CN108238541A - A kind of steel construction indirect cool tower triangle hoisting gripping member - Google Patents
A kind of steel construction indirect cool tower triangle hoisting gripping member Download PDFInfo
- Publication number
- CN108238541A CN108238541A CN201810239095.0A CN201810239095A CN108238541A CN 108238541 A CN108238541 A CN 108238541A CN 201810239095 A CN201810239095 A CN 201810239095A CN 108238541 A CN108238541 A CN 108238541A
- Authority
- CN
- China
- Prior art keywords
- fixture
- pedestal
- fixed arm
- arm
- steel construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 15
- 239000010959 steel Substances 0.000 title claims abstract description 15
- 238000010276 construction Methods 0.000 title claims abstract description 12
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 28
- 239000003381 stabilizer Substances 0.000 claims abstract description 11
- 230000003014 reinforcing effect Effects 0.000 claims description 4
- 238000000034 method Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009877 rendering Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
The present invention provides a kind of steel construction indirect cool tower triangle hoisting gripping member, by setting three lifting points triangular in shape on the triangle steelframe of component, for extending the distance between lifting point and component, so as to make lifting rope far from the covering on component, covering is avoided to generate damage by lifting rope, while improves lifting efficiency;Specifically include fixture and lower fixture, upper fixture includes the pedestal of strip, fixture bayonet is installed at the both ends of pedestal, fixed arm is installed on pedestal, fixed arm is L-shaped with pedestal, the first hoisting port is installed in the outer end of fixed arm, wherein, fixed arm and the fixture bayonet are located at respectively on opposite two sides of pedestal;Lower fixture includes the base arm of strip, and connecting hole and stabilizer blade are equipped in one end of base arm, and stabilizer blade, in V-shape, the second hoisting port is equipped in the other end of base arm with the base arm.
Description
Technical field
The present invention relates to steel construction indirect cool towers to install application field, and in particular to a kind of steel construction indirect cool tower triangle lifting card
Tool.
Background technology
Conventional hanging method is that suspension centre is set up directly on the triangle steelframe of component, and this hanging method can not be kept away
Exempt from component in hoisting process, grasped because swing causes lifting rope to be worn the covering of triangle steelframe upper surface, and to personnel
The precision of work has higher requirement, and the operating space of lifting is also controlled in the range of very little, seriously affects hanging for component
Fill efficiency.
Invention content
The present invention provides a kind of steel construction indirect cool tower triangle hoisting gripping member, by setting three on the triangle steelframe of component
A lifting point triangular in shape, for extending the distance between lifting point and component, so as to make lifting rope far from the covering on component,
Covering is avoided to generate damage by lifting rope, while improves lifting efficiency.
A kind of steel construction indirect cool tower triangle hoisting gripping member, it is characterised in that:Including upper fixture and lower fixture, the upper fixture
Pedestal including strip is installed with fixture bayonet at the both ends of the pedestal, and fixed arm, institute are installed on the pedestal
State fixed arm and the pedestal be L-shaped, the first hoisting port is installed in the outer end of the fixed arm, wherein, the fixed arm with
The fixture bayonet is located at respectively on two opposite sides of the pedestal;
The lower fixture includes the base arm of strip, and connecting hole and stabilizer blade, the stabilizer blade and institute are equipped in one end of the base arm
Base arm is stated in V-shape, the second hoisting port is equipped in the other end of the base arm.
The principle of the present invention:Component is made to tilt upward promotion by upper fixture and lower fixture, upper fixture passes through two fixtures
Bayonet is connected to the top of component triangle steelframe, while fixed arm extends to the top of triangle steelframe, makes the first hoisting port
Far from the triangle steelframe, wherein, be respectively equipped in the both sides on the triangle steelframe top one it is described on fixture;Lower card
The connecting hole of tool is fixedly connected on the centre position of the triangle steelframe lower part, is located at the triangle steelframe with fixture at present
Upper surface, the stabilizer blade of lower fixture is supported on the triangle steelframe;Then it is connected one to one respectively by three lifting ropes
On two on the second hoisting port of the upper and lower fixture of the first hoisting port of fixture, inclined state is kept simultaneously so as to fulfill component
It is lifted up.
More preferably to realize the present invention, may further be:Connecting rod, the both ends of the connecting rod are equipped on fixture on described
It is fixedly connected respectively with the pedestal and fixation wall, the connecting rod, pedestal and fixed arm combination are triangular in shape, in the connection
Bar is equipped with lifting lug;It is connected one to one respectively on two on the lifting lug of fixture by two wind ropes, by controlling this two
Wind rope is from the both sides control member movement in the horizontal direction of component.
More preferably to realize the present invention, may further be:The fixture bayonet is U-shaped, and the fixture bayonet of this shape more can
Adapt to the square steel on triangle steelframe top.
More preferably to realize the present invention, may further be:Reinforcing rib is equipped in the both sides of the fixture bayonet.
