CN108249316A - A kind of material carrying implement - Google Patents

A kind of material carrying implement Download PDF

Info

Publication number
CN108249316A
CN108249316A CN201810068878.7A CN201810068878A CN108249316A CN 108249316 A CN108249316 A CN 108249316A CN 201810068878 A CN201810068878 A CN 201810068878A CN 108249316 A CN108249316 A CN 108249316A
Authority
CN
China
Prior art keywords
column
girder
front column
pulley
left front
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810068878.7A
Other languages
Chinese (zh)
Inventor
孟杨
孟笑天
田毅
尚佩
尚可
孟笑
孟欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810068878.7A priority Critical patent/CN108249316A/en
Publication of CN108249316A publication Critical patent/CN108249316A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • B66C19/02Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries collapsible
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C5/00Base supporting structures with legs
    • B66C5/02Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods
    • B66C5/025Tripods
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C5/00Base supporting structures with legs
    • B66C5/02Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods
    • B66C5/04Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods with runways or tracks supported for movements relative to bridge or gantry
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D1/00Rope, cable, or chain winding mechanisms; Capstans
    • B66D1/02Driving gear
    • B66D1/12Driving gear incorporating electric motors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of material carrying implements, it includes left front column, right front column, rear column, girder, fixed frame, motor, pulley, counterweight and hook, fixed frame is herringbone structure, girder is bolted on rear column, left front column and right front column are connected respectively by crossbeam with girder, fluting is provided on girder, the front end of fluting is equipped with twin shaft pulley, the rear portion installation motor of fluting, wirerope one end is fixed on motor shaft, the other end is connected around twin shaft pulley with pulley, and hook is fixed on pulley, and counterweight is fixed on the tail portion of girder.The present invention can be substituted effectively and the construction materials such as sand, lime or ornament materials are manually upstairs carried from ground, be improved work efficiency, and reduce labor intensity, securely and reliably, advantageously reduce the construction cost and decoration cost of user.

Description

A kind of material carrying implement
Technical field
The invention belongs to carry, elevating mechanism technical field more particularly to a kind of material carrying implement more particularly to one kind build It builds or the carrying implement of ornament materials.
Background technology
Construction site or the materials such as sand, cement and ceramic tile for fitting up occasion need manpower transport upstairs to job location, Labor intensity is big, is easily damaged the cargo being handled upside down, and is also easy to trickle down, and causes to waste.
Authorization Notice No. is the Chinese utility model patent of CN2878313Y, a kind of open " material that lifting is facilitated to be promoted Elevator, including crane arm, steel wire rope, pulley, engine base and speed reducer etc..Crane arm top sets pulley, and speed reducer is placed in bottom, Steel wire rope one end connects speed reducer, and around pulley, the other end sets Lift hook.Crane arm is mounted on by its Rotary cloumn on engine base. Engine base sleeve containing column, triangular support bracket and hound etc..Column upper cartridge is articulated and connected with trishores bar, lower part peripheral hardware Movable sleeve, movable sleeve and hound etc..Column upper cartridge is articulated and connected with trishores bar, lower part peripheral hardware movable sleeve, activity Set and hound articulated connection, the hound other end and the articulated connection of the trishores bar " hoisting mechanism is simple in structure, dismounting side Just, but carrying stability is poor, is unfavorable for largely promoting and carrying building or finishing material.
Therefore there is an urgent need for it is a kind of it is laborsaving, be easily moved, handling efficiency is high, safe and practical material carrying machine equipment.
Invention content
It is an object of the invention to solve the problems of the above-mentioned prior art, a kind of material carrying implement is provided, to improve Handling efficiency and security reliability save manpower, reduce labor intensity, while facilitate installation and transfer.
The present invention adopts the following technical scheme that:
A kind of material carrying implement of the present invention, including stent, motor, pulley and hook, stent before left front column, the right side by standing Column, rear column, girder and with being reconstructed into, left front column, right front column and rear column distribution triangular in shape.
Rear column is connected by bolt, screw rod and girder, and left front column and right front column are connected respectively by crossbeam and girder It connects, girder is equipped with fluting, and downward, fluting is internally provided with twin shaft pulley to slotted openings, and twin shaft pulley is by pulley with linking up with phase Even, fluting is moved forward and backward for twin shaft pulley, and motor is mounted on the lower part of girder, and positioned at the rear portion of fluting, motor passes through steel wire Rope is connected with twin shaft pulley and pulley, and counterweight is by pulley hanging on the girder of rear column side.
Equipped with fixed frame on girder, for preventing girder from deforming, fixed frame is herringbone structure, herringbone fixed frame Lower part be equipped with column, fixed frame is fixed by bolts to the forepart of girder.Left front column, right front column, rear column, girder, horizontal stroke The material of beam and fixed frame is rectangular steel tube.Crossbeam is divided into two parts, and a part is welded on left front column or right front column, separately A part is welded on girder, and two parts suit connection is fixed with bolt.
Left front column, the top of right front column and rear column and bottom are separately installed with lead screw, and lead screw includes screw rod And nut, screw head are tack.The lower part of left front column, right front column and rear column is equipped with pedestal, pedestal and lead screw it is flat Head screw rod connects, and installation rubber pad or plank below pedestal, pedestal damage floor by pressure for preventing from carrying.
(1) the present invention uses disengaging mode bearing goods, and freedom is passed in and out even if narrow door and window, using disconnected Electric protection, it can be ensured that the safety of construction personnel downstairs.Integrated motor steel wire rope can be lengthened voluntarily, solve asking for high-rise feeding hardly possible Topic.
(2) the present invention is made of stent, motor, twin shaft pulley, pulley and hook, and material carrying implement can be replaced effectively The construction materials such as sand, lime or finishing material are manually upstairs carried from ground, improves working efficiency, reduces labor intensity, It is safe and reliable, advantageously reduce construction and the decoration cost of user.
(3) tri- root posts of, girder and crossbeam form stent consolidate, reliably, stability it is good, each component fixes company with bolt It connects, it is easy to disassemble, it is installed and used convenient for completing at one to be moved to another place after carrying.
(4) column lower ends are equipped with pedestal, are implanted into rubber pad or plank below pedestal, prevent carrying implement from damaging floor by pressure.
(5) the present invention carries for the promotion of the buildings such as sand, cement and floor tile or finishing material, it can also be used to other The carrying work of field cargo.
Description of the drawings
Fig. 1 is the structure diagram of material carrying implement of the present invention;
In figure:1- twin shafts pulley, 2- flutings, 3- pulleys, 4- hook, 5- fixed frames, 6- crossbeams, the right front columns of 7-, 8- master Beam, 9- lead screw, 10- bolts, 11- rear columns, 12- motors, 13- left front columns, 14- pillars, 15- pedestals, 16- counterweights, 17- Sliding slot.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, the technical solution below in the present invention carries out clear Chu is fully described by, it is clear that described embodiment is part of the embodiment of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other without creative efforts Embodiment shall fall within the protection scope of the present invention.
1 embodiment 1 of embodiment is to set the material conveying device of A-frame
The material carrying implement of the present invention is made of stent, motor 12, pulley 3, twin shaft pulley 1 and hook 4, and stent is by a left side Front column 13, right front column 7, rear column 11, girder 8 are formed, and left front column 13, right front column 7 and rear column 11 are triangular in shape The line of distribution, specially 11 installation site of left front column 13, right front column 7 and rear column forms a triangle, left front vertical Column 13, right front column 7, rear column 11 are located at vertex of a triangle respectively, this is because the stability of triangle is preferable, girder 8 On rear column 11, and pass through bolt 10, screw rod fastening, left front column 13 and right front column 7 pass through respective crossbeam 6 respectively It is connect with girder 8, and passes through bolt 10 and fasten, crossbeam 6 divides for two parts, and a part is welded on left front column 13 or right front column On 7, another part is welded on girder 8, two parts suit connection of crossbeam 6.
The left front column 13, right front column 7, rear column 11, crossbeam 6 and girder 8 material selection rectangular steel tube, by It is that face contacts in rectangular steel tube, convenient for being fixed with bolts.8 bottom of girder is equipped with fluting 2, and twin shaft pulley 1 is mounted on and opens Slot 2 it is interior, twin shaft pulley 1 can simultaneously move freely in fluting 2, and twin shaft pulley 14 is connected by pulley 3 with linking up with, and motor 2 is pacified Mounted in the lower part of girder 8, positioned at the rear portion of fluting 2, wirerope one end is fixed on motor shaft, and the other end is solid around twin shaft pulley 1 Pulley 3 is scheduled on, 4 hanging of hook is on pulley 3.
The top of left front column 13, right front column 7 and rear column 11 is respectively provided with lead screw 9, is connected by screw bolts the side of being Just Assembling, single-piece size is smaller, conveniently moves another position, left front column 13, right front column 7 and rear column 11 Top equipped with pedestal 15, pedestal 15 is connect with the flat head screw of lead screw 9, and rubber pad or plank are installed in the lower part of pedestal 15, Prevent carrying implement from damaging floor by pressure.
Motor 12 uses two-phase induction motor, due to electric mostly using two-phase within doors, so using two-phase induction motor, it certainly also can basis Practical construction site situation selection three phase electric machine.
2 embodiment 2 of embodiment is increases counter weight device on the basis of embodiment 1
Material carrying implement of the present invention is made of stent, motor 12, pulley 3, twin shaft pulley 1 and hook 4, and stent is by left front Column 13, right front column 7, rear column 11, girder 8, counterweight 16 are formed, and left front column 13, right front column 7 and rear column 11 are in three The line of 11 installation site of angular distribution, specially left front column 13, right front column 7 and rear column forms a triangle, left Front column 13, right front column 7, rear column 11 are located at vertex of a triangle respectively, and girder 8 is mounted on rear column 11, and is passed through Bolt 10, nut fastening, left front column 13 and right front column 7 are connect, and pass through bolt respectively by various crossbeams 6 with girder 8 10 fastenings, crossbeam 6 divide for two parts, and a part is welded on left front column 13 and/or right front column 7, and another part is welded on Two parts suit connection on girder 8.
The left front column 13, right front column 7, rear column 11, crossbeam 6 and girder 8 material selection rectangular steel tube.It is main 8 bottom of beam is equipped with fluting 2, and twin shaft pulley 1 is mounted on the interior of fluting 2, and twin shaft pulley 1 can simultaneously move freely, twin shaft in fluting 2 Pulley 1 is connected by pulley 3 with hook 4, and motor 2 is mounted on the lower part of girder 8, and positioned at the rear portion of fluting 2, wirerope one end is fixed On motor shaft, the other end is fixed on pulley 3 around twin shaft pulley 1, and 4 hanging of hook is on pulley 3.Counterweight 16 passes through sliding slot 17 On the girder 8 of rear column side, realization once lifts more cargos, prevents from leaning forward for hanging.
The top of left front column 13, right front column 7 and rear column 11 is respectively provided with lead screw 9, is stood before left front column 13, the right side The top of column 7 and rear column 11 is equipped with pedestal 15, and pedestal 15 is connect with the flat head screw of lead screw 9, the lower part installation of pedestal 15 Rubber pad or plank, prevent carrying implement from damaging floor by pressure.
Motor 12 uses two-phase induction motor, due to electric mostly using two-phase within doors, so using two-phase induction motor, it certainly also can basis Practical construction site situation selection three phase electric machine.
3 embodiment 3 of embodiment is increases fixed frame on the basis of embodiment 2
As shown in Figure 1, the material carrying implement of the present invention, by stent, motor 12,4 structures of pulley 3, twin shaft pulley 1 and hook Into stent is made of left front column 13, right front column 7, rear column 11, girder 8, counterweight 16, left front column 13, right front column 7 With 11 distribution triangular in shape of rear column, the specially line of 11 installation site of left front column 13, right front column 7 and rear column is formed One triangle, left front column 13, right front column 7, rear column 11 are located at vertex of a triangle respectively, this is because triangle Stability is good, and girder 8 is mounted on rear column 11, and passes through bolt 10, screw rod fastening, and left front column 13 and right front column 7 divide It is not connect by respective crossbeam 6 with girder 8, and passes through bolt 10 and fasten, crossbeam 6 divides for two parts, and a part is welded on left front On column 13 and/or right front column 7, another part is welded on two parts suit connection on girder 8.
Fixed frame 5 is installed, and positioned at 8 forepart of girder, for preventing girder 8 from deforming upon, fixed frame 5 is on girder 8 Herringbone structure, the both ends of the fixed frame of herringbone structure are fixed on by bolt 10 on girder 8, lambdoid structure and master Beam 8 forms the shape of triangle, realizes the stabilization function of fixed frame 5, branch is provided in the middle part of the prong of 5 herringbone structure of fixed frame Column 14, one end are fixed on fixed frame 5, and the other end is fixed on girder 8, girder can be prevented to be bent.
The left front column 13, right front column 7, rear column 11, crossbeam 6 and girder 8 material selection rectangular steel tube.It is main 8 bottom of beam is equipped with fluting 2, and twin shaft pulley 1 is mounted on the interior of fluting 2, and twin shaft pulley 1 can simultaneously move freely, twin shaft in fluting 2 Pulley 1 is connected by pulley 3 with hook 4, and motor 2 is mounted on the lower part of girder 8, and positioned at the rear portion of fluting 2, wirerope one end is fixed On motor shaft, the other end is fixed on pulley 3 around twin shaft pulley 1, and 4 hanging of hook is on pulley 3.Counterweight 16 passes through sliding slot 17 On the girder 8 of rear column side, this is to once lift more cargos for hanging.
The top of left front column 13, right front column 7 and rear column 11 is respectively provided with lead screw 9, is stood before left front column 13, the right side The top of column 7 and rear column 11 is equipped with pedestal 15, and pedestal 15 is connect with the flat head screw of lead screw 9, the lower part installation of pedestal 15 Rubber pad or plank, prevent carrying implement from damaging floor by pressure.
Motor 12 uses two-phase induction motor, due to electric mostly using two-phase within doors, so using two-phase induction motor, it certainly also can basis Practical construction site situation selection three phase electric machine.
The application method of material carrying implement of the present invention:
The components such as left front column 13, right front column 7, rear column 11, girder 8 and motor 12 are transported to decoration construction room Window position, install, fastened with bolt 10 as shown in Figure 1, connect 12 power supply of motor.8 forepart of girder is stretched out outside window, is started Motor 12 promotes the material that is handled upside down from ground, and material trays are hung up with hook 4, is promoted before window or during designated position, stirred Change-over switch shuts down motor 12, and dragging twin shaft pulley 1 is moved to along fluting in window, unloads material, removes twin shaft pulley 1 to window Outside, then start motor, material tray returned into ground, continue to carry or with material tray is pulled back, unload material, Continue landing to carry.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although The present invention is described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that:It still may be used To modify to the technical solution recorded in foregoing embodiments or carry out equivalent replacement to which part technical characteristic; And these modification or replace, various embodiments of the present invention technical solution that it does not separate the essence of the corresponding technical solution spirit and Range.

Claims (7)

1. a kind of material carrying implement, including stent, motor (12), pulley (3), hook (4), which is characterized in that the stent It is made of left front column (13), right front column (7), rear column (11), girder (8) and counterweight (16), the left front column (13), The line of right front column (7) and rear column (11) installation site form a triangle, left front column (13), right front column (7), Rear column (11) is located at vertex of a triangle respectively, and girder (8) rear portion is set on rear column (11), and pass through bolt (10), Screw rod is fixedly connected, and left front column (13) and right front column (7) are connected, and lead to respectively by respective crossbeam (6) with girder (8) It is fixed to cross bolt (10);
Described girder (8) front bottom end is equipped with fluting (2), is equipped with twin shaft pulley (1) in fluting (2), twin shaft pulley (1) is simultaneously It can be moved freely in fluting (2), wirerope one end is fixed on pulley (3), and the other end is fixed on motor around twin shaft pulley (1) (12) on axis, hook (4) is installed on pulley (3), and motor (12) is installed on the lower part of girder (8), and after fluting (2) Portion, counterweight (16) hanging is in the tail portion of girder (8).
2. a kind of material carrying implement according to claim 1, which is characterized in that be equipped with fixation on the girder (8) Frame (5), fixed frame (5) are herringbone structure, and the herringbone both ends of fixed frame (5) are fixed on girder (8) by bolt (10) Forepart, fixed frame (5) herringbone prong middle part are equipped with pillar (14), and pillar (14) one end is fixed on fixed frame (5) prong, Pillar (14) other end is fixed on by bolt (10) on girder (8).
3. a kind of material carrying implement according to claim 1 or 2, which is characterized in that the left front column (13), it is right before Column (7), rear column (11), fixed frame (5), crossbeam (6) and girder (8) material be rectangular steel tube.
4. material carrying implement according to claim 2, which is characterized in that the crossbeam (6) is divided into two parts, a part It is welded on left front column (13) or right front column (7), another part is welded on girder (8), two parts suit of crossbeam (6) Together, blending bolt (10) fastens.
5. a kind of material carrying implement according to claim 1, which is characterized in that the left front column (13), it is right before stand The top and bottom of column (7) and rear column (11) are respectively provided with lead screw (9), and the lead screw (9) includes screw rod and nut, spiral shell Head is tack.
6. a kind of material carrying implement according to claim 5, which is characterized in that the left front column (13), it is right before stand The lower end of column (7) and rear column (11) is equipped with pedestal (15), and pedestal (15) is provided with internal thread, and lead screw (9) is consolidated by screw thread Due on pedestal (15), pedestal (15) lower part is provided with rubber pad or plank.
7. a kind of material carrying implement according to claim 1, which is characterized in that the motor (12) is two-phase induction motor.
CN201810068878.7A 2018-01-24 2018-01-24 A kind of material carrying implement Pending CN108249316A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810068878.7A CN108249316A (en) 2018-01-24 2018-01-24 A kind of material carrying implement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810068878.7A CN108249316A (en) 2018-01-24 2018-01-24 A kind of material carrying implement

