CN109704209B - The integrated machine equipment of handling, rotation and operation platform function can be achieved - Google Patents

The integrated machine equipment of handling, rotation and operation platform function can be achieved Download PDF

Info

Publication number
CN109704209B
CN109704209B CN201910079615.0A CN201910079615A CN109704209B CN 109704209 B CN109704209 B CN 109704209B CN 201910079615 A CN201910079615 A CN 201910079615A CN 109704209 B CN109704209 B CN 109704209B
Authority
CN
China
Prior art keywords
boom
driving device
operating platform
control mechanism
rotation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910079615.0A
Other languages
Chinese (zh)
Other versions
CN109704209A (en
Inventor
刘爱东
李常宇
张文龙
孙忠全
李升波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Rivers Curtain Wall System Engineering Co Ltd
Original Assignee
Beijing Rivers Curtain Wall System Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Rivers Curtain Wall System Engineering Co Ltd filed Critical Beijing Rivers Curtain Wall System Engineering Co Ltd
Priority to CN201910079615.0A priority Critical patent/CN109704209B/en
Publication of CN109704209A publication Critical patent/CN109704209A/en
Application granted granted Critical
Publication of CN109704209B publication Critical patent/CN109704209B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

A kind of integrated machine equipment of achievable handling, rotation and operation platform function, pedestal including rectangle, the pedestal are extended downwardly equipped with rail wheel and supporting track, which is equipped with support, the support top surface is upwardly extended equipped with column, and crossbeam and ballast box are equipped at the top of the column;It is additionally provided with boom at the top of the column, which is equipped with supporting beam;The boom bottom surface is equipped with slide, which is equipped with electric block, and the lifting rope bottom end of the electric block is fixed at the top of operating platform;The operating platform side is equipped with folding extension frame, and it further includes control mechanism that the operating platform other side opposite with the extension frame, which is equipped with weight linear meter, controls the clump weight of the extension frame and weight linear meter simultaneously far from or close to the operating platform.The present invention has the combination function of traditional construction equipment, and construction efficiency is high, easy to operate simple and direct.

Description

The integrated machine equipment of handling, rotation and operation platform function can be achieved
Technical field
The present invention relates to a kind of construction hoisting equipment, especially a kind of achievable handling, rotation and operation platform function Integrated machine equipment.
Background technique
With the continuous development of architectural design, the personalized trend of building is more and more obvious, building shape solid space It becomes increasingly complex, how the case where guaranteeing safety, cost, realizes the installation of architectural image complex engineering, demand day It is beneficial urgent.Existing measure is mainly fixed circular orbit, fixed hanging basket, homemade small gun carriage, but practical application compared with For clumsiness, installation and dismounting period are longer, while inconvenience in use process, directly affect construction efficiency;Simultaneously because of engineering Between difference reason, cause versatility not strong, and consider from security standpoint, stationary track installation and remove when worker Security risk it is larger.Fixed hanging basket is distributed more widely, causes danger source more, and hanging basket counterweight is more, to structure floor requirement High or needs take the measures such as dispersion load, there are many defects in this way.
Summary of the invention
The object of the present invention is to provide the integrated machine equipment of a kind of achievable handling, rotation and operation platform function, tools There is the combination function of traditional construction equipment, construction efficiency is high, easy to operate simple and direct.
To achieve the above object, the present invention takes following technical scheme:
The integrated machine equipment of a kind of achievable handling, rotation and operation platform function, the pedestal including rectangle, the pedestal four Two rail wheels that a end extends downwardly equipped with rail wheel, positioned at the same side are located on supporting track, two supporting track phases It is mutually parallel;The base top is equipped with support, and is equipped with rotating device therebetween, and making can opposite water between the support and the pedestal Flat turn is dynamic;The support top surface is upwardly extended equipped with column, which extends outwardly equipped with crossbeam, which sets There is ballast box;Further extend outward equipped with boom at the top of the column, the boom bottom end and the crossbeam inner end are hinged, enable the boom around The crossbeam inner ends thereof;The column side is equipped with support column, and supporting beam is equipped at the top of the support column, and the both ends of the supporting beam are distinguished It is hinged with the support top end and the boom bottom;The boom, support column, supporting beam and the crossbeam are located at same perpendicular; The boom bottom surface is equipped with can be equipped with electric block along the slide that the boom moves, the slide, and the lifting rope bottom end of the electric block is solid At the top of operating platform;The operating platform side is equipped with folding extension frame, sets between the extension frame and the operating platform There is first driving device, and perhaps withdrawal and then the separate or close operation can be unfolded under the driving of first driving device Platform;The operating platform other side opposite with the extension frame is equipped with weight linear meter, and the weight linear meter inner end and the operating platform are hinged, Outer end is equipped with clump weight;The second driving device is equipped between the weight linear meter and the operating platform, and can be in second driving device Be rotated by, make the clump weight far from or close to the operating platform;
It further include control mechanism, the first driving device and the second driving device are connected to control mechanism, the control machine Structure controls the first driving device and the second driving device, puts down the extension frame and clump weight far from or close to the operation simultaneously Platform;The rotating device, the driving device of rail wheel, the driving device of slide, electric block are connected to the control mechanism.
Further, lifting device is equipped between the rail wheel and the pedestal, the base end face is equipped with traveling wheel; The lifting device is connected to the control mechanism.
Further, the boom is equipped with the hoisting arm expansion device for adjusting length of boom, which connects It is connected to the control mechanism.
Further, the angle between the boom and the crossbeam is 135 degree.
Further, the column is equipped with wireless remote controller, is connected to the control mechanism.
Further, the ballast box is water tank, is equipped with intake pump and suction pump and weight sensor, is connected to institute State control mechanism.
The beneficial effects of the present invention are: the present invention only needs a set of equipment, can efficiently solve engineering prevailing traffic, installation, The all problems of operator's operating platform, it is ensured that in Super High engineering construction without the lifting problem of tower crane, solve biography System sets up scaffold, sets up the measures such as hanging basket offer worker operation platform problem, shortens the integral cycle of engineering, simultaneously Safety is good, operation is convenient, and versatility is high, environmentally protective, reusable, saves manpower and time, reduces construction cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the integrated machine equipment of the present invention achievable handling, rotation and operation platform function.
Specific embodiment
Below in conjunction with drawings and examples, the present invention is described in further detail.
As shown in Figure 1, the present invention provides the integrated machine equipment of a kind of achievable handling, rotation and operation platform function, packet The pedestal 1 of rectangle is included, 1 four ends of the pedestal are extended downwardly equipped with rail wheel 11, positioned at two rail wheels 11 of the same side In on supporting track 12, two supporting tracks 12 are parallel to each other.It is equipped with support 2 at the top of the pedestal 1, and is equipped with rotation therebetween Device 21, making can relative level rotation between the support 2 and the pedestal 1.2 top surface of support is upwardly extended equipped with column 3, this is vertical 3 top horizontal of column extends outwardly equipped with crossbeam 4, which is equipped with ballast box 41.It further extends outward and sets at the top of the column 3 There is boom 5,5 bottom end of boom and 4 inner end of crossbeam are hinged, enable the boom 5 around 4 inner ends thereof of crossbeam.3 side of column Equipped with support column 6, be equipped with supporting beam 61 at the top of the support column 6, the both ends of the supporting beam 61 respectively with 6 top of support column and should 5 bottom of boom is hinged.The boom 5, support column 6, supporting beam 61 and the crossbeam 4 are located at same perpendicular, the boom 5 and the cross Angle between beam 4 is 135 degree.5 bottom surface of boom, which is equipped with, to be equipped with electronic along the slide 51 that the boom 5 moves, the slide 51 7 top of operating platform is fixed in cucurbit, the lifting rope bottom end of the electric block.7 side of operating platform is equipped with folding extension Frame 71 is equipped with first driving device, and can open up under the driving of first driving device between the extension frame 71 and the operating platform 7 Open perhaps withdraw so that far from or close to the operating platform 7.The operating platform 7 other side opposite with the extension frame 71 is set There is weight linear meter 72,72 inner end of weight linear meter and the operating platform 7 are hinged, and outer end is equipped with clump weight 73.The weight linear meter 72 and the behaviour Make between platform 7 be equipped with the second driving device, and being rotated by second driving device, keep the clump weight 73 separate Or close to the operating platform 7.
Integrated machine equipment of the present invention further includes control mechanism, the rotating device 21, the driving device of rail wheel 11, slide 51 Driving device, electric block be connected to the control mechanism.In addition, the first driving device and the second driving device are all connected with To control mechanism, which controls the first driving device and the second driving device, makes the extension frame 71 and clump weight 73 Simultaneously far from or close to the operating platform 7.
Lifting device is equipped between the rail wheel 11 and the pedestal 1, which is equipped with traveling wheel 13, makes rail wheel After 11 rise, traveling wheel 13 supports whole equipment to transport to other places, which is connected to the control mechanism.The boom, 5 set There is the hoisting arm expansion device 52 for adjusting 5 length of boom, which is connected to the control mechanism.
For operational safety, which is equipped with wireless remote controller 8, is connected to the control mechanism.
In order to adapt to the lifting object of different weight, which is water tank, is equipped with intake pump and suction pump and weight Sensor is connected to the control mechanism.Control mechanism adjusts intake pump and water outlet pump, makes according to the lifting object of different weight The overall weight of ballast box 41 matches with lifting object, increases the security performance of equipment.
The present invention is suitable for various construction sets, component and fitting handling, installation and provides installation personnel operating platform.Such as curtain The top of the building bodies such as wall, steel construction, civil engineering is as lifting appliance, the nonstandard measure of such as track that alternative tradition uses, and Flexibly, securely and reliably.Present device has the function of the simultaneously operating of installation personnel operating platform, flexible conversion, has lifting When laterally walking, longitudinal walking, left and right angle rotate 340 degree, vertical lifting, functions, installation effectiveness and the safety such as remote control Ensure that performance boost is larger.Present device solves whole measure prime cost in engineering, can effectively improve engineering construction Efficiency reduces cost, and equipment is recycled, and reduces the steel loss of traditional measures, and weld job is environmentally protective.It is applied from whole Work convenience, safety and versatility are significantly improved.The present invention may be implemented entire project difference operating condition vertical transport, The demands such as installation, later period engineering maintenance, have greatly saved cost, have saved material, improve safety, and perfect realization Architectural effect, and process, is easy for installation, it can be widely applied in various buildings and building curtain wall construction, special energy The installation requirements for solving complex model curtain wall are pacified without the building for taking the combination of many kinds of measures of traditional method to be just able to achieve Dress.Around building border, integrated machine equipment of the present invention can be walked by rail wheel along supporting track, be furnished with long-range nothing in operation Line remote control device increases safety reliability.Entire integrated machine equipment design science is careful, dexterous, realizes in three-dimensional space The handling of any point is sent to, installs, and provides operating platform when installation, carries out all standing, a machine to building solid space Has multiple function, the multiple measure methods for having reached traditional construction mode combine the function being just able to achieve.
The above examples are only used to illustrate the technical scheme of the present invention and are not limiting, although referring to embodiment to the present invention into Row be described in detail, it will be appreciated by those skilled in the art that can with modification or equivalent replacement of the technical solution of the present invention are made, Without departing from the objective and range of the technical program, should all cover in scope of the presently claimed invention.

Claims (6)

1. the integrated machine equipment of a kind of achievable handling, rotation and operation platform function, which is characterized in that the bottom including rectangle Seat, two rail wheels that four ends of the pedestal extend downwardly equipped with rail wheel, positioned at the same side are located on supporting track, and two Supporting track is parallel to each other;The base top is equipped with support, and is equipped with rotating device therebetween, make the support and the pedestal it Between can relative level rotation;The support top surface is upwardly extended equipped with column, which extends outwardly equipped with crossbeam, should Crossbeam outer end is equipped with ballast box;It further extends outward at the top of the column equipped with boom, the boom bottom end and the crossbeam inner end are hinged, make The boom can be around the crossbeam inner ends thereof;The column side is equipped with support column, is equipped with supporting beam, the supporting beam at the top of the support column Both ends it is hinged with the support top end and the boom bottom respectively;The boom, support column, supporting beam and the crossbeam are located at same Perpendicular;The boom bottom surface, which is equipped with, to be equipped with electric block along the slide that the boom moves, the slide, which hangs Rope bottom end is fixed at the top of operating platform;The operating platform side is equipped with folding extension frame, and the extension frame and the operation are flat It is equipped with first driving device between platform, and perhaps withdrawal and then separate or lean on can be unfolded under the driving of first driving device The nearly operating platform;The operating platform other side opposite with the extension frame is equipped with weight linear meter, the weight linear meter inner end and the operation Platform is hinged, and outer end is equipped with clump weight;Between the weight linear meter and the operating platform be equipped with the second driving device, and can this second Driving device is rotated by, and keeps the clump weight separate or close to the operating platform;
It further include control mechanism, the first driving device and the second driving device are connected to control mechanism, the control mechanism control The first driving device and the second driving device are made, makes the extension frame and clump weight simultaneously far from or close to the operating platform; The rotating device, the driving device of rail wheel, the driving device of slide, electric block are connected to the control mechanism.
2. the integrated machine equipment of achievable handling according to claim 1, rotation and operation platform function, feature exist In: lifting device is equipped between the rail wheel and the pedestal, the base end face is equipped with traveling wheel;Lifting device connection To the control mechanism.
3. the integrated machine equipment of achievable handling according to claim 1 or 2, rotation and operation platform function, feature Be: the boom is equipped with the hoisting arm expansion device for adjusting length of boom, which is connected to the control Mechanism.
4. the integrated machine equipment of achievable handling according to claim 1, rotation and operation platform function, feature exist In: the angle between the boom and the crossbeam is 135 degree.
5. the integrated machine equipment of achievable handling according to claim 1, rotation and operation platform function, feature exist In: the column is equipped with wireless remote controller, is connected to the control mechanism.
6. the integrated machine equipment of achievable handling according to claim 1, rotation and operation platform function, feature exist In: the ballast box is water tank, is equipped with intake pump and suction pump and weight sensor, is connected to the control mechanism.
CN201910079615.0A 2019-01-28 2019-01-28 The integrated machine equipment of handling, rotation and operation platform function can be achieved Active CN109704209B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910079615.0A CN109704209B (en) 2019-01-28 2019-01-28 The integrated machine equipment of handling, rotation and operation platform function can be achieved

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910079615.0A CN109704209B (en) 2019-01-28 2019-01-28 The integrated machine equipment of handling, rotation and operation platform function can be achieved

Publications (2)

Publication Number Publication Date
CN109704209A CN109704209A (en) 2019-05-03
CN109704209B true CN109704209B (en) 2019-11-26

Family

ID=66261853

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910079615.0A Active CN109704209B (en) 2019-01-28 2019-01-28 The integrated machine equipment of handling, rotation and operation platform function can be achieved

Country Status (1)

Country Link
CN (1) CN109704209B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111943055A (en) * 2020-07-06 2020-11-17 上海金冠幕墙科技有限公司 Hoisting structure for curtain wall unit bodies of high-rise and super high-rise buildings
CN111877720A (en) * 2020-07-08 2020-11-03 国网山东省电力公司济南市济阳区供电公司 Iron tower construction platform
CN113863632B (en) * 2021-09-03 2022-11-11 北京江河幕墙系统工程有限公司 Method for automatically applying structural adhesive on construction site
CN115288440A (en) * 2022-07-11 2022-11-04 中国建筑第八工程局有限公司 Rail mounted lift platform and rail mounted gallows integration system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0471305A1 (en) * 1990-08-17 1992-02-19 Paul Frey-Wigger Platform mountable on a mobile crane
US5445032A (en) * 1994-09-09 1995-08-29 Dixon; Joe K. Load testing apparatus and method for a personnel platform
CN1263044A (en) * 1999-12-30 2000-08-16 王绍清 Wall jib mobile crane
CN101905840A (en) * 2010-07-07 2010-12-08 大连大矿冶金起重机有限公司 Underground coal mine crane
CN202400754U (en) * 2011-12-14 2012-08-29 南京梅山冶金发展有限公司 Mast crane
CN107285203A (en) * 2017-06-15 2017-10-24 窦智扬 A kind of novel architecture tower crane

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0471305A1 (en) * 1990-08-17 1992-02-19 Paul Frey-Wigger Platform mountable on a mobile crane
US5445032A (en) * 1994-09-09 1995-08-29 Dixon; Joe K. Load testing apparatus and method for a personnel platform
CN1263044A (en) * 1999-12-30 2000-08-16 王绍清 Wall jib mobile crane
CN101905840A (en) * 2010-07-07 2010-12-08 大连大矿冶金起重机有限公司 Underground coal mine crane
CN202400754U (en) * 2011-12-14 2012-08-29 南京梅山冶金发展有限公司 Mast crane
CN107285203A (en) * 2017-06-15 2017-10-24 窦智扬 A kind of novel architecture tower crane

Also Published As

Publication number Publication date
CN109704209A (en) 2019-05-03

Similar Documents

Publication Publication Date Title
CN109704209B (en) The integrated machine equipment of handling, rotation and operation platform function can be achieved
CN102397039B (en) Folding window cleaning equipment
CN103086279B (en) Vertical transportation construction method for building construction
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN202445989U (en) Full-automatic window cleaning machine
CN106006488B (en) aerial work platform
CN204474187U (en) A kind of wall type turning crane
CN205472336U (en) Loop wheel machine that construction was used
CN102406485A (en) Full-automatic window cleaning machine
CN104146651A (en) Winch type window cleaning machine
CN104291222A (en) Rigid protection and crane integration system inside super high-rise building core tube
CN205442496U (en) High -rise building roof curtain lifting device
CN203095440U (en) Special lifting device for asphalt pavement maintenance truck in high-altitude low-temperature region
CN209353734U (en) For installing the double-track device of curtain wall
CN204802839U (en) Jacking equipment for building
CN107165399A (en) A kind of high-altitude external wall maintenance unit
CN207312995U (en) One kind self-control bridge-collision-avoidance wall form hanging device
CN206273951U (en) The hoisting apparatus of attachment type raise scaffold
CN205653077U (en) Tower crane for building site of band shift dynamic formula scaffold frame
CN105800479A (en) Tower crane for construction site with movable scaffold
CN202989702U (en) Track switch hoisting transportation operation device
CN204251234U (en) For the Multifunctional aloft-work hoisting crane of wind-power electricity generation machine overhauling, maintenance
CN214613641U (en) Hanging basket type bridge drainage pipe construction trolley
CN209006355U (en) A kind of indirect cool tower automatic flushing device
CN205257816U (en) Be used for lifting machine in wind generating set cabin

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant