CN108171442A - A kind of Intelligent Dynamic project management method and relevant device - Google Patents

A kind of Intelligent Dynamic project management method and relevant device Download PDF

Info

Publication number
CN108171442A
CN108171442A CN201810049830.1A CN201810049830A CN108171442A CN 108171442 A CN108171442 A CN 108171442A CN 201810049830 A CN201810049830 A CN 201810049830A CN 108171442 A CN108171442 A CN 108171442A
Authority
CN
China
Prior art keywords
task
target
goal task
pending
project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810049830.1A
Other languages
Chinese (zh)
Inventor
邓滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Weibo Technology Co Ltd
Original Assignee
Shenzhen Weibo Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Weibo Technology Co Ltd filed Critical Shenzhen Weibo Technology Co Ltd
Priority to CN201810049830.1A priority Critical patent/CN108171442A/en
Publication of CN108171442A publication Critical patent/CN108171442A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The embodiment of the invention discloses a kind of Intelligent Dynamic project management method and relevant devices, can effectively solve the wasting of resources, improve the efficiency of management.This method includes:Determine the target scheduling of target developing project;Multiple pending tasks are distributed according to preset rules to multiple prime principals;Each prime principal is received according to the executive condition of each pending task fed back in practical implementation;Executive condition is analyzed according to default AI computation models, to judge to reach the goal task of predetermined threshold value in multiple pending tasks with the presence or absence of degree of urgency;If so, the degree of urgency prompting message of goal task is sent to the corresponding target responsible person of goal task;Dynamic adjustment in due course carries out target scheduling according to the attribute information of goal task that target responsible person feeds back;It repeats, until all tasks processing in target scheduling is completed.

Description

A kind of Intelligent Dynamic project management method and relevant device
Technical field
The present invention relates to project management field more particularly to a kind of Intelligent Dynamic project management methods and relevant device.
Background technology
Currently for the work of engineering development project management, during practical executive plan, because level-one supply need to be coordinated Quotient, two level supplier, Deng Ge enterprises of tooling manufacturing enterprise respective needs perform plan, links are numerous and diverse, Ren Yihuan There is exception in section, the plan of this song engineering development project can all be caused to be delayed, so as to the progress to entire engineering development project Management produces bigger effect.
When in engineering development or project management process, when something goes wrong, engineering development or project management need and one The affiliated enterprises such as grade supplier, two level supplier and tooling manufacturing enterprise are solved by artificial session discussing.If Constituent parts perform respective task when information feedback promptness not enough, strain countermeasure not in time, can not only make entire engineering development The plan of project is delayed, but also a large amount of human and material resources can be wasted, financial resources are discussed, with to the engineering development project plan into Row is readjusted.
Invention content
For above-mentioned technical problem, an embodiment of the present invention provides a kind of Intelligent Dynamic project management methods and correlation to set It is standby, each task in exploration project into Mobile state can be adjusted, control the dynamic situation of project development in time, coordinate project The communication work of each link in development process, effectively solves problem of resource waste.
The first aspect of the embodiment of the present invention provides a kind of Intelligent Dynamic project management method, applied to project development management System, including:
Step 1:Determine the target scheduling of target developing project, the target developing project include multiple pending tasks, Content, time started and the deadline of the multiple pending task;
Step 2:The multiple pending task is distributed according to preset rules to multiple prime principals;
Step 3:Each prime principal is received according to each described pending fed back in practical implementation The executive condition of business;
Step 4:The executive condition is analyzed according to default AI computation models, to judge the multiple pending Reach the goal task of predetermined threshold value in business with the presence or absence of degree of urgency;
Step 5:If so, it sends the degree of urgency prompting message of the goal task and strains work instruction to the target The corresponding target responsible person of task, the degree of urgency prompting message are associated with preset issued transaction grade;
Step 6:By the target responsible person according to it is described strain work instruction and with the degree of urgency prompting message phase Intelligent Dynamic project management system described in the attribute information typing of the goal task of associated issued transaction grade feedback, institute The attribute information for stating goal task includes the executive condition of the goal task and/or the completion situation of the goal task;
Step 7:Target scheduling progress dynamic is adjusted according to the attribute information of the goal task;
Step 2 is repeated to step 7, until all tasks processing in the target scheduling is completed.
Optionally, described distribute the multiple pending task to multiple prime principals according to preset rules includes:
Each pending task is distributed in the form of small routine to each pending task corresponding first and is responsible for People.
Optionally, the target scheduling of the determining target developing project includes:
Obtain all pending tasks in the target developing project;
At the beginning of calculating all pending tasks and the deadline;
According at the beginning of all pending tasks and the deadline is to the institute in the target developing project There is pending task to be arranged, to determine the target scheduling.
Optionally, the attribute information according to the goal task includes target scheduling progress dynamic adjustment:
Receive the executive condition of the goal task of the target responsible person feedback and/or the completion of the goal task Situation;
According to the executive condition of the goal task and/or the completion situation of the goal task, with the goal task Deadline on the basis of determine the goal task target completion date;
The target scheduling is adjusted according to the target completion date.
Optionally, when reaching the goal task of predetermined threshold value there is no degree of urgency in the pending task, the side Method further includes:
All execution tasks in the target developing project are handled based on the target scheduling.
Second aspect of the embodiment of the present invention provides a kind of Intelligent Dynamic project management device, applied to project development management System, including:
Determination unit, for performing step 1:Determine the target scheduling of target developing project, the target developing project packet Include content, time started and the deadline of multiple pending tasks, the multiple pending task;
Allocation unit, for performing step 2:The multiple pending task is distributed according to preset rules to multiple first Responsible person;
Receiving unit, for performing step 3:Each prime principal is received according to being fed back in practical implementation The executive condition of each pending task;
Judging unit, for performing step 4:The executive condition is analyzed according to default AI computation models, to sentence Reach the goal task of predetermined threshold value in the multiple pending task of breaking with the presence or absence of degree of urgency;
Transmitting element, for performing step 5:If so, send degree of urgency prompting message and the strain of the goal task Work instruction is to the corresponding target responsible person of the goal task, the degree of urgency prompting message and preset issued transaction grade It is associated;
First processing units, for performing step 6:By the target responsible person according to it is described strain work instruction and with Intelligence described in the attribute information typing of the goal task of the associated issued transaction grade feedback of degree of urgency prompting message Dynamic project management system, the attribute information of the goal task include the executive condition of the goal task and/or described The completion situation of goal task;
Dynamic adjustment unit, for performing step 7:According to the attribute information of the goal task to the target scheduling into Degree dynamic adjusts;
Second processing unit, for repeating step 2 to step 7, at all tasks in the target scheduling Reason is completed.
Optionally, the allocation unit is specifically used for:
Each pending task is distributed in the form of small routine to each pending task corresponding first and is responsible for People.
Optionally, the determination unit is specifically used for:
Obtain all pending tasks in the target developing project;
At the beginning of calculating all pending tasks and the deadline;
According at the beginning of all pending tasks and the deadline is to the institute in the target developing project There is pending task to be arranged, to determine the target scheduling.
The third aspect of the embodiment of the present invention provides a kind of processor, and the processor is for running computer program, institute The step of Intelligent Dynamic project management method as described in above-mentioned any one being performed when stating computer program operation.
Fourth aspect of the embodiment of the present invention provides a kind of computer readable storage medium, is stored thereon with computer journey Sequence, it is characterised in that:The computer program realizes the Intelligent Dynamic project described in above-mentioned any one when being executed by processor The step of management method.
In technical solution provided in an embodiment of the present invention, relative to the prior art, the embodiment of the present invention can be to developing item Each task in mesh is adjusted into Mobile state, controls the dynamic situation of project development in time, is coordinated each in project development process The communication work of link, effectively solves problem of resource waste.
Description of the drawings
Fig. 1 is one embodiment schematic diagram of Intelligent Dynamic project management method in the embodiment of the present invention;
Fig. 2 is an embodiment schematic diagram of Intelligent Dynamic project management device in the embodiment of the present invention;
Fig. 3 is the hardware architecture diagram of Intelligent Dynamic project management device in the embodiment of the present invention.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, the every other implementation that those skilled in the art are obtained without creative efforts Example, shall fall within the protection scope of the present invention.
Referring to Fig. 1, one embodiment of Intelligent Dynamic project management method includes in the embodiment of the present invention:
101st, step 1:Determine the target scheduling of target developing project.
In the present embodiment, each phased mission of project development and person liable and it is expected that the beginning of each task and complete can be specified Into the time.Specifically, determining an exploration project, i.e., after exploration project, it may be determined that the target of the target developing project Scheduling, the target developing project include multiple pending tasks multiple stages in other words.That is, in target developing project Multiple pending tasks or the scheduling in multiple stages.In the target scheduling can include each phased mission of target open project and At the beginning of responsible person and each phased mission and the deadline.
It should be noted that in the target scheduling for determining target developing project, target developing project can be obtained first In all pending tasks, at the beginning of then calculating all pending tasks and the deadline (it is unlimited devise a stratagem calculate Mode, such as can be calculated according to the urgency level of each pending task), finally, according to all pending tasks Time started and deadline arrange all pending tasks in target developing project, to determine target scheduling (i.e. when at the beginning of having obtained all pending tasks and after the deadline, at the beginning of execution task being based on Between and the deadline all pending tasks are ranked up).Such as target developing project includes:A, B, C tri- is pending Task, three pending tasks are performed respectively by three different supplying units respectively, and it is each pending to calculate A, B, C At the beginning of task and the deadline, at the beginning of being based ultimately upon each pending task of A, B, C and the deadline Tri- pending tasks of A, B, C are ranked up, obtain target scheduling.
It should be noted that multiple execution tasks or multiple stages can be included in target developing project in step 1, In order to make it easy to understand, it is illustrated so that target developing project includes multiple execution tasks as an example below.
102nd, step 2:Multiple pending tasks are distributed according to preset rules to multiple prime principals.
In the present embodiment, since the possible corresponding supplying unit of each execution task is different, each execution task pair The responsible person answered is also possible to difference.It is responsible for so can distribute multiple execution tasks to multiple targets according to preset rules People, such as each pending task in the form of small routine can be distributed to each pending task corresponding first and be responsible for People.
It should be noted that the attribute information of pending task can be included in each pending task, such as the execution The material that task needs, needs the information such as the time completed.
It should be noted that distribute task in the form of small routine in above-mentioned steps, a kind of only executive mode, certainly There can also be other executive modes, such as directly distribute each pending task to target corresponding to each pending task Responsible person does not limit specifically herein.
103rd, step 3:Each prime principal is received according to each pending task fed back in practical implementation Executive condition.
In the present embodiment, each pending task is distributed in the form of small routine to each pending task corresponding After one responsible person, the responsible person of each pending task can be with the execution feelings of the corresponding pending task of Real-time Feedback Condition, such as it is the starting stage that A, which performs the task stage residing at present, B performs task intermediate stage in stage residing at present etc. Deng.Specifically, due in project development implementation procedure, the corresponding person liable of each task, shape is performed according to practical in project Condition reporting system, as whether whether each task in project complete as scheduled, shift to an earlier date, delay and the extension scheduled completion time Etc. data.
104th, step 4:Executive condition is analyzed according to default AI computation models, to judge in multiple pending tasks Reach the goal task of predetermined threshold value with the presence or absence of degree of urgency, if so, performing step 105.
In the present embodiment, can establish based on projects development Experience and big data AI (artificial intelligence, Artificial Intelligence) computation model, do not limit the number for establishing default AI computation models specifically herein, such as Corresponding AI computation models can be established for each engineering development project, a total engineering development project can also be established AI computation models.It is specific herein not limit the time for establishing default AI computation models, as long as carrying out analyzing it to executive condition Preceding foundation.The executive condition of each pending task is analyzed, and then judge more based on default AI computation models Reach the goal task of predetermined threshold value in a pending task with the presence or absence of degree of urgency, if so, performing step 105.
105th, step 5:Degree of urgency prompting message and the strain work instruction for sending goal task are corresponding to goal task Target responsible person.
It, can when the goal task for reaching predetermined threshold value in multiple pending tasks there are degree of urgency in the present embodiment With by the degree of urgency prompting message of the goal task and strain work instruction to the corresponding responsible person of goal task, wherein, it is urgent It is associated with preset issued transaction grade to spend prompting message, that is to say, that when system is established, i.e., there is provided issued transactions etc. Grade, and issued transaction registration is established into incidence relation with degree of urgency prompting message.Specifically, according to AI operations, goal task is opened Pressing degree is sent out, sends out warning information, and the corresponding person liable of goal task, administrator and relevant people are notified in the form of small routine Member and/or, by relevant equipment in the form of small routine or Quick Response Code, while provide strain work instruction, person liable, Manager and related personnel are in the presence of handling according to strain work instruction to current, such as increase equipment, coordinate to add Send someone hand, overtime work overworks, external processing, arranges special messenger's follow-up etc., it is ensured that reaches manufacturing plan as scheduled, timely processing is abnormal Alarm project.Meanwhile current concrete condition is fed back.
It should be noted that when there is no the goal tasks for having degree of urgency to reach predetermined threshold value in multiple pending tasks When, all execution tasks in target developing project can be handled based on target scheduling, and monitoring objective exploitation in real time The executive condition of all execution tasks and degree of urgency situation in project.When the target for finding to there is degree of urgency to reach predetermined threshold value During task, that is, perform step 105.
106th, step 6:By target responsible person according to strain work instruction and thing associated with degree of urgency prompting message The attribute information of the goal task of business processing grade feedback is to target scheduling typing Intelligent Dynamic project management system.
In the present embodiment, it is sent to target by the degree of urgency prompting message of goal task and strain work instruction and is responsible for After people, target responsible person is according to strain work instruction and issued transaction grade associated with degree of urgency prompting message to mesh The executive condition of mark task and/or completion situation are fed back, for example, by the plan of goal task in advance, the information such as delay into Row feedback.Specifically, the corresponding person liable of goal task, manager and related personnel set according to strain work instruction as increased It is standby, coordinate plus hand of sending someone, overtime work overwork, external processing, arrange special messenger's follow-up etc., accelerate project development progress, timely processing is different Often alarm task.Meanwhile project development progress input system is fed back.
It should be noted that can be feedback executive condition herein, such as which kind of stage be gone to, completion can also be fed back Which kind of degree situation, such as performance level reach, can also two feed back simultaneously, do not limit specifically.
107th, target scheduling is adjusted into Mobile state according to the attribute information of goal task.
In the present embodiment, receive target responsible person feedback goal task executive condition and/or goal task it is complete It, can be according to the executive condition of goal task and/or the completion situation of goal task, during with the completion of goal task after work situation Between on the basis of determine the target completion date of goal task, deadline of the goal task is initial scheduled target task Completion date.And target scheduling is adjusted according to target completion date.Specifically, system is performed according to practical item development In plan in advance, the report work information such as delay, dynamic, in due course is adjusted overall progress, and notify related responsibility in time People.
108th, step 2 is repeated to step 7, until all tasks processing in target scheduling is completed.
It, can be based on the mesh after adjustment after being adjusted according to target completion date to target scheduling in the present embodiment Mark scheduling repeats step 2 to step 6, is completed until being handled to all tasks in target scheduling, i.e., until target developing item Until mesh exploitation is completed.
In view of the foregoing it is apparent that the present invention, by the intelligent operation of AI computation models, calculates in target developing project Each task degree of urgency, in the form of small routine send mission bit stream, timely and effectively to the progress of target developing task exception The in due course intelligent reminding of situation, scientific guidance related personnel carry out Plan rescheduling, effectively solve the wasting of resources, improve the efficiency of management.
The Intelligent Dynamic project management method in the embodiment of the present invention is described above, the present invention is implemented below Intelligent Dynamic project management device in example is described, referring to Fig. 2, Intelligent Dynamic project management fills in the embodiment of the present invention The one embodiment put includes:
Determination unit 201, for performing step 1:Determine the target scheduling of target developing project, the target developing project Content, time started and deadline including multiple pending tasks, the multiple pending task;
Allocation unit 202, for performing step 2:The multiple pending task is distributed according to preset rules to multiple Prime principal;
Receiving unit 203, for performing step 3:Each prime principal is received according to anti-in practical implementation The executive condition of each pending task of feedback;
Judging unit 204, for performing step 4:The executive condition is analyzed according to default AI computation models, with Judge the goal task for reaching predetermined threshold value in the multiple pending task with the presence or absence of degree of urgency;
Transmitting element 205, for performing step 5:If so, it sends the degree of urgency prompting message of the goal task and answers Become work and be directed to the corresponding target responsible person of the goal task, the degree of urgency prompting message and preset issued transaction etc. Grade is associated;
First processing units 206, for performing step 6:By the target responsible person according to it is described strain work instruction with And the attribute information typing institute of the goal task of issued transaction grade feedback associated with the degree of urgency prompting message State Intelligent Dynamic project management system, the attribute information of the goal task include the goal task executive condition and/or The completion situation of the goal task;
Dynamic adjustment unit 207, for performing step 7:The target is arranged according to the attribute information of the goal task Cheng Jindu dynamics adjust;
Second processing unit 208, for repeating step 2 to step 7, until all tasks in the target scheduling Processing is completed.
Wherein, allocation unit 202 is specifically used for:
Distribute each pending task to prime principal corresponding to each pending task in the form of small routine.
Determination unit 201 is specifically used for:
Obtain all pending tasks in target developing project;
At the beginning of calculating all pending tasks and the deadline;
According at the beginning of all pending tasks and the deadline is to all pending in target developing project Task is arranged, to determine target scheduling.
In view of the foregoing it is apparent that the present invention, by the intelligent operation of AI computation models, calculates in target developing project Each task degree of urgency, in the form of small routine send mission bit stream, timely and effectively to the progress of target developing task exception The in due course intelligent reminding of situation, scientific guidance related personnel carry out Plan rescheduling, effectively solve the wasting of resources, improve the efficiency of management.
It should be noted that it in the above-described embodiments, all emphasizes particularly on different fields to the description of each embodiment, in some embodiment The part being not described in may refer to the associated description of other embodiments.
Referring to Fig. 3, the embodiment of the present invention additionally provides a kind of Intelligent Dynamic project management device, the Intelligent Dynamic item Mesh managing device includes processor 301 and memory 302, above-mentioned determination unit, allocation unit and judging unit etc. and is used as journey Sequence unit stores in memory, performs above procedure unit stored in memory by processor to realize corresponding work( Energy.
Comprising kernel in processor 301, gone in memory to transfer corresponding program unit by kernel.Kernel can set one It is a or more, user data is updated by adjusting kernel parameter.
Memory 302 may include the volatile memory in computer-readable medium, random access memory (RAM) And/or the forms such as Nonvolatile memory, such as read-only memory (ROM) or flash memory (flash RAM), memory includes at least one Storage chip.
An embodiment of the present invention provides a kind of storage mediums, are stored thereon with program, real when which is executed by processor The existing Intelligent Dynamic project management method.
An embodiment of the present invention provides a kind of processor, the processor is used to run program, wherein, described program operation Intelligent Dynamic project management method described in Shi Zhihang.
Present invention also provides a kind of computer program products, first when being performed on data processing equipment, being adapted for carrying out The program of beginningization there are as below methods step:
Step 1:Determine the target scheduling of target developing project, the target developing project include multiple pending tasks, Content, time started and the deadline of the multiple pending task;
Step 2:The multiple pending task is distributed according to preset rules to multiple prime principals;
Step 3:Each prime principal is received according to each described pending fed back in practical implementation The executive condition of business;
Step 4:The executive condition is analyzed according to default AI computation models, to judge the multiple pending Reach the goal task of predetermined threshold value in business with the presence or absence of degree of urgency;
Step 5:If so, it sends the degree of urgency prompting message of the goal task and strains work instruction to the target The corresponding target responsible person of task, the degree of urgency prompting message are associated with preset issued transaction grade;
Step 6:By the target responsible person according to it is described strain work instruction and with the degree of urgency prompting message phase Intelligent Dynamic project management system described in the attribute information typing of the goal task of associated issued transaction grade feedback, institute The attribute information for stating goal task includes the executive condition of the goal task and/or the completion situation of the goal task;
Step 7:Target scheduling progress dynamic is adjusted according to the attribute information of the goal task;
Step 2 is repeated to step 7, until all tasks processing in the target scheduling is completed.
Optionally, described distribute the multiple pending task to multiple prime principals according to preset rules includes:
Each pending task is distributed in the form of small routine to each pending task corresponding first and is responsible for People.
Optionally, the target scheduling of the determining target developing project includes:
Obtain all pending tasks in the target developing project;
At the beginning of calculating all pending tasks and the deadline;
According at the beginning of all pending tasks and the deadline is to the institute in the target developing project There is pending task to be arranged, to determine the target scheduling.
Optionally, the attribute information according to the goal task includes target scheduling progress dynamic adjustment:
Receive the executive condition of the goal task of the target responsible person feedback and/or the completion of the goal task Situation;
According to the executive condition of the goal task and/or the completion situation of the goal task, with the goal task Deadline on the basis of determine the goal task target completion date;
The target scheduling is adjusted according to the target completion date.
Optionally, when reaching the goal task of predetermined threshold value there is no degree of urgency in the pending task, based on institute Target scheduling is stated to handle all execution tasks in the target developing project.
It should be understood by those skilled in the art that, embodiments herein can be provided as method, system or computer program Product.Therefore, the reality in terms of complete hardware embodiment, complete software embodiment or combination software and hardware can be used in the application Apply the form of example.Moreover, the computer for wherein including computer usable program code in one or more can be used in the application The computer program production that usable storage medium is implemented on (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) The form of product.
The application be with reference to the method for the embodiment of the present application, equipment (system) and computer program product flow chart and/ Or block diagram describes.It should be understood that each flow that can be realized by computer program instructions in flowchart and/or the block diagram and/ Or the flow in box and flowchart and/or the block diagram and/or the combination of box.These computer program instructions can be provided To the processor of all-purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to generate one A machine so that the instruction generation performed by computer or the processor of other programmable data processing devices is used to implement The device of function specified in one flow of flow chart or multiple flows and/or one box of block diagram or multiple boxes.
These computer program instructions, which may also be stored in, can guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works so that the instruction generation being stored in the computer-readable memory includes referring to Enable the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one box of block diagram or The function of being specified in multiple boxes.
These computer program instructions can be also loaded into computer or other programmable data processing devices so that counted Series of operation steps are performed on calculation machine or other programmable devices to generate computer implemented processing, so as in computer or The instruction offer performed on other programmable devices is used to implement in one flow of flow chart or multiple flows and/or block diagram one The step of function of being specified in a box or multiple boxes.
In a typical configuration, computing device includes one or more processors (CPU), input/output interface, net Network interface and memory.
Memory may include computer-readable medium in volatile memory, random access memory (RAM) and/ Or the forms such as Nonvolatile memory, such as read-only memory (ROM) or flash memory (flash RAM).Memory is computer-readable Jie The example of matter.
Computer-readable medium includes permanent and non-permanent, removable and non-removable media can be by any method Or technology come realize information store.Information can be computer-readable instruction, data structure, the module of program or other data. The example of the storage medium of computer includes, but are not limited to phase transition internal memory (PRAM), static RAM (SRAM), moves State random access memory (DRAM), other kinds of random access memory (RAM), read-only memory (ROM), electric erasable Programmable read only memory (EEPROM), fast flash memory bank or other memory techniques, CD-ROM read-only memory (CD-ROM), Digital versatile disc (DVD) or other optical storages, magnetic tape cassette, the storage of tape magnetic rigid disk or other magnetic storage apparatus Or any other non-transmission medium, available for storing the information that can be accessed by a computing device.It defines, calculates according to herein Machine readable medium does not include temporary computer readable media (transitory media), such as data-signal and carrier wave of modulation.
It should also be noted that, term " comprising ", "comprising" or its any other variant are intended to nonexcludability Comprising so that process, method, commodity or equipment including a series of elements are not only including those elements, but also wrap Include other elements that are not explicitly listed or further include for this process, method, commodity or equipment it is intrinsic will Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including element Also there are other identical elements in process, method, commodity or equipment.
It will be understood by those skilled in the art that embodiments herein can be provided as method, system or computer program product. Therefore, complete hardware embodiment, complete software embodiment or the embodiment in terms of combining software and hardware can be used in the application Form.It is deposited moreover, the application can be used to can be used in one or more computers for wherein including computer usable program code The shape of computer program product that storage media is implemented on (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) Formula.
The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although with reference to the foregoing embodiments The present invention is described in detail, it will be understood by those of ordinary skill in the art that:It still can be to aforementioned each implementation Technical solution recorded in example modifies or carries out equivalent replacement to which part technical characteristic;And these modification or It replaces, the spirit and scope for various embodiments of the present invention technical solution that it does not separate the essence of the corresponding technical solution.

Claims (10)

1. a kind of method of Intelligent Dynamic project management, applied to Intelligent Dynamic project management system, which is characterized in that including:
Step 1:Determine the target scheduling of target developing project, the target developing project includes multiple pending tasks, described Content, time started and the deadline of multiple pending tasks;
Step 2:The multiple pending task is distributed according to preset rules to multiple prime principals;
Step 3:Each prime principal is received according to each pending task fed back in practical implementation Executive condition;
Step 4:The executive condition is analyzed according to default AI computation models, to judge in the multiple pending task Reach the goal task of predetermined threshold value with the presence or absence of degree of urgency;
Step 5:If so, it sends the degree of urgency prompting message of the goal task and strains work instruction to the goal task Corresponding target responsible person, the degree of urgency prompting message are associated with preset issued transaction grade;
Step 6:By the target responsible person according to the strain work instruction and associated with the degree of urgency prompting message Issued transaction grade feedback the goal task attribute information typing described in Intelligent Dynamic project management system, the mesh The attribute information of mark task includes the executive condition of the goal task and/or the completion situation of the goal task;
Step 7:Target scheduling progress dynamic is adjusted according to the attribute information of the goal task;
Step 2 is repeated to step 7, until all tasks processing in the target scheduling is completed.
2. according to the method described in claim 1, it is characterized in that, it is described by the multiple pending task according to preset rules Distribution to multiple prime principals include:
Distribute each pending task to prime principal corresponding to each pending task in the form of small routine.
3. according to the method described in claim 1, it is characterized in that, the target scheduling of the determining target developing project includes:
Obtain all pending tasks in the target developing project;
At the beginning of calculating all pending tasks and the deadline;
According at the beginning of all pending tasks and the deadline in the target developing project to being needed Execution task is arranged, to determine the target scheduling.
4. according to the method described in claim 3, it is characterized in that, the attribute information according to the goal task is to described The dynamic adjustment of target scheduling progress includes:
Receive the executive condition of the goal task and/or the completion feelings of the goal task of the target responsible person feedback Condition;
According to the executive condition of the goal task and/or the completion situation of the goal task, with the complete of the goal task The target completion date of the goal task is determined on the basis of into the time;
The target scheduling is adjusted according to the target completion date.
5. according to the method described in claim 1, it is characterized in that, to reach pre- when there is no degree of urgency in the pending task If during the goal task of threshold value, the method further includes:
All execution tasks in the target developing project are handled based on the target scheduling.
6. a kind of Intelligent Dynamic project management device manages system applied to project development, which is characterized in that including:
Determination unit, for performing step 1:Determine the target scheduling of target developing project, the target developing project includes more Content, time started and the deadline of a pending task, the multiple pending task;
Allocation unit, for performing step 2:The multiple pending task is distributed according to preset rules to multiple first and is responsible for People;
Receiving unit, for performing step 3:It is each according to what is fed back in practical implementation to receive each prime principal The executive condition of the pending task;
Judging unit, for performing step 4:The executive condition is analyzed according to default AI computation models, to judge State the goal task for reaching predetermined threshold value in multiple pending tasks with the presence or absence of degree of urgency;
Transmitting element, for performing step 5:If so, send the degree of urgency prompting message of the goal task and strain work The corresponding target responsible person of the goal task is directed to, the degree of urgency prompting message is related to preset issued transaction grade Connection;
First processing units, for performing step 6:By the target responsible person according to it is described strain work instruction and with it is described It is intelligently moved described in the attribute information typing of the goal task of the associated issued transaction grade feedback of degree of urgency prompting message State project management system, the attribute information of the goal task include the executive condition of the goal task and/or the target The completion situation of task;
Dynamic adjustment unit, for performing step 7:The target scheduling progress is moved according to the attribute information of the goal task State adjusts;
Second processing unit, for repeating step 2 to step 7, until all tasks in the target scheduling have been handled Into.
7. device according to claim 6, which is characterized in that the allocation unit is specifically used for:
Distribute each pending task to prime principal corresponding to each pending task in the form of small routine.
8. device according to claim 6, which is characterized in that the determination unit is specifically used for:
Obtain all pending tasks in the target developing project;
At the beginning of calculating all pending tasks and the deadline;
According at the beginning of all pending tasks and the deadline in the target developing project to being needed Execution task is arranged, to determine the target scheduling.
9. a kind of processor, which is characterized in that the processor is for running computer program, when the computer program is run The step of performing the Intelligent Dynamic project management method as described in any one in claim 1 to 5.
10. a kind of computer readable storage medium, is stored thereon with computer program, it is characterised in that:The computer program The step of Intelligent Dynamic project management method as described in any one in claim 1 to 5 is realized when being executed by processor.
CN201810049830.1A 2018-01-18 2018-01-18 A kind of Intelligent Dynamic project management method and relevant device Pending CN108171442A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810049830.1A CN108171442A (en) 2018-01-18 2018-01-18 A kind of Intelligent Dynamic project management method and relevant device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810049830.1A CN108171442A (en) 2018-01-18 2018-01-18 A kind of Intelligent Dynamic project management method and relevant device

Publications (1)

Publication Number Publication Date
CN108171442A true CN108171442A (en) 2018-06-15

Family

ID=62515175

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810049830.1A Pending CN108171442A (en) 2018-01-18 2018-01-18 A kind of Intelligent Dynamic project management method and relevant device

Country Status (1)

Country Link
CN (1) CN108171442A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109636202A (en) * 2018-12-14 2019-04-16 万翼科技有限公司 The calculation method of effectiveness parameters, device and storage medium per capita
CN114358658A (en) * 2022-03-10 2022-04-15 广东粤海集团企业服务有限公司 Working group data processing method and system
CN115049373A (en) * 2022-08-17 2022-09-13 恒丰银行股份有限公司 Method, equipment and medium for realizing multi-level management of production jobs
CN115509723A (en) * 2022-11-01 2022-12-23 中科雨辰科技有限公司 Data processing system for acquiring non-target task object
CN117635044A (en) * 2023-11-29 2024-03-01 武汉荆楚点石数码设计有限公司 Efficient game research and development project management method, system and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060112390A1 (en) * 2004-11-24 2006-05-25 Yoshiyuki Hamaoka Systems and methods for performing real-time processing using multiple processors
CN102799966A (en) * 2012-06-29 2012-11-28 厦门易用软件技术有限公司 Monitoring and early-warning system of enterprise project executing schedule
CN106408259A (en) * 2016-09-18 2017-02-15 西安易营信息科技有限公司 Construction project site work task pushing and plan feedback linking method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060112390A1 (en) * 2004-11-24 2006-05-25 Yoshiyuki Hamaoka Systems and methods for performing real-time processing using multiple processors
CN102799966A (en) * 2012-06-29 2012-11-28 厦门易用软件技术有限公司 Monitoring and early-warning system of enterprise project executing schedule
CN106408259A (en) * 2016-09-18 2017-02-15 西安易营信息科技有限公司 Construction project site work task pushing and plan feedback linking method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109636202A (en) * 2018-12-14 2019-04-16 万翼科技有限公司 The calculation method of effectiveness parameters, device and storage medium per capita
CN109636202B (en) * 2018-12-14 2021-05-18 万翼科技有限公司 Calculation method and device for per-person efficiency parameter and storage medium
CN114358658A (en) * 2022-03-10 2022-04-15 广东粤海集团企业服务有限公司 Working group data processing method and system
CN115049373A (en) * 2022-08-17 2022-09-13 恒丰银行股份有限公司 Method, equipment and medium for realizing multi-level management of production jobs
CN115049373B (en) * 2022-08-17 2022-12-16 恒丰银行股份有限公司 Method, equipment and medium for realizing multi-level management of production jobs
CN115509723A (en) * 2022-11-01 2022-12-23 中科雨辰科技有限公司 Data processing system for acquiring non-target task object
CN115509723B (en) * 2022-11-01 2023-10-20 中科雨辰科技有限公司 Data processing system for acquiring non-target task object
CN117635044A (en) * 2023-11-29 2024-03-01 武汉荆楚点石数码设计有限公司 Efficient game research and development project management method, system and storage medium

Similar Documents

Publication Publication Date Title
CN108171442A (en) A kind of Intelligent Dynamic project management method and relevant device
Lohmer et al. Analysis of resilience strategies and ripple effect in blockchain-coordinated supply chains: An agent-based simulation study
Giannakis et al. A multi-agent based framework for supply chain risk management
Bilal et al. Investigating profitability performance of construction projects using big data: A project analytics approach
Chiadamrong et al. Optimal design of supply chain network under uncertainty environment using hybrid analytical and simulation modeling approach
Liu et al. A two-stage robust optimization approach for the berth allocation problem under uncertainty
CN108241350A (en) A kind of Intelligent Dynamic manufacture execution method and relevant device
Grassi et al. Assessing the performances of a novel decentralised scheduling approach in Industry 4.0 and cloud manufacturing contexts
CN102592195A (en) Project control system and method based on development of products
JP2021507418A (en) Trained dynamic control complex system
Miller et al. The critical role of information and information technology in future accelerated radical innovation
Gajpal et al. Two efficient heuristics to solve the integrated load distribution and production planning problem
Mishra et al. Study of maintenance project manpower dynamics in Indian software outsourcing industry
Ding et al. Real‐Time Monitoring and Optimal Resource Allocation for Automated Container Terminals: A Digital Twin Application at the Yangshan Port
Saad et al. A DES approach for the contextual load modelling of supply chain system for instability analysis
Heinrich et al. Quality-of-service-aware service selection: A novel approach considering potential service failures and nondeterministic service values
Rivera et al. Using publish/subscribe middleware for distributed EV charging optimization
Pintea et al. Towards a secure two-stage supply chain network: a transportation-cost approach
Guarnaschelli et al. An approach based on constraint satisfaction problems to disruptive event management in supply chains
Bzdyra et al. Mass customized projects portfolio scheduling-imprecise operations time approach
Tripathi et al. Emergent Technologies for Supply Chain Risk and Disruption Management
Upadhyaya et al. Maximum Entropy Solution for M X/G/1 Priority Reiterate G-queue Under Working Breakdown and Working Vacation.
Christoforidis et al. Simulated comparison of push/pull production with committed and non-committed automated guided vehicles
Aslam et al. Modeling of nonlinear supply chain management with lead-times based on Takagi-Sugeno fuzzy control model
Zatsarinnyy et al. Innovative approach to updating the digital platform ecosystem

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180615