CN109704209B - The integrated machine equipment of handling, rotation and operation platform function can be achieved - Google Patents
The integrated machine equipment of handling, rotation and operation platform function can be achieved Download PDFInfo
- Publication number
- CN109704209B CN109704209B CN201910079615.0A CN201910079615A CN109704209B CN 109704209 B CN109704209 B CN 109704209B CN 201910079615 A CN201910079615 A CN 201910079615A CN 109704209 B CN109704209 B CN 109704209B
- Authority
- CN
- China
- Prior art keywords
- boom
- driving device
- operating platform
- control mechanism
- rotation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Jib Cranes (AREA)
Abstract
A kind of integrated machine equipment of achievable handling, rotation and operation platform function, pedestal including rectangle, the pedestal are extended downwardly equipped with rail wheel and supporting track, which is equipped with support, the support top surface is upwardly extended equipped with column, and crossbeam and ballast box are equipped at the top of the column;It is additionally provided with boom at the top of the column, which is equipped with supporting beam;The boom bottom surface is equipped with slide, which is equipped with electric block, and the lifting rope bottom end of the electric block is fixed at the top of operating platform;The operating platform side is equipped with folding extension frame, and it further includes control mechanism that the operating platform other side opposite with the extension frame, which is equipped with weight linear meter, controls the clump weight of the extension frame and weight linear meter simultaneously far from or close to the operating platform.The present invention has the combination function of traditional construction equipment, and construction efficiency is high, easy to operate simple and direct.
Description
Technical field
The present invention relates to a kind of construction hoisting equipment, especially a kind of achievable handling, rotation and operation platform function
Integrated machine equipment.
Background technique
With the continuous development of architectural design, the personalized trend of building is more and more obvious, building shape solid space
It becomes increasingly complex, how the case where guaranteeing safety, cost, realizes the installation of architectural image complex engineering, demand day
It is beneficial urgent.Existing measure is mainly fixed circular orbit, fixed hanging basket, homemade small gun carriage, but practical application compared with
For clumsiness, installation and dismounting period are longer, while inconvenience in use process, directly affect construction efficiency;Simultaneously because of engineering
Between difference reason, cause versatility not strong, and consider from security standpoint, stationary track installation and remove when worker
Security risk it is larger.Fixed hanging basket is distributed more widely, causes danger source more, and hanging basket counterweight is more, to structure floor requirement
High or needs take the measures such as dispersion load, there are many defects in this way.
Summary of the invention
The object of the present invention is to provide the integrated machine equipment of a kind of achievable handling, rotation and operation platform function, tools
There is the combination function of traditional construction equipment, construction efficiency is high, easy to operate simple and direct.
To achieve the above object, the present invention takes following technical scheme:
The integrated machine equipment of a kind of achievable handling, rotation and operation platform function, the pedestal including rectangle, the pedestal four
Two rail wheels that a end extends downwardly equipped with rail wheel, positioned at the same side are located on supporting track, two supporting track phases
It is mutually parallel;The base top is equipped with support, and is equipped with rotating device therebetween, and making can opposite water between the support and the pedestal
Flat turn is dynamic;The support top surface is upwardly extended equipped with column, which extends outwardly equipped with crossbeam, which sets
There is ballast box;Further extend outward equipped with boom at the top of the column, the boom bottom end and the crossbeam inner end are hinged, enable the boom around
The crossbeam inner ends thereof;The column side is equipped with support column, and supporting beam is equipped at the top of the support column, and the both ends of the supporting beam are distinguished
It is hinged with the support top end and the boom bottom;The boom, support column, supporting beam and the crossbeam are located at same perpendicular;
The boom bottom surface is equipped with can be equipped with electric block along the slide that the boom moves, the slide, and the lifting rope bottom end of the electric block is solid
At the top of operating platform;The operating platform side is equipped with folding extension frame, sets between the extension frame and the operating platform
There is first driving device, and perhaps withdrawal and then the separate or close operation can be unfolded under the driving of first driving device
Platform;The operating platform other side opposite with the extension frame is equipped with weight linear meter, and the weight linear meter inner end and the operating platform are hinged,
Outer end is equipped with clump weight;The second driving device is equipped between the weight linear meter and the operating platform, and can be in second driving device
Be rotated by, make the clump weight far from or close to the operating platform;
It further include control mechanism, the first driving device and the second driving device are connected to control mechanism, the control machine
Structure controls the first driving device and the second driving device, puts down the extension frame and clump weight far from or close to the operation simultaneously
Platform;The rotating device, the driving device of rail wheel, the driving device of slide, electric block are connected to the control mechanism.
Further, lifting device is equipped between the rail wheel and the pedestal, the base end face is equipped with traveling wheel;
The lifting device is connected to the control mechanism.
Further, the boom is equipped with the hoisting arm expansion device for adjusting length of boom, which connects
It is connected to the control mechanism.
Further, the angle between the boom and the crossbeam is 135 degree.
Further, the column is equipped with wireless remote controller, is connected to the control mechanism.
Further, the ballast box is water tank, is equipped with intake pump and suction pump and weight sensor, is connected to institute
State control mechanism.
The beneficial effects of the present invention are: the present invention only needs a set of equipment, can efficiently solve engineering prevailing traffic, installation,
The all problems of operator's operating platform, it is ensured that in Super High engineering construction without the lifting problem of tower crane, solve biography
System sets up scaffold, sets up the measures such as hanging basket offer worker operation platform problem, shortens the integral cycle of engineering, simultaneously
Safety is good, operation is convenient, and versatility is high, environmentally protective, reusable, saves manpower and time, reduces construction cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the integrated machine equipment of the present invention achievable handling, rotation and operation platform function.
Specific embodiment
Below in conjunction with drawings and examples, the present invention is described in further detail.
As shown in Figure 1, the present invention provides the integrated machine equipment of a kind of achievable handling, rotation and operation platform function, packet
The pedestal 1 of rectangle is included, 1 four ends of the pedestal are extended downwardly equipped with rail wheel 11, positioned at two rail wheels 11 of the same side
In on supporting track 12, two supporting tracks 12 are parallel to each other.It is equipped with support 2 at the top of the pedestal 1, and is equipped with rotation therebetween
Device 21, making can relative level rotation between the support 2 and the pedestal 1.2 top surface of support is upwardly extended equipped with column 3, this is vertical
3 top horizontal of column extends outwardly equipped with crossbeam 4, which is equipped with ballast box 41.It further extends outward and sets at the top of the column 3
There is boom 5,5 bottom end of boom and 4 inner end of crossbeam are hinged, enable the boom 5 around 4 inner ends thereof of crossbeam.3 side of column
Equipped with support column 6, be equipped with supporting beam 61 at the top of the support column 6, the both ends of the supporting beam 61 respectively with 6 top of support column and should
5 bottom of boom is hinged.The boom 5, support column 6, supporting beam 61 and the crossbeam 4 are located at same perpendicular, the boom 5 and the cross
Angle between beam 4 is 135 degree.5 bottom surface of boom, which is equipped with, to be equipped with electronic along the slide 51 that the boom 5 moves, the slide 51
7 top of operating platform is fixed in cucurbit, the lifting rope bottom end of the electric block.7 side of operating platform is equipped with folding extension
Frame 71 is equipped with first driving device, and can open up under the driving of first driving device between the extension frame 71 and the operating platform 7
Open perhaps withdraw so that far from or close to the operating platform 7.The operating platform 7 other side opposite with the extension frame 71 is set
There is weight linear meter 72,72 inner end of weight linear meter and the operating platform 7 are hinged, and outer end is equipped with clump weight 73.The weight linear meter 72 and the behaviour
Make between platform 7 be equipped with the second driving device, and being rotated by second driving device, keep the clump weight 73 separate
Or close to the operating platform 7.
Integrated machine equipment of the present invention further includes control mechanism, the rotating device 21, the driving device of rail wheel 11, slide 51
Driving device, electric block be connected to the control mechanism.In addition, the first driving device and the second driving device are all connected with
To control mechanism, which controls the first driving device and the second driving device, makes the extension frame 71 and clump weight 73
Simultaneously far from or close to the operating platform 7.
Lifting device is equipped between the rail wheel 11 and the pedestal 1, which is equipped with traveling wheel 13, makes rail wheel
After 11 rise, traveling wheel 13 supports whole equipment to transport to other places, which is connected to the control mechanism.The boom, 5 set
There is the hoisting arm expansion device 52 for adjusting 5 length of boom, which is connected to the control mechanism.
For operational safety, which is equipped with wireless remote controller 8, is connected to the control mechanism.
In order to adapt to the lifting object of different weight, which is water tank, is equipped with intake pump and suction pump and weight
Sensor is connected to the control mechanism.Control mechanism adjusts intake pump and water outlet pump, makes according to the lifting object of different weight
The overall weight of ballast box 41 matches with lifting object, increases the security performance of equipment.
The present invention is suitable for various construction sets, component and fitting handling, installation and provides installation personnel operating platform.Such as curtain
The top of the building bodies such as wall, steel construction, civil engineering is as lifting appliance, the nonstandard measure of such as track that alternative tradition uses, and
Flexibly, securely and reliably.Present device has the function of the simultaneously operating of installation personnel operating platform, flexible conversion, has lifting
When laterally walking, longitudinal walking, left and right angle rotate 340 degree, vertical lifting, functions, installation effectiveness and the safety such as remote control
Ensure that performance boost is larger.Present device solves whole measure prime cost in engineering, can effectively improve engineering construction
Efficiency reduces cost, and equipment is recycled, and reduces the steel loss of traditional measures, and weld job is environmentally protective.It is applied from whole
Work convenience, safety and versatility are significantly improved.The present invention may be implemented entire project difference operating condition vertical transport,
The demands such as installation, later period engineering maintenance, have greatly saved cost, have saved material, improve safety, and perfect realization
Architectural effect, and process, is easy for installation, it can be widely applied in various buildings and building curtain wall construction, special energy
The installation requirements for solving complex model curtain wall are pacified without the building for taking the combination of many kinds of measures of traditional method to be just able to achieve
Dress.Around building border, integrated machine equipment of the present invention can be walked by rail wheel along supporting track, be furnished with long-range nothing in operation
Line remote control device increases safety reliability.Entire integrated machine equipment design science is careful, dexterous, realizes in three-dimensional space
The handling of any point is sent to, installs, and provides operating platform when installation, carries out all standing, a machine to building solid space
Has multiple function, the multiple measure methods for having reached traditional construction mode combine the function being just able to achieve.
The above examples are only used to illustrate the technical scheme of the present invention and are not limiting, although referring to embodiment to the present invention into
Row be described in detail, it will be appreciated by those skilled in the art that can with modification or equivalent replacement of the technical solution of the present invention are made,
Without departing from the objective and range of the technical program, should all cover in scope of the presently claimed invention.
Claims (6)
1. the integrated machine equipment of a kind of achievable handling, rotation and operation platform function, which is characterized in that the bottom including rectangle
Seat, two rail wheels that four ends of the pedestal extend downwardly equipped with rail wheel, positioned at the same side are located on supporting track, and two
Supporting track is parallel to each other;The base top is equipped with support, and is equipped with rotating device therebetween, make the support and the pedestal it
Between can relative level rotation;The support top surface is upwardly extended equipped with column, which extends outwardly equipped with crossbeam, should
Crossbeam outer end is equipped with ballast box;It further extends outward at the top of the column equipped with boom, the boom bottom end and the crossbeam inner end are hinged, make
The boom can be around the crossbeam inner ends thereof;The column side is equipped with support column, is equipped with supporting beam, the supporting beam at the top of the support column
Both ends it is hinged with the support top end and the boom bottom respectively;The boom, support column, supporting beam and the crossbeam are located at same
Perpendicular;The boom bottom surface, which is equipped with, to be equipped with electric block along the slide that the boom moves, the slide, which hangs
Rope bottom end is fixed at the top of operating platform;The operating platform side is equipped with folding extension frame, and the extension frame and the operation are flat
It is equipped with first driving device between platform, and perhaps withdrawal and then separate or lean on can be unfolded under the driving of first driving device
The nearly operating platform;The operating platform other side opposite with the extension frame is equipped with weight linear meter, the weight linear meter inner end and the operation
Platform is hinged, and outer end is equipped with clump weight;Between the weight linear meter and the operating platform be equipped with the second driving device, and can this second
Driving device is rotated by, and keeps the clump weight separate or close to the operating platform;
It further include control mechanism, the first driving device and the second driving device are connected to control mechanism, the control mechanism control
The first driving device and the second driving device are made, makes the extension frame and clump weight simultaneously far from or close to the operating platform;
The rotating device, the driving device of rail wheel, the driving device of slide, electric block are connected to the control mechanism.
2. the integrated machine equipment of achievable handling according to claim 1, rotation and operation platform function, feature exist
In: lifting device is equipped between the rail wheel and the pedestal, the base end face is equipped with traveling wheel;Lifting device connection
To the control mechanism.
3. the integrated machine equipment of achievable handling according to claim 1 or 2, rotation and operation platform function, feature
Be: the boom is equipped with the hoisting arm expansion device for adjusting length of boom, which is connected to the control
Mechanism.
4. the integrated machine equipment of achievable handling according to claim 1, rotation and operation platform function, feature exist
In: the angle between the boom and the crossbeam is 135 degree.
5. the integrated machine equipment of achievable handling according to claim 1, rotation and operation platform function, feature exist
In: the column is equipped with wireless remote controller, is connected to the control mechanism.
6. the integrated machine equipment of achievable handling according to claim 1, rotation and operation platform function, feature exist
In: the ballast box is water tank, is equipped with intake pump and suction pump and weight sensor, is connected to the control mechanism.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910079615.0A CN109704209B (en) | 2019-01-28 | 2019-01-28 | The integrated machine equipment of handling, rotation and operation platform function can be achieved |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910079615.0A CN109704209B (en) | 2019-01-28 | 2019-01-28 | The integrated machine equipment of handling, rotation and operation platform function can be achieved |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109704209A CN109704209A (en) | 2019-05-03 |
CN109704209B true CN109704209B (en) | 2019-11-26 |
Family
ID=66261853
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910079615.0A Active CN109704209B (en) | 2019-01-28 | 2019-01-28 | The integrated machine equipment of handling, rotation and operation platform function can be achieved |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109704209B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111943055A (en) * | 2020-07-06 | 2020-11-17 | 上海金冠幕墙科技有限公司 | Hoisting structure for curtain wall unit bodies of high-rise and super high-rise buildings |
CN111877720A (en) * | 2020-07-08 | 2020-11-03 | 国网山东省电力公司济南市济阳区供电公司 | Iron tower construction platform |
CN113863632B (en) * | 2021-09-03 | 2022-11-11 | 北京江河幕墙系统工程有限公司 | Method for automatically applying structural adhesive on construction site |
CN115288440A (en) * | 2022-07-11 | 2022-11-04 | 中国建筑第八工程局有限公司 | Rail mounted lift platform and rail mounted gallows integration system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0471305A1 (en) * | 1990-08-17 | 1992-02-19 | Paul Frey-Wigger | Platform mountable on a mobile crane |
US5445032A (en) * | 1994-09-09 | 1995-08-29 | Dixon; Joe K. | Load testing apparatus and method for a personnel platform |
CN1263044A (en) * | 1999-12-30 | 2000-08-16 | 王绍清 | Wall jib mobile crane |
CN101905840A (en) * | 2010-07-07 | 2010-12-08 | 大连大矿冶金起重机有限公司 | Underground coal mine crane |
CN202400754U (en) * | 2011-12-14 | 2012-08-29 | 南京梅山冶金发展有限公司 | Mast crane |
CN107285203A (en) * | 2017-06-15 | 2017-10-24 | 窦智扬 | A kind of novel architecture tower crane |
-
2019
- 2019-01-28 CN CN201910079615.0A patent/CN109704209B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0471305A1 (en) * | 1990-08-17 | 1992-02-19 | Paul Frey-Wigger | Platform mountable on a mobile crane |
US5445032A (en) * | 1994-09-09 | 1995-08-29 | Dixon; Joe K. | Load testing apparatus and method for a personnel platform |
CN1263044A (en) * | 1999-12-30 | 2000-08-16 | 王绍清 | Wall jib mobile crane |
CN101905840A (en) * | 2010-07-07 | 2010-12-08 | 大连大矿冶金起重机有限公司 | Underground coal mine crane |
CN202400754U (en) * | 2011-12-14 | 2012-08-29 | 南京梅山冶金发展有限公司 | Mast crane |
CN107285203A (en) * | 2017-06-15 | 2017-10-24 | 窦智扬 | A kind of novel architecture tower crane |
Also Published As
Publication number | Publication date |
---|---|
CN109704209A (en) | 2019-05-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109704209B (en) | The integrated machine equipment of handling, rotation and operation platform function can be achieved | |
CN102397039B (en) | Folding window cleaning equipment | |
CN103086279B (en) | Vertical transportation construction method for building construction | |
CN103711301A (en) | Construction method and device for two-track movable electric basket and lifting hoist | |
CN202445989U (en) | Full-automatic window cleaning machine | |
CN106006488B (en) | aerial work platform | |
CN204474187U (en) | A kind of wall type turning crane | |
CN205472336U (en) | Loop wheel machine that construction was used | |
CN102406485A (en) | Full-automatic window cleaning machine | |
CN104146651A (en) | Winch type window cleaning machine | |
CN104291222A (en) | Rigid protection and crane integration system inside super high-rise building core tube | |
CN205442496U (en) | High -rise building roof curtain lifting device | |
CN203095440U (en) | Special lifting device for asphalt pavement maintenance truck in high-altitude low-temperature region | |
CN209353734U (en) | For installing the double-track device of curtain wall | |
CN204802839U (en) | Jacking equipment for building | |
CN107165399A (en) | A kind of high-altitude external wall maintenance unit | |
CN207312995U (en) | One kind self-control bridge-collision-avoidance wall form hanging device | |
CN206273951U (en) | The hoisting apparatus of attachment type raise scaffold | |
CN205653077U (en) | Tower crane for building site of band shift dynamic formula scaffold frame | |
CN105800479A (en) | Tower crane for construction site with movable scaffold | |
CN202989702U (en) | Track switch hoisting transportation operation device | |
CN204251234U (en) | For the Multifunctional aloft-work hoisting crane of wind-power electricity generation machine overhauling, maintenance | |
CN214613641U (en) | Hanging basket type bridge drainage pipe construction trolley | |
CN209006355U (en) | A kind of indirect cool tower automatic flushing device | |
CN205257816U (en) | Be used for lifting machine in wind generating set cabin |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |