Invention content
The technical problems to be solved by the invention are to provide a kind of water monitoring device, can solve above-mentioned present technology
The problems in.
The present invention is achieved through the following technical solutions:A kind of water monitoring device of the present invention, including monitoring machine
Body and the water process body being fixed on the monitoring body right side, the monitoring body right end face, which is equipped with, to supply water
Pipe, the water process body left end face are equipped with water receiving pipe, and the feed pipe is connect with being equipped at the water receiving pipe docking
The pipe jointer of the two, the monitoring body leading exterior surface are equipped with LED light, spelter, the zinc are equipped on the downside of the LED light
Rhone is equipped on the left of block, the draining front of the slot is fixed at the top of the monitoring body front end surface, the monitoring body
There is solar panel, the monitoring body left end face is installed with accumulator, is connected in the inner wall of the rhone rear end and sets
There is the first drainpipe of oblique back lower place extension, the first drainpipe tail portion extending end is connected equipped with the second cavity, institute
It states and water generating equipment is equipped in the second cavity, the second cavity bottom inner wall is connected equipped with the second drainpipe, and described the
Two drainpipe tail ends are connected in inner roof wall at the top of the monitoring body rear end end face, the rhone equipped with first
Slide guide chamber, the first slide guide intracavitary, which is equipped with, drives gate equipment, is set in the monitoring machine body on the right side of the first slide guide chamber
There is the first cavity, water level monitoring column be equipped in first cavity, is slidably connected on the water level monitoring column and is equipped with float,
The water level monitoring column top is equipped with to be equipped with up and down with the corresponding radar inductor of the float, the water level monitoring column right side
The drinking-water pipe of extension, the bottom of the tube extending end that draws water is located above the first cavity bottom inner wall, but does not contact, and
End is fixed with filtering head, and extending end is connected equipped with suction pump at the top of the drinking-water pipe, and the suction pump outer surface is embedding
In the first cavity top inner wall, and connection fixed thereto, the suction pump top end are connected with the feed pipe
It is logical, it is equipped with PH monitors, heavy metal monitor, bacterium prison in first cavity of the drinking-water pipe right end successively from left to right
Instrument, monitoring turbidimeter are surveyed, vulcanized sodium colour developing item is equipped in the heavy metal monitor, is equipped in the inner wall of the first cavity right side
Centralized control cabinet, the first cavity bottom inner wall is interior to be equipped with water inlet;The driving gate equipment includes the first slide guide chamber
It is interior to be slidably connected the flashboard being equipped with and the adjusting threaded rod extended up and down, the tune are connect with the flashboard thread fitting
It saves extending end power connector at the top of threaded rod and is equipped with the first motor, the first motor outer surface is embedded at described first
In slide guide chamber bottom interior wall, and connection fixed thereto, realization automatically control flashboard and move up and down, and control the drain discharge of rhone
And switch, it is additionally provided with heat extraction component on the first motor outer surface.
Preferably technical solution, the water treatment machine body is interior to be equipped with third cavity, the third cavity right end face
Through equipped with outlet pipe, the water process body left end inner wall is run through in the water receiving pipe right end tail portion, and empty with the third
Chamber is connected, and active carbon net is equipped in first cavity, adsorbs larger particles and harmful bacteria in water, the active carbon net
Right end is equipped with chitosan and adsorbs barrier, adsorbs the toxic heavy metals such as mercury, lead, chromium, arsenic, nickel in water, and the chitosan adsorbs barrier
Right end is equipped with semi-transparent envelope barrier, further to cross dirty particle and toxic heavy metal object, the semi-transparent envelope barrier right end in drainage and set
There is ion exchange resin agent barrier.
Preferably technical solution, the water generating equipment include in second cavity rotary head that is equipped with and embedding
Generator in the second cavity top inner wall, the rotary head are circumferentially with propeller, the top end surface of the rotary head
The first rotation axis extended up and down is installed with, extending end is connect with the generator power at the top of first rotation axis.
Preferably technical solution, the solar panel and the generator and the accumulator Electricity Federation, for storing
Battery charges, and battery stores electricity energy is simultaneously powered for first motor, the suction pump, radar inductor, centralized control cabinet.
Preferably technical solution, the radar inductor and the first motor Electricity Federation, realize float and radar
The position sensing water level of inductor contact, the first motor operation of control make flashboard adjust to suitable position, reach control water level
Purpose, the centralized control cabinet terminal and the suction pump and the first motor Electricity Federation, and with the radar inductor electricity processed
Connection, the centralized control cabinet beginning and the PH monitors, heavy metal monitor, bacterial monitoring instrument, monitoring turbidimeter Electricity Federation, that is, realize
When monitoring that water quality is problematic, the power supply of radar inductor is automatically cut off, centralized control cabinet itself controls the first motor to make flashboard complete
Rhone is closed, and at the same time control suction pump operating is drawn water and handled.
Preferably technical solution, the monitoring organism bottom are set there are two corresponding inserted link.
Preferably technical solution, the heat extraction component include the metal being arranged on the first motor outer surface
Iron plate, the metallic iron on piece are fixedly installed sending out the hot fan, and the metal iron plate is provided with more than three pieces and uniformly around being located at
On the first motor outer surface.
The beneficial effects of the invention are as follows:The configuration of the present invention is simple, it is easy to operate, solar energy is equipped with by device integral outer
Solar panel, accumulator and water generating equipment is internally provided with, automatic generation is realized and with battery stores electricity energy, further through outer
Portion sets LED light, finds that this device is forbidden destroying for common equipment convenient for people, and electrochemistry can be prevented by being equipped with spelter further through outside
Corrosion device shell increases service using life, and further through the first cavity is equipped in monitoring machine body, water level is equipped in the first cavity
Column is monitored, sliding connection is equipped with float on water level monitoring column, and water level monitoring column top is equipped with corresponding with the float
Radar inductor, the first cavity left side are equipped with rhone, are connected in rhone top inner wall and are led equipped with the first slide guide chamber, first
Sliding intracavitary is equipped with driving gate equipment, and driving gate equipment passes through the first motor drive, radar inductor and the first motor
Electricity Federation, so as to automatically control the aperture of flashboard, achieve the purpose that control water level, in the first cavity on the right side of water level monitoring column on
The drinking-water pipe of lower extension, bottom of the tube of drawing water extending end are equipped with filtering head, and drinking-water pipe top extending end, which is connected to be equipped with, to draw water
Pump, suction pump top end surface are equipped with feed pipe, and extending end through monitoring body right end face and stretches out on the right side of the feed pipe,
It is equipped with PH monitors, heavy metal monitor, bacterial monitoring instrument, turbidity prison in the first cavity on the right side of drinking-water pipe successively from left to right
Instrument is surveyed, the heavy metal monitor, the first cavity right side inner wall is interior to be equipped with centralized control cabinet, centralized control cabinet terminal and the first motor Electricity Federation
And radar inductor Electricity Federation, centralized control cabinet beginning and PH monitors, heavy metal monitor, bacterial monitoring instrument, monitoring turbidimeter electricity
Connection realizes that each monitoring instrument sends a signal to centralized control cabinet, the sensing of centralized control cabinet control radar when monitoring that water quality is problematic automatically
Device powers off, and itself controllable flashboard emergency cut-off rhone, while the control pump operation that draws water draws water progress, further through monitoring machine
Water process body is installed on the right side of body, third cavity is equipped in water treatment machine body, is equipped with and lives successively from left to right in third cavity
Property charcoal net, chitosan absorption barrier, semi-transparent envelope barrier, ion exchange resin agent barrier, realization automatically controls treated sewage, energy saving
Environmental protection, floor space is small, is easy to move and fix, and the service life period is long, and monitoring effect is apparent.
Specific embodiment
As shown in Figure 1, Figure 2 and Figure 3, a kind of water monitoring device of the invention, including monitoring body 4 and fixed setting
Water process body 6 on 4 right side of the monitoring body, 4 right end face of the monitoring body is equipped with feed pipe 723, described
6 left end face of water process body is equipped with water receiving pipe 62, and the feed pipe 62 is connect with being equipped at 62 docking of water receiving pipe
The pipe jointer 621 of the two, 4 leading exterior surface of the monitoring body are equipped with LED light 42, and 42 downside of LED light is equipped with zinc
Block 43,43 left side of spelter are equipped with rhone 44, and 44 front end of rhone is through monitoring 4 front end surface of body, institute
It states 4 top of monitoring body and is installed with solar panel 41, monitoring 4 left end face of body is installed with accumulator 5, the row
Be connected the first drainpipe 441 extended equipped with the oblique back lower place in 44 rear end inner wall of sink, 441 tail portion of the first drainpipe
Extending end is connected equipped with the second cavity 46, and second cavity 46 is interior to be equipped with water generating equipment, second cavity 46
Bottom interior wall is connected equipped with the second drainpipe 47, and 47 tail end of the second drainpipe is through 4 rear end of the monitoring body
End face is connected in the 44 top inner roof wall of rhone equipped with the first slide guide chamber 9, and driving is equipped in the first slide guide chamber 9
Gate equipment, the monitoring body 4 on 9 right side of the first slide guide chamber is interior to be equipped with the first cavity 7, is set in first cavity 7
There is water level monitoring column 71, be slidably connected on the water level monitoring column 71 and be equipped with float 712,71 top of water level monitoring column
Equipped with the 712 corresponding radar inductor 711 of float, 71 right side of the water level monitoring column is equipped with drawing water of extending up and down
Pipe 72, the 72 bottom extending end of drinking-water pipe is located above 7 bottom interior wall of the first cavity, but does not contact, and in end
It is fixed with filtering head 721, the 72 top extending end of drinking-water pipe is connected equipped with suction pump 722, outside the suction pump 722
Surface is embedded in 7 top inner wall of the first cavity, and connection fixed thereto, 722 top end of suction pump with it is described
Feed pipe 723 is connected, in first cavity 7 of 72 right end of drinking-water pipe from left to right successively be equipped with PH monitors 73,
Heavy metal monitor 74, bacterial monitoring instrument 75, monitoring turbidimeter 76, the heavy metal monitor 74 is interior to be equipped with vulcanized sodium colour developing item
741, the 7 right side inner wall of the first cavity is interior to be equipped with centralized control cabinet 77, and water inlet is equipped in the 7 bottom interior wall body of the first cavity
78;The driving gate equipment include in the first slide guide chamber 9 flashboard 91 that is equipped with of sliding connection and with the lock
The adjusting threaded rod 93 that the connection of 91 thread fitting of plate extends up and down, the adjusting 93 top extending end power connector of threaded rod are set
There is the first motor 92,92 outer surface of the first motor is embedded in 9 bottom interior wall of the first slide guide chamber, and solid therewith
Fixed connection, realization automatically control flashboard 91 and move up and down, and control the drain discharge and switch of rhone 44, described first is electronic
Machine is additionally provided with heat extraction component on 92 outer surface.
Valuably, third cavity 8 is equipped in the water process body 6,8 right end face of third cavity, which runs through, to be equipped with out
Water pipe 61, the 62 right end tail portion of water receiving pipe run through the 6 left end inner wall of water process body, and with 8 phase of third cavity
Connection, first cavity 8 is interior to be equipped with active carbon net 81, adsorbs larger particles and harmful bacteria in water, the active carbon net
81 right ends are equipped with chitosan and adsorb barrier 82, adsorb the toxic heavy metals such as mercury, lead, chromium, arsenic, nickel in water, the chitosan absorption
82 right end of barrier is equipped with semi-transparent envelope barrier 83, further to cross dirty particle and toxic heavy metal object, the semi-permeable membrane screen in drainage
Hinder 83 right ends equipped with ion exchange resin agent barrier 84, toxic heavy metal band point ion in ion-exchange degradation water is realized most
Whole safe handling sewage, discharge are for use.
Valuably, the water generating equipment includes the rotary head 461 being equipped in second cavity 46 and is embedded at institute
The generator 464 in 46 top inner wall of the second cavity is stated, the rotary head 461 is circumferentially with propeller 462, the rotary head 461
Top end surface is installed with the first rotation axis 463 extended up and down, the 463 top extending end of the first rotation axis and the power generation
464 power connector of machine is realized and utilizes the water slug power generation by monitoring, energy conservation and environmental protection.
Valuably, the solar panel 41 and the generator 464 and 5 Electricity Federation of accumulator, fill for accumulator 5
Electricity, accumulator 5 store electric energy and are supplied for first motor 92, the suction pump 722, radar inductor 711, centralized control cabinet 77
Electricity realizes heat recovery, energy saving.
Valuably, the radar inductor 711 and 92 Electricity Federation of the first motor realize that float 712 senses with radar
The position sensing water level that device 711 contacts, control the first motor 92 operating make flashboard 91 adjust to suitable position, reach control water
The purpose of position, 77 terminal of centralized control cabinet and the suction pump 722 and the first motor Electricity Federation, and with the radar sense processed
Answer 711 Electricity Federation of device, 77 beginning of centralized control cabinet and the PH monitors 73, heavy metal monitor 74, bacterial monitoring instrument 75, turbidity
76 Electricity Federation of monitor when that is, realization monitors that water quality is problematic, automatically cuts off radar inductor 711 and powers, centralized control cabinet 77 itself
Control the first motor 92 that flashboard 91 is made to completely close rhone 44, and at the same time the control operating of suction pump 722 is drawn water and located
Reason improves device continuous work, sewage is controlled to leak in time, conducive to environmental protection.
Valuably, 4 bottom of the monitoring body is set there are two corresponding inserted link 45, convenient in fixing device and water channel.
Valuably, the heat extraction component includes the metal iron plate 111 being arranged on 92 outer surface of the first motor, institute
It states and sending out the hot fan 112 is fixedly installed on metal iron plate 111, the metal iron plate 111 is provided with more than three pieces and uniform winding
On 92 outer surface of the first motor, by the metal iron plate 111 absorbing and distribute first motor 92
The heat generated during operation, it is general to increase the efficiency that the metal iron plate 111 radiates by the sending out the hot fan 112.
During original state, float 712 is located at 71 bottommost of water level monitoring column, and radar inductor 711 stops power supply state, lock
91 complete closing rhone of plate, centralized control cabinet 77 stop power supply state.
It is then that device is whole by the water channel of device integral shift to required monitoring when needing water security monitoring
Body is fixed on water channel upstream, and seals the left and right sides, makes water that can only flow through downstream by the present apparatus, at this point, by centralized control cabinet 77
Power supply, water enter by the water inlet 78 of bottom in the first cavity 7, and after stable level, float 711 floats to designated position,
At this point, after PH monitors 73, heavy metal monitor 74, bacterial monitoring instrument 75, monitoring turbidimeter 76 monitor, if water quality does not have
During problem, centralized control cabinet 77 is automatically controlled powers to radar inductor 711, and radar inductor 711 is obtained by the position of float 712
Corresponding signal sends the first motor of signal 92 and drives adjusting threaded rod 93, moves up flashboard 91, rhone 44 is made to open to right
Answer aperture, at this point, flow, which enters, passes through the first drainpipe 441 in rhone 44, due in the first drainpipe 441 water by weight
Power acts on, and flows into the second cavity 46 and forms enormous impact force, and impact propeller 462 rotates, and propeller 462 drives rotary head 461
Rotation, rotary head 461 drive the first rotation axis 463 to rotate, and generator 464 are made to generate electricity and by electrical energy transportation to accumulator 5, hereafter water
Stream discharged by the second drainpipe 47, when water quality when something goes wrong, centralized control cabinet 77 automatically controls radar inductor 711 and powers off, collect
Control cabinet 77 automatically controls the first motor 92 and adjusting threaded rod 93 is driven to rotate, and moves down flashboard 91 and closes rhone 44, works as row
When sink 44 completely closes, centralized control cabinet 77 controls the operating of suction pump 722 to draw water, and flow enters drinking-water pipe after filtering head 721
It in 72, then flows into feed pipe 723, enters in third cavity 8 after water receiving pipe 62, flow is by active carbon net 81, shell
After glycan absorption barrier 82, semi-transparent envelope barrier 83, the processing of ion exchange resin agent barrier 84, completely may be used after the discharge of water outlet 61
With normal use.
The beneficial effects of the invention are as follows:The configuration of the present invention is simple, it is easy to operate, solar energy is equipped with by device integral outer
Solar panel, accumulator and water generating equipment is internally provided with, automatic generation is realized and with battery stores electricity energy, further through outer
Portion sets LED light, finds that this device is forbidden destroying for common equipment convenient for people, and electrochemistry can be prevented by being equipped with spelter further through outside
Corrosion device shell increases service using life, and further through the first cavity is equipped in monitoring machine body, water level is equipped in the first cavity
Column is monitored, sliding connection is equipped with float on water level monitoring column, and water level monitoring column top is equipped with corresponding with the float
Radar inductor, the first cavity left side are equipped with rhone, are connected in rhone top inner wall and are led equipped with the first slide guide chamber, first
Sliding intracavitary is equipped with driving gate equipment, and driving gate equipment passes through the first motor drive, radar inductor and the first motor
Electricity Federation, so as to automatically control the aperture of flashboard, achieve the purpose that control water level, in the first cavity on the right side of water level monitoring column on
The drinking-water pipe of lower extension, bottom of the tube of drawing water extending end are equipped with filtering head, and drinking-water pipe top extending end, which is connected to be equipped with, to draw water
Pump, suction pump top end surface are equipped with feed pipe, and extending end through monitoring body right end face and stretches out on the right side of the feed pipe,
It is equipped with PH monitors, heavy metal monitor, bacterial monitoring instrument, turbidity prison in the first cavity on the right side of drinking-water pipe successively from left to right
Instrument is surveyed, the heavy metal monitor, the first cavity right side inner wall is interior to be equipped with centralized control cabinet, centralized control cabinet terminal and the first motor Electricity Federation
And radar inductor Electricity Federation, centralized control cabinet beginning and PH monitors, heavy metal monitor, bacterial monitoring instrument, monitoring turbidimeter electricity
Connection realizes that each monitoring instrument sends a signal to centralized control cabinet, the sensing of centralized control cabinet control radar when monitoring that water quality is problematic automatically
Device powers off, and itself controllable flashboard emergency cut-off rhone, while the control pump operation that draws water draws water progress, further through monitoring machine
Water process body is installed on the right side of body, third cavity is equipped in water treatment machine body, is equipped with and lives successively from left to right in third cavity
Property charcoal net, chitosan absorption barrier, semi-transparent envelope barrier, ion exchange resin agent barrier, realization automatically controls treated sewage, energy saving
Environmental protection, floor space is small, is easy to move and fix, and the service life period is long, and monitoring effect is apparent.
The above description is merely a specific embodiment, but protection scope of the present invention is not limited thereto, any
The change or replacement expected without creative work, should be covered by the protection scope of the present invention.Therefore, it is of the invention
Protection domain should be determined by the scope of protection defined in the claims.