CN108241350A - A kind of Intelligent Dynamic manufacture execution method and relevant device - Google Patents

A kind of Intelligent Dynamic manufacture execution method and relevant device Download PDF

Info

Publication number
CN108241350A
CN108241350A CN201810049361.3A CN201810049361A CN108241350A CN 108241350 A CN108241350 A CN 108241350A CN 201810049361 A CN201810049361 A CN 201810049361A CN 108241350 A CN108241350 A CN 108241350A
Authority
CN
China
Prior art keywords
task
target
produced
production
target production
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810049361.3A
Other languages
Chinese (zh)
Inventor
邓滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Weibo Technology Co Ltd
Original Assignee
Shenzhen Weibo Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Weibo Technology Co Ltd filed Critical Shenzhen Weibo Technology Co Ltd
Priority to CN201810049361.3A priority Critical patent/CN108241350A/en
Publication of CN108241350A publication Critical patent/CN108241350A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32252Scheduling production, machining, job shop
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Abstract

The embodiment of the invention discloses a kind of Intelligent Dynamic manufacture execution method and relevant devices, can effectively solve the wasting of resources, improve the efficiency of management.This method includes:Determine the target scheduling of target developing project;Step 2:Multiple tasks to be produced are distributed according to preset rules to multiple prime principals:Receive the executive condition of each task to be produced of each prime principal feedback;Executive condition is analyzed according to default AI computation models, to judge to reach the target production task of predetermined threshold value in multiple tasks to be produced with the presence or absence of degree of urgency;If so, the degree of urgency prompting message of target production task is sent to the corresponding target responsible person of target production task;The attribute information for the target production task fed back according to target responsible person is adjusted target scheduling;It repeats, until all tasks processing in target scheduling is completed.

Description

A kind of Intelligent Dynamic manufacture execution method and relevant device
Technical field
The present invention relates to management domain more particularly to a kind of production scheduling method and relevant devices.
Background technology
Production scheduling refers to the process of distribute production task to resources of production.Under the premise of energy force-summing device is considered, In the case where material quantity is certain, the production sequence of each production task is arranged, optimizes production sequence, optimum choice production is set It is standby so as to reduce the stand-by period, balance each machine and the produce load of worker.So as to optimize production capacity, production efficiency is improved, is shortened Produce (order) time in advance.
In the management implementation procedure of actual production scheduling, manufacture execution etc., often because of a certain exception in scheduling, and cause Entire production scheduling is nervous or delays, so as to be produced bigger effect to entire production scheduling.If the real-time letter in production scheduling Breath feedback promptness is inadequate, strains countermeasure not in time, whole production scheduling will all be made to delay, and need to waste larger manpower Session discussing, to be readjusted to production scheduling.
Invention content
For above-mentioned technical problem, an embodiment of the present invention provides a kind of Intelligent Dynamic manufacture execution methods and correlation to set It is standby, can timely and effectively to manufacturing schedule unusual condition in due course intelligence be adjusted, effectively solve waste of human resource, carry The high efficiency of management.
The first aspect of the embodiment of the present invention provides a kind of Intelligent Dynamic manufacture execution method, applied to project development management System, including:
Step 1:Determine target production scheduling, the target production scheduling includes multiple tasks to be produced, the multiple Content, equipment, time started and the deadline of task to be produced;
Step 2:The multiple task to be produced is distributed according to preset rules to multiple prime principals and/or multiple One equipment;
Step 3:Each prime principal and/or each first equipment are received according to anti-in actual production process The condition of production of each task to be produced of feedback;
Step 4:The condition of production is analyzed according to default AI computation models, to judge the multiple to be produced Reach the target production task of predetermined threshold value in business with the presence or absence of degree of urgency;
Step 5:If so, send the target production task degree of urgency prompting message and strain work instruction to described The corresponding target responsible person of target production task and/or target device, the degree of urgency prompting message and preset issued transaction Grade is associated;
Step 6:By the target responsible person and/or target device according to the strain work instruction and with it is described urgent It is intelligently moved described in the attribute information typing of the target production task of the associated issued transaction grade feedback of degree prompting message State manufacturing execution system, the attribute information of the target production task include the target production task the condition of production and/or The completion situation of the target production task;
Step 7:Target production scheduling progress dynamic is adjusted according to the attribute information of the target production task;
Step 2 is repeated to step 7, until all production tasks processing in the target production scheduling is completed.
Optionally, it is described the multiple task to be produced is distributed according to preset rules to multiple prime principals and/or Multiple first equipment include:
Each task to be produced is distributed in the form of small routine to each task to be produced corresponding first and is responsible for People;
And/or
By each task to be produced distribute to the Quick Response Code of the corresponding first equipment mark of each task to be produced and/ Or small routine.
Optionally, the determining target production scheduling includes:
At the beginning of calculating each task to be produced and the deadline;
At the beginning of to each task to be produced and the deadline arranges, to determine that the target produces Scheduling.
Optionally, the attribute information according to the target production task is to the target scheduling progress dynamic adjustment package It includes:
Receive the production status of the target production task of the target responsible person and/or target device feedback And/or the completion situation of the target production task;
According to the production status of the target production task and/or the completion situation of the target production task, with described The target completion date of the target production task is determined on the basis of the deadline of target production task;
The target production scheduling is adjusted according to the target completion date.
Optionally, when degree of urgency being not present in the task to be produced reaching default preset target production task, base The multiple task to be produced is handled in the target scheduling.
Second aspect of the embodiment of the present invention provides a kind of Intelligent Dynamic manufacture executive device, applied to project development management System, including:
Determination unit, for performing step 1:Determine target production scheduling, the target production scheduling includes multiple treat Content, equipment, time started and the deadline of production task, the multiple task to be produced;
Allocation unit, for performing step 2:The multiple task to be produced is distributed according to preset rules to multiple first Responsible person and/or multiple first equipment;
Receiving unit, for performing step 3:Receive each prime principal and/or each first equipment root According to the condition of production of each task to be produced fed back in actual production process;
Judging unit, for step 4:The condition of production is analyzed according to default AI computation models, to judge State the target production task for reaching predetermined threshold value in multiple tasks to be produced with the presence or absence of degree of urgency;
Transmitting element, for performing step 5:If so, send the target production task degree of urgency prompting message and Work instruction is strained to the corresponding target responsible person of the target production task and/or target device, the degree of urgency reminds letter Breath is associated with preset issued transaction grade;
First processing units, for performing step 6:By the target responsible person and/or target device according to the strain The target production task of work instruction and issued transaction grade associated with degree of urgency prompting message feedback Intelligent Dynamic manufacturing execution system described in attribute information typing, the attribute information of the target production task are given birth to including the target The completion situation of the condition of production of production task and/or the target production task;
Dynamic adjustment unit, for performing step 7:The target is arranged according to the attribute information of the target production task Cheng Jindu dynamics adjust;
Processing unit, for repeating step 2 to step 7, until all productions in the target production scheduling are appointed Business processing is completed.
Optionally, the allocation unit is specifically used for:
Each task to be produced is distributed in the form of small routine to each task to be produced corresponding first and is responsible for People;
And/or
By each task to be produced distribute to the Quick Response Code of the corresponding first equipment mark of each task to be produced and/ Or small routine.
Optionally, the determination unit is specifically used for:
At the beginning of calculating each task to be produced and the deadline;
At the beginning of to each task to be produced and the deadline arranges, to determine that the target produces Scheduling.
The third aspect of the embodiment of the present invention provides a kind of processor, and the processor is for running computer program, institute State the step of Intelligent Dynamic manufacture execution method as described in above-mentioned any one is performed during computer program operation.
Fourth aspect of the embodiment of the present invention provides a kind of computer readable storage medium, is stored thereon with computer journey Sequence, it is characterised in that:The computer program realizes the Intelligent Dynamic manufacture described in above-mentioned any one when being executed by processor The step of execution method.
In technical solution provided in an embodiment of the present invention, relative to the prior art, in the embodiment of the present invention, calculated by AI The intelligent operation of model calculates the degree of urgency of each task to be produced, and mission bit stream is sent in the form of small routine, timely and effectively right Progress unusual condition in production process carries out being adjusted in due course intelligence, effectively solves waste of human resource, improves management Efficiency.
Description of the drawings
Fig. 1 is one embodiment schematic diagram that Intelligent Dynamic manufactures execution method in the embodiment of the present invention;
Fig. 2 is the embodiment schematic diagram that Intelligent Dynamic manufactures executive device in the embodiment of the present invention;
Fig. 3 is the hardware architecture diagram that Intelligent Dynamic manufactures executive device in the embodiment of the present invention.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, the every other implementation that those skilled in the art are obtained without creative efforts Example, shall fall within the protection scope of the present invention.
Referring to Fig. 1, Fig. 1 is one embodiment schematic diagram that Intelligent Dynamic manufactures execution method in the embodiment of the present invention, Applied to manufacture execution system, including:
101st, step 1:Determine target production scheduling.
In the present embodiment, in unit when being produced, target all production tasks to be produced can be determined first, with And it is responsible for the person liable of each task to be produced, meanwhile, based on all production tasks to be produced and it is responsible for each task to be produced Person liable generate target production scheduling, i.e., a sequence is carried out to current all tasks to be produced, that is to say, that will be all Task to be produced separates the sequence of successively production, which includes multiple tasks to be produced.Specifically, clearly It is each to manufacture plan target and person liable, process equipment, it is contemplated that the beginning of each task and deadline.
It should be noted that when determining target production scheduling, can calculate at the beginning of all tasks to be produced with And the deadline (it is unlimited devise a stratagem calculate mode, such as can be calculated according to the urgency level of each task to be produced or Calculated according to the demand of client), to each task to be produced at the beginning of and the deadline arrange, with determine Target production scheduling.(i.e. when at the beginning of having obtained all tasks to be produced and after the deadline, being based on performing At the beginning of task and the deadline is ranked up all tasks to be produced).Such as target production scheduling includes:A、B、 Tri- tasks to be produced of C, calculate each task to be produced of A, B, C at the beginning of and the deadline, it is each to be based ultimately upon A, B, C At the beginning of a task to be produced and the deadline is ranked up tri- tasks to be produced of A, B, C, obtains target production Scheduling.
102nd, step 2:Multiple tasks to be produced are distributed according to preset rules to multiple prime principals and/or multiple One equipment.
In the present embodiment, due to that in multiple execution tasks to be produced, may be divided into three kinds of situations, first:It is all to be produced Task is performed by people;Second:All tasks to be produced are performed by equipment;Third:In all tasks to be produced Some is performed by people, and remainder is performed by equipment.It so can be by multiple execution tasks according to default rule It then distributes to multiple prime principals and/or multiple first equipment.It such as can be by each task to be produced with the shape of small routine Formula distributes prime principal corresponding to each task to be produced;And/or each task to be produced is distributed to each to be produced The Quick Response Code or small routine of corresponding first device identification of task.
It should be noted that responsible person corresponding to production task is distributed in the form of small routine in above-mentioned steps, only It is a kind of executive mode, naturally it is also possible to have other executive modes, such as each task to be produced is directly distributed to each The corresponding target responsible person of task to be produced, does not limit specifically herein.
It should be noted that when there is the third situation, production task can will be performed by people and is sent to the life The corresponding responsible person of production task will be performed production task by equipment and be sent to the corresponding equipment of the production task.
103rd, step 3:Each prime principal and/or each first equipment are received according to being fed back in actual production process The condition of production of each task to be produced.
In the present embodiment, corresponding to three kinds of situations described above, each task to be produced corresponds to responsible person and/or each The corresponding equipment of task to be produced can be performed and be appointed with the condition of production of the corresponding task to be produced of Real-time Feedback, such as A The business stage residing at present is the starting stage, and B performs task intermediate stage in stage residing at present etc..Specifically, production It manufactures in implementation procedure, person liable or equipment are fed back according to practical practice condition, such as scheduled whether each task to be produced It completes, whether shift to an earlier date, whether delaying and data, the user such as extension scheduled completion time are fed back by terminal small routine, if It is standby to be fed back by small routine or Quick Response Code.
104th, step 4:The condition of production is analyzed according to default AI computation models, to judge in multiple tasks to be produced Reach the target production task of predetermined threshold value with the presence or absence of degree of urgency, if so, performing step 105.
In the present embodiment, AI (artificial intelligence, Artificial based on industry experience and big data can be established Intelligence) computation model, it is specific herein not limit the number for establishing default AI computation models, such as be directed to be generated The corresponding industry of task of production respectively establishes corresponding AI computation models, can also establish the corresponding industry of task to be produced One total AI computation model.It is specific herein not limit the time for establishing default AI computation models, if to executive condition into It is established before row analysis.The condition of production of each task to be produced is analyzed based on default AI computation models, and then The target production task for reaching predetermined threshold value in multiple tasks to be produced with the presence or absence of degree of urgency is judged, if so, performing step Rapid 105.
105th, step 5:The degree of urgency prompting message and strain work instruction to target production for sending target production task are appointed It is engaged in corresponding target responsible person and/or target device.
In the present embodiment, corresponding to three kinds of situations in step 103, to be reached when there are degree of urgency in multiple tasks to be produced To predetermined threshold value target production task when, can by the degree of urgency prompting message of the target production task and strain work instruction The corresponding target responsible person of target production task and/or target device are sent to, wherein, degree of urgency prompting message and preset thing Business processing grade is associated, that is to say, that when system is established, i.e., there is provided issued transaction grade, and issued transaction is registered Incidence relation is established with degree of urgency prompting message.Specifically, manufacturing pressing degree according to the operation of AI computation models, send out pre- Alert information, and notified in the form of small routine person liable, administrator and related personnel and/or, in the form of small routine or Quick Response Code Notify equipment;Provide strain work instruction simultaneously.For example, person liable, manager and related personnel hold according to strain work instruction The corresponding operation of row, such as increase equipment, coordination plus hand of sending someone, overtime work are overworked, external processing, special messenger are arranged to follow up, it is ensured that such as Phase reaches manufacturing plan, timely processing abnormal alarm project.Meanwhile manufacturing schedule is fed back.
It should be noted that it is sent to the degree of urgency prompting message of target responsible person and is sent to the degree of urgency of target device There may be differences for prompting message, it is also possible to and it is identical, as long as target responsible person and target device can identify, do not do specifically It limits.
It should be noted that appoint when there is no the target productions for having degree of urgency to reach predetermined threshold value in multiple tasks to be produced During business, multiple tasks to be produced can be handled based on target production scheduling, and monitor multiple task to be produced in real time The condition of production and degree of urgency situation.When finding to have the target production task that degree of urgency reaches predetermined threshold value, that is, perform step Rapid 105.
106th, step 6:Target responsible person and/or target device are reminded into letter according to strain work instruction and with degree of urgency The attribute information typing Intelligent Dynamic manufacturing execution system of the target production task of the associated issued transaction grade feedback of manner of breathing.
In the present embodiment, three kinds of situations in corresponding step 103 are sent out by the degree of urgency prompting message of target production task It send to target responsible person and/or target device, target responsible person and/or target device are by target responsible person and/or target The target production that equipment is fed back according to strain work instruction and issued transaction grade associated with degree of urgency prompting message is appointed The attribute information typing Intelligent Dynamic manufacturing execution system of business.It can be the feedback condition of production herein, such as produce to which kind of rank Section, completion situation can also be fed back, such as which kind of degree is performance level reach, can also two feed back simultaneously, do not limit specifically.
107th, target production scheduling is adjusted into Mobile state according to the attribute information of target production task.
In the present embodiment, the report work information such as system shifts to an earlier date according to actual production manufacture plan in execution, delays, dynamic , in due course carry out corporate plan adjustment, and responsible person concerned is notified in the form of small routine in time.Specifically, receiving target After the condition of production of target production task and/or the completion situation of target production task that responsible person and/or target device are fed back, It can be according to the condition of production of target production task and/or the completion situation of target production task, with the complete of target production task The target completion date of target production task is determined on the basis of into the time, the deadline of the target production task is initial estimated Target production task completion date, and target production scheduling is adjusted according to target completion date.
108th, step 2 is repeated to step 7, until all tasks processing in target production scheduling is completed.
In the present embodiment, after being adjusted according to target completion date to target production scheduling, after adjustment being based on Target production scheduling repeat step 2 to step 6, until all tasks to be produced in target production scheduling have been handled Into.
In conclusion in the embodiment of the present invention, by the intelligent operation of AI computation models, the tight of each task to be produced is calculated Compel degree, mission bit stream is sent in the form of small routine, in due course intelligence timely and effectively is carried out to the progress unusual condition in production process Energy is adjusted, and effectively solves waste of human resource, improves the efficiency of management.
The Intelligent Dynamic manufacture execution method in the embodiment of the present invention is described above, the present invention is implemented below Intelligent Dynamic manufacture executive device in example is described.
Referring to Fig. 2, Fig. 2 is one embodiment that Intelligent Dynamic manufactures executive device in the embodiment of the present invention, it is applied to Manufacture execution system, including:
Determination unit 201, for performing step 1:Determine target production scheduling, the target production scheduling includes multiple Content, equipment, time started and the deadline of task to be produced, the multiple task to be produced;
Allocation unit 202, for performing step 2:The multiple task to be produced is distributed according to preset rules to multiple Prime principal and/or multiple first equipment;
Receiving unit 203, for performing step 3:Receive each prime principal and/or each first equipment According to the condition of production of each task to be produced fed back in actual production process;
Judging unit 204, for step 4:The condition of production is analyzed according to default AI computation models, to judge Reach the target production task of predetermined threshold value in the multiple task to be produced with the presence or absence of degree of urgency;
Transmitting element 205, for performing step 5:If so, send the degree of urgency prompting message of the target production task And strain work instruction, to the corresponding target responsible person of the target production task and/or target device, the degree of urgency is reminded Information is associated with preset issued transaction grade;
First processing units 206, for performing step 6:The target responsible person and/or target device are answered according to described Become the target production task of work instruction and issued transaction grade associated with degree of urgency prompting message feedback Attribute information typing described in Intelligent Dynamic manufacturing execution system, the attribute information of the target production task includes the target The completion situation of the condition of production of production task and/or the target production task;
Dynamic adjustment unit 207, for performing step 7:According to the attribute information of the target production task to the mesh Scheduling progress dynamic is marked to adjust;
Processing unit 208, for repeating step 2 to step 7, until all productions in the target production scheduling Task processing is completed.
Wherein, allocation unit 202 is specifically used for:
Distribute each task to be produced to prime principal corresponding to each task to be produced in the form of small routine;
And/or
Each task to be produced is distributed to the Quick Response Code of the corresponding first equipment mark of each task to be produced and/or small Program.
Determination unit 201 is specifically used for:
At the beginning of calculating each task to be produced and the deadline;
At the beginning of to each task to be produced and the deadline arranges, to determine target production scheduling.
In conclusion in the embodiment of the present invention, by the intelligent operation of AI computation models, the tight of each task to be produced is calculated Compel degree, mission bit stream is sent in the form of small routine, in due course intelligence timely and effectively is carried out to the progress unusual condition in production process Energy is adjusted, and effectively solves waste of human resource, improves the efficiency of management.
It should be noted that it in the above-described embodiments, all emphasizes particularly on different fields to the description of each embodiment, in some embodiment The part being not described in may refer to the associated description of other embodiments.
Referring to Fig. 3, the embodiment of the present invention additionally provides a kind of Intelligent Dynamic manufacture executive device, the Intelligent Dynamic system It makes executive device and includes processor 301 and memory 302, above-mentioned determination unit, allocation unit and judging unit etc. as journey Sequence unit stores in memory, performs above procedure unit stored in memory by processor to realize corresponding work( Energy.
Comprising kernel in processor 301, gone in memory to transfer corresponding program unit by kernel.Kernel can set one It is a or more, user data is updated by adjusting kernel parameter.
Memory 302 may include the volatile memory in computer-readable medium, random access memory (RAM) And/or the forms such as Nonvolatile memory, such as read-only memory (ROM) or flash memory (flash RAM), memory includes at least one Storage chip.
An embodiment of the present invention provides a kind of storage mediums, are stored thereon with program, real when which is executed by processor The existing Intelligent Dynamic manufacture execution method.
An embodiment of the present invention provides a kind of processor, the processor is used to run program, wherein, described program operation Intelligent Dynamic described in Shi Zhihang manufactures execution method.
Present invention also provides a kind of computer program products, first when being performed on data processing equipment, being adapted for carrying out The program of beginningization there are as below methods step:
Step 1:Determine target production scheduling, the target production scheduling includes multiple tasks to be produced, the multiple Content, equipment, time started and the deadline of task to be produced;
Step 2:The multiple task to be produced is distributed according to preset rules to multiple prime principals and/or multiple One equipment;
Step 3:Each prime principal and/or each first equipment are received according to anti-in actual production process The condition of production of each task to be produced of feedback;
Step 4:The condition of production is analyzed according to default AI computation models, to judge the multiple to be produced Reach the target production task of predetermined threshold value in business with the presence or absence of degree of urgency;
Step 5:If so, send the target production task degree of urgency prompting message and strain work instruction to described The corresponding target responsible person of target production task and/or target device, the degree of urgency prompting message and preset issued transaction Grade is associated;
Step 6:By the target responsible person and/or target device according to the strain work instruction and with it is described urgent It is intelligently moved described in the attribute information typing of the target production task of the associated issued transaction grade feedback of degree prompting message State manufacturing execution system, the attribute information of the target production task include the target production task the condition of production and/or The completion situation of the target production task;
Step 7:Target production scheduling progress dynamic is adjusted according to the attribute information of the target production task;
Step 2 is repeated to step 7, until all production tasks processing in the target production scheduling is completed.
Optionally, it is described the multiple task to be produced is distributed according to preset rules to multiple prime principals and/or Multiple first equipment include:
Each task to be produced is distributed in the form of small routine to each task to be produced corresponding first and is responsible for People;
And/or
By each task to be produced distribute to the Quick Response Code of the corresponding first equipment mark of each task to be produced and/ Or small routine.
Optionally, the determining target production scheduling includes:
At the beginning of calculating each task to be produced and the deadline;
At the beginning of to each task to be produced and the deadline arranges, to determine that the target produces Scheduling.
Optionally, the attribute information according to the target production task is to the target scheduling progress dynamic adjustment package It includes:
Receive the production status of the target production task of the target responsible person and/or target device feedback And/or the completion situation of the target production task;
According to the production status of the target production task and/or the completion situation of the target production task, with described The target completion date of the target production task is determined on the basis of the deadline of target production task;
The target production scheduling is adjusted according to the target completion date.
Optionally, when degree of urgency being not present in the task to be produced reaching default preset target production task, base The multiple task to be produced is handled in the target scheduling.
It should be understood by those skilled in the art that, embodiments herein can be provided as method, system or computer program Product.Therefore, the reality in terms of complete hardware embodiment, complete software embodiment or combination software and hardware can be used in the application Apply the form of example.Moreover, the computer for wherein including computer usable program code in one or more can be used in the application The computer program production that usable storage medium is implemented on (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) The form of product.
The application be with reference to the method for the embodiment of the present application, equipment (system) and computer program product flow chart and/ Or block diagram describes.It should be understood that each flow that can be realized by computer program instructions in flowchart and/or the block diagram and/ Or the flow in box and flowchart and/or the block diagram and/or the combination of box.These computer program instructions can be provided To the processor of all-purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to generate one A machine so that the instruction generation performed by computer or the processor of other programmable data processing devices is used to implement The device of function specified in one flow of flow chart or multiple flows and/or one box of block diagram or multiple boxes.
These computer program instructions, which may also be stored in, can guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works so that the instruction generation being stored in the computer-readable memory includes referring to Enable the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one box of block diagram or The function of being specified in multiple boxes.
These computer program instructions can be also loaded into computer or other programmable data processing devices so that counted Series of operation steps are performed on calculation machine or other programmable devices to generate computer implemented processing, so as in computer or The instruction offer performed on other programmable devices is used to implement in one flow of flow chart or multiple flows and/or block diagram one The step of function of being specified in a box or multiple boxes.
In a typical configuration, computing device includes one or more processors (CPU), input/output interface, net Network interface and memory.
Memory may include computer-readable medium in volatile memory, random access memory (RAM) and/ Or the forms such as Nonvolatile memory, such as read-only memory (ROM) or flash memory (flash RAM).Memory is computer-readable Jie The example of matter.
Computer-readable medium includes permanent and non-permanent, removable and non-removable media can be by any method Or technology come realize information store.Information can be computer-readable instruction, data structure, the module of program or other data. The example of the storage medium of computer includes, but are not limited to phase transition internal memory (PRAM), static RAM (SRAM), moves State random access memory (DRAM), other kinds of random access memory (RAM), read-only memory (ROM), electric erasable Programmable read only memory (EEPROM), fast flash memory bank or other memory techniques, CD-ROM read-only memory (CD-ROM), Digital versatile disc (DVD) or other optical storages, magnetic tape cassette, the storage of tape magnetic rigid disk or other magnetic storage apparatus Or any other non-transmission medium, available for storing the information that can be accessed by a computing device.It defines, calculates according to herein Machine readable medium does not include temporary computer readable media (transitory media), such as data-signal and carrier wave of modulation.
It should also be noted that, term " comprising ", "comprising" or its any other variant are intended to nonexcludability Comprising so that process, method, commodity or equipment including a series of elements are not only including those elements, but also wrap Include other elements that are not explicitly listed or further include for this process, method, commodity or equipment it is intrinsic will Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including element Also there are other identical elements in process, method, commodity or equipment.
It will be understood by those skilled in the art that embodiments herein can be provided as method, system or computer program product. Therefore, complete hardware embodiment, complete software embodiment or the embodiment in terms of combining software and hardware can be used in the application Form.It is deposited moreover, the application can be used to can be used in one or more computers for wherein including computer usable program code The shape of computer program product that storage media is implemented on (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) Formula.
The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although with reference to the foregoing embodiments The present invention is described in detail, it will be understood by those of ordinary skill in the art that:It still can be to aforementioned each implementation Technical solution recorded in example modifies or carries out equivalent replacement to which part technical characteristic;And these modification or It replaces, the spirit and scope for various embodiments of the present invention technical solution that it does not separate the essence of the corresponding technical solution.

Claims (10)

1. a kind of Intelligent Dynamic manufactures execution method, applied to Intelligent Dynamic manufacturing execution system, which is characterized in that including:
Step 1:Determine target production scheduling, the target production scheduling includes multiple tasks to be produced, the multiple to be generated Content, equipment, time started and the deadline of production task;
Step 2:The multiple task to be produced is distributed according to preset rules to multiple prime principals and/or multiple first and is set It is standby;
Step 3:Each prime principal and/or each first equipment are received according to being fed back in actual production process The condition of production of each task to be produced;
Step 4:The condition of production is analyzed according to default AI computation models, to judge in the multiple task to be produced Reach the target production task of predetermined threshold value with the presence or absence of degree of urgency;
Step 5:If so, it sends the degree of urgency prompting message of the target production task and strains work instruction to the target The corresponding target responsible person of production task and/or target device, the degree of urgency prompting message and preset issued transaction grade It is associated;
Step 6:The target responsible person and/or target device are carried according to the strain work instruction and with the degree of urgency Intelligent Dynamic system described in the attribute information typing of the target production task of the associated issued transaction grade feedback of information of waking up Make execution system, the attribute information of the target production task includes the condition of production of the target production task and/or described The completion situation of target production task;
Step 7:Target production scheduling progress dynamic is adjusted according to the attribute information of the target production task;
Step 2 is repeated to step 7, until all production tasks processing in the target production scheduling is completed.
2. according to the method described in claim 1, it is characterized in that, it is described by the multiple task to be produced according to preset rules Distribution to multiple prime principals and/or multiple first equipment include:
Distribute each task to be produced to prime principal corresponding to each task to be produced in the form of small routine;
And/or
Each task to be produced is distributed to the Quick Response Code of the corresponding first equipment mark of each task to be produced and/or small Program.
3. according to the method described in claim 1, it is characterized in that, the determining target production scheduling includes:
At the beginning of calculating each task to be produced and the deadline;
At the beginning of to each task to be produced and the deadline arranges, to determine the target production row Journey.
4. the according to the method described in claim 3, it is characterized in that, attribute information pair according to the target production task The target scheduling progress dynamic adjustment includes:
Receive the target responsible person and/or the target device feedback the target production task production status and/or The completion situation of the target production task;
According to the production status of the target production task and/or the completion situation of the target production task, with the target The target completion date of the target production task is determined on the basis of the deadline of production task;
The target production scheduling is adjusted according to the target completion date.
5. according to the method described in claim 1, it is characterized in that, to reach pre- when there is no degree of urgency in the task to be produced If during preset target production task, the method further includes:
The multiple task to be produced is handled based on the target scheduling.
6. a kind of Intelligent Dynamic manufactures executive device, applied to Intelligent Dynamic manufacturing execution system, which is characterized in that including:
Determination unit, for performing step 1:Determine target production scheduling, the target production scheduling includes multiple to be produced Content, equipment, time started and the deadline of task, the multiple task to be produced;
Allocation unit, for performing step 2:The multiple task to be produced is distributed according to preset rules to multiple first and is responsible for People and/or multiple first equipment;
Receiving unit, for performing step 3:Each prime principal and/or each first equipment are received according to reality The condition of production of each task to be produced fed back in the production process of border;
Judging unit, for step 4:The condition of production is analyzed according to default AI computation models, it is described more to judge Reach the target production task of predetermined threshold value in a task to be produced with the presence or absence of degree of urgency;
Transmitting element, for performing step 5:If so, send degree of urgency prompting message and the strain of the target production task Work instruction to the corresponding target responsible person of the target production task and/or target device, the degree of urgency prompting message with Preset issued transaction grade is associated;
First processing units, for performing step 6:By the target responsible person and/or target device according to the strain work The attribute of the target production task of guide and issued transaction grade associated with degree of urgency prompting message feedback Intelligent Dynamic manufacturing execution system described in data input, the attribute information of the target production task include target production and appoint The completion situation of the condition of production of business and/or the target production task;
Dynamic adjustment unit, for performing step 7:According to the attribute information of the target production task to the target scheduling into Degree dynamic adjusts;
Processing unit, for repeating step 2 to step 7, at all production tasks in the target production scheduling Reason is completed.
7. device according to claim 6, which is characterized in that the allocation unit is specifically used for:
Distribute each task to be produced to prime principal corresponding to each task to be produced in the form of small routine;
And/or
Each task to be produced is distributed to the Quick Response Code of the corresponding first equipment mark of each task to be produced and/or small Program.
8. device according to claim 6, which is characterized in that the determination unit is specifically used for:
At the beginning of calculating each task to be produced and the deadline;
At the beginning of to each task to be produced and the deadline arranges, to determine the target production row Journey.
9. a kind of processor, which is characterized in that the processor is for running computer program, when the computer program is run The step of performing the Intelligent Dynamic manufacture execution method as described in any one in claim 1 to 5.
10. a kind of computer readable storage medium, is stored thereon with computer program, it is characterised in that:The computer program The step of Intelligent Dynamic manufacture execution method as described in any one in claim 1 to 5 is realized when being executed by processor.
CN201810049361.3A 2018-01-18 2018-01-18 A kind of Intelligent Dynamic manufacture execution method and relevant device Pending CN108241350A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810049361.3A CN108241350A (en) 2018-01-18 2018-01-18 A kind of Intelligent Dynamic manufacture execution method and relevant device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810049361.3A CN108241350A (en) 2018-01-18 2018-01-18 A kind of Intelligent Dynamic manufacture execution method and relevant device

Publications (1)

Publication Number Publication Date
CN108241350A true CN108241350A (en) 2018-07-03

Family

ID=62698665

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810049361.3A Pending CN108241350A (en) 2018-01-18 2018-01-18 A kind of Intelligent Dynamic manufacture execution method and relevant device

Country Status (1)

Country Link
CN (1) CN108241350A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109388116A (en) * 2018-10-31 2019-02-26 金蝶软件(中国)有限公司 A kind of production management method, management system for internet of things and relevant device
CN110009253A (en) * 2019-04-15 2019-07-12 广船国际有限公司 A kind of production scheduling method, apparatus, equipment and the storage medium of ship
CN111353703A (en) * 2020-02-28 2020-06-30 苏州智澜供应链管理有限公司 Intelligent production process control method and system
CN112580841A (en) * 2019-09-29 2021-03-30 北京国双科技有限公司 Production scheduling method and device, electronic equipment and storage medium
CN113703396A (en) * 2021-07-26 2021-11-26 北京市机械施工集团有限公司 Intelligent upgrading method of numerical control cutting equipment based on intelligent terminal

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1746910A (en) * 2004-09-11 2006-03-15 鸿富锦精密工业(深圳)有限公司 Mould Machining production deploying management system and method
CN1760902A (en) * 2005-11-11 2006-04-19 杭州电子科技大学 Method for optimizing scheduling system by technical imitaitng real flow
US7124087B1 (en) * 2000-11-03 2006-10-17 International Business Machines Corporation System and method for updating user home automation systems
CN101271543A (en) * 2008-04-23 2008-09-24 永凯软件技术(上海)有限公司 Production scheduling system and method using genetic algorithm based on elite solution pool
CN101706886A (en) * 2009-08-28 2010-05-12 华南理工大学 Order-driven Single-piece small-batch combined flow production method for processing workshop
CN202306259U (en) * 2011-07-18 2012-07-04 广州市花都东捷实业有限公司 Automatic management system device of automobile electrophoretic coating production
CN102799966A (en) * 2012-06-29 2012-11-28 厦门易用软件技术有限公司 Monitoring and early-warning system of enterprise project executing schedule
CN103182838A (en) * 2011-12-31 2013-07-03 北大方正集团有限公司 Method and device for automatically monitoring newspaper production processes
CN103475702A (en) * 2013-09-04 2013-12-25 重庆大学 Networked outside processing progress real-time control method based on mobile terminal
CN104240406A (en) * 2014-07-30 2014-12-24 上海技亨信息科技有限公司 Printing production control and early-warning system
CN106292580A (en) * 2016-08-10 2017-01-04 深圳市益普科技有限公司 A kind of intelligent integrated formula semiconductor manufacturing performs system

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7124087B1 (en) * 2000-11-03 2006-10-17 International Business Machines Corporation System and method for updating user home automation systems
CN1746910A (en) * 2004-09-11 2006-03-15 鸿富锦精密工业(深圳)有限公司 Mould Machining production deploying management system and method
CN1760902A (en) * 2005-11-11 2006-04-19 杭州电子科技大学 Method for optimizing scheduling system by technical imitaitng real flow
CN101271543A (en) * 2008-04-23 2008-09-24 永凯软件技术(上海)有限公司 Production scheduling system and method using genetic algorithm based on elite solution pool
CN101706886A (en) * 2009-08-28 2010-05-12 华南理工大学 Order-driven Single-piece small-batch combined flow production method for processing workshop
CN202306259U (en) * 2011-07-18 2012-07-04 广州市花都东捷实业有限公司 Automatic management system device of automobile electrophoretic coating production
CN103182838A (en) * 2011-12-31 2013-07-03 北大方正集团有限公司 Method and device for automatically monitoring newspaper production processes
CN102799966A (en) * 2012-06-29 2012-11-28 厦门易用软件技术有限公司 Monitoring and early-warning system of enterprise project executing schedule
CN103475702A (en) * 2013-09-04 2013-12-25 重庆大学 Networked outside processing progress real-time control method based on mobile terminal
CN104240406A (en) * 2014-07-30 2014-12-24 上海技亨信息科技有限公司 Printing production control and early-warning system
CN106292580A (en) * 2016-08-10 2017-01-04 深圳市益普科技有限公司 A kind of intelligent integrated formula semiconductor manufacturing performs system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109388116A (en) * 2018-10-31 2019-02-26 金蝶软件(中国)有限公司 A kind of production management method, management system for internet of things and relevant device
CN109388116B (en) * 2018-10-31 2021-08-20 金蝶软件(中国)有限公司 Production management method, Internet of things management system and related equipment
CN110009253A (en) * 2019-04-15 2019-07-12 广船国际有限公司 A kind of production scheduling method, apparatus, equipment and the storage medium of ship
CN112580841A (en) * 2019-09-29 2021-03-30 北京国双科技有限公司 Production scheduling method and device, electronic equipment and storage medium
CN111353703A (en) * 2020-02-28 2020-06-30 苏州智澜供应链管理有限公司 Intelligent production process control method and system
CN113703396A (en) * 2021-07-26 2021-11-26 北京市机械施工集团有限公司 Intelligent upgrading method of numerical control cutting equipment based on intelligent terminal
CN113703396B (en) * 2021-07-26 2023-05-09 北京市机械施工集团有限公司 Intelligent upgrading method of numerical control cutting equipment based on intelligent terminal

Similar Documents

Publication Publication Date Title
CN108241350A (en) A kind of Intelligent Dynamic manufacture execution method and relevant device
CN104657220B (en) Scheduling model and method based on deadline and expense restriction in mixed cloud
CN108171442A (en) A kind of Intelligent Dynamic project management method and relevant device
Prachitmutita et al. Auto-scaling microservices on IaaS under SLA with cost-effective framework
Yu et al. Reputation-aware task allocation for human trustees
Liu et al. A two-stage robust optimization approach for the berth allocation problem under uncertainty
CN110489437A (en) Distributed transaction processing method, device, computer equipment and storage medium
Ihara et al. Many-objective virtual machine placement for dynamic environments
CN110781180B (en) Data screening method and data screening device
CN104199912B (en) A kind of method and device of task processing
CN106815254A (en) A kind of data processing method and device
CN109582452A (en) A kind of container dispatching method, dispatching device and electronic equipment
US20200364646A1 (en) Automated Assignment of Tasks Based on User Profile Data for Improved Efficiency
Smolka et al. Evaluation of fog application placement algorithms: a survey
WO2023116067A1 (en) Power service decomposition method and system for 5g cloud-edge-end collaboration
Mezni et al. Security‐aware SaaS placement using swarm intelligence
Stauffer et al. Elasticity management for capacity planning in software as a service cloud computing
Tiwari et al. Service adaptive broking mechanism using MROSP algorithm
Biran et al. Federated cloud computing as system of systems
AlOrbani et al. Load balancing and resource allocation in smart cities using reinforcement learning
CN110471769A (en) A kind of method for managing resource and device of virtual machine
CN109242680B (en) Method for dynamically adjusting block chain consensus
CN104853231B (en) Information processing method, equipment and system
Firdhous et al. An enhanced quality of service-based trust model for cloud computing
CN109710410A (en) A kind of internet information resource distribution method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180703

RJ01 Rejection of invention patent application after publication