Beneficial effects of the present invention:The top setting of triangle steelframe is arranged on there are two upper fixture, lower part is provided with one
A lower fixture using 3 lifting modes triangular in shape in hoisting process, while the position of each suspension centre is extended outwardly, even if
Component significantly swings, adjusts, and lifting rope will not be made to touch covering, avoids lifting rope and covering is caused to damage;It gives simultaneously
Operating personnel have reserved larger operating space, accelerate the speed of lifting, improve lifting effect.
Description of the drawings
Fig. 1 illustrates the structure diagram of upper fixture in the present invention;
Fig. 2 illustrates the structure diagram of lower fixture in the present invention;
Fig. 3 illustrates the using renderings of the present invention.
In figure, 1, pedestal;2nd, fixed arm;3rd, fixture bayonet;31st, bayonet lock;4th, reinforcing rib;5th, connecting rod;6th, lifting lug;7th,
One hoisting port;8th, base arm;9th, stabilizer blade;10th, connecting hole;11st, the second hoisting port;101st, triangle steelframe;102nd, covering;103rd, on
Fixture;104th, lower fixture.
Specific embodiment
It elaborates below in conjunction with the accompanying drawings to the present invention.
A kind of steel construction indirect cool tower triangle hoisting gripping member, including upper fixture and lower fixture, as shown in Figure 1, the upper fixture
Pedestal 1 including strip is installed with fixture bayonet 3 at the both ends of the pedestal 1, fixation is installed on the pedestal 1
Arm 2, the fixed arm 2 and the pedestal 1 are L-shaped, and the first hoisting port 7 is installed in the outer end of the fixed arm 2, wherein, institute
It is U-shaped to state fixture bayonet 3, and the fixture bayonet 3 of this shape is suitable for the square steel on triangle steelframe top, in the fixture card
Mouthfuls 3 both sides are equipped with reinforcing rib 4, and the fixed arm 2 and the fixture bayonet 3 are respectively positioned at opposite two of the pedestal 1
On side;In addition, connecting rod 5 is equipped on fixture on described, the both ends of the connecting rod 5 respectively with the pedestal 1 and fixed
Wall 2 is fixedly connected, the connecting rod 5, pedestal 1 and fixed arm 2 combine it is triangular in shape, in the connecting rod 5 be equipped with lifting lug 6;
It is connected one to one respectively on two on the lifting lug 6 of fixture by two wind ropes, by controlling this two wind ropes from component
The movement in the horizontal direction of both sides control member;
As shown in Fig. 2, the lower fixture includes the base arm 8 of strip, connecting hole 10 and stabilizer blade are equipped in one end of the base arm 8
9, the stabilizer blade 9, in V-shape, the second hoisting port 11 is equipped in the other end of the base arm 8 with the base arm 8;
Wherein, pedestal 1, fixed arm 2 and base arm 8 use H profile steel.
The operation principle of the present invention:As shown in figure 3, component includes triangle steelframe 101 and is fixed on triangle steelframe 101
Covering 102 above makes component tilt upward promotion by upper fixture 103 and lower fixture 104, and upper fixture 103 passes through two cards
Tool bayonet 3 is connected to the top of triangle steelframe 101, while fixed arm 2 extends to the top of triangle steelframe 101, needs to note
Meaning is that the distance that fixation wall 2 extends must exceed 103 edge of covering, make the first hoisting port 7 far from the triangle steelframe 101 and
Far from covering 102, wherein, be respectively equipped in the both sides on 101 top of triangle steelframe one it is described on fixture 103;Lower card
The connecting hole 10 of tool 104 is fixedly connected on the centre position of 101 lower part of triangle steelframe, is located at institute with fixture 104 at present
The upper surface of triangle steelframe 101 is stated, the stabilizer blade 9 of lower fixture 104 is supported on the triangle steelframe 101;Then pass through three
Root lifting rope connects one to one the second hoisting port 11 of on the two 7 upper and lower fixture 104 of the first hoisting port of fixture 103 respectively
On, make three lifting point distributions triangular in shape, keep inclined state so as to fulfill component and be lifted up.
The basic principles, main features and the advantages of the invention have been shown and described above.The technology of the industry
Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this
The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes
Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its
Equivalent thereof.
Claims (4)
1. a kind of steel construction indirect cool tower triangle hoisting gripping member, it is characterised in that:Including upper fixture and lower fixture, the upper fixture packet
The pedestal of strip is included, fixture bayonet is installed at the both ends of the pedestal, fixed arm is installed on the pedestal, it is described
Fixed arm and the pedestal are L-shaped, and the first hoisting port is installed in the outer end of the fixed arm, wherein, the fixed arm and institute
Fixture bayonet is stated respectively to be located on two opposite sides of the pedestal;
The lower fixture includes the base arm of strip, and connecting hole and stabilizer blade, the stabilizer blade and institute are equipped in one end of the base arm
Base arm is stated in V-shape, the second hoisting port is equipped in the other end of the base arm.
2. a kind of steel construction indirect cool tower triangle hoisting gripping member according to claim 1, it is characterised in that:The fixture on described
Be equipped with connecting rod, the both ends of the connecting rod are fixedly connected respectively with the pedestal and fixation wall, the connecting rod, pedestal and
Fixed arm combination is triangular in shape, and lifting lug is equipped in the connecting rod.
3. a kind of steel construction indirect cool tower triangle hoisting gripping member according to claim 1 or 2, it is characterised in that:The fixture
Bayonet is U-shaped.
4. a kind of steel construction indirect cool tower triangle hoisting gripping member according to claim 1, it is characterised in that:In the fixture card
The both sides of mouth are equipped with reinforcing rib.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810239095.0A CN108238541A (en) | 2018-03-22 | 2018-03-22 | A kind of steel construction indirect cool tower triangle hoisting gripping member |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810239095.0A CN108238541A (en) | 2018-03-22 | 2018-03-22 | A kind of steel construction indirect cool tower triangle hoisting gripping member |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108238541A true CN108238541A (en) | 2018-07-03 |
Family
ID=62699104
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810239095.0A Pending CN108238541A (en) | 2018-03-22 | 2018-03-22 | A kind of steel construction indirect cool tower triangle hoisting gripping member |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108238541A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1053388A (en) * | 1996-08-09 | 1998-02-24 | Iwata:Kk | Concrete product hanging device |
DE102012207150A1 (en) * | 2012-04-30 | 2013-10-31 | Andrea Amann | Crossbar for attaching load at attachment points of crane hook in construction site, has operable drive unit that is arranged for varying length of connecting unit e.g. cable for connecting to-be tilted load with attachment points |
CN206051264U (en) * | 2016-09-29 | 2017-03-29 | 中国化学工程第三建设有限公司 | A kind of one side tilting steel structure hoisting instrument |
CN206615928U (en) * | 2017-02-22 | 2017-11-07 | 中国二十冶集团有限公司 | Steel structure beam has bad luck fixture |
CN206624553U (en) * | 2016-12-23 | 2017-11-10 | 中国建筑第八工程局有限公司 | Lifting component system |
CN207957510U (en) * | 2018-03-22 | 2018-10-12 | 河南省第二建设集团有限公司 | A kind of steel construction indirect cool tower triangle hoisting gripping member |
-
2018
- 2018-03-22 CN CN201810239095.0A patent/CN108238541A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1053388A (en) * | 1996-08-09 | 1998-02-24 | Iwata:Kk | Concrete product hanging device |
DE102012207150A1 (en) * | 2012-04-30 | 2013-10-31 | Andrea Amann | Crossbar for attaching load at attachment points of crane hook in construction site, has operable drive unit that is arranged for varying length of connecting unit e.g. cable for connecting to-be tilted load with attachment points |
CN206051264U (en) * | 2016-09-29 | 2017-03-29 | 中国化学工程第三建设有限公司 | A kind of one side tilting steel structure hoisting instrument |
CN206624553U (en) * | 2016-12-23 | 2017-11-10 | 中国建筑第八工程局有限公司 | Lifting component system |
CN206615928U (en) * | 2017-02-22 | 2017-11-07 | 中国二十冶集团有限公司 | Steel structure beam has bad luck fixture |
CN207957510U (en) * | 2018-03-22 | 2018-10-12 | 河南省第二建设集团有限公司 | A kind of steel construction indirect cool tower triangle hoisting gripping member |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202625587U (en) | Balance rotatable lifting appliance | |
CN105433855B (en) | Frame-type multifunctional stretches window cleaning equipment | |
CN209651700U (en) | Efficient hoisting board tool | |
CN207957510U (en) | A kind of steel construction indirect cool tower triangle hoisting gripping member | |
CN103058069B (en) | Horizontal arm tower-type crane | |
CN108238541A (en) | A kind of steel construction indirect cool tower triangle hoisting gripping member | |
CN205779929U (en) | A kind of blower fan and dismounting assembly structure thereof | |
CN102765664B (en) | Pulley assembly and hoisting crane | |
CN102237654B (en) | Method for replacing jumper string using tool at double angle hanging point | |
CN206569904U (en) | A kind of suspender for lifting steel plate | |
CN207030735U (en) | Prefabricated balcony lifts servicing unit | |
CN206680062U (en) | A kind of prefabricated part hanging instrument | |
CN206076835U (en) | A kind of tower crane for changing insulator chain on strain rod tower | |
CN205306884U (en) | Window machine is wiped in multi -functional extension of frame -type | |
CN206014261U (en) | A kind of steel crane beam flatness adjustment equipment | |
CN204689351U (en) | A kind of H profile steel structural elements suspender | |
CN209942208U (en) | Pulley type front-hung hoist mounting structure for climbing frame lifting | |
CN208234393U (en) | A kind of multifunctional hanging tool for bridge prefabrication lifting component | |
CN208235335U (en) | A kind of hanging cable operating platform for drag-line installation | |
CN208516850U (en) | A kind of cement rod-type power transmission line overhead ground wire auxiliary device | |
CN207685682U (en) | A kind of bridge hoisting mechanism | |
CN207090875U (en) | A kind of tower barrel of wind generating set saddle platform cable hanging apparatus | |
CN205294671U (en) | Device of falling roof beam | |
CN206878385U (en) | It is a kind of can adjust automatically Impact direction stringing coaster and wire tensioning device | |
CN205743216U (en) | A kind of electric pole caps raising device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |