical wall pouring height of each inside casing is 2-6m.
Preferably, cavity is provided between the frame structure and the inner frame structure, the cavity width is 0.2-1m.
The beneficial effects of the present invention are:Anechoic chamber is built in by underground, installation acoustical panel by anechoic chamber's construction method And metal isolator makes anechoic chamber's erasure effect more preferably, and metal isolator, component anechoic chamber outline border and interior are installed by this method Time duration is short needed for frame, makes resource input more harmonious.
The device of the invention has other characteristics and advantages, these characteristics and advantages from the attached drawing being incorporated herein and with It will be apparent in specific embodiment afterwards or will be in the attached drawing and subsequent specific embodiment being incorporated herein Middle to be stated in detail, these the drawings and specific embodiments are used together to explain the specific principle of the present invention.
Description of the drawings
Exemplary embodiment of the invention is described in more detail in conjunction with the accompanying drawings, it is of the invention above-mentioned and its Its purpose, feature and advantage will be apparent, wherein, in exemplary embodiment of the invention, identical reference label Typically represent same parts.
Fig. 1 shows anechoic chamber's construction method schematic diagram according to embodiment of the present invention.
Fig. 2 shows the signals of the anechoic chamber of anechoic chamber's construction method building according to embodiment of the present invention Figure.
Reference sign:
1st, sole plate;2nd, metal isolator;3rd, the vertical wall of outline border;4th, interior frame bottom plate;5th, the vertical wall of inside casing;6th, it is interior Frame top plate beam;7th, internal frame top plate;8th, outline border top plate beam;9th, outline border top plate;10th, pile;11st, outer frame bottom plate;12nd, inside casing vertical Second pouring wall;13rd, inside casing ground beam;14th, bottom plate;15th, cavity.
Specific embodiment
The present invention is more fully described below with reference to accompanying drawings.Although the preferred implementation side of the present invention is shown in attached drawing Formula, however, it is to be appreciated that may be realized in various forms the present invention without should be limited by embodiments set forth herein.Phase Instead, these embodiments are provided so that the present invention is more thorough and complete, and can be by the scope of the present invention completely It is communicated to those skilled in the art.
Fig. 1 shows anechoic chamber's construction method schematic diagram according to embodiment of the present invention.According to the embodiment party A kind of anechoic chamber's construction method of formula, including:
Excavate anechoic chamber's foundation pit, foundation depth 15-30m;
Sole plate is laid in bottom of foundation ditch, metal isolator is installed on sole plate;
Anechoic chamber's frame structure is built, including:The vertical wall of outline border, cast outline border vertical wall point are poured into a mould in foundation pit surrounding It is poured into a mould for 2-5 times, passes through acoustical panel installed part and outline border in cast upper surface installation acoustical panel installed part after cast every time Vertical wall installation acoustical panel.
Anechoic chamber's inner frame structure is built, including:The frame bottom plate in metal isolator upper, on the inside of the vertical wall of outline border The vertical wall of inside casing is poured into a mould, frame structure and inner frame structure are in foundation pit.
Specifically, foundation pit is excavated according to the specification of building anechoic chamber, foundation depth 15-30m can make anechoic chamber whole In underground, make erasure effect more preferable, inner frame structure is made to be independent vibration isolation by being laid with sole plate and installation metal isolator Basis carries out effectively isolation external vibration, and then make anechoic chamber's erasure effect more preferable, anechoic chamber's construction party by metal isolator Method is laid with sole plate by digging according to foundation pit, in bottom of foundation ditch, and metal isolator is installed on floor, then carries out outline border and interior The construction of mount structure makes work progress more simple while reduces construction investment cost.
By repeatedly pouring into a mould installation acoustical panel installed part, convenient for the installation and dismounting of acoustical panel, acoustical panel, which can play, to disappear Sound, the effect of sound insulation, while dismantle and be conveniently replaceable damaged acoustical panel.
In one example, internal frame top plate and internal frame top plate beam are set up including being based on inner frame structure;Based on the vertical wall of outline border Body sets up outline border top plate and outline border top plate beam.
Specifically, ventilation opening is provided on inside casing plate-girder and outline border plate-girder, ventilation device can be set on ventilation opening to disappear Tone chamber is aerated ventilation.
In one example, it is included in installation abatvoix on the inside of the vertical wall of inside casing.
In one example, sole plate is laid in bottom of foundation ditch to include:Concrete cushion is poured into a mould in bottom of foundation ditch;Mixed Solidifying soil padding upper sole plate and outer frame bottom plate.
In one example, include in bottom of foundation ditch cast concrete cushion:It is reserved during concrete cushion is poured into a mould Pile is driven underground at pile mouth for pile mouth.
Specifically, traditional handicraft is cut the earth afterwards first to drive piles, and the present invention is reserved using during concrete cushion is poured into a mould Pile mouth, the design that then pile is driven underground at pile mouth, avoid make since ground is soft pile run-off the straight or Fracture, leads to danger of the construction quality there are hidden danger.The quality of engineering is improved using this design, while during less construction Between.
In one example, frame bottom plate includes in metal isolator upper:Frame bottom plate in advance formwork cast, then By formwork pour into a mould in frame bottom plate be mounted on metal isolator above.Using the design of frame bottom plate in the cast of advance formwork, avoid Directly cast damages metal isolator, while can directly be torn open using when frame bottom plate generation is damaged in process afterwards Interior frame bottom plate is unloaded, facilitates and anechoic chamber is safeguarded, increases construction quality, convenient for the use to anechoic chamber.
In one example, frame bottom plate includes in metal isolator upper:Based on metal isolator shape, pour in advance The metal isolator protection cap that note matches with metal isolator shape, in advance protects metal isolator during frame bottom plate in cast Protecting cover is buckled on metal isolator.Metal isolator is protected, while make inside casing knot using advance casting metal vibration isolator protection cap Structure is more firm.
In one example, the cast vertical wall of inside casing divides 2-4 completion.
In one example, the vertical wall pouring height of each inside casing is 2-6m.
It is divided into multiple cast, makes operation more convenient, accelerate construction speed, while makes the vertical wall of inside casing more steady Gu.
In one example, cavity, cavity width 0.2-1m are provided between frame structure and inner frame structure.Setting is empty Chamber plays the role of noise reduction, sound insulation.
Embodiment:
Fig. 2 shows the signals of the anechoic chamber of anechoic chamber's construction method building according to embodiment of the present invention Figure.
As shown in Fig. 2, a kind of anechoic chamber's construction method, including:
Excavate anechoic chamber's foundation pit, foundation depth 18.385m;
Sole plate 1 is laid in bottom of foundation ditch, metal isolator 2 is installed on sole plate 1;
Anechoic chamber's frame structure is built, including:The vertical wall 3 of outline border is poured into a mould in foundation pit surrounding, pours into a mould the vertical wall 3 of outline border It is divided into 3 times to pour into a mould, is installed after cast in cast upper surface installation acoustical panel installed part (not shown) by acoustical panel every time Part and the vertical wall 3 of outline border install acoustical panel (not shown).
Anechoic chamber's inner frame structure is built, including:The frame bottom plate 4 in 2 upper of metal isolator, in the vertical wall 3 of outline border The vertical wall 5 of inside casing is poured into a mould in inside, and frame structure and inner frame structure are in foundation pit.
Wherein, internal frame top plate 7 and internal frame top plate beam 6 are set up including being based on inner frame structure;It is set up based on the vertical wall 3 of outline border Outline border top plate 9 and outline border top plate beam 8.
Wherein, it is included in the vertical 12 inside installation abatvoix of wall of inside casing.
Wherein, sole plate 1 is laid in bottom of foundation ditch to include:Concrete cushion is poured into a mould in bottom of foundation ditch;In concrete mats Layer upper sole plate and outer frame bottom plate 11.
Wherein, include in bottom of foundation ditch cast concrete cushion:Pile mouth is reserved during concrete cushion is poured into a mould, Pile 10 is driven underground at pile mouth.
Wherein, frame bottom plate 4 includes in 2 upper of metal isolator:Frame bottom plate 4 in advance formwork cast, then will branch Frame bottom plate 4 is mounted on 2 top of metal isolator in mould cast.
Wherein, the cast vertical wall 5 of inside casing divides 3 completions.
Wherein, cavity 15, cavity width 250mm are provided between frame structure and inner frame structure.
Wherein, metal isolator 2 is metal spring vibration isolator.
During practice of construction, excavation of foundation pit depth reaches 18.385m, solves protective slope structure safety and stability and precipitation and deep basal pit is opened Then digging problem carries out waterproof and constructs with protective layer, with after protection, being laid with sole plate, basic bottom is being laid with by waterproof The interspersed set aside pre-embedded for carrying out electromechanical speciality during plate 1, while outer frame bottom plate 11 is poured into a mould, the outer frame bottom plate 11 of anechoic room and basis Bottom plate pours 300mm together, is poured into -17.085m, and metal isolator 2 is then installed on sole plate, is laid with sole plate Metal isolator mounting hole to be reserved when 1, then pours into a mould the vertical wall 3 of outline border in foundation pit surrounding, cast is divided into be completed three times, and first Step is from sole plate upper surface -17.085m to -11.20m, and second step is from -11.20m to -7m, and third step is from -7m to outline border top Plate-girder lower surface -2.65m installs acoustical panel installed part in pouring layer upper surface after cast every time, is installed by acoustical panel Part installs acoustical panel, and the interior frame bottom plate 4 for then pouring into a mould advance formwork is mounted on metal isolator 2, and interior frame bottom plate 4 includes interior Frame ground beam 13 and bottom plate 14, in the vertical 3 inside cast vertical wall 5 of inside casing of wall of outline border, cast is divided into be completed three times, the first step 13 upper surface -16.20m of inside casing ground beam to -11.20m, vertical second of the cast wall 12 of inside casing are poured into -7m from -11.20m, Third step is finally based on inner frame structure and sets up internal frame top plate 7 and internal frame top plate from -7m to 6 lower surface -4.20m of internal frame top plate beam Beam 6;Outline border top plate 9 and outline border top plate beam 8 are set up based on the vertical wall of outline border.
1 is see the table below according to the specific design parameter of anechoic room beam of the present embodiment.
2 are see the table below according to the specific design parameter of the anechoic room of the present embodiment.
The 1 specific design parameter of anechoic room beam of table
The specific design parameter of 2 anechoic room of table
It will be understood by those skilled in the art that above to the purpose of the description of the embodiment of the present invention only for illustratively saying The advantageous effect of bright the embodiment of the present invention is not intended to limit embodiments of the invention to given any example.
Various embodiments of the present invention are described above, above description is exemplary, and non-exclusive, and It is not limited to disclosed each embodiment.In the case of without departing from the scope and spirit of illustrated each embodiment, for this skill Many modifications and changes will be apparent from for the those of ordinary skill in art field.The selection of term used herein, purport In the principle for best explaining each embodiment, practical application or to the improvement of the technology in market or make the art Other those of ordinary skill are understood that embodiments disclosed herein.

Claims (10)

1. a kind of anechoic chamber's construction method, including:
Anechoic chamber's foundation pit is excavated, the foundation depth is 15-30m;
Sole plate is laid in bottom of foundation ditch, metal isolator is installed on sole plate;
Anechoic chamber's frame structure is built, including:The vertical wall of outline border, the cast outline border vertical wall point are poured into a mould in foundation pit surrounding It is poured into a mould for 2-5 times, passes through acoustical panel installed part and outline border in cast upper surface installation acoustical panel installed part after cast every time Vertical wall installation acoustical panel.
Anechoic chamber's inner frame structure is built, including:The frame bottom plate in the metal isolator upper, in the vertical wall of the outline border The vertical wall of inside casing is poured into a mould in inside, and the frame structure and the inner frame structure are in the foundation pit.
2. anechoic chamber's construction method according to claim 1, wherein, set up internal frame top plate and interior including being based on inner frame structure Frame top plate beam;Outline border top plate and outline border top plate beam are set up based on the vertical wall of outline border.
3. anechoic chamber's construction method according to claim 1, wherein, it is included in installation sound-absorbing on the inside of the vertical wall of inside casing Plate.
4. anechoic chamber's construction method according to claim 1, wherein, it is described to include in bottom of foundation ditch laying sole plate: Concrete cushion is poured into a mould in bottom of foundation ditch;In concrete cushion upper sole plate and outer frame bottom plate.
5. anechoic chamber's construction method according to claim 4, wherein, it is described to pour into a mould concrete cushion packet in bottom of foundation ditch It includes:Pile mouth is reserved during concrete cushion is poured into a mould, pile is driven underground at the pile mouth.
6. anechoic chamber's construction method according to claim 1, wherein, in the metal isolator upper inside casing wall packet It includes:Frame bottom plate in advance formwork cast, then pours into a mould the interior frame bottom plate above the metal isolator by formwork.
7. anechoic chamber's construction method according to claim 1, wherein, the frame bottom plate packet in the metal isolator upper It includes:Based on the metal isolator shape, cast in advance is protected with the metal isolator that the metal isolator shape matches Metal isolator protection cap, is buckled on the metal isolator by lid in advance in cast during frame bottom plate.
8. anechoic chamber's construction method according to claim 1, wherein, the cast vertical wall of inside casing divides 2-4 completion.
9. anechoic chamber's construction method according to claim 1, wherein, each vertical wall pouring height of inside casing is 2-6m.
10. anechoic chamber's construction method according to claim 1, wherein, between the frame structure and the inner frame structure Cavity is provided with, the cavity width is 0.2-1m.
CN201611262028.8A 2016-12-30 2016-12-30 Anechoic chamber's construction method Active CN108265754B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611262028.8A CN108265754B (en) 2016-12-30 2016-12-30 Anechoic chamber's construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611262028.8A CN108265754B (en) 2016-12-30 2016-12-30 Anechoic chamber's construction method

Publications (2)

Publication Number Publication Date
CN108265754A true CN108265754A (en) 2018-07-10
CN108265754B CN108265754B (en) 2019-05-28

Family

ID=62755168

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611262028.8A Active CN108265754B (en) 2016-12-30 2016-12-30 Anechoic chamber's construction method

Country Status (1)

Country Link
CN (1) CN108265754B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2405068Y (en) * 2000-01-31 2000-11-08 王法源 Comprehensive device for vibration damping and noise reducing in sound field
CN101016822A (en) * 2007-01-05 2007-08-15 钟超英 Environmental protection energy-saving ventilating noise reduction window
CN101070713A (en) * 2006-05-08 2007-11-14 冯刚克 Environment-protection energy-saving ventilating air-conditioning sound-insulating novel building and construction method
CN101487300A (en) * 2009-02-10 2009-07-22 中船第九设计研究院工程有限公司 Ultra-low background noise whole elimination room
CN102268922A (en) * 2011-06-17 2011-12-07 中国建筑第六工程局有限公司 Method for constructing curved roof of integral semi-anechoic room of automobile noise laboratory
CN202090681U (en) * 2011-05-19 2011-12-28 上海朗诗建筑科技有限公司 Building structure with single residential buildings and residential estate underground equipment room in double-wall separation
CN102477748A (en) * 2010-11-20 2012-05-30 戴正欣 Unit solid-borne noise treatment device
CN104695740A (en) * 2015-01-06 2015-06-10 江苏中南建筑产业集团有限责任公司 Vibration-isolated construction method for ventilation air-conditioning machine room
CN204718182U (en) * 2015-04-01 2015-10-21 陕西方亚新能源科技有限公司 A kind of noise reduction cooling system for earth source heat pump unit

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2405068Y (en) * 2000-01-31 2000-11-08 王法源 Comprehensive device for vibration damping and noise reducing in sound field
CN101070713A (en) * 2006-05-08 2007-11-14 冯刚克 Environment-protection energy-saving ventilating air-conditioning sound-insulating novel building and construction method
CN101016822A (en) * 2007-01-05 2007-08-15 钟超英 Environmental protection energy-saving ventilating noise reduction window
CN101487300A (en) * 2009-02-10 2009-07-22 中船第九设计研究院工程有限公司 Ultra-low background noise whole elimination room
CN102477748A (en) * 2010-11-20 2012-05-30 戴正欣 Unit solid-borne noise treatment device
CN202090681U (en) * 2011-05-19 2011-12-28 上海朗诗建筑科技有限公司 Building structure with single residential buildings and residential estate underground equipment room in double-wall separation
CN102268922A (en) * 2011-06-17 2011-12-07 中国建筑第六工程局有限公司 Method for constructing curved roof of integral semi-anechoic room of automobile noise laboratory
CN104695740A (en) * 2015-01-06 2015-06-10 江苏中南建筑产业集团有限责任公司 Vibration-isolated construction method for ventilation air-conditioning machine room
CN204718182U (en) * 2015-04-01 2015-10-21 陕西方亚新能源科技有限公司 A kind of noise reduction cooling system for earth source heat pump unit

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
曲昭嘉等编著: "《实用建筑工程施工工艺及通病防治手册》", 31 January 2010 *
裴刚编著: "《民用建筑设计与构造》", 31 August 2014 *

Also Published As

Publication number Publication date
CN108265754B (en) 2019-05-28

Similar Documents

Publication Publication Date Title
CN203361033U (en) Protective device for intercepting falling rocks of through cut
CN105714833A (en) Construction method of steel plate pile open caisson support
JP4021056B2 (en) Underground structure construction method such as underground pit for parking lot installation
JP2009007894A (en) Ground liquefaction preventing method, liquefaction registant ground, and building base part structure
KR101109520B1 (en) Method for constructing earth retaining wall using steel pipe
CN108265754B (en) Anechoic chamber's construction method
JP5515579B2 (en) Mountain retaining wall structure, method for constructing mountain retaining wall structure
CN110172996A (en) Equipment Foundations vibration insulation structure and its construction method
JPH0220769B2 (en)
JP3174431U (en) Liquefaction phenomenon reproduction device
JP2011111726A (en) Method for forming floor
JP3530128B2 (en) Composite waterproofing method for underground structures
JPH09209361A (en) Pilingh method in pit structure
JPH0874281A (en) Ground consolidation process for vibration control and liquefaction prevention
KR20100045535A (en) Concrete structure by hole for reducing noises and vibration between floors
JP4475116B2 (en) Vertical shaft structure and its construction method
JP2000045265A (en) Formation method of ground surface vibration cut-off ditch
JP3909585B2 (en) Steel pipe pile tip consolidation method
JP2012017590A (en) Tunnel construction method
JP5468165B1 (en) Sand sand control method
CN104963360A (en) Construction technology facilitating underground storage of cables
JP2006118152A (en) Method for constructing circular closed conduit by open excavation system
JP2005213963A (en) Pile head constructing method
JP2016205004A (en) Ground improvement method, ground improvement structure and improved ground
JPS63567B2 (en)

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant