CN108241350A - A kind of Intelligent Dynamic manufacture execution method and relevant device - Google Patents
A kind of Intelligent Dynamic manufacture execution method and relevant device Download PDFInfo
- Publication number
- CN108241350A CN108241350A CN201810049361.3A CN201810049361A CN108241350A CN 108241350 A CN108241350 A CN 108241350A CN 201810049361 A CN201810049361 A CN 201810049361A CN 108241350 A CN108241350 A CN 108241350A
- Authority
- CN
- China
- Prior art keywords
- task
- target
- produced
- production
- target production
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32252—Scheduling production, machining, job shop
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Abstract
The embodiment of the invention discloses a kind of Intelligent Dynamic manufacture execution method and relevant devices, can effectively solve the wasting of resources, improve the efficiency of management.This method includes:Determine the target scheduling of target developing project;Step 2:Multiple tasks to be produced are distributed according to preset rules to multiple prime principals:Receive the executive condition of each task to be produced of each prime principal feedback;Executive condition is analyzed according to default AI computation models, to judge to reach the target production task of predetermined threshold value in multiple tasks to be produced with the presence or absence of degree of urgency;If so, the degree of urgency prompting message of target production task is sent to the corresponding target responsible person of target production task;The attribute information for the target production task fed back according to target responsible person is adjusted target scheduling;It repeats, until all tasks processing in target scheduling is completed.
Description
Technical field
The present invention relates to management domain more particularly to a kind of production scheduling method and relevant devices.
Background technology
Production scheduling refers to the process of distribute production task to resources of production.Under the premise of energy force-summing device is considered,
In the case where material quantity is certain, the production sequence of each production task is arranged, optimizes production sequence, optimum choice production is set
It is standby so as to reduce the stand-by period, balance each machine and the produce load of worker.So as to optimize production capacity, production efficiency is improved, is shortened
Produce (order) time in advance.
In the management implementation procedure of actual production scheduling, manufacture execution etc., often because of a certain exception in scheduling, and cause
Entire production scheduling is nervous or delays, so as to be produced bigger effect to entire production scheduling.If the real-time letter in production scheduling
Breath feedback promptness is inadequate, strains countermeasure not in time, whole production scheduling will all be made to delay, and need to waste larger manpower
Session discussing, to be readjusted to production scheduling.
Invention content
For above-mentioned technical problem, an embodiment of the present invention provides a kind of Intelligent Dynamic manufacture execution methods and correlation to set
It is standby, can timely and effectively to manufacturing schedule unusual condition in due course intelligence be adjusted, effectively solve waste of human resource, carry
The high efficiency of management.
The first aspect of the embodiment of the present invention provides a kind of Intelligent Dynamic manufacture execution method, applied to project development management
System, including:
Step 1:Determine target production scheduling, the target production scheduling includes multiple tasks to be produced, the multiple
Content, equipment, time started and the deadline of task to be produced;
Step 2:The multiple task to be produced is distributed according to preset rules to multiple prime principals and/or multiple
One equipment;
Step 3:Each prime principal and/or each first equipment are received according to anti-in actual production process
The condition of production of each task to be produced of feedback;
Step 4:The condition of production is analyzed according to default AI computation models, to judge the multiple to be produced
Reach the target production task of predetermined threshold value in business with the presence or absence of degree of urgency;
Step 5:If so, send the target production task degree of urgency prompting message and strain work instruction to described
The corresponding target responsible person of target production task and/or target device, the degree of urgency prompting message and preset issued transaction
Grade is associated;
Step 6:By the target responsible person and/or target device according to the strain work instruction and with it is described urgent
It is intelligently moved described in the attribute information typing of the target production task of the associated issued transaction grade feedback of degree prompting message
State manufacturing execution system, the attribute information of the target production task include the target production task the condition of production and/or
The completion situation of the target production task;
Step 7:Target production scheduling progress dynamic is adjusted according to the attribute information of the target production task;
Step 2 is repeated to step 7, until all production tasks processing in the target production scheduling is completed.
Optionally, it is described the multiple task to be produced is distributed according to preset rules to multiple prime principals and/or
Multiple first equipment include:
Each task to be produced is distributed in the form of small routine to each task to be produced corresponding first and is responsible for
People;
And/or
By each task to be produced distribute to the Quick Response Code of the corresponding first equipment mark of each task to be produced and/
Or small routine.
Optionally, the determining target production scheduling includes:
At the beginning of calculating each task to be produced and the deadline;
At the beginning of to each task to be produced and the deadline arranges, to determine that the target produces
Scheduling.
Optionally, the attribute information according to the target production task is to the target scheduling progress dynamic adjustment package
It includes:
Receive the production status of the target production task of the target responsible person and/or target device feedback
And/or the completion situation of the target production task;
According to the production status of the target production task and/or the completion situation of the target production task, with described
The target completion date of the target production task is determined on the basis of the deadline of target production task;
The target production scheduling is adjusted according to the target completion date.
Optionally, when degree of urgency being not present in the task to be produced reaching default preset target production task, base
The multiple task to be produced is handled in the target scheduling.
Second aspect of the embodiment of the present invention provides a kind of Intelligent Dynamic manufacture executive device, applied to project development management
System, including:
Determination unit, for performing step 1:Determine target production scheduling, the target production scheduling includes multiple treat
Content, equipment, time started and the deadline of production task, the multiple task to be produced;
Allocation unit, for performing step 2:The multiple task to be produced is distributed according to preset rules to multiple first
Responsible person and/or multiple first equipment;
Receiving unit, for performing step 3:Receive each prime principal and/or each first equipment root
According to the condition of production of each task to be produced fed back in actual production process;
Judging unit, for step 4:The condition of production is analyzed according to default AI computation models, to judge
State the target production task for reaching predetermined threshold value in multiple tasks to be produced with the presence or absence of degree of urgency;
Transmitting element, for performing step 5:If so, send the target production task degree of urgency prompting message and
Work instruction is strained to the corresponding target responsible person of the target production task and/or target device, the degree of urgency reminds letter
Breath is associated with preset issued transaction grade;
First processing units, for performing step 6:By the target responsible person and/or target device according to the strain
The target production task of work instruction and issued transaction grade associated with degree of urgency prompting message feedback
Intelligent Dynamic manufacturing execution system described in attribute information typing, the attribute information of the target production task are given birth to including the target
The completion situation of the condition of production of production task and/or the target production task;
Dynamic adjustment unit, for performing step 7:The target is arranged according to the attribute information of the target production task
Cheng Jindu dynamics adjust;
Processing unit, for repeating step 2 to step 7, until all productions in the target production scheduling are appointed
Business processing is completed.
Optionally, the allocation unit is specifically used for:
Each task to be produced is distributed in the form of small routine to each task to be produced corresponding first and is responsible for
People;
And/or
By each task to be produced distribute to the Quick Response Code of the corresponding first equipment mark of each task to be produced and/
Or small routine.
Optionally, the determination unit is specifically used for:
At the beginning of calculating each task to be produced and the deadline;
At the beginning of to each task to be produced and the deadline arranges, to determine that the target produces
Scheduling.
The third aspect of the embodiment of the present invention provides a kind of processor, and the processor is for running computer program, institute
State the step of Intelligent Dynamic manufacture execution method as described in above-mentioned any one is performed during computer program operation.
Fourth aspect of the embodiment of the present invention provides a kind of computer readable storage medium, is stored thereon with computer journey
Sequence, it is characterised in that:The computer program realizes the Intelligent Dynamic manufacture described in above-mentioned any one when being executed by processor
The step of execution method.
In technical solution provided in an embodiment of the present invention, relative to the prior art, in the embodiment of the present invention, calculated by AI
The intelligent operation of model calculates the degree of urgency of each task to be produced, and mission bit stream is sent in the form of small routine, timely and effectively right
Progress unusual condition in production process carries out being adjusted in due course intelligence, effectively solves waste of human resource, improves management
Efficiency.
Description of the drawings
Fig. 1 is one embodiment schematic diagram that Intelligent Dynamic manufactures execution method in the embodiment of the present invention;
Fig. 2 is the embodiment schematic diagram that Intelligent Dynamic manufactures executive device in the embodiment of the present invention;
Fig. 3 is the hardware architecture diagram that Intelligent Dynamic manufactures executive device in the embodiment of the present invention.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, the every other implementation that those skilled in the art are obtained without creative efforts
Example, shall fall within the protection scope of the present invention.
Referring to Fig. 1, Fig. 1 is one embodiment schematic diagram that Intelligent Dynamic manufactures execution method in the embodiment of the present invention,
Applied to manufacture execution system, including:
101st, step 1:Determine target production scheduling.
In the present embodiment, in unit when being produced, target all production tasks to be produced can be determined first, with
And it is responsible for the person liable of each task to be produced, meanwhile, based on all production tasks to be produced and it is responsible for each task to be produced
Person liable generate target production scheduling, i.e., a sequence is carried out to current all tasks to be produced, that is to say, that will be all
Task to be produced separates the sequence of successively production, which includes multiple tasks to be produced.Specifically, clearly
It is each to manufacture plan target and person liable, process equipment, it is contemplated that the beginning of each task and deadline.
It should be noted that when determining target production scheduling, can calculate at the beginning of all tasks to be produced with
And the deadline (it is unlimited devise a stratagem calculate mode, such as can be calculated according to the urgency level of each task to be produced or
Calculated according to the demand of client), to each task to be produced at the beginning of and the deadline arrange, with determine
Target production scheduling.(i.e. when at the beginning of having obtained all tasks to be produced and after the deadline, being based on performing
At the beginning of task and the deadline is ranked up all tasks to be produced).Such as target production scheduling includes:A、B、
Tri- tasks to be produced of C, calculate each task to be produced of A, B, C at the beginning of and the deadline, it is each to be based ultimately upon A, B, C
At the beginning of a task to be produced and the deadline is ranked up tri- tasks to be produced of A, B, C, obtains target production
Scheduling.
102nd, step 2:Multiple tasks to be produced are distributed according to preset rules to multiple prime principals and/or multiple
One equipment.
In the present embodiment, due to that in multiple execution tasks to be produced, may be divided into three kinds of situations, first:It is all to be produced
Task is performed by people;Second:All tasks to be produced are performed by equipment;Third:In all tasks to be produced
Some is performed by people, and remainder is performed by equipment.It so can be by multiple execution tasks according to default rule
It then distributes to multiple prime principals and/or multiple first equipment.It such as can be by each task to be produced with the shape of small routine
Formula distributes prime principal corresponding to each task to be produced;And/or each task to be produced is distributed to each to be produced
The Quick Response Code or small routine of corresponding first device identification of task.
It should be noted that responsible person corresponding to production task is distributed in the form of small routine in above-mentioned steps, only
It is a kind of executive mode, naturally it is also possible to have other executive modes, such as each task to be produced is directly distributed to each
The corresponding target responsible person of task to be produced, does not limit specifically herein.
It should be noted that when there is the third situation, production task can will be performed by people and is sent to the life
The corresponding responsible person of production task will be performed production task by equipment and be sent to the corresponding equipment of the production task.
103rd, step 3:Each prime principal and/or each first equipment are received according to being fed back in actual production process
The condition of production of each task to be produced.
In the present embodiment, corresponding to three kinds of situations described above, each task to be produced corresponds to responsible person and/or each
The corresponding equipment of task to be produced can be performed and be appointed with the condition of production of the corresponding task to be produced of Real-time Feedback, such as A
The business stage residing at present is the starting stage, and B performs task intermediate stage in stage residing at present etc..Specifically, production
It manufactures in implementation procedure, person liable or equipment are fed back according to practical practice condition, such as scheduled whether each task to be produced
It completes, whether shift to an earlier date, whether delaying and data, the user such as extension scheduled completion time are fed back by terminal small routine, if
It is standby to be fed back by small routine or Quick Response Code.
104th, step 4:The condition of production is analyzed according to default AI computation models, to judge in multiple tasks to be produced
Reach the target production task of predetermined threshold value with the presence or absence of degree of urgency, if so, performing step 105.
In the present embodiment, AI (artificial intelligence, Artificial based on industry experience and big data can be established
Intelligence) computation model, it is specific herein not limit the number for establishing default AI computation models, such as be directed to be generated
The corresponding industry of task of production respectively establishes corresponding AI computation models, can also establish the corresponding industry of task to be produced
One total AI computation model.It is specific herein not limit the time for establishing default AI computation models, if to executive condition into
It is established before row analysis.The condition of production of each task to be produced is analyzed based on default AI computation models, and then
The target production task for reaching predetermined threshold value in multiple tasks to be produced with the presence or absence of degree of urgency is judged, if so, performing step
Rapid 105.
105th, step 5:The degree of urgency prompting message and strain work instruction to target production for sending target production task are appointed
It is engaged in corresponding target responsible person and/or target device.
In the present embodiment, corresponding to three kinds of situations in step 103, to be reached when there are degree of urgency in multiple tasks to be produced
To predetermined threshold value target production task when, can by the degree of urgency prompting message of the target production task and strain work instruction
The corresponding target responsible person of target production task and/or target device are sent to, wherein, degree of urgency prompting message and preset thing
Business processing grade is associated, that is to say, that when system is established, i.e., there is provided issued transaction grade, and issued transaction is registered
Incidence relation is established with degree of urgency prompting message.Specifically, manufacturing pressing degree according to the operation of AI computation models, send out pre-
Alert information, and notified in the form of small routine person liable, administrator and related personnel and/or, in the form of small routine or Quick Response Code
Notify equipment;Provide strain work instruction simultaneously.For example, person liable, manager and related personnel hold according to strain work instruction
The corresponding operation of row, such as increase equipment, coordination plus hand of sending someone, overtime work are overworked, external processing, special messenger are arranged to follow up, it is ensured that such as
Phase reaches manufacturing plan, timely processing abnormal alarm project.Meanwhile manufacturing schedule is fed back.
It should be noted that it is sent to the degree of urgency prompting message of target responsible person and is sent to the degree of urgency of target device
There may be differences for prompting message, it is also possible to and it is identical, as long as target responsible person and target device can identify, do not do specifically
It limits.
It should be noted that appoint when there is no the target productions for having degree of urgency to reach predetermined threshold value in multiple tasks to be produced
During business, multiple tasks to be produced can be handled based on target production scheduling, and monitor multiple task to be produced in real time
The condition of production and degree of urgency situation.When finding to have the target production task that degree of urgency reaches predetermined threshold value, that is, perform step
Rapid 105.
106th, step 6:Target responsible person and/or target device are reminded into letter according to strain work instruction and with degree of urgency
The attribute information typing Intelligent Dynamic manufacturing execution system of the target production task of the associated issued transaction grade feedback of manner of breathing.
In the present embodiment, three kinds of situations in corresponding step 103 are sent out by the degree of urgency prompting message of target production task
It send to target responsible person and/or target device, target responsible person and/or target device are by target responsible person and/or target
The target production that equipment is fed back according to strain work instruction and issued transaction grade associated with degree of urgency prompting message is appointed
The attribute information typing Intelligent Dynamic manufacturing execution system of business.It can be the feedback condition of production herein, such as produce to which kind of rank
Section, completion situation can also be fed back, such as which kind of degree is performance level reach, can also two feed back simultaneously, do not limit specifically.
107th, target production scheduling is adjusted into Mobile state according to the attribute information of target production task.
In the present embodiment, the report work information such as system shifts to an earlier date according to actual production manufacture plan in execution, delays, dynamic
, in due course carry out corporate plan adjustment, and responsible person concerned is notified in the form of small routine in time.Specifically, receiving target
After the condition of production of target production task and/or the completion situation of target production task that responsible person and/or target device are fed back,
It can be according to the condition of production of target production task and/or the completion situation of target production task, with the complete of target production task
The target completion date of target production task is determined on the basis of into the time, the deadline of the target production task is initial estimated
Target production task completion date, and target production scheduling is adjusted according to target completion date.
108th, step 2 is repeated to step 7, until all tasks processing in target production scheduling is completed.
In the present embodiment, after being adjusted according to target completion date to target production scheduling, after adjustment being based on
Target production scheduling repeat step 2 to step 6, until all tasks to be produced in target production scheduling have been handled
Into.
In conclusion in the embodiment of the present invention, by the intelligent operation of AI computation models, the tight of each task to be produced is calculated
Compel degree, mission bit stream is sent in the form of small routine, in due course intelligence timely and effectively is carried out to the progress unusual condition in production process
Energy is adjusted, and effectively solves waste of human resource, improves the efficiency of management.
The Intelligent Dynamic manufacture execution method in the embodiment of the present invention is described above, the present invention is implemented below
Intelligent Dynamic manufacture executive device in example is described.
Referring to Fig. 2, Fig. 2 is one embodiment that Intelligent Dynamic manufactures executive device in the embodiment of the present invention, it is applied to
Manufacture execution system, including:
Determination unit 201, for performing step 1:Determine target production scheduling, the target production scheduling includes multiple
Content, equipment, time started and the deadline of task to be produced, the multiple task to be produced;
Allocation unit 202, for performing step 2:The multiple task to be produced is distributed according to preset rules to multiple
Prime principal and/or multiple first equipment;
Receiving unit 203, for performing step 3:Receive each prime principal and/or each first equipment
According to the condition of production of each task to be produced fed back in actual production process;
Judging unit 204, for step 4:The condition of production is analyzed according to default AI computation models, to judge
Reach the target production task of predetermined threshold value in the multiple task to be produced with the presence or absence of degree of urgency;
Transmitting element 205, for performing step 5:If so, send the degree of urgency prompting message of the target production task
And strain work instruction, to the corresponding target responsible person of the target production task and/or target device, the degree of urgency is reminded
Information is associated with preset issued transaction grade;
First processing units 206, for performing step 6:The target responsible person and/or target device are answered according to described
Become the target production task of work instruction and issued transaction grade associated with degree of urgency prompting message feedback
Attribute information typing described in Intelligent Dynamic manufacturing execution system, the attribute information of the target production task includes the target
The completion situation of the condition of production of production task and/or the target production task;
Dynamic adjustment unit 207, for performing step 7:According to the attribute information of the target production task to the mesh
Scheduling progress dynamic is marked to adjust;
Processing unit 208, for repeating step 2 to step 7, until all productions in the target production scheduling
Task processing is completed.
Wherein, allocation unit 202 is specifically used for:
Distribute each task to be produced to prime principal corresponding to each task to be produced in the form of small routine;
And/or
Each task to be produced is distributed to the Quick Response Code of the corresponding first equipment mark of each task to be produced and/or small
Program.
Determination unit 201 is specifically used for:
At the beginning of calculating each task to be produced and the deadline;
At the beginning of to each task to be produced and the deadline arranges, to determine target production scheduling.
In conclusion in the embodiment of the present invention, by the intelligent operation of AI computation models, the tight of each task to be produced is calculated
Compel degree, mission bit stream is sent in the form of small routine, in due course intelligence timely and effectively is carried out to the progress unusual condition in production process
Energy is adjusted, and effectively solves waste of human resource, improves the efficiency of management.
It should be noted that it in the above-described embodiments, all emphasizes particularly on different fields to the description of each embodiment, in some embodiment
The part being not described in may refer to the associated description of other embodiments.
Referring to Fig. 3, the embodiment of the present invention additionally provides a kind of Intelligent Dynamic manufacture executive device, the Intelligent Dynamic system
It makes executive device and includes processor 301 and memory 302, above-mentioned determination unit, allocation unit and judging unit etc. as journey
Sequence unit stores in memory, performs above procedure unit stored in memory by processor to realize corresponding work(
Energy.
Comprising kernel in processor 301, gone in memory to transfer corresponding program unit by kernel.Kernel can set one
It is a or more, user data is updated by adjusting kernel parameter.
Memory 302 may include the volatile memory in computer-readable medium, random access memory (RAM)
And/or the forms such as Nonvolatile memory, such as read-only memory (ROM) or flash memory (flash RAM), memory includes at least one
Storage chip.
An embodiment of the present invention provides a kind of storage mediums, are stored thereon with program, real when which is executed by processor
The existing Intelligent Dynamic manufacture execution method.
An embodiment of the present invention provides a kind of processor, the processor is used to run program, wherein, described program operation
Intelligent Dynamic described in Shi Zhihang manufactures execution method.
Present invention also provides a kind of computer program products, first when being performed on data processing equipment, being adapted for carrying out
The program of beginningization there are as below methods step:
Step 1:Determine target production scheduling, the target production scheduling includes multiple tasks to be produced, the multiple
Content, equipment, time started and the deadline of task to be produced;
Step 2:The multiple task to be produced is distributed according to preset rules to multiple prime principals and/or multiple
One equipment;
Step 3:Each prime principal and/or each first equipment are received according to anti-in actual production process
The condition of production of each task to be produced of feedback;
Step 4:The condition of production is analyzed according to default AI computation models, to judge the multiple to be produced
Reach the target production task of predetermined threshold value in business with the presence or absence of degree of urgency;
Step 5:If so, send the target production task degree of urgency prompting message and strain work instruction to described
The corresponding target responsible person of target production task and/or target device, the degree of urgency prompting message and preset issued transaction
Grade is associated;
Step 6:By the target responsible person and/or target device according to the strain work instruction and with it is described urgent
It is intelligently moved described in the attribute information typing of the target production task of the associated issued transaction grade feedback of degree prompting message
State manufacturing execution system, the attribute information of the target production task include the target production task the condition of production and/or
The completion situation of the target production task;
Step 7:Target production scheduling progress dynamic is adjusted according to the attribute information of the target production task;
Step 2 is repeated to step 7, until all production tasks processing in the target production scheduling is completed.
Optionally, it is described the multiple task to be produced is distributed according to preset rules to multiple prime principals and/or
Multiple first equipment include:
Each task to be produced is distributed in the form of small routine to each task to be produced corresponding first and is responsible for
People;
And/or
By each task to be produced distribute to the Quick Response Code of the corresponding first equipment mark of each task to be produced and/
Or small routine.
Optionally, the determining target production scheduling includes:
At the beginning of calculating each task to be produced and the deadline;
At the beginning of to each task to be produced and the deadline arranges, to determine that the target produces
Scheduling.
Optionally, the attribute information according to the target production task is to the target scheduling progress dynamic adjustment package
It includes:
Receive the production status of the target production task of the target responsible person and/or target device feedback
And/or the completion situation of the target production task;
According to the production status of the target production task and/or the completion situation of the target production task, with described
The target completion date of the target production task is determined on the basis of the deadline of target production task;
The target production scheduling is adjusted according to the target completion date.
Optionally, when degree of urgency being not present in the task to be produced reaching default preset target production task, base
The multiple task to be produced is handled in the target scheduling.
It should be understood by those skilled in the art that, embodiments herein can be provided as method, system or computer program
Product.Therefore, the reality in terms of complete hardware embodiment, complete software embodiment or combination software and hardware can be used in the application
Apply the form of example.Moreover, the computer for wherein including computer usable program code in one or more can be used in the application
The computer program production that usable storage medium is implemented on (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.)
The form of product.
The application be with reference to the method for the embodiment of the present application, equipment (system) and computer program product flow chart and/
Or block diagram describes.It should be understood that each flow that can be realized by computer program instructions in flowchart and/or the block diagram and/
Or the flow in box and flowchart and/or the block diagram and/or the combination of box.These computer program instructions can be provided
To the processor of all-purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to generate one
A machine so that the instruction generation performed by computer or the processor of other programmable data processing devices is used to implement
The device of function specified in one flow of flow chart or multiple flows and/or one box of block diagram or multiple boxes.
These computer program instructions, which may also be stored in, can guide computer or other programmable data processing devices with spy
Determine in the computer-readable memory that mode works so that the instruction generation being stored in the computer-readable memory includes referring to
Enable the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one box of block diagram or
The function of being specified in multiple boxes.
These computer program instructions can be also loaded into computer or other programmable data processing devices so that counted
Series of operation steps are performed on calculation machine or other programmable devices to generate computer implemented processing, so as in computer or
The instruction offer performed on other programmable devices is used to implement in one flow of flow chart or multiple flows and/or block diagram one
The step of function of being specified in a box or multiple boxes.
In a typical configuration, computing device includes one or more processors (CPU), input/output interface, net
Network interface and memory.
Memory may include computer-readable medium in volatile memory, random access memory (RAM) and/
Or the forms such as Nonvolatile memory, such as read-only memory (ROM) or flash memory (flash RAM).Memory is computer-readable Jie
The example of matter.
Computer-readable medium includes permanent and non-permanent, removable and non-removable media can be by any method
Or technology come realize information store.Information can be computer-readable instruction, data structure, the module of program or other data.
The example of the storage medium of computer includes, but are not limited to phase transition internal memory (PRAM), static RAM (SRAM), moves
State random access memory (DRAM), other kinds of random access memory (RAM), read-only memory (ROM), electric erasable
Programmable read only memory (EEPROM), fast flash memory bank or other memory techniques, CD-ROM read-only memory (CD-ROM),
Digital versatile disc (DVD) or other optical storages, magnetic tape cassette, the storage of tape magnetic rigid disk or other magnetic storage apparatus
Or any other non-transmission medium, available for storing the information that can be accessed by a computing device.It defines, calculates according to herein
Machine readable medium does not include temporary computer readable media (transitory media), such as data-signal and carrier wave of modulation.
It should also be noted that, term " comprising ", "comprising" or its any other variant are intended to nonexcludability
Comprising so that process, method, commodity or equipment including a series of elements are not only including those elements, but also wrap
Include other elements that are not explicitly listed or further include for this process, method, commodity or equipment it is intrinsic will
Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including element
Also there are other identical elements in process, method, commodity or equipment.
It will be understood by those skilled in the art that embodiments herein can be provided as method, system or computer program product.
Therefore, complete hardware embodiment, complete software embodiment or the embodiment in terms of combining software and hardware can be used in the application
Form.It is deposited moreover, the application can be used to can be used in one or more computers for wherein including computer usable program code
The shape of computer program product that storage media is implemented on (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.)
Formula.
The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although with reference to the foregoing embodiments
The present invention is described in detail, it will be understood by those of ordinary skill in the art that:It still can be to aforementioned each implementation
Technical solution recorded in example modifies or carries out equivalent replacement to which part technical characteristic;And these modification or
It replaces, the spirit and scope for various embodiments of the present invention technical solution that it does not separate the essence of the corresponding technical solution.
Claims (10)
1. a kind of Intelligent Dynamic manufactures execution method, applied to Intelligent Dynamic manufacturing execution system, which is characterized in that including:
Step 1:Determine target production scheduling, the target production scheduling includes multiple tasks to be produced, the multiple to be generated
Content, equipment, time started and the deadline of production task;
Step 2:The multiple task to be produced is distributed according to preset rules to multiple prime principals and/or multiple first and is set
It is standby;
Step 3:Each prime principal and/or each first equipment are received according to being fed back in actual production process
The condition of production of each task to be produced;
Step 4:The condition of production is analyzed according to default AI computation models, to judge in the multiple task to be produced
Reach the target production task of predetermined threshold value with the presence or absence of degree of urgency;
Step 5:If so, it sends the degree of urgency prompting message of the target production task and strains work instruction to the target
The corresponding target responsible person of production task and/or target device, the degree of urgency prompting message and preset issued transaction grade
It is associated;
Step 6:The target responsible person and/or target device are carried according to the strain work instruction and with the degree of urgency
Intelligent Dynamic system described in the attribute information typing of the target production task of the associated issued transaction grade feedback of information of waking up
Make execution system, the attribute information of the target production task includes the condition of production of the target production task and/or described
The completion situation of target production task;
Step 7:Target production scheduling progress dynamic is adjusted according to the attribute information of the target production task;
Step 2 is repeated to step 7, until all production tasks processing in the target production scheduling is completed.
2. according to the method described in claim 1, it is characterized in that, it is described by the multiple task to be produced according to preset rules
Distribution to multiple prime principals and/or multiple first equipment include:
Distribute each task to be produced to prime principal corresponding to each task to be produced in the form of small routine;
And/or
Each task to be produced is distributed to the Quick Response Code of the corresponding first equipment mark of each task to be produced and/or small
Program.
3. according to the method described in claim 1, it is characterized in that, the determining target production scheduling includes:
At the beginning of calculating each task to be produced and the deadline;
At the beginning of to each task to be produced and the deadline arranges, to determine the target production row
Journey.
4. the according to the method described in claim 3, it is characterized in that, attribute information pair according to the target production task
The target scheduling progress dynamic adjustment includes:
Receive the target responsible person and/or the target device feedback the target production task production status and/or
The completion situation of the target production task;
According to the production status of the target production task and/or the completion situation of the target production task, with the target
The target completion date of the target production task is determined on the basis of the deadline of production task;
The target production scheduling is adjusted according to the target completion date.
5. according to the method described in claim 1, it is characterized in that, to reach pre- when there is no degree of urgency in the task to be produced
If during preset target production task, the method further includes:
The multiple task to be produced is handled based on the target scheduling.
6. a kind of Intelligent Dynamic manufactures executive device, applied to Intelligent Dynamic manufacturing execution system, which is characterized in that including:
Determination unit, for performing step 1:Determine target production scheduling, the target production scheduling includes multiple to be produced
Content, equipment, time started and the deadline of task, the multiple task to be produced;
Allocation unit, for performing step 2:The multiple task to be produced is distributed according to preset rules to multiple first and is responsible for
People and/or multiple first equipment;
Receiving unit, for performing step 3:Each prime principal and/or each first equipment are received according to reality
The condition of production of each task to be produced fed back in the production process of border;
Judging unit, for step 4:The condition of production is analyzed according to default AI computation models, it is described more to judge
Reach the target production task of predetermined threshold value in a task to be produced with the presence or absence of degree of urgency;
Transmitting element, for performing step 5:If so, send degree of urgency prompting message and the strain of the target production task
Work instruction to the corresponding target responsible person of the target production task and/or target device, the degree of urgency prompting message with
Preset issued transaction grade is associated;
First processing units, for performing step 6:By the target responsible person and/or target device according to the strain work
The attribute of the target production task of guide and issued transaction grade associated with degree of urgency prompting message feedback
Intelligent Dynamic manufacturing execution system described in data input, the attribute information of the target production task include target production and appoint
The completion situation of the condition of production of business and/or the target production task;
Dynamic adjustment unit, for performing step 7:According to the attribute information of the target production task to the target scheduling into
Degree dynamic adjusts;
Processing unit, for repeating step 2 to step 7, at all production tasks in the target production scheduling
Reason is completed.
7. device according to claim 6, which is characterized in that the allocation unit is specifically used for:
Distribute each task to be produced to prime principal corresponding to each task to be produced in the form of small routine;
And/or
Each task to be produced is distributed to the Quick Response Code of the corresponding first equipment mark of each task to be produced and/or small
Program.
8. device according to claim 6, which is characterized in that the determination unit is specifically used for:
At the beginning of calculating each task to be produced and the deadline;
At the beginning of to each task to be produced and the deadline arranges, to determine the target production row
Journey.
9. a kind of processor, which is characterized in that the processor is for running computer program, when the computer program is run
The step of performing the Intelligent Dynamic manufacture execution method as described in any one in claim 1 to 5.
10. a kind of computer readable storage medium, is stored thereon with computer program, it is characterised in that:The computer program
The step of Intelligent Dynamic manufacture execution method as described in any one in claim 1 to 5 is realized when being executed by processor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810049361.3A CN108241350A (en) | 2018-01-18 | 2018-01-18 | A kind of Intelligent Dynamic manufacture execution method and relevant device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810049361.3A CN108241350A (en) | 2018-01-18 | 2018-01-18 | A kind of Intelligent Dynamic manufacture execution method and relevant device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108241350A true CN108241350A (en) | 2018-07-03 |
Family
ID=62698665
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810049361.3A Pending CN108241350A (en) | 2018-01-18 | 2018-01-18 | A kind of Intelligent Dynamic manufacture execution method and relevant device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108241350A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109388116A (en) * | 2018-10-31 | 2019-02-26 | 金蝶软件(中国)有限公司 | A kind of production management method, management system for internet of things and relevant device |
CN110009253A (en) * | 2019-04-15 | 2019-07-12 | 广船国际有限公司 | A kind of production scheduling method, apparatus, equipment and the storage medium of ship |
CN111353703A (en) * | 2020-02-28 | 2020-06-30 | 苏州智澜供应链管理有限公司 | Intelligent production process control method and system |
CN112580841A (en) * | 2019-09-29 | 2021-03-30 | 北京国双科技有限公司 | Production scheduling method and device, electronic equipment and storage medium |
CN113703396A (en) * | 2021-07-26 | 2021-11-26 | 北京市机械施工集团有限公司 | Intelligent upgrading method of numerical control cutting equipment based on intelligent terminal |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1746910A (en) * | 2004-09-11 | 2006-03-15 | 鸿富锦精密工业(深圳)有限公司 | Mould Machining production deploying management system and method |
CN1760902A (en) * | 2005-11-11 | 2006-04-19 | 杭州电子科技大学 | Method for optimizing scheduling system by technical imitaitng real flow |
US7124087B1 (en) * | 2000-11-03 | 2006-10-17 | International Business Machines Corporation | System and method for updating user home automation systems |
CN101271543A (en) * | 2008-04-23 | 2008-09-24 | 永凯软件技术(上海)有限公司 | Production scheduling system and method using genetic algorithm based on elite solution pool |
CN101706886A (en) * | 2009-08-28 | 2010-05-12 | 华南理工大学 | Order-driven Single-piece small-batch combined flow production method for processing workshop |
CN202306259U (en) * | 2011-07-18 | 2012-07-04 | 广州市花都东捷实业有限公司 | Automatic management system device of automobile electrophoretic coating production |
CN102799966A (en) * | 2012-06-29 | 2012-11-28 | 厦门易用软件技术有限公司 | Monitoring and early-warning system of enterprise project executing schedule |
CN103182838A (en) * | 2011-12-31 | 2013-07-03 | 北大方正集团有限公司 | Method and device for automatically monitoring newspaper production processes |
CN103475702A (en) * | 2013-09-04 | 2013-12-25 | 重庆大学 | Networked outside processing progress real-time control method based on mobile terminal |
CN104240406A (en) * | 2014-07-30 | 2014-12-24 | 上海技亨信息科技有限公司 | Printing production control and early-warning system |
CN106292580A (en) * | 2016-08-10 | 2017-01-04 | 深圳市益普科技有限公司 | A kind of intelligent integrated formula semiconductor manufacturing performs system |
-
2018
- 2018-01-18 CN CN201810049361.3A patent/CN108241350A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7124087B1 (en) * | 2000-11-03 | 2006-10-17 | International Business Machines Corporation | System and method for updating user home automation systems |
CN1746910A (en) * | 2004-09-11 | 2006-03-15 | 鸿富锦精密工业(深圳)有限公司 | Mould Machining production deploying management system and method |
CN1760902A (en) * | 2005-11-11 | 2006-04-19 | 杭州电子科技大学 | Method for optimizing scheduling system by technical imitaitng real flow |
CN101271543A (en) * | 2008-04-23 | 2008-09-24 | 永凯软件技术(上海)有限公司 | Production scheduling system and method using genetic algorithm based on elite solution pool |
CN101706886A (en) * | 2009-08-28 | 2010-05-12 | 华南理工大学 | Order-driven Single-piece small-batch combined flow production method for processing workshop |
CN202306259U (en) * | 2011-07-18 | 2012-07-04 | 广州市花都东捷实业有限公司 | Automatic management system device of automobile electrophoretic coating production |
CN103182838A (en) * | 2011-12-31 | 2013-07-03 | 北大方正集团有限公司 | Method and device for automatically monitoring newspaper production processes |
CN102799966A (en) * | 2012-06-29 | 2012-11-28 | 厦门易用软件技术有限公司 | Monitoring and early-warning system of enterprise project executing schedule |
CN103475702A (en) * | 2013-09-04 | 2013-12-25 | 重庆大学 | Networked outside processing progress real-time control method based on mobile terminal |
CN104240406A (en) * | 2014-07-30 | 2014-12-24 | 上海技亨信息科技有限公司 | Printing production control and early-warning system |
CN106292580A (en) * | 2016-08-10 | 2017-01-04 | 深圳市益普科技有限公司 | A kind of intelligent integrated formula semiconductor manufacturing performs system |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109388116A (en) * | 2018-10-31 | 2019-02-26 | 金蝶软件(中国)有限公司 | A kind of production management method, management system for internet of things and relevant device |
CN109388116B (en) * | 2018-10-31 | 2021-08-20 | 金蝶软件(中国)有限公司 | Production management method, Internet of things management system and related equipment |
CN110009253A (en) * | 2019-04-15 | 2019-07-12 | 广船国际有限公司 | A kind of production scheduling method, apparatus, equipment and the storage medium of ship |
CN112580841A (en) * | 2019-09-29 | 2021-03-30 | 北京国双科技有限公司 | Production scheduling method and device, electronic equipment and storage medium |
CN111353703A (en) * | 2020-02-28 | 2020-06-30 | 苏州智澜供应链管理有限公司 | Intelligent production process control method and system |
CN113703396A (en) * | 2021-07-26 | 2021-11-26 | 北京市机械施工集团有限公司 | Intelligent upgrading method of numerical control cutting equipment based on intelligent terminal |
CN113703396B (en) * | 2021-07-26 | 2023-05-09 | 北京市机械施工集团有限公司 | Intelligent upgrading method of numerical control cutting equipment based on intelligent terminal |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108241350A (en) | A kind of Intelligent Dynamic manufacture execution method and relevant device | |
CN104657220B (en) | Scheduling model and method based on deadline and expense restriction in mixed cloud | |
CN108171442A (en) | A kind of Intelligent Dynamic project management method and relevant device | |
Prachitmutita et al. | Auto-scaling microservices on IaaS under SLA with cost-effective framework | |
Yu et al. | Reputation-aware task allocation for human trustees | |
Liu et al. | A two-stage robust optimization approach for the berth allocation problem under uncertainty | |
CN110489437A (en) | Distributed transaction processing method, device, computer equipment and storage medium | |
Ihara et al. | Many-objective virtual machine placement for dynamic environments | |
CN110781180B (en) | Data screening method and data screening device | |
CN104199912B (en) | A kind of method and device of task processing | |
CN106815254A (en) | A kind of data processing method and device | |
CN109582452A (en) | A kind of container dispatching method, dispatching device and electronic equipment | |
US20200364646A1 (en) | Automated Assignment of Tasks Based on User Profile Data for Improved Efficiency | |
Smolka et al. | Evaluation of fog application placement algorithms: a survey | |
WO2023116067A1 (en) | Power service decomposition method and system for 5g cloud-edge-end collaboration | |
Mezni et al. | Security‐aware SaaS placement using swarm intelligence | |
Stauffer et al. | Elasticity management for capacity planning in software as a service cloud computing | |
Tiwari et al. | Service adaptive broking mechanism using MROSP algorithm | |
Biran et al. | Federated cloud computing as system of systems | |
AlOrbani et al. | Load balancing and resource allocation in smart cities using reinforcement learning | |
CN110471769A (en) | A kind of method for managing resource and device of virtual machine | |
CN109242680B (en) | Method for dynamically adjusting block chain consensus | |
CN104853231B (en) | Information processing method, equipment and system | |
Firdhous et al. | An enhanced quality of service-based trust model for cloud computing | |
CN109710410A (en) | A kind of internet information resource distribution method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180703 |
|
RJ01 | Rejection of invention patent application after publication |