CN108252202A - A kind of bridge pier - Google Patents

A kind of bridge pier Download PDF

Info

Publication number
CN108252202A
CN108252202A CN201611240582.6A CN201611240582A CN108252202A CN 108252202 A CN108252202 A CN 108252202A CN 201611240582 A CN201611240582 A CN 201611240582A CN 108252202 A CN108252202 A CN 108252202A
Authority
CN
China
Prior art keywords
bridge
ship
bridge pier
buoy
pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201611240582.6A
Other languages
Chinese (zh)
Inventor
马闯
汪风珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhangjiajie Institute of Aeronautical Engineering
Original Assignee
Zhangjiajie Institute of Aeronautical Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhangjiajie Institute of Aeronautical Engineering filed Critical Zhangjiajie Institute of Aeronautical Engineering
Priority to CN201611240582.6A priority Critical patent/CN108252202A/en
Publication of CN108252202A publication Critical patent/CN108252202A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B22/00Buoys
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/08Damp-proof or other insulating layers; Drainage arrangements or devices ; Bridge deck surfacings
    • E01D19/086Drainage arrangements or devices
    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G3/00Traffic control systems for marine craft
    • G08G3/02Anti-collision systems
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B22/00Buoys
    • B63B2022/006Buoys specially adapted for measuring or watch purposes

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Remote Sensing (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Bridge pier is hollow structure, and bridge pier underwater portion or under ground portion using camera head monitor bridge pier situation, and termite medicine syringe is set on bridge pier, so as to monitor find termite after killed in time, the buoy Dynamic Announce ship of use can by height, in the flood season, bridge is hit to prevent ship superelevation, reflective tape is set on bridge pier, ship night is facilitated to pass through, in addition, the bridge pier of the present invention is easy to repair after impaired than existing bridge pier.

Description

A kind of bridge pier
Technical field
The invention belongs to building engineering field, more particularly to a kind of bridge pier of bridge.
Background technology
It is inquired by patent consulting website soopat, using bridge, underground, monitoring as key search, applicant retrieves Two pieces patent is the 2016204263867 and refined 2014202536451 of Zhejiang Ocean university respectively, and Zhejiang Ocean is big What is learned is the underwater detection device of a mechanical type, and refined is to utilize acoustics multi-beam range measurement principle, this two pieces patent The situation of intuitive visual inspection apparatus observation bridge pier underwater portion it is not related to, in addition, either underwater or low-lying location Bridge, bridge pier always some be imbedded in underground, the physical state of this part of bridge pier also directly with the longevity of bridge It orders and safety-related, for example bridge is eaten into erosion by termite or bridge periphery acidity is higher, and concrete is formed to corrode and is made With, and termite medicine, by retrieval, there are following frequent species:DDVP, phoxim, chlopyrifos, Le Siben, sevin, bromine cyanogen Chrysanthemum ester, Biphenthrin, imidacloprid, avermectin, aluminum phosphate, bitter bark, Siberian cocklebur.
By checking, termite medicine is based on synthetic pyrethroid class pesticide and organophosphorus pesticide, synthetic pyrethroid Class drug and organophosphorus pesticide easily alkalize failure, and the lime in cement is exactly exactly alkaline matter, this gives bridge pier prevention termite Bring problem.
Invention content
Technical characteristic:A kind of bridge pier, it is characterized in that:
Bridge pier is made of following several technical essentials, these technical essentials can be used individually, can also combine use,
1st, bridge pier uses hollow structure, has osculum in hollow structure;
2nd, bridge pier is in hollow structure and bridge pier is underwater or the peripheral of underground installs camera, for monitoring the physics shape of bridge pier Condition, camera are placed in using waterproof construction or by camera in camera head protecting pipe;
3rd, in bridge pier hollow structure and pier footing part setting termite medicine syringe, prevent termite moth erosion bridge pier;
4th, brushing reflectorised paint or installation warning lamp on bridge pier;
5th, using the limit for height parameter of buoy Dynamic Announce bridge, correspondingly, ship shows draft using buoy, so as to calculate Go out ship to pass through the bridge heights of needs, to prevent ship from colliding bridge.
Hollow structure refers to that the pier shaft part of bridge pier is hollow, and osculum is close to foundation, top in pier shaft lower part Cap portion is solid construction, and top cap part has through-hole to be used for communicating with the hollow space of pier shaft, and top cap partial through holes diameter ensures More than camera diameter, to be convenient for changing camera, the through-hole of top cap part is communicated with bridge floor.
Buoyage is mainly made of float tube, floating ball, buoy, code reader, control computer, prior-warning device, communication device,
By following formula calculate bridge allow ship by height, formula h=h1-h2, wherein, h refer to allow ship lead to Row height, h1 refer to bridge allow by highest bit value, h2 refer to code reader transmission data;
The float tube is for installing floating ball, buoy and the water pipe of code reader, and there are intake-outlet, Inlet and outlet water in float tube lower end Mouth is connected with the river water surface, and code reader is mounted on the upper end of float tube, and code reader is connect with control computer;
The floating ball is the spherical body of solid or hollow light material moved up and down using buoyancy, control buoy, During using hollow-core construction, floating ball allows the material for being more than the density of water using density, and light material refers to that density is less than the close of water The material of degree;
The buoy is the mark post for being carved with length data, and buoy upper end is 0 scale, and lower end relies on floating ball, so as to water level Lifting, buoy also synchronization lifting;
The data that the control computer is transmitted by receiving code reader, calculating bridge using software allows current ship high Degree when allowing current ship height in early warning numberical range, reminds shippping traffic note that notice by prior-warning device Implement labor control, control computer synchronization is connect with weather warning center, when the severe weather conditions for occurring forbidding ship's navigation When, shipping information is sent to control department, while ship is reminded to pull in shore, suspend by prior-warning device by control computer;
The prior-warning device refers to that bridge allows the height passed through of ship to be carried in early warning numberical range by voice, light Awake ship pays attention to;
The communication device refers to the letter that ship control department, ship driver and passenger are linked up using wireless network and mobile phone The electronic equipment that breath data send and receive, communication device are connected with control computer.
Description of the drawings:
Attached drawing 1 is bridge pier structure schematic diagram, and 1 is pier shaft, and 2 be termite medicine syringe, and 3 be camera head protecting pipe, and 4 be discharge outlet, 5 It is basis, 2-1 is medicine outlet, and 2-2 is medicine entrance;
Attached drawing 2 is bridge pier structure schematic diagram, and 1 is pier shaft, and 4 be discharge outlet, and 5 be basis, and 6 be camera head protecting pipe;
Attached drawing 3 is bridge pier structure schematic diagram, and 1 is pier shaft, and 4 be discharge outlet, and 5 be basis, and 7 be top cap, and 8 be through-hole;
Attached drawing 4 is bridge pier structure schematic diagram, and 1 is pier shaft, and 2 be termite medicine syringe, and 3 be camera head protecting pipe, and 4 be discharge outlet, 5 It is basis, 7 be top cap, and 8 be through-hole, and 9 be termite medicine syringe, and 2-1 is medicine outlet, and 2-2 is medicine entrance;
Attached drawing 5 is buoy parts schematic diagram, and 10 be floating ball, and 11 be buoy, and 12 be float tube;
Attached drawing 6 is buoy working state schematic representation, and 10 be floating ball, and 11 be buoy, and 12 be float tube, and 12-1 is float tube Inlet and outlet water Mouthful.
Specific embodiment:Applicant is introduced with reference to attached drawing:
Bridge pier is mainly made of top cap 7, pier shaft 1, basic 5 three parts, and the top cap refers to the top of bridge pier, top cap be for Body of a bridge structure is shelved, pier shaft is the middle section of bridge pier, and basis is the lower part of bridge pier, and basic area directly decides bridge The size of load-bearing, either underwater or land, basis is most of to be buried in underground,
Under identical material condition, such as identical volume of concrete and identical steel, if the height that bridge pier needs are built Spend it is identical, actually or entity structure hollow-core construction, the structure of bridge pier is more safe and reliable, due to hollow-core construction bridge pier more Greatly, correspondingly, in the case that bridge weight is certain, to the pressure smaller of bridge pier, then have a bit, hollow-core construction is conducive to observation bridge pier Physical state, it is found that after bridge pier goes wrong, there is certain repairing effect, analogy finds that bridge pier is damaged, such as hit It hits, then, it is possible to hollow parts concrete perfusion, reinforcement structure, there is discharge outlet in bridge pier lower part, the effect of osculum is By hollow space water discharge that may be present, especially winter, water freezing, volume become larger, and exist to bridge pier structure and adversely affect.
Whether there is water according to bridge pier lower part, the laying of camera is divided to two kinds, and one kind is that have water, and camera head protecting pipe is from bridge pier There is a certain distance, camera head protecting pipe has glass, and camera is facilitated to shoot with video-corder bridge pier underwater portion, and one kind is anhydrous, camera Protection pipe is to be close to basic laying, and camera head protecting pipe equally has glass, observes basal status by glass, anhydrous bridge pier is taken the photograph As the basic part that head is shot with video-corder is fairly limited, still, by laying a certain number of cameras, it is still able to observe that bridge pier shape The more area of condition, especially termite, it should be noted that underwater or under ground portion is one using camera head monitor bridge pier Very simple technology, still, significant for bridge structure, some bridges duck in drink for a long time, physical arrangement It is washed away by flow, if flow velocity quickly or flow pH value is relatively low, there is concrete structure very big influence, Citing, Cili the Lishui River bridge underwater portion have reformed into cellular, discharge water maintenance if not area just outside a city gate power station, all also cover in drum In.
Termite is due to that can eat into erosion concrete, to bridge structure there are great destruction, but synthesize pyrethroid Esters medicine and organophosphorus pesticide easily alkalize failure, using camera, observe bridge pier there are termite and then utilize termite Termite medicine is perfused in medicine syringe, is killed, the termite medicine syringe in hollow structure has medicine outlet, drug along bridge pier inner wall Entrance is directly communicated with bridge floor, in this way, with regard to termite medicine can be perfused directly on bridge floor, and the termite medicine syringe of foundation is then It is communicated with basic outer wall, termite medicine kills termite by basic outer wall.
Bridge easily sets height-limiting frame, still, ship from colliding bridge also has news report, for example, eastern unlike highway culvert Ship from colliding bridge accident just once occurred for ten thousand river of tabernaemontanus bulrush, and the principle of buoy is that float tube is connected with the water surface by intake-outlet, according to According to the principle of linker, the water level of float tube can with the fluctuation in stage in river, floating ball fluctuation with the fluctuation of river water, so as to Buoy on floating ball can also move up and down, and the lifting value of buoy is converted into bridge by computer allows current numerical value, still Bridge height will not change, and the lifting value of buoy is converted into bridge by computer allows current numerical value, be measured by buoy Bridge allow by ship height just there are one accurate numerical value, by above-mentioned data using wireless network, be sent to needs By the captain or operating personnel of bridge, the numerical value conversion of measurement into a kind of method of computer data be that scale is scribed on buoy, For scale value using buoy lower end as maximum value, buoy upper end is 0 degree, and code reader, code reader and computer are set in the upper end of float tube Connection scans the altitude information that buoy indicates by code reader, and the data transmission of scanning to computer is utilized formula meter by code reader Calculate, formula is h=h1-h2, and h is exactly to allow ship headroom, h1 be bridge allow by highest bit value, h2 is barcode scanning Device transmission data, and h setting safety warning data, when h numerical value be less than safe early warning numerical value when, ship by when lead to It crosses artificial or machine and sends warning information, to ship by implementing control, do not have the ship of current condition, do not allow to pass through, Especially river Flooding, bridge allow by ship height tailing off, still, due to lacking specific data, some captains May leave things to chance, be forced through by rule of thumb, there is a specific data, ship by when can just know what is what, it should be noted that Bed level do not allow current ship highly only occur in flood it is surging when, so not need to measure entire riverbed high for buoy Degree, because riverbed is generally all higher, dynamically measuring entire bed level does not have practical significance,
When weather conditions are severe, during unsuitable navigation, in discretion Quan captain's hand whether actually navigation at present, as east The star shipwreck accident of side is exactly bad weather, captain fails to order to suspend in time pull in shore caused by, if weather conditions are not It is suitble to navigation, if passenger knows rather than the independent ruling of captain, the star accident in east perhaps can be to avoid, by warning, It is also a kind of reminding effect, control department monitors ship and navigates by water in violation of rules and regulations, and ship is supervised, which to suspend also, to play a role.

Claims (3)

1. a kind of bridge pier, it is characterized in that:
Bridge pier is made of following several technical essentials, these technical essentials can be used individually, can also combine use,
1st, bridge pier uses hollow structure, has osculum in hollow structure;
2nd, bridge pier is in hollow structure and bridge pier is underwater or the peripheral of underground installs camera, for monitoring the physics shape of bridge pier Condition, camera are placed in using waterproof construction or by camera in camera head protecting pipe;
3rd, in bridge pier hollow structure and pier footing part setting termite medicine syringe, prevent termite moth erosion bridge pier;
4th, brushing reflectorised paint or installation warning lamp on bridge pier;
5th, using the limit for height parameter of buoy Dynamic Announce bridge, correspondingly, ship shows draft using buoy, so as to calculate Go out ship to pass through the bridge heights of needs, to prevent ship from colliding bridge.
2. according to bridge pier described in claim 1, the bridge pier uses hollow structure, has osculum in hollow structure, special Sign is:
Hollow structure refers to that the pier shaft part of bridge pier is hollow, and osculum is close to foundation, top cap portion in pier shaft lower part It is solid construction to divide, and top cap part has through-hole to be used for communicating with the hollow space of pier shaft, and the guarantee of top cap partial through holes diameter is more than Camera diameter, to be convenient for changing camera, the through-hole of top cap part is communicated with bridge floor.
3. according to bridge pier described in claim 1, the limit for height parameter using buoy Dynamic Announce bridge, it is characterized in that:
Buoyage is mainly made of float tube, floating ball, buoy, code reader, control computer, prior-warning device, communication device,
By following formula calculate bridge allow ship by height, formula h=h1-h2, wherein, h refer to allow ship lead to Row height, h1 refer to bridge allow by highest bit value, h2 refer to code reader transmission data,
The float tube is for installing floating ball, buoy and the water pipe of code reader, and there are intake-outlet, Inlet and outlet water in float tube lower end Mouthful connect with the river water surface, code reader is mounted on the upper end of float tube, and code reader is with controlling computer to connect, and code reader is by scanning Altitude scale data conversion is transmitted to control computer into electronic data;
The floating ball is the spherical body of solid or hollow light material moved up and down using buoyancy, control buoy, During using hollow-core construction, floating ball allows the material for being more than the density of water using density, and light material refers to that density is less than the close of water The material of degree;
The buoy is the mark post for being carved with length data, and buoy upper end is 0 scale, and lower end relies on floating ball, so as to water level Lifting, buoy also synchronization lifting;
The data that the control computer is transmitted by receiving code reader, calculating bridge using software allows current ship high Degree when allowing current ship height in early warning numberical range, reminds shippping traffic note that notice by prior-warning device Implement labor control, control computer synchronization is connect with weather warning center, when occurring forbidding ship's navigation or limit ship's navigation Severe weather conditions when, control computer shipping information is sent to control department, while remind ship by prior-warning device Oceangoing ship pulls in shore, suspends;
The prior-warning device refers to that bridge allows the height passed through of ship to be carried in early warning numberical range by voice, light Awake ship pays attention to;
The communication device refers to the letter that ship control department, ship driver and passenger are linked up using wireless network and mobile phone The electronic equipment that breath data send and receive, communication device are connected with control computer.
CN201611240582.6A 2016-12-29 2016-12-29 A kind of bridge pier Withdrawn CN108252202A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611240582.6A CN108252202A (en) 2016-12-29 2016-12-29 A kind of bridge pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611240582.6A CN108252202A (en) 2016-12-29 2016-12-29 A kind of bridge pier

Publications (1)

Publication Number Publication Date
CN108252202A true CN108252202A (en) 2018-07-06

Family

ID=62719512

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611240582.6A Withdrawn CN108252202A (en) 2016-12-29 2016-12-29 A kind of bridge pier

Country Status (1)

Country Link
CN (1) CN108252202A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115748534A (en) * 2022-11-16 2023-03-07 江苏第二师范学院 Landscape design garden road intelligence notice board

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115748534A (en) * 2022-11-16 2023-03-07 江苏第二师范学院 Landscape design garden road intelligence notice board

Similar Documents

Publication Publication Date Title
KR101799861B1 (en) Flood damage adjustment distribution input device
TWI705760B (en) Automatic box net settlement system
CN104778375B (en) A kind of submarine cable risk assessment probability analysis method of classification quantitative
CN206930663U (en) Float type water monitoring device
WO2011162861A1 (en) Aquaculture geodesic fish cage
CN206034367U (en) Flood control water retaining device positioning system based on bluetooth communication
CN103175946A (en) System and method for automatically monitoring lake-flooding of shallow lake
US9165453B2 (en) Rip current sensor and warning system with anchor
CN206467559U (en) A kind of bridge pier
CN106033637A (en) Cable-free independent long-term working landslide hazard landslide hazard monitoring early warning method and system
CN203869755U (en) Wireless alarming device for automatic monitoring of water level
CN206394824U (en) A kind of multi-functional port marker
CN108252202A (en) A kind of bridge pier
CN201927156U (en) Fully-automatic flood-prevention alarming and water-level measuring tape device
JP7017200B6 (en) How to install the monitoring and measurement system and the monitoring and measurement tower
CN201844866U (en) Flood preventing water level measuring tape device with fully-automatic warning function
CN1332226C (en) A deep sea submerged buoy measuring system
CN205131584U (en) Marine monitoring platform
CN201188819Y (en) Ups and downs net cage
CN114908818B (en) Foundation pit deformation observation device
CN215715490U (en) Distributed gravity anchor structure of artificial fish reef and fan foundation of marine ranching
CN115902874A (en) Monitoring system based on fish reef
US9580152B2 (en) Deployable anchoring device
KR20170081589A (en) Typhoon Disaster Discharge Distribution Input Device
CN105277259A (en) Wireless alarming device for automatic monitoring of water level

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20180706