Publications (1)

Publication Number Publication Date
CN108249316A true CN108249316A (en) 2018-07-06

Family

ID=62742971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810068878.7A Pending CN108249316A (en) 2018-01-24 2018-01-24 A kind of material carrying implement

Country Status (1)

Country Link
CN (1) CN108249316A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108892053A (en) * 2018-09-18 2018-11-27 苏州艾士德机械有限公司 The boom hoisting for hanging position can be adjusted

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE801767C (en) * 1949-10-16 1951-01-22 Erich Renz Tripod loader
CN2895368Y (en) * 2005-12-02 2007-05-02 于学伟 Small-sized storey slings
CN200964331Y (en) * 2006-11-10 2007-10-24 沈阳天川货物起重吊装有限责任公司 Easy dismounting pulley type professional hoisting support for construction material
CN201154877Y (en) * 2007-12-22 2008-11-26 潘安芳 Simple dismounting type cantilever sliding small crane
CN201932842U (en) * 2011-03-04 2011-08-17 孙永涛 Indoor chute-type mini crane
CN202369278U (en) * 2011-08-05 2012-08-08 吕金向 Portable lifting machine
CN203199913U (en) * 2013-04-10 2013-09-18 中建城市建设发展有限公司 Assembling and disassembling type hoisting truss
CN204384739U (en) * 2014-12-26 2015-06-10 天津东方海川门窗幕墙工程有限公司 Loop wheel machine

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE801767C (en) * 1949-10-16 1951-01-22 Erich Renz Tripod loader
CN2895368Y (en) * 2005-12-02 2007-05-02 于学伟 Small-sized storey slings
CN200964331Y (en) * 2006-11-10 2007-10-24 沈阳天川货物起重吊装有限责任公司 Easy dismounting pulley type professional hoisting support for construction material
CN201154877Y (en) * 2007-12-22 2008-11-26 潘安芳 Simple dismounting type cantilever sliding small crane
CN201932842U (en) * 2011-03-04 2011-08-17 孙永涛 Indoor chute-type mini crane
CN202369278U (en) * 2011-08-05 2012-08-08 吕金向 Portable lifting machine
CN203199913U (en) * 2013-04-10 2013-09-18 中建城市建设发展有限公司 Assembling and disassembling type hoisting truss
CN204384739U (en) * 2014-12-26 2015-06-10 天津东方海川门窗幕墙工程有限公司 Loop wheel machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108892053A (en) * 2018-09-18 2018-11-27 苏州艾士德机械有限公司 The boom hoisting for hanging position can be adjusted

Similar Documents

Publication Publication Date Title
CN103086279B (en) Vertical transportation construction method for building construction
CN109704209B (en) The integrated machine equipment of handling, rotation and operation platform function can be achieved
CN105080016A (en) Special transport car for high-rise building fire rescue system
CN201024048Y (en) Automatic material-feeding machine
CN106829781A (en) Mobile shipment crane and its operating method of one kind
CN108249316A (en) A kind of material carrying implement
JP2000145129A (en) Staging provided with load lifter
CN2848802Y (en) Loading device easy for assembling and disassembling
CN216141163U (en) Indoor curtain wall glass installation construction equipment
CN109516409A (en) Flooring construction tower crane turns device for hoisting
CN201264878Y (en) Easy-to-detach hoisting combined rack
CN214423956U (en) Multifunctional hanging basket for building construction
CN208883352U (en) A kind of dismountable hanging device
CN213326443U (en) Quick unloading platform
CN200964331Y (en) Easy dismounting pulley type professional hoisting support for construction material
CN2429511Y (en) Multifunctional hoisting trolley apparatus
CN204251234U (en) For the Multifunctional aloft-work hoisting crane of wind-power electricity generation machine overhauling, maintenance
CN210559078U (en) Small-size material lifting machine
CN209259612U (en) A kind of feeding device for construction
CN113213315A (en) Transfer method for building partition board
CN208137388U (en) A kind of civil engineering work construction bracket
CN201236119Y (en) Mobile swing machine
CN217264431U (en) Grab bucket crane
CN104609316A (en) Longitudinal tripartite balance simple lifting jack
CN205419582U (en) Floor hoist

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